CN201190410Y - Control device for leveling in auto lifting process for hanging scaffold - Google Patents
Control device for leveling in auto lifting process for hanging scaffold Download PDFInfo
- Publication number
- CN201190410Y CN201190410Y CNU2008200352693U CN200820035269U CN201190410Y CN 201190410 Y CN201190410 Y CN 201190410Y CN U2008200352693 U CNU2008200352693 U CN U2008200352693U CN 200820035269 U CN200820035269 U CN 200820035269U CN 201190410 Y CN201190410 Y CN 201190410Y
- Authority
- CN
- China
- Prior art keywords
- climbing
- power unit
- hydraulic power
- electric control
- leveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model relates to a climbing leveling controlling system for a climbing model and a climbing frame, which belongs to the technical field of an attached elevating scaffold used in building construction. The climbing leveling controlling system has the technical scheme that the climbing leveling controlling system for a climbing model and a climbing frame comprises a left jacking oil cylinder and a right jacking oil cylinder arranged in a spacing mode; the left jacking oil cylinder is connected with a left hydraulic power unit by pipelines; the right jacking oil cylinder is connected with a right hydraulic power unit by pipelines; both the left hydraulic power unit and the right hydraulic power unit are connected with a silver switch in an electric cabinet; an operation button is arranged on the electric cabinet or is externally connected with the electric cabinet. The utility model has the characteristics of simple processing, convenient installation, easy operation, visual action, safety, reliability, labor and material saving, low cost, and the like.
Description
Technical field
The utility model belongs to the attachment type raise scaffold technical field of using in the building operations, relates in particular to a kind of control system of automatic climbing leveling of creeping formwork.
Background technology
The control system more complicated of the automatic climbing leveling that domestic and international at present many attachment type raise scaffolds adopt, the component of processing assembling are more, and assembly and adjustment bothers, and the general personnel in back appear in fault does not handle complicated operation, the expense of taking a lot of work material, cost height.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provides that a kind of easy for installation, processing ease, action are directly perceived, safe and reliable, the control device of lower-cost climbing form hanging scaffold automatic climbing and leveling.
The technical scheme that provides according to the utility model, the control device of described climbing form hanging scaffold automatic climbing and leveling, comprise the left jacking cylinder and the right jacking cylinder that are provided with at interval, left side jacking cylinder links to each other with left hydraulic power unit by circuit, right jacking cylinder links to each other with right hydraulic power unit by circuit, a left side hydraulic power unit, right hydraulic power unit all join by the mercoid switch in circuit and the electric control box, on electric control box or the external control device action button of electric control box.
Electric control box is provided with action button by the external electric control handle of lead on electric control handle.
The control device of climbing form hanging scaffold automatic climbing and leveling of the present utility model, characteristics such as have that simple, easy for installation, the processing ease of processing, action are directly perceived, safe and reliable, labor and material saving, cost are low.
Description of drawings
Fig. 1 is an overall structure schematic diagram of the present utility model.
Fig. 2 be among Fig. 1 electric control box and on the control button distribution map.
The specific embodiment
The utility model is described in further detail below in conjunction with concrete drawings and Examples.
As shown in the figure: it comprises the left jacking cylinder 2 and right jacking cylinder 8 that is provided with at interval, left side jacking cylinder 2 links to each other with left hydraulic power unit 3 by circuit, right jacking cylinder 8 links to each other with right hydraulic power unit 7 by circuit, a left side hydraulic power unit 3, right hydraulic power unit 7 all join by circuit and electric control box 4 interior mercoid switches 5, on electric control box 4 or the external control device action button of electric control box 4.Electric control box 4 is provided with action button by the external electric control handle 6 of lead on electric control handle 6.
The control device of this climbing form hanging scaffold automatic climbing and leveling, by climbing frame 1, left side jacking cylinder 2, left side hydraulic power unit 3, electric control box 4, mercoid switch 5, electric control handle 6, right hydraulic power unit 7, right jacking cylinder 8 compositions such as grade, horizontal level at electric control box 4 back panel wiring plates, install the mercoid switch of the glass shell of three fine-tuning contacts, be serially connected in the electric control circuit, when mercoid switch 5 is in the level position, by the action button on electric control handle 6 or electric control box 4 panels, can start left hydraulic power unit 3 simultaneously and right hydraulic power unit 7 carries out work, realization climbing frame 1 is stretched under the cylinder action left jacking cylinder 2 and right jacking cylinder 8, reaches the purpose of upwards climbing synchronously.
Support body 1 upwards climbs in the process, if the angle of inclination of regulation appears surpassing in support body 1, the mercoid switch 5 of automatic horizontal will move, left hydraulic power unit 3 or the right hydraulic power unit 7 that to stretch left faster jacking cylinder 2 of cylinder or right jacking cylinder 8 quit work, and stretch the slower oil cylinder of cylinder and pumping plant works on, reach when stretching the cylinder identical control of oil cylinder faster height when stretching the jacking that makes progress of the slower oil cylinder of cylinder, two pumps, the two cylinders jacking climbing frame 1 of working together simultaneously again reaches the purpose of climbing synchronously.
The mercoid switch 5 of automatic horizontal system is installed in fine-tuning electric control box 4 inside, and is serially connected in the electric control circuit.
Claims (2)
1, a kind of control device of climbing form hanging scaffold automatic climbing and leveling, it is characterized in that: it comprises the left jacking cylinder (2) and right jacking cylinder (8) that is provided with at interval, left side jacking cylinder (2) links to each other with left hydraulic power unit (3) by circuit, right jacking cylinder (8) links to each other with right hydraulic power unit (7) by circuit, left side hydraulic power unit (3), right hydraulic power unit (7) all join by the mercoid switch in circuit and the electric control box (4), go up or the external control device action button of electric control box (4) at electric control box (4).
2, the control device of climbing form hanging scaffold automatic climbing and leveling as claimed in claim 1 is characterized in that: electric control box (4) is provided with action button by the external electric control handle of lead (6) on electric control handle (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200352693U CN201190410Y (en) | 2008-04-29 | 2008-04-29 | Control device for leveling in auto lifting process for hanging scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200352693U CN201190410Y (en) | 2008-04-29 | 2008-04-29 | Control device for leveling in auto lifting process for hanging scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201190410Y true CN201190410Y (en) | 2009-02-04 |
Family
ID=40334569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200352693U Expired - Fee Related CN201190410Y (en) | 2008-04-29 | 2008-04-29 | Control device for leveling in auto lifting process for hanging scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201190410Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953338A (en) * | 2012-11-20 | 2013-03-06 | 山东省路桥集团有限公司 | Open and close control system for mould |
CN113356604A (en) * | 2021-06-21 | 2021-09-07 | 中建二局第一建筑工程有限公司 | Self-climbing type intelligent unloading platform for multi-storey building construction |
-
2008
- 2008-04-29 CN CNU2008200352693U patent/CN201190410Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953338A (en) * | 2012-11-20 | 2013-03-06 | 山东省路桥集团有限公司 | Open and close control system for mould |
CN113356604A (en) * | 2021-06-21 | 2021-09-07 | 中建二局第一建筑工程有限公司 | Self-climbing type intelligent unloading platform for multi-storey building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201197A (en) | Combined movable lifting scaffold | |
CN204676926U (en) | A kind of building iron structure bracing frame | |
CN105433855B (en) | Frame-type multifunctional stretches window cleaning equipment | |
CN105600441A (en) | Building wall material intelligent production line pneumatic magnetic suction plate device | |
CN202091169U (en) | Dewatering pump control device based on programmable logic controller (PLC) | |
CN201190410Y (en) | Control device for leveling in auto lifting process for hanging scaffold | |
CN104295134A (en) | Solar-powered monitoring three-dimensional garage | |
CN101289898A (en) | Climbing form hanging scaffold automatic climbing and leveling control device | |
KR100812283B1 (en) | Synchronous/asynchronous structure lifting apparatus and method | |
CN208150864U (en) | A kind of construction material lifting apparatus | |
CN203728474U (en) | Substation special elevator | |
CN202415081U (en) | Automatic lifting device for color steel coil | |
CN206858065U (en) | A kind of construction material mobile device | |
CN109208922B (en) | Wall body is adjusted well installation auxiliary device | |
CN214329837U (en) | Automatic balance adjusting system for hanging basket | |
CN204225458U (en) | A kind of novel household building crane | |
CN204198344U (en) | Mobile lift | |
CN203820332U (en) | Large-scale tower-type crane capable of taking driver | |
CN111313309A (en) | Stroke-controllable guide rail hydraulic lifting type underground ring main unit system and control method | |
CN201703930U (en) | Rotatable integrated upper holdout device for home elevator | |
CN201232570Y (en) | Mining explosion suppression automatic water discharging monitor | |
CN204577035U (en) | A kind of construction work management bulletin board | |
CN209277798U (en) | It is a kind of for repairing wind power generation stepped landing stabilising arrangement | |
CN101113721A (en) | Submerging prevention system for ground electrical apparatus in wind generating set tower frame | |
CN207375676U (en) | A kind of lifting gear of electric power first-aid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Jiangsu Shenxi Building Machinery Co., Ltd. Assignor: Wu Jie Contract record no.: 2011320000083 Denomination of utility model: Climbing form hanging scaffold automatic climbing and leveling control device Granted publication date: 20090204 License type: Exclusive License Record date: 20110224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090204 Termination date: 20160429 |