CN201152021Y - Finalizing mould for pre-embedding workshop column anchor bolt - Google Patents

Finalizing mould for pre-embedding workshop column anchor bolt Download PDF

Info

Publication number
CN201152021Y
CN201152021Y CNU2008200043651U CN200820004365U CN201152021Y CN 201152021 Y CN201152021 Y CN 201152021Y CN U2008200043651 U CNU2008200043651 U CN U2008200043651U CN 200820004365 U CN200820004365 U CN 200820004365U CN 201152021 Y CN201152021 Y CN 201152021Y
Authority
CN
China
Prior art keywords
bolt
plate
location
arm
locating plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200043651U
Other languages
Chinese (zh)
Inventor
姜长顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CNU2008200043651U priority Critical patent/CN201152021Y/en
Application granted granted Critical
Publication of CN201152021Y publication Critical patent/CN201152021Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a mould used in fundamental concreting construction, in particular to a shaping mould used for embedding a stone bolt of a workshop columniation. The module comprises a locating plate made of a bamboo veneer or a wood adhesive sheet and batten cross arms. Locating control punches are arranged on the locating plate at intervals and correspond to each group of bolt. The batten cross arms are respectively arranged on both sides of each bow of the bolt. Both ends of the batten cross arm has permanent connection with the back-out of a short column formwork by a steel nail. The locating plate is arranged on the batten cross arm. And the locating plate and the batten cross arm are connected and fixed by the steel nail. The shaping mould used for embedding the stone bolt of the workshop columniation has the beneficial effects that construction efficiency is greatly decreased; construction precision meets code requirements; the bamboo veneer or the wood adhesive sheet has low manufacturing cost and is on cyclic use, thus greatly reducing construction cost. So the shaping model is especially applicable for the engineer of an industrial factory building with the same class number and the similar size of the bolt.

Description

The pre-buried shaper of using of factory building columns stone bolt
Technical field:
The utility model relates to the mould that uses in the base concrete pouring construction, the pre-buried shaper of using of especially a kind of factory building columns stone bolt.
Background technology:
At present, during the base concrete pouring construction, adopt steel materials such as angle steel, channel-section steel to make the stone bolt fixed mount, complex procedures, after construction was finished, the bolt frame also was embedded in the concrete, caused the steel waste, had increased construction costs.ZL02270506.6 discloses a kind of pre-embedded anchoring bolts locating support, though displacement or inclination are accurately located, prevented to produce to stone bolt can guarantee to build the time, the column part that its angle steel is made still is embedded in the concrete, can not reuse.
Summary of the invention:
The technical problems to be solved in the utility model is: a kind of utilization perforating on bamboo (wood) offset plate is provided, last lower nut is fixed, as the bolt frame, be different from the bolt frame that adopts the steel welding, make it to have enough to meet the need use, reduce the pre-buried shaper of using of factory building columns stone bolt of engineering construction cost.
The technical scheme that addresses the above problem employing is: the pre-buried shaper of using of a kind of factory building columns stone bolt, comprise that material is the location-plate of bamboo offset plate or wood glue plate, the flitch cross-arm, described location-plate is arranged at intervals with on it and every group of bolt positioning control hole one to one, described flitch cross-arm is divided into every row's bolt both sides, its two ends are suitable for reading affixed by steel nail and short column template, this location-plate is tiled on this flitch cross-arm, both are connected and fixed by steel nail, the positioning control hole on the pairing location-plate is passed in every row's bolt upper end, and by last, lower nut is fixedlyed connected with this location-plate.
Compared with prior art, the beneficial effects of the utility model are: efficiency of construction improves greatly, and construction precision reaches code requirement, and bamboo (wood) offset plate mould cost is low and can have enough to meet the need use, construction cost reduces greatly, is particularly useful for the similar engineering of bolt group number size in the industrial premises.
Description of drawings:
Fig. 1 is a plane structure schematic diagram of the present utility model.
Fig. 2 is a cross-sectional view of the present utility model.
Among the figure:
The specific embodiment:
The utility model is described in further detail below in conjunction with drawings and Examples.
The pre-buried shaper of using of the described factory building columns stone bolt of present embodiment is made of location-plate 1, flitch cross-arm 2, steel nail 4, nut 6, and location-plate 1 adopts thick bamboo offset plate of 12mm or the thick wood glue plate of 20mm to make, and flitch cross-arm 2 specifications are 60 * 90mm.
The requirement that the size of location-plate 1 is put 200mm outward by relative one group of bolt 7 axis of location-plate 1 outward flange is made, the spacing of pressing bolt 7 in the drawing is provided with on location-plate 1 and every group of bolt 7 positioning control hole 3 one to one at interval, and the aperture in positioning control hole 3 is greater than diameter of bolt 0.5mm.
A flitch cross-arm 2 is placed in the both sides of every row's bolt 7, and flitch cross-arm 2 is no more than 20mm with the edge spacing of nut 6.Flitch cross-arm 2 two ends are affixed by steel nail 4 and short column template suitable for reading 5, location-plate 1 is tiled on the flitch cross-arm 2, both are connected and fixed by steel nail 4, and pairing positioning control hole 3 is passed in every row's bolt 7 upper ends, and fixedly connected with location-plate 1 by upper and lower nut 6.
Because bolt 7 relies on location-plate 1 and is fixedly connected, be to guarantee bolt 7 pre-buried precision, the support that must guarantee bolt 7 footing firmly and forbid to reduce the strong point in Fig. 2, has increased to socket at the footing place of bolt 7 and has used reinforcing bar 8.In addition, bolt 7 upper end screw threads will be with adhesive tape with its parcel protection.

Claims (4)

1, the pre-buried shaper of using of a kind of factory building columns stone bolt, comprise that material is location-plate, the flitch cross-arm of bamboo offset plate or wood glue plate, it is characterized in that: described location-plate is arranged at intervals with on it and every group of bolt positioning control hole one to one, described flitch cross-arm is divided into every row's bolt both sides, its two ends are suitable for reading affixed by steel nail and short column template, this location-plate is tiled on this flitch cross-arm, both are connected and fixed by steel nail, the positioning control hole on the pairing location-plate is passed in every row's bolt upper end, and fixedlys connected with this location-plate by upper and lower nut.
2, the pre-buried shaper of using of factory building columns stone bolt according to claim 1 is characterized in that the relative one group of bolt axis of location-plate outward flange puts 200mm outward.
3, the pre-buried shaper of using of factory building columns stone bolt according to claim 1 is characterized in that aperture, positioning control hole is greater than diameter of bolt 0.5mm.
4, the pre-buried shaper of using of factory building columns stone bolt according to claim 1 is characterized in that flitch cross-arm and nut edge spacing are no more than 20mm.
CNU2008200043651U 2008-02-01 2008-02-01 Finalizing mould for pre-embedding workshop column anchor bolt Expired - Fee Related CN201152021Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200043651U CN201152021Y (en) 2008-02-01 2008-02-01 Finalizing mould for pre-embedding workshop column anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200043651U CN201152021Y (en) 2008-02-01 2008-02-01 Finalizing mould for pre-embedding workshop column anchor bolt

Publications (1)

Publication Number Publication Date
CN201152021Y true CN201152021Y (en) 2008-11-19

Family

ID=40127701

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200043651U Expired - Fee Related CN201152021Y (en) 2008-02-01 2008-02-01 Finalizing mould for pre-embedding workshop column anchor bolt

Country Status (1)

Country Link
CN (1) CN201152021Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080383A (en) * 2010-12-31 2011-06-01 中国二十二冶集团有限公司 Suspension type embedded part and hole reserved template fixing method
CN104695557A (en) * 2015-01-31 2015-06-10 陕西建工安装集团有限公司 Steel structure building construction method for one-step pre-burying of foundation bolts
CN107100277A (en) * 2017-05-26 2017-08-29 五冶集团上海有限公司 The fixing means of built-in fitting
CN110080273A (en) * 2019-04-30 2019-08-02 中国化学工程第六建设有限公司 The method for carrying out the installation of steel construction foundation bolt using flitch
CN110747893A (en) * 2019-09-18 2020-02-04 中国二冶集团有限公司 Embedded bolt auxiliary device and embedded bolt fixing method
CN111456060A (en) * 2020-04-15 2020-07-28 中国十七冶集团有限公司 Construction method of concrete foundation embedded steel ring
CN111889909A (en) * 2020-08-06 2020-11-06 刘秀娟 Forming and welding process for steel structure embedded foundation bolts

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080383A (en) * 2010-12-31 2011-06-01 中国二十二冶集团有限公司 Suspension type embedded part and hole reserved template fixing method
CN104695557A (en) * 2015-01-31 2015-06-10 陕西建工安装集团有限公司 Steel structure building construction method for one-step pre-burying of foundation bolts
CN104695557B (en) * 2015-01-31 2017-04-19 陕西建工安装集团有限公司 Steel structure building construction method for one-step pre-burying of foundation bolts
CN107100277A (en) * 2017-05-26 2017-08-29 五冶集团上海有限公司 The fixing means of built-in fitting
CN110080273A (en) * 2019-04-30 2019-08-02 中国化学工程第六建设有限公司 The method for carrying out the installation of steel construction foundation bolt using flitch
CN110080273B (en) * 2019-04-30 2021-01-26 中国化学工程第六建设有限公司 Method for mounting steel structure foundation bolt by utilizing batten
CN110747893A (en) * 2019-09-18 2020-02-04 中国二冶集团有限公司 Embedded bolt auxiliary device and embedded bolt fixing method
CN111456060A (en) * 2020-04-15 2020-07-28 中国十七冶集团有限公司 Construction method of concrete foundation embedded steel ring
CN111889909A (en) * 2020-08-06 2020-11-06 刘秀娟 Forming and welding process for steel structure embedded foundation bolts

Similar Documents

Publication Publication Date Title
CN201152021Y (en) Finalizing mould for pre-embedding workshop column anchor bolt
CN202913420U (en) Reusable positioning device for installing foundation bolts
CN206306252U (en) A kind of prefabricated small box girder reinforcing bar colligation moulding bed
CN108894116B (en) Prefabricated stand column assembling construction method
CN205907674U (en) Wall template reinforcement bearing structure is led on circulated servicetype ground even wall
CN202100002U (en) Stair formalization die
CN202214735U (en) Pedestal anchor bolt positioning tool for shallow foundation
CN202090614U (en) Double-layer positioning mold made of waste wooden rubber plates for embedding anchor bolt
CN102912977A (en) Mold used for pouring shaped stair
CN202831514U (en) Adjustable wallboard hanging part
CN201474303U (en) Beam column template clip
CN203049608U (en) Communication tower foundation pre-buried foundation bolt device
CN203008371U (en) Cast-in-place concrete stand suspended mold installation structure
CN203007848U (en) T beam middle transverse diaphragm casting tooling
CN201943501U (en) Steel-wood door frame
CN202672709U (en) Spliced bamboo plywood hyperboloid pattern plate and bracing system thereof
CN204983519U (en) Novel soft and hard package installation metal pendant
CN209723017U (en) Column foundation cup mouth core model anti-floating system
CN114250965A (en) Climbing frame wall-attaching device for variable cross-section construction of high-rise building and construction method thereof
CN203441094U (en) Embedded part of hydraulic climbing formwork
CN202148494U (en) Formwork support for bridge
CN204826636U (en) Ear design support is chosen to plain type roof beam
CN201381584Y (en) Combined reinforcement stirrup for concrete
CN201209322Y (en) Column angle chamfering mold for overhead equipment foundation platform
CN202248774U (en) Fixing device for waterstone dividing strip

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA 22MCC GROUP CORPORATION LTD.

Free format text: FORMER NAME: MCC JINGTANG CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee after: China MCC 22 Group Corp., Ltd.

Address before: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee before: MCC Jingtang Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20150201

EXPY Termination of patent right or utility model