- CN201137074Y CN201137074Y CNU2007200158542U CN200720015854U CN201137074Y CN 201137074 Y CN201137074 Y CN 201137074Y CN U2007200158542 U CNU2007200158542 U CN U2007200158542U CN 200720015854 U CN200720015854 U CN 200720015854U CN 201137074 Y CN201137074 Y CN 201137074Y
- Authority
- CN
- China
- Prior art keywords
- cast
- pile body
- place
- pile
- hypomere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to an impact resistant building driven cast-in-place belled pile adapted for high-rise building foundation engineering, which structurally includes an upper section which is provided with a steel tube filled with concrete inside and a lower section cast-in-place pile body with uneven outer surface, the upper section steel tube and the lower section cast-in-place pile body are integrally anchored by an upper cast-in-pile base, the joint of the upper section steel tube and the lower section cast-in-place pile body is equipped with stabilizing reinforcements, inserted reinforcements of the cast-in-place pile body of the lower section cast-in-pile pile body is in general arrangement, and further a cast-in-place base is arranged at the lower end of the lower section cast-in-place pile body. The stability, impact resistance and utilization ratio of material intensity are significantly increased, single pile bearing capacity is higher, preset effects are easy to achieve, the operation is convenient and the cost is reduced.
Description
Technical field
The utility model relates to a kind of expanded bore pile for building, particularly relates to a kind of anti-impact force immersed tube bored expanded bore pile for building that is applicable in the highrise building foundation engineering and is applicable to other any ground soil properties, safe class.
Background technology
The pile foundation engineering that is used for the high building lot of highrise building and requirement for bearing capacity at present is general to adopt three kinds of immersed tube bored expanded bore pile, preformed pile and large diameter bored piles.Wherein the large diameter bored pile bearing capacity is the highest, but its involve great expense, work efficiency is low, and is and seriously polluted during construction; The quality of preformed pile is good, bearing capacity is also higher, but the cost of preformed pile is also high at present, generally is used for the higher building of safe class.What wherein be most widely used is ram-expanded pile, and this pile body is a cast-in-situ steel concrete, and pile crown is prefabricated; When executing, earlier the prefabricated pile crown of immersed tube is imbedded the hardpan in the ground, irritate concrete cast pile then; But because the soil property age difference that the earth's crust forms, soft foundation is soft usually with the increase of the crust layer degree of depth, hardpan is alternately state, like this when continuous piling construction, after execute stake and can produce extruding soil layer, the stake that will have influence on perfusion formerly and not solidify fully as yet, especially especially serious at the intersection of weak soil layer and hardpan, broken pile often appears, necking, thereby cause having approximately can't meet the quality requirement of tube-sinking cast-in-situ pile about 20%, force the designer to reduce the standard of bearing capacity of single pile, cause down stake to be gathered, cause soil body gross distortion, even jeopardize the quality of pile body; This another shortcoming is that bearing capacity is low, be to increase bearing capacity, the general way that adopts at the bottom of after irritating concrete cast pile body, adding companding, but because of its utilization add companding at the bottom of mode make the uncertain and standard of its shape size, its application is limited to.Though the utility model patent of the immersed tube prefabricated expanded bore pile of anti-impact force that the inventor has applied for has solved the problems referred to above, but find in actual use, the junction of pile body exists that bearing capacity and anti-impact force are weak, the problem of steadiness difference, manipulate loaded down with trivial details, the cost height.
The utility model content
The problem that the utility model exists at prior art, and provide a kind of scope of application wide, obviously improve strength of materials utilization rate, bearing capacity of single pile is higher and reach the anti-impact force immersed tube bored expanded bore pile for building of the Expected Results of design, the junction that has solved pile body exists bearing capacity and anti-impact force is weak, the problem of steadiness difference, easy for operation, reduced cost.
The technical scheme that the utility model technical solution problem is adopted is: epimere is set to steel pipe, and concrete is set in the steel pipe; External surface forms the cast-in-place pile body of scraggly hypomere, by last Cast-in-place concrete base epimere steel pipe and the cast-in-place pile body of hypomere are fused, the internal connection of epimere steel pipe and the cast-in-place pile body of hypomere is provided with the firm muscle of chiasma type, the joint bar of the cast-in-place pile body of the cast-in-place pile body of hypomere is to be provided with usually, and the lower end of the cast-in-place pile body of hypomere is provided with the Cast-in-place concrete base.
The center of described Cast-in-place concrete base and last Cast-in-place concrete base is coaxial with the center of precast prestressed pile body of epimere and the cast-in-place pile body of hypomere.
The utility model adopts the more piece pile body and expands base more than two, because the performance to the lower bottom base bearing capacity of upper bed-plate produces good influence, being provided with the performance of each section pile body frictional resistance of each base is favourable, make stake be in the state work down of economical rationality all the time, obviously improve the bearing capacity of single pile and the utilization rate of the strength of materials, strengthened firm muscle, reach the Expected Results of design easily, satisfy the needs of construction work better, no matter simultaneously applied widely is high level or low-rise building, safe class and ground soil property situation can both be combined into the immersed tube prefabricated multistage under-reamed pile that is complementary with it.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of precast pile of the present utility model.
Among the figure: 1, Cast-in-place concrete base; 2, go up the Cast-in-place concrete base; 3, epimere steel pipe; 5, the joint bar of cast-in-place pile body; 7, the cast-in-place pile body of hypomere, 8, concrete, 9, firm muscle.
The specific embodiment
Embodiment of the present utility model is described in detail in conjunction with the accompanying drawings, but protection domain of the present utility model is not limit by embodiment.
As shown in Figure 1, epimere is set to steel pipe 3, steel duct is provided with concrete eight, the hypomere pile body is the cast-in-place pile body 7 of hypomere, by last Cast-in-place concrete base 2 epimere steel pipe 3 and the cast-in-place pile body 7 of hypomere are fused, the internal connection of the cast-in-place pile body 7 of epimere steel pipe 3 and hypomere is provided with the firm muscle 9 of chiasma type, and the joint bar 5 of the cast-in-place pile body of the cast-in-place pile body 7 of hypomere is to be provided with usually, and the lower end of the cast-in-place pile body 7 of hypomere is provided with Cast-in-place concrete base 1.Make the external surface of the cast-in-place pile body 7 of its hypomere form scraggly surface with the soil compaction method, can also be provided with two-stage or multistage prefabricated or cast-in-place pile body as required in the upper end of epimere steel pipe 4.
The shape of Cast-in-place concrete base 1 and last Cast-in-place concrete base 2 is not limit, and its vertical section is a kind of in the up-small and down-big trapezoidal or sharpening triangle.
Claims (2)
1, a kind of anti-impact force immersed tube bored expanded bore pile for building, it is characterized in that it is to be made of following structure: epimere is set to steel pipe (3), and concrete (8) is set in the steel pipe; External surface forms the cast-in-place pile body of scraggly hypomere (7), by last Cast-in-place concrete base (2) epimere steel pipe (3) and the cast-in-place pile body of hypomere (7) are fused, the internal connection of epimere steel pipe (3) and the cast-in-place pile body of hypomere (7) is provided with the firm muscle of chiasma type (9), the joint bar (5) of the cast-in-place pile body of the cast-in-place pile body of hypomere (7) is to be provided with usually, and the lower end of the cast-in-place pile body of hypomere (7) is provided with Cast-in-place concrete base (1).
2,, it is characterized in that the center of described Cast-in-place concrete base (1) and last Cast-in-place concrete base (2) is coaxial with the center of epimere steel pipe (3) and the cast-in-place pile body of hypomere (7) according to claim 1 immersed tube bored expanded bore pile for building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200158542U CN201137074Y (en) | 2007-11-13 | 2007-11-13 | Impact force resistant pipe caisson filling pile for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200158542U CN201137074Y (en) | 2007-11-13 | 2007-11-13 | Impact force resistant pipe caisson filling pile for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201137074Y true CN201137074Y (en) | 2008-10-22 |
Family
ID=40037760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200158542U Expired - Fee Related CN201137074Y (en) | 2007-11-13 | 2007-11-13 | Impact force resistant pipe caisson filling pile for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201137074Y (en) |
-
2007
- 2007-11-13 CN CNU2007200158542U patent/CN201137074Y/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201137074Y (en) | Impact force resistant pipe caisson filling pile for building | |
CN201137063Y (en) | High bearing capacity pipe caisson pouring club-footed pile | |
CN201087400Y (en) | High bearing ability immersed tube filling pedestal pile | |
CN201137065Y (en) | Impact force resistant pipe caisson prefabricated club-footed pile for high-rise building | |
CN201137088Y (en) | Pipe caisson pouring club-footed pile | |
CN201137062Y (en) | Pipe caisson pouring club-footed pile | |
CN201137068Y (en) | Impact force resistant pipe caisson filling pile for high-rise building | |
CN201137071Y (en) | Impact force resistant pipe caisson prefabricated club-footed pile | |
CN201137096Y (en) | Impact force resistant pipe caisson filling club-footed pile | |
CN201121318Y (en) | Immersed tube pedestal pile | |
CN201137091Y (en) | Impact force resistant architecture base club-footed pile | |
CN201137075Y (en) | Pipe caisson club-footed pile | |
CN201089900Y (en) | Sink pipe perfusion club-footed pile for construction against impulse force | |
CN201137103Y (en) | High bearing capacity club-footed pile suitable for high-rise building basic construction | |
CN201137090Y (en) | Pipe caisson club-footed pile | |
CN201087351Y (en) | Anti-impact immersed tube filling pedestal pile for construction | |
CN201137112Y (en) | Impact force resistant architecture base club-footed pile | |
CN201137061Y (en) | High-rise building club-footed pile | |
CN201121316Y (en) | High bearing ability pedestal pile suitable for high-rise building foundation construction | |
CN201137110Y (en) | Impact force resistant club-footed pile for high-rise building | |
CN201121317Y (en) | Anti-impact pedestal pile for building foundation construction | |
CN201089902Y (en) | Sink pipe perfusion club-footed pile | |
CN201144417Y (en) | Anti-impact force sinking pipe perfusion pedestal pile for construction | |
CN201089904Y (en) | High-rise building club-footed pile | |
CN201137089Y (en) | High-rise building club-footed pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081022 Termination date: 20091214 |