CN201172572Y - Lifting beam device for handling steel tubes - Google Patents

Lifting beam device for handling steel tubes Download PDF

Info

Publication number
CN201172572Y
CN201172572Y CNU2008200117833U CN200820011783U CN201172572Y CN 201172572 Y CN201172572 Y CN 201172572Y CN U2008200117833 U CNU2008200117833 U CN U2008200117833U CN 200820011783 U CN200820011783 U CN 200820011783U CN 201172572 Y CN201172572 Y CN 201172572Y
Authority
CN
China
Prior art keywords
steel
pipe
steel pipe
sling
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200117833U
Other languages
Chinese (zh)
Inventor
于祥顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Liaoning Dragon Pipe Industries Co., Ltd.
Original Assignee
ANSHAN DELONG STEEL PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANSHAN DELONG STEEL PIPE Co Ltd filed Critical ANSHAN DELONG STEEL PIPE Co Ltd
Priority to CNU2008200117833U priority Critical patent/CN201172572Y/en
Application granted granted Critical
Publication of CN201172572Y publication Critical patent/CN201172572Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a steel pipe hoisting hanging beam device, which is composed of a sling tube steel wire, a steel pipe main beam, two main hanging steel wires and a sling ring, wherein the upper end of the main hanging steel wire is suspended on the hook of a crane via the sling ring and the line sling at the lower end is sheathed on the steel pipe main beam, the upper end of the sling tube steel wire is sheathed on the steel pipe main beam and the lower end is connected with a lifting hook, two ends of the lower of the steel pipe main beam are welded with a round pipe 1 at the part of 0.5-1.5m from the pipe end for baffling the two main hanging steel wires from sliding, the outer side of the sling tube steel wire at the upper of the steel pipe main beam is welded with a round pipe 2 for baffling the sling tube steel wire from sliding down, the lower end of the inner wall of the steel pipe main beam is welded with a counterweight steel pipe for baffling the rotation of the hanging beam. Compared with the prior art, the steel pipe hoisting hanging beam device has the advantages of simple structure, low cost and high working efficiency, which can lift 2 to 11 steel pipes via one hook according to different standards of the step pipes and change the force direction of the sling tube hook, having no damage on the pipe end.

Description

Steel pipe handling hanging beam device
Technical field
The utility model relates to the steel pipe handling hanging beam device in the steel pipe handling field.
Background technology
The steel pipe loading and unloading, handling is the very important work of steel pipe enterprise.Original this work is being dragged the handling of steel rope hanging tube by 2 frame workers, and labour intensity is very big, and efficient is very low, and to pipe end damage especially severe.
This traditional steel pipe handling mode has seriously restricted the production efficiency of enterprise, and pipe quality is affected.
Summary of the invention
For addressing the above problem, the purpose of this utility model provide a kind of simple in structure, cost is low, high efficiency and to the damage-free substantially steel pipe handling of steel tube end part hanging beam device.
For achieving the above object, the utility model is realized by the following technical solutions:
Steel pipe handling hanging beam device, by swing pipe steel rope, steel pipe girder, the master hangs steel rope, suspension ring are formed, the main steel rope upper end of hanging is suspended on the crane gib head by suspension ring, and the lower end rope sling is set on the steel pipe girder; Swing pipe steel rope upper end is set on the steel pipe girder lower end connecting shackle; It is 2 that described master hangs steel rope; Described swing pipe steel rope is many.
Each is welded with apart from pipe end 0.5-1.5 rice and stops 2 masters to hang the pipe one that steel rope slides at two ends, steel pipe girder bottom; Respectively be welded with the pipe two that stops the landing of swing pipe steel rope in the steel pipe girder top swing pipe steel rope outside; Be welded with the counterweight steel pipe that prevents that hanging beam from rotating in steel pipe girder inwall lower end.
Compared with prior art, the beneficial effects of the utility model are:
Simple in structure, cost is low, high efficiency.According to the difference of steel pipe specification, can 2 to 11 steel pipes of a hook block, and changed the force direction that is subjected to of swing pipe gib head, pipe end is not damaged substantially.
Description of drawings
Fig. 1 is a steel pipe handling hanging beam apparatus structure scheme drawing;
Fig. 2 is a steel pipe handling hanging beam device swing pipe scheme drawing.
Among the figure: 1-swing pipe steel rope 2-steel pipe girder 3-master hangs steel rope 4-suspension ring 5-steel pipe 6-counterweight steel pipe 7-pipe one 8-pipe two
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is described further:
See Fig. 1, Fig. 2, steel pipe handling hanging beam device by swing pipe steel rope 1, steel pipe girder 2, the master hangs steel rope 3, suspension ring 4 are formed, mainly hangs steel rope 3 upper ends and is suspended on the crane gib head by suspension ring 4, and the lower end rope sling is set on the steel pipe girder 2; Swing pipe steel rope 1 upper end is set on the steel pipe girder 2, the lower end connecting shackle; It is 2 that described master hangs steel rope; Described swing pipe steel rope is many.
Steel pipe girder 2 is made by one 11 meters long φ 325 * 8 steel pipes, each welds 21 cun masters of φ 50 pipes, one 7 preventions apart from 1 meter of pipe end and hangs steel rope 3 slips at the two ends, bottom, be welded with φ 50 pipes 28 in the outside, swing pipe steel rope 1 upper end on steel pipe girder 2 tops and stop the landing of many 4 fens swing pipe steel ropes, 11 meters φ 108 * 4 counterweight steel pipes 6 are welded to steel pipe girder φ 325 * 8 steel pipe inwall lower ends and keep hanging beam not rotate.The standard steel pipe is 12 meters long, 11 meters of steel pipe girders are long, the swing pipe steel rope is apart from the every limit 500mm of pipe end when that is to say swing pipe, people's arm is very light just to be got at, reduced the labor content of dragging steel cable back and forth like this, the people also may stand in the outside of pipe, has reduced the generation of safety misadventure, and can hang many steel pipes simultaneously.Because steel pipe has short chi situation, the swing pipe steel rope in the middle of will using.

Claims (4)

1, steel pipe handling hanging beam device is characterized in that, it by swing pipe steel rope, steel pipe girder, the master hangs steel rope, suspension ring are formed, the main steel rope upper end of hanging is suspended on the crane gib head by suspension ring, the lower end rope sling is set on the steel pipe girder; Swing pipe steel rope upper end is set on the steel pipe girder lower end connecting shackle; It is 2 that described master hangs steel rope; Described swing pipe steel rope is many.
2, steel pipe handling hanging beam device according to claim 1 is characterized in that, each is welded with apart from pipe end 0.5-1.5 rice and stops 2 masters to hang the pipe one that steel rope slides at two ends, steel pipe girder bottom.
3, steel pipe handling hanging beam device according to claim 1 is characterized in that, respectively is welded with the pipe two that stops the landing of swing pipe steel rope in the steel pipe girder top swing pipe steel rope outside.
4, steel pipe handling hanging beam device according to claim 1 is characterized in that, is welded with the counterweight steel pipe that prevents that hanging beam from rotating in steel pipe girder inwall lower end.
CNU2008200117833U 2008-03-28 2008-03-28 Lifting beam device for handling steel tubes Expired - Fee Related CN201172572Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200117833U CN201172572Y (en) 2008-03-28 2008-03-28 Lifting beam device for handling steel tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200117833U CN201172572Y (en) 2008-03-28 2008-03-28 Lifting beam device for handling steel tubes

Publications (1)

Publication Number Publication Date
CN201172572Y true CN201172572Y (en) 2008-12-31

Family

ID=40199682

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200117833U Expired - Fee Related CN201172572Y (en) 2008-03-28 2008-03-28 Lifting beam device for handling steel tubes

Country Status (1)

Country Link
CN (1) CN201172572Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105174029A (en) * 2015-10-09 2015-12-23 中国石油集团海洋工程(青岛)有限公司 Hoister for hoisting wide-bore super-long pipe section with insulating layer
CN108644487A (en) * 2018-04-28 2018-10-12 安徽砼宇特构科技有限公司 A kind of convenience in transport formula concrete plug

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105174029A (en) * 2015-10-09 2015-12-23 中国石油集团海洋工程(青岛)有限公司 Hoister for hoisting wide-bore super-long pipe section with insulating layer
CN108644487A (en) * 2018-04-28 2018-10-12 安徽砼宇特构科技有限公司 A kind of convenience in transport formula concrete plug

Similar Documents

Publication Publication Date Title
CN201460182U (en) Construction trolley on trolley line of bridge crane
CN205932941U (en) A device for handling of precast box girder template
CN202296842U (en) Hanger special for universal shaft of vertical rolling mill
CN201172572Y (en) Lifting beam device for handling steel tubes
CN105645249A (en) Balance crane used for hoisting box girders of steel bridge
CN101967823A (en) Tubular pile upper mould and hoisting system thereof
CN202107425U (en) Oil drum sling
CN205241057U (en) Simple and easy grapple is used in pipeline hoist and mount
CN206088728U (en) Novel large -scale gallows of taking a trial run
CN205132903U (en) Steel wire slings
CN210393441U (en) Lifting appliance for crane
CN201385979Y (en) Rotary lifting bent
CN205634613U (en) A balanced hanging beam for hoisting steel bridge box girder
CN203359781U (en) Hoisting device adopting clamp ring hoisting lug to hoist tower equipment
CN108975181A (en) A kind of method for dismounting of derrick crane
CN212245913U (en) Suspension device for roof steel structure
CN201686393U (en) Derrick mast hoisting tool
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN202897792U (en) Pipeline lifting device
CN206511798U (en) The special hanger of large-scale component pallet
CN101734549A (en) Lifting sling
CN201605579U (en) Tubular pile industrial steel cage suspending device
CN211998474U (en) Locking lifting appliance for lifting pipeline
CN106996196A (en) A kind of large diameter pipeline integral hoisting construction method
CN205114815U (en) Parallel hoist of diesel engine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090220

Address after: Liaoning province Anshan City mountain road building No. 139, zip code: 114039

Patentee after: MCC Liaoning Dragon Pipe Industries Co., Ltd.

Address before: Liaoning province Anshan City mountain road building No. 139, zip code: 114031

Patentee before: Anshan Delong Steel Pipe Co., Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA METALLURGICAL LIAONING DELONG STEEL TUBE CO.

Free format text: FORMER OWNER: ANSHAN DELONG STEEL GUAN CO., LTD.

Effective date: 20090220

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081231

Termination date: 20120328