CN201163020Y - Water storage tank of closed circulating phase-change heat distribution system of industrial boiler - Google Patents

Water storage tank of closed circulating phase-change heat distribution system of industrial boiler Download PDF

Info

Publication number
CN201163020Y
CN201163020Y CNU2008200282008U CN200820028200U CN201163020Y CN 201163020 Y CN201163020 Y CN 201163020Y CN U2008200282008 U CNU2008200282008 U CN U2008200282008U CN 200820028200 U CN200820028200 U CN 200820028200U CN 201163020 Y CN201163020 Y CN 201163020Y
Authority
CN
China
Prior art keywords
water
pipe
tank
tank body
blow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200282008U
Other languages
Chinese (zh)
Inventor
刘绍允
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Qiaoshangqiao Boiler Container Manufacture Co., Ltd.
Original Assignee
刘绍允
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘绍允 filed Critical 刘绍允
Priority to CNU2008200282008U priority Critical patent/CN201163020Y/en
Application granted granted Critical
Publication of CN201163020Y publication Critical patent/CN201163020Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a water storage pot for a closed cyclic phase-change heating system of an industrial boiler. A precipitation chamber having a water inlet pipe and a sewage discharge pipe, as well as a sewage discharger consisting of a transverse sewage collecting pipe and a vertical sewage collecting pipe, is arranged inside a pot body; the upper part of the pot body is provided with a water replenishing box; a water release pipe of the water replenishing box passes through the wall of the pot and enters the upper part of an inner cavity of the pot body. During the operation of the system, after condensed water enters the precipitation chamber inside the pot body, impurities carried by the condensed water are precipitated and then discharged through the sewage discharge pipe; when a boiler feed water pump in the system pumps water from the water storage pot, the impurities precipitated on the bottom of the pot can be regularly collected and discharged by the sewage discharger, so as to purify the condensed water; the water replenishing box arranged on the upper part of the pot body can directly utilize boiler steam to heat replenished water and input the replenished water with gas and scale removed into the pot, so as to make up for water shortage caused by the run-out, emission and leakage of water and to maintain the water balance of the system. The water storage pot is compact in structure and convenient to use, and has good functions of storing water, adjusting, discharging sewage, purifying and replenishing water for the system.

Description

The closed circulating phase-change heat distribution system of industrial boiler water tank
Technical field
The utility model belongs to the Heat Supply Engineering apparatus field, relate to a kind of in closed circulating phase-change heat distribution system of industrial boiler matching used water tank.
Background technology
At present, in known Industrial Boiler phase-change heat distribution system, condensed water reclaimer terminal all is to send the water work of boiler back to from the condensed water in system's liquid collecting jar, so not only the indirect steam of Chan Shenging can run off, extraneous air also can dissolve in the condensed water simultaneously, both waste heat energy, also caused the corrosion to system equipment such as oxygen and carbon dioxide.
The utility model content
The purpose of this utility model is to overcome the defective that prior art exists, and a kind of closed circulating phase-change heat distribution system of industrial boiler water tank with scrubbing, dirt eliminating function and moisturizing scale removal, degassing function is provided.
The water tank that provides is a kind of boiler and the degassing of the scrubbing between low level liquid collecting jar water replanishing device that is arranged on closed circulating phase-change heat distribution system of industrial boiler for achieving the above object, it has a tank body that has the water level meter that is installed on the base, a mud chamber and an excretion machine of being made up of dirty pipe of horizontal receipts and vertical blow-off pipe of bringing water pipe and blow-off pipe into is housed in tank body, the end opening of vertical blow-off pipe passes to the dirty pipe of horizontal receipts middle part in the excretion machine, and outlet is passed the tank body upper wall and stretched out outside the jar; On tank body top water supply tank is housed, the adjutage of water supply tank passes the top that tank skin proceeds to tank inner chamber.System is in service, and behind the mud chamber, the contamination precipitation that condensed water is entrained can regularly be collected by excretion machine at the impurity of jar inner bottom part deposition and discharge after blow-off pipe is discharged, and realizes scrubbing, blowdown, the purpose of purification and condensation water in condensed water enters tank body; Meanwhile, the water supply tank that is contained in tank body top utilizes Boiler Steam directly to heat moisturizing, makes it the detergency that outgases in boiling, in the moisturizing input jar after the detergency that will outgas then, take this to remedy system equipment because of running, emit, leak the lack of water that causes, keep the water balance of system.
Compared with the prior art, the beneficial effects of the utility model mainly contain 4 points: 1, be provided with the mud chamber in the water tank and the dirty device two-step purification decontamination apparatus of hesitating, can remove effectively from impurity in the upstream condensed water and pollutant; 2, utilize water supply tank to replenish through the degassing the purifying waste water of detergency, keep the water balance of system to system; 3, can regulate the upstream that links to each other with tank body, inflow, water yield and the operating pressure of downstream high temperature pump by the value of hydrospace in the jar and headroom, high-temperature pump is normally moved; 4, adopt integrated project organization, the mud chamber is located in the jar, and water supply tank etc. is contained in above the tank body, so just make the compact overall structure of water tank, Operation and maintenance are convenient in the saving space.
Description of drawings
Fig. 1 is the structure principle chart of a specific embodiment of the utility model.
Fig. 2 is the structure principle chart of water supply tank among Fig. 1.
Fig. 3 is the left view of Fig. 2.
Each label title is respectively among the figure: the 1-base, and the 2-heat-insulation layer, 3-tank body, 4-are received dirty pipe, 5-water level meter, 6-blow-off pipe, 7-water supply tank, 8-outlet pipe, the 9-safety valve, 10-forcing pipe, 11-mud chamber blow-off pipe, 12-mud chamber, 13-mud chamber water inlet pipe, 14-water supply tank blow-off pipe, 15-water supply tank adjutage, 16-heating tube, the 17-forcing pipe, 18-blow-down pipe, 19-water supply tank heat-insulation layer, 20-moisturizing casing, the 21-descaler, 22-descaler water inlet pipe, 23-water supply tank water level meter.
The specific embodiment
Referring to accompanying drawing, the tank body 3 of closed circulating phase-change heat distribution system of industrial boiler water tank described in the utility model is contained on the base 1, and tank wall is lined with heat-insulation layer 2 outward.The mud chamber 12 that has water inlet pipe 13 and blow-off pipe 11 places in the tank body 3, the end opening of its water inlet pipe 13 passes to 12 bottoms, mud chamber, the outlet of blow-off pipe 11 is passed the tank body upper wall and is stretched out outside the jar, when system moves, enter the bottom that impurity in the condensed water of mud chamber 12 is deposited to mud chamber 12 by water inlet pipe 13, the condensed water of post precipitation is suitable for reading overflowing from the mud chamber, and the sewage that contains impurity is discharged from blow-off pipe 11 by the tank body back pressure.Be located at excretion machines in the tank body 3 and receive by a sealing two ends horizontal that 4 and vertical blow-off pipes 6 of dirty pipe form, laterally receive dirty pipe 4 sealing two ends and place the tank body inner bottom part, on its tube wall, be drilled with a plurality of apertures, the end opening of vertical blow-off pipe 6 passes to the dirty pipe of horizontal receipts 4 middle parts, outlet is passed the tank body upper wall and is stretched out outside the jar, can be deposited on the impurity of tank body 3 bottoms by excretion machine from blow-off pipe 6 discharges by jar interior back pressure during work.
Water supply tank 7 is contained in above the tank body 3, and its structure as shown in Figures 2 and 3.It has the casing 20 of a band conical bottom, and blow-off pipe 14 is equipped with in casing 20 bottoms, and the adjutage 15 of water supply tank 7 passes the top that tank skin proceeds to tank body 3 inner chambers; In the side of casing 20 descaler 21 is housed, the outlet pipe of descaler 21 is communicated with casing 20, one end also is housed respectively in the casing side passes to heating tube 16, forcing pipe 17 and blow-down pipe 18 in the casing 20, on the coil pipe section wall that heating tube 16 feeds in the casings 20, be distributed with a plurality of apertures.Start water supply tank work when system needs moisturizing, its course of work is: open the water inlet pipe 22 of blow-down pipe 18 and descaler earlier, the water of handling through descaler 21 is entered in the casing 20, the air of casing 20 is discharged from, and stops into water when water reaches peak level; Open heating tube 16, steam pass-out in the aperture that the heating tube wall distributes of being sent here by boiler enters the water, directly carry out heat exchange with water, the dissolved air in case in the water of water boiling back is separated out, and the precipitation of scales thing of generation is deposited at the bottom of the case and then from blow-off pipe 14 and discharges; Close blow-down pipe 18 and heating tube 16 afterwards again, open forcing pipe 17 and adjutage 15, the degassing, detergency hydraulic pressure in the water supply tank are gone in the water tank, replenish the water of disappearance.Above process is that water supply tank 7 just started when water storage was fallen only to lowest water level in water tank tank body 3.In the water tank water level just often, water supply tank 7 is in stopped status.
Except that water supply tank, safety valve 9 and forcing pipe 10 also are housed on tank body 3 tops.When system moves, the steam that comes from boiler reduces pressure after forcing pipe 10 is transported in the water tank, the anti-required intake pressure of cavitation when a jar interior maintenance is drawn water greater than the boiler high temperature water-supply pump, if the pressure in jar surpasses the highest qualification pressure, safety valve 9 is opened, discharge over-pressure gas, jar internal pressure is maintained in the pressure thresholding of qualification, guarantee the normal operation of boiler feed pump.Label 8 is an outlet pipe among Fig. 1, and the end opening of outlet pipe 8 passes to the bottom of water tank, suitable for readingly then is connected with the water inlet pipe of boiler high temperature pump.

Claims (5)

1, a kind of closed circulating phase-change heat distribution system of industrial boiler water tank, has a tank body that has water level meter (5) (3) that is installed on the base (1), it is characterized in that: a mud chamber (12) and an excretion machine of being made up of horizontal dirty pipes of receipts (4) and vertical blow-off pipe (6) of bringing water pipe (13) and blow-off pipe (11) into is housed in tank body (3), the end opening of vertical blow-off pipe (6) passes to the dirty pipes of horizontal receipts (4) middle part in the excretion machine, and outlet is passed the tank body upper wall and stretched out outside the jar; On tank body (3) top water supply tank (7) is housed, the adjutage (15) of water supply tank (7) passes the top that tank skin proceeds to tank body (3) inner chamber.
2, water tank according to claim 1 is characterized in that: the end opening of mud chamber's water inlet pipe (13) passes to bottom, mud chamber (12), and the outlet of mud chamber's blow-off pipe (11) is passed the tank body upper wall and stretched out outside the jar.
3, water tank according to claim 1 is characterized in that: the dirty pipes of horizontal receipts (4) of excretion machine place the tank body inner bottom part, receive the sealing two ends of dirty pipe (4), are drilled with a plurality of apertures on its tube wall.
4, water tank according to claim 1, it is characterized in that: water supply tank (7) has the casing (20) of a band conical bottom, blow-off pipe (14) is equipped with in casing (20) bottom, in the side of casing (20) descaler (21) is housed, the outlet pipe of descaler (21) is communicated with casing (20), one end also is housed respectively in the casing side passes to heating tube (16), forcing pipe (17) and blow-down pipe (18) in the casing (20), be distributed with a plurality of apertures on the coil pipe section wall in heating tube (16) feeds casing (20).
5, water tank according to claim 1 is characterized in that: on tank body (3) top safety valve (9) and forcing pipe (10) are housed.
CNU2008200282008U 2008-01-25 2008-01-25 Water storage tank of closed circulating phase-change heat distribution system of industrial boiler Expired - Fee Related CN201163020Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200282008U CN201163020Y (en) 2008-01-25 2008-01-25 Water storage tank of closed circulating phase-change heat distribution system of industrial boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200282008U CN201163020Y (en) 2008-01-25 2008-01-25 Water storage tank of closed circulating phase-change heat distribution system of industrial boiler

Publications (1)

Publication Number Publication Date
CN201163020Y true CN201163020Y (en) 2008-12-10

Family

ID=40183955

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200282008U Expired - Fee Related CN201163020Y (en) 2008-01-25 2008-01-25 Water storage tank of closed circulating phase-change heat distribution system of industrial boiler

Country Status (1)

Country Link
CN (1) CN201163020Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104979A (en) * 2013-03-11 2013-05-15 山东省特种设备检验研究院枣庄分院 Continuous blowdown and recirculating device at bottom of hot water boiler
CN109945280A (en) * 2019-04-16 2019-06-28 西安交通大学 Heat pipe mode phase-change heat distribution system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104979A (en) * 2013-03-11 2013-05-15 山东省特种设备检验研究院枣庄分院 Continuous blowdown and recirculating device at bottom of hot water boiler
CN109945280A (en) * 2019-04-16 2019-06-28 西安交通大学 Heat pipe mode phase-change heat distribution system
CN109945280B (en) * 2019-04-16 2024-01-09 西安交通大学 Heat pipe mode phase change heating system

Similar Documents

Publication Publication Date Title
CN108423727B (en) Coal gasification black water decompression flash evaporation device and working method
CN203560885U (en) Continuous blowdown waste heat recovery system used for boiler
CN201163020Y (en) Water storage tank of closed circulating phase-change heat distribution system of industrial boiler
CN101011635A (en) Solvent recovery-separation apparatus
CN104163461B (en) A kind of novel water treatment purifier
CN109269344B (en) Online chemical cleaning liquid preparation system
CN107557088B (en) Gas hydrate decomposes and reaction liquid recovery unit
CN115773492A (en) Wet nitrogen charging maintenance method for quick start of waste heat boiler of gas turbine
CN109179728A (en) A kind of deoxidation air film system for plant gas demineralized water dilatation
CN104163459B (en) Household water filter
CN111811310A (en) Combined multi-stage energy saver of waste water, waste heat and residual steam recycling equipment
CN102944084A (en) Refrigerator vacuum maintaining device
CN220601496U (en) Deaerator and grey water pipeline system
CN2730854Y (en) Vacuum deoxygenizer for boiler water
CN218944401U (en) A low molecular weight collection device for 107 silicone rubber production
CN217210535U (en) Online waste fitting discharging of negative pressure ammonia cooler
CN209511966U (en) From the dirty waste water composite heat carrier generator of row
CN108928863B (en) Filter screen type pollution discharge integrated barrel for water removal of air storage tank
CN203861021U (en) Distillation type water dispenser
CN212987186U (en) Boiler condensate water circulating device
CN219284040U (en) Cooling device for calcium carbide method acetylene production system
CN219252152U (en) Spray drainage recovery system of analytic gas compressor
CN219141548U (en) Steam condensate recycling system
CN219885723U (en) Grey water treatment system
CN201340024Y (en) Low decontamination liquid collection tank for canned cycle phase transition heating system of industrial boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XI'AN TERUISHI HEAT ENERGY TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: LIU SHAOYUN

Effective date: 20090327

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090327

Address after: Shaanxi city of Xi'an Province Tang Yan Road No. 35 block E of modern city 28 floor, zip code: 710065

Patentee after: Xi'an Teruisi Heat Energy Technology Co., Ltd.

Address before: 1-4-502, spring garden area, Changle street, Xi'an, Shaanxi, Changan District Province, 710100

Patentee before: Liu Shaoyun

ASS Succession or assignment of patent right

Owner name: LIU SHAOYUN

Free format text: FORMER OWNER: XI'AN TERUISHI HEAT ENERGY TECHNOLOGY CO., LTD.

Effective date: 20091023

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20091023

Address after: 1-4-502, spring garden area, Changle street, Xi'an, Shaanxi, Changan District Province, 710100

Patentee after: Liu Shaoyun

Address before: Shaanxi city of Xi'an Province Tang Yan Road No. 35 block E of modern city 28 floor, zip code: 710065

Patentee before: Xi'an Teruisi Heat Energy Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: SHAANXI QIAOSHANGQIAO BOILER CONTAINER MANUFACTURI

Free format text: FORMER OWNER: LIU SHAOYUN

Effective date: 20111102

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Shaoyun

Inventor after: Hao Jinlu

Inventor after: Song Guisheng

Inventor before: Liu Shaoyun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU SHAOYUN TO: LIU SHAOYUN HAO JINLU SONG GUISHENG

Free format text: CORRECT: ADDRESS; FROM: 710100 XI'AN, SHAANXI PROVINCE TO: 714105 WEINAN, SHAANXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20111102

Address after: 714105 Shaanxi province Huaxian Chi high road

Patentee after: Shaanxi Qiaoshangqiao Boiler Container Manufacture Co., Ltd.

Address before: 710100, 1-4-502, Changan District garden, Changle street, Xi'an, Shaanxi

Patentee before: Liu Shaoyun

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081210

Termination date: 20130125