CN201151911Y - 一种半边岩地基结构 - Google Patents

一种半边岩地基结构 Download PDF

Info

Publication number
CN201151911Y
CN201151911Y CNU2007202016419U CN200720201641U CN201151911Y CN 201151911 Y CN201151911 Y CN 201151911Y CN U2007202016419 U CNU2007202016419 U CN U2007202016419U CN 200720201641 U CN200720201641 U CN 200720201641U CN 201151911 Y CN201151911 Y CN 201151911Y
Authority
CN
China
Prior art keywords
foundation
steel pipe
pipe pile
rock
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007202016419U
Other languages
English (en)
Inventor
宋泽恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU2007202016419U priority Critical patent/CN201151911Y/zh
Application granted granted Critical
Publication of CN201151911Y publication Critical patent/CN201151911Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型提供了一种半边岩地基结构,它一边是岩石地基(1),一边是土地基(2),在土地基(2)里有钢管桩(3),基础(4)坐落在钢管桩(3)和岩石地基(1)共同构筑的地基上。既适合溶岩地区地貌的特点,又很好的解决了地基承载力不足的问题,施工简便,工程造价低,满足承载力要求,保证了基础及上部结构的安全。

Description

一种半边岩地基结构
技术领域
本实用新型涉及一种地基结构,具体来说涉及一种适用于喀斯特地貌(岩溶地貌)的地基结构。
背景技术
喀斯特地貌,又称岩溶地貌,是具有溶蚀力的水对可溶性岩石进行溶蚀等作用所形成的地表和地下形态的总称。它以溶蚀作用为主,还包括流水的冲蚀、潜蚀,以及坍陷等机械侵蚀过程。中国喀斯特地貌分布广、面积大,主要分布在广西、贵州、云南东部和广东北部,是世界上最大的岩溶区之一。这些岩溶地区岩石面高低起伏变化大,岩石露头无连续性和规律性,表层岩层往往十分破脆,常常引起地基承载力不足、不均匀沉降、地基滑动和塌陷等地基变形破坏,造成上部结构(房屋)倾斜。
现有的技术中,常用的人工地基处理方法有换土垫层法、重锤表层夯实、强夯、振冲、砂桩挤密、深层搅拌、堆载预压、化学加固等方法,但这些方法通常都不太适合岩溶地区的地理特点,往往出现钻探或冲(钻)孔桩作业时,发生漏浆、漏水、塌孔;同一承台,桩长相差甚大,数米到十余米;预制桩压(打)破顶板突然掉入洞穴,深层搅拌桩掉入洞穴;静压(锤击)预制管桩断桩率高,断桩率10%,甚至有的高达30~60%;地面塌陷,相邻建筑沉裂等等一系列问题。
发明内容
本实用新型所要解决的问题是提供一种半边岩地基结构,既适合岩溶地区地貌的特点,又很好的解决了地基承载力不足的问题,施工简便,工程造价低,满足承载力要求,保证了基础及上部结构的安全。
为了解决上述问题本实应新型提供了一种半边岩地基结构,该地基结构一边是岩石地基1,一边是土地基2,在土地基2里打钢管桩3,基础4坐落在钢管桩3和岩石地基1共同构筑的地基上,此地基适合溶岩地区地貌的特点,满足地基承载力的要求。
土地基2中钢管桩3的数量是10~20根/平方米。
钢管桩3直径为40~60mm,管壁厚度为2~4mm。
基础4坐落在钢管桩3和岩石地基1共同构筑的地基上,满足地基承载力的要求,保证基础及上部结构的安全。
与现有技术相比,本实用新型的半边岩地基结构,既适合溶岩地区地貌的特点,又很好的解决了地基承载力不足的问题,施工简便,工程造价低,满足承载力要求,保证了基础及上部结构的安全。
附图说明
图1为实用新型的剖面图。
附图的标记分别为:1-岩石地基,2土地基,3-钢管桩,4基础。
具体实施方案
实施例1:地基结构一边是岩石地基1,一边是土地基2,在土地基2里有钢管桩3,基础4坐落在钢管桩3和岩石地基1共同构筑的地基上。土地基2中钢管桩3的数量是15根/平方米,钢管桩3直径为50mm,厚度为3mm。该地基结构适合溶岩地区地貌的特点,满足地基承载力的要求。
实施例2:地基结构一边是岩石地基1,一边是土地基2,在土地基2里有钢管桩3,基础4坐落在钢管桩3和岩石地基1共同构筑的地基上。土地基2中钢管桩3的数量是20根/平方米,钢管桩3直径为50mm,厚度为3mm。该地基结构适合溶岩地区地貌的特点,满足地基承载力的要求。

Claims (3)

1.一种半边岩地基结构,该地基结构一边是岩石地基(1),一边是土地基(2),其特征在于:在土地基(2)里有钢管桩(3),在钢管桩(3)和岩石地基(1)共同构筑的地基上有基础(4)。
2.根据权利要求1所述的半边岩地基结构,其特征在于:土地基(2)中钢管桩(3)的数量是10~20根/平方米。
3.根据权利要求1所述的半边岩地基结构,其特征在于:钢管桩(3)直径为40~60mm,管壁厚度为2~4mm。
CNU2007202016419U 2007-12-17 2007-12-17 一种半边岩地基结构 Expired - Fee Related CN201151911Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007202016419U CN201151911Y (zh) 2007-12-17 2007-12-17 一种半边岩地基结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007202016419U CN201151911Y (zh) 2007-12-17 2007-12-17 一种半边岩地基结构

Publications (1)

Publication Number Publication Date
CN201151911Y true CN201151911Y (zh) 2008-11-19

Family

ID=40127589

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007202016419U Expired - Fee Related CN201151911Y (zh) 2007-12-17 2007-12-17 一种半边岩地基结构

Country Status (1)

Country Link
CN (1) CN201151911Y (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561262A (zh) * 2020-05-29 2020-08-21 贵州建工集团第一建筑工程有限责任公司 一种岩溶地区大尺寸桩孔旋挖钻机成孔方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561262A (zh) * 2020-05-29 2020-08-21 贵州建工集团第一建筑工程有限责任公司 一种岩溶地区大尺寸桩孔旋挖钻机成孔方法

Similar Documents

Publication Publication Date Title
CN103924602B (zh) 深厚软土基坑施工方法
CN102226336A (zh) 地基加固处理方法
CN101906786A (zh) 软土地层含承压水基坑突涌渗透破坏判断方法
CN202559368U (zh) 一种沉管隧道带帽钢管减沉桩结构
CN101967819B (zh) 一种用于变电站软土地基施工的强夯置换综合法
CN106096162A (zh) 一种确定盾构土仓压力的方法及其数学模型和构建方法
CN204212162U (zh) 一种边坡注浆固结结构
CN204780938U (zh) 一种新型的可回收拉锚式双排桩支护结构
CN201151911Y (zh) 一种半边岩地基结构
CN103221613A (zh) 锥形打桩单脚架
CN205662918U (zh) 风积沙螺旋钢桩结构
CN204780939U (zh) 一种桅杆式双排桩支护系统
CN204703176U (zh) 软土地区坑中坑钢砼沉井
CN204199274U (zh) 一种预留泥浆空间内桩身带扩大头外桩身变强度的组合桩
Demir et al. Analysis of ring footings using field test results
Rashchenko et al. The Main Features of Hydraulic Fill Soils and River Dnieper Alluvial Deposits in the Kyiv Region
CN102966074B (zh) 人工河道护岸结构及其施工方法
CN102677671A (zh) 一种厚渣石层场地预制桩施工方法
Olyansky et al. Features of construction of buildings and constructions on loessial the bases in Moldova
CN201268857Y (zh) 清土铲
CN207314340U (zh) 用于原位注水素土挤密桩复合地基施工的沉管桩机
CN206457856U (zh) 一种地面防开裂结构
CN205116208U (zh) 海上风电场风机单桩基础
CN216275613U (zh) 一种适用于软土的复合地基处理结构
CN209099345U (zh) 一种高强度防渗复合桩基系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20141217

EXPY Termination of patent right or utility model