CN201156081Y - Gas dynamic 8 path load test instrument - Google Patents
Gas dynamic 8 path load test instrument Download PDFInfo
- Publication number
- CN201156081Y CN201156081Y CN 200820018529 CN200820018529U CN201156081Y CN 201156081 Y CN201156081 Y CN 201156081Y CN 200820018529 CN200820018529 CN 200820018529 CN 200820018529 U CN200820018529 U CN 200820018529U CN 201156081 Y CN201156081 Y CN 201156081Y
- Authority
- CN
- China
- Prior art keywords
- control circuit
- module
- power supply
- oralia
- connects
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 32
- 238000013461 design Methods 0.000 abstract description 2
- 230000006378 damage Effects 0.000 description 3
- 238000001514 detection method Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Abstract
The utility model provides a pneumatic eight-way load tester. Two groups of interfaces respectively connected with two power supplies to be tested are arranged outside a case. A circuit inside the case consists of an automatic Pin releasing module, an automatic switching module and a load control circuit module. The automatic Pin releasing module consists of an air cylinder, a connecting bar, a switch control circuit and a plurality of eight-way testing interface boards. The piston rod of the air cylinder is connected with the connecting rod. The connecting rod is connected with two eight-way testing interface boards, which are respectively connected with the switch control circuit. The automatic switching module consists of two relay control circuits which provide power supply for the eight-way testing interface board. The load control circuit module for providing alternating-current input voltage, current and sequence control is connected with power supply to be tested. The pneumatic eight-way load tester has the advantages of reasonable design, simple operation, safety and reliability, thus being worth spreading and application.
Description
1, technical field
The utility model relates to a kind of power supply test equipment, specifically a kind of pneumatic type 8 road load testing instruments.
2, background technology
At present, carry out load testing and adopt artificial manual mode to carry out usually, not only efficient is low, also loses efficacy because of the man-made fault in the test process causes detecting easily.
How to improve the quality that research and development and IQC judge that power supply product detects, especially avoid the IQC related personnel damage that human factor causes power supply when detecting power supply, improve the ease for use when detecting, reliability, degree of accuracy become the important technological problems that product detects.
3, summary of the invention
The purpose of this utility model is to overcome above-mentioned shortcoming, provides a kind of automatic switchover power supply to be detected, pneumatic type 8 road load testing instruments of intelligent fast transition.
The technical solution of the utility model realizes in the following manner, pneumatic type 8 road load testing instruments, be outside equipped with two groups of interfaces that connect two power supplys to be measured at housing, circuit is formed by taking off Pin module, automatic switchover module and load control circuit module automatically in the housing.Automatically take off the Pin module and be made up of cylinder, connecting link, ON-OFF control circuit, the 8 drive tests oralia of trying, the piston rod of cylinder connects connecting link, and connecting link connects two 8 drive tests oralia of trying, and the 8 drive tests oralia of trying connects ON-OFF control circuit respectively.The automatic switchover module is made up of two groups of bang-bang circuits that provide 8 drive tests to try the oralia power supply.Ac input voltage is provided, and the load control circuit module of electric current and sequential control connects power supply to be measured.
The utility model has the advantages that:
1, ease for use, reliability and the degree of accuracy of load detecting have been improved;
2, the robotization that power supply detects, intellectuality have been improved;
3, the detection of having avoided man-made fault to cause was lost efficacy, and the destruction that human factor causes power supply to be measured in the testing process.
4, description of drawings
Accompanying drawing 1 is the functional block diagram of pneumatic type 8 road load testing instruments.
Mark in the accompanying drawing is represented respectively: cylinder 1, connecting link 2, ON-OFF control circuit 3,8 drive tests try oralia 4, bang-bang circuit 5, load control circuit 6.
5, embodiment
Below in conjunction with accompanying drawing pneumatic type 8 road load testing instruments of the present utility model are done following detailed description the in detail.
As shown in Figure 1, pneumatic type of the present utility model 8 road load testing instrument both sides outside housing are provided with the interface that connects two power supplys to be measured, and circuit is formed by taking off Pin module, automatic switchover module and load control circuit module automatically in the housing.When one is waitd upon survey power supply detect finish after, this instrument can automatically switch to the detection to another power supply, effectively improves testing efficiency.
Automatically taking off the Pin module is made up of cylinder 1, connecting link 2, two groups of ON-OFF control circuit 3 and the two group of 8 drive test oralia 4 of trying.The piston rod of cylinder 1 connects connecting link 2, for connecting link 2 provides power drive.Connecting link 2 connects two 8 drive tests oralia 4 of trying.The 8 drive tests oralia 4 of trying connects ON-OFF control circuit 3 respectively.After having detected a power supply to be measured, take off the Pin module automatically under the driving of cylinder 1, automatically switch to detection to another power supply, reduced tester's labor intensity and the conserver power source plug time.Power supply is inserted in try output line part on the oralia 4 of 8 drive tests, breaks away from automatically, can avoid extracting the output line that damages power supply, cause power source performance bad because of human factor by ON-OFF control circuit 3.
The automatic switchover module provides the bang-bang circuit 5 of power supply to form by two groups to the 8 drive tests oralia 4 of trying.
The load control circuit module provides ac input voltage to power supply to be measured, electric current and sequential control.Load control circuit 6 connects power supply to be measured.
Pneumatic type 8 road load testing instruments design of the present utility model are reasonable, simple in structure, safe and reliable, easy to use, be easy to characteristics such as maintenance, thereby, have good value for applications.
Claims (1)
1, pneumatic type 8 road load testing instruments is characterized in that both sides are provided with two groups of interfaces that connect two power supplys to be measured outside housing, and circuit is formed by taking off Pin module, automatic switchover module and load control circuit module automatically in the housing; Automatically take off the Pin module and be made up of cylinder, connecting link, ON-OFF control circuit, the 8 drive tests oralia of trying, the piston rod of cylinder connects connecting link, and connecting link connects two 8 drive tests oralia of trying, and the 8 drive tests oralia of trying connects ON-OFF control circuit respectively; The automatic switchover module is made up of two groups of bang-bang circuits that provide 8 drive tests to try the oralia power supply; Ac input voltage is provided, and the load control circuit module of electric current and sequential control connects power supply to be measured.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200820018529 CN201156081Y (en) | 2008-03-04 | 2008-03-04 | Gas dynamic 8 path load test instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200820018529 CN201156081Y (en) | 2008-03-04 | 2008-03-04 | Gas dynamic 8 path load test instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201156081Y true CN201156081Y (en) | 2008-11-26 |
Family
ID=40103862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200820018529 Expired - Fee Related CN201156081Y (en) | 2008-03-04 | 2008-03-04 | Gas dynamic 8 path load test instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201156081Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104181433A (en) * | 2013-05-24 | 2014-12-03 | 路华科技(深圳)有限公司 | Power supply PCM connecting plate test platform |
-
2008
- 2008-03-04 CN CN 200820018529 patent/CN201156081Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104181433A (en) * | 2013-05-24 | 2014-12-03 | 路华科技(深圳)有限公司 | Power supply PCM connecting plate test platform |
CN104181433B (en) * | 2013-05-24 | 2017-02-08 | 路华科技(深圳)有限公司 | Power supply PCM connecting plate test platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103278769B (en) | A kind of checkout gear of relay | |
CN201812030U (en) | Detecting device of relays | |
CN202189273U (en) | General tool detection apparatus used for air-conditioning controller test | |
CN104345228A (en) | Distribution box tester | |
CN201156081Y (en) | Gas dynamic 8 path load test instrument | |
CN107656199A (en) | With relay rapid detection apparatus directly perceived and its detection method in hand-held tunnel | |
CN205581246U (en) | Pencil detection loop | |
CN112034298A (en) | Switch test device | |
CN201868333U (en) | Relay control circuit with current detection function | |
CN104237573B (en) | Charger for mobile phone ATE | |
CN204316171U (en) | A kind of debugging operations platform of automatic change-over controller | |
CN102478630A (en) | Relay function testing device and testing method thereof | |
CN103675682B (en) | A kind of multistation integral test system for detecting motor | |
CN205844436U (en) | Intelligent set top box power supply adaptor performance detector | |
CN201637823U (en) | Test bench for special miniature breaker for railway signalling | |
CN105162009B (en) | A kind of switch cubicle carriage fault searches processing servicing unit and application | |
CN107346004A (en) | A kind of signal lamp failure detection means based on voltage effective value | |
CN201242586Y (en) | Detection device for electrical leakage sensor printed circuit board | |
CN207440266U (en) | A kind of signal lamp failure detection device based on voltage effective value | |
CN105606994A (en) | Testing device for SIU module of financial self-service equipment, and testing method thereof | |
CN202676340U (en) | Relay contact pressure detection mechanism | |
CN202903931U (en) | Relay protection tripping node calibration apparatus | |
CN208384021U (en) | Odd even split winding displacement quality test device | |
CN202177671U (en) | Electronic component parameter testing platform | |
CN102082042A (en) | Relay control circuit with current detecting function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081126 Termination date: 20110304 |