CN201137062Y - Pipe caisson pouring club-footed pile - Google Patents

Pipe caisson pouring club-footed pile Download PDF

Info

Publication number
CN201137062Y
CN201137062Y CNU2007200157643U CN200720015764U CN201137062Y CN 201137062 Y CN201137062 Y CN 201137062Y CN U2007200157643 U CNU2007200157643 U CN U2007200157643U CN 200720015764 U CN200720015764 U CN 200720015764U CN 201137062 Y CN201137062 Y CN 201137062Y
Authority
CN
China
Prior art keywords
cast
place
steel pipe
pile
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200157643U
Other languages
Chinese (zh)
Inventor
王茂华
孙伟萍
王国奋
杨国龙
姚健生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200157643U priority Critical patent/CN201137062Y/en
Application granted granted Critical
Publication of CN201137062Y publication Critical patent/CN201137062Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a belled pile for buildings, in particular relating to a driven cast-in-place belled pile in foundation engineering of a high-rise building. The driven cast-in-place belled pile is formed by the structure as follows: an upper section is equipped with a steel pipe, a lower section is equipped with a cast-in-place pile with a knaggy outer surface, the steel pipe of the upper section is integrally anchored with the cast-in-place pile body of the lower section via an upper cast-in-place concrete base, stabilizing reinforcements are arranged at the connection position of the steel pipe of the upper section and the cast-in-place pile body of the lower section, lower inserted reinforcements of the steel pipe of the upper section are disposed in the steel pipe of the upper section, upper inserted reinforcements of the cast-in-situ of the lower section are in normal arrangement and are connected with the lower inserted reinforcements of the steel pipe of the upper section which are embedded at the lower end of the steel pipe of the upper end, the lower end of the cast-in-place of the lower section is equipped with a cast-in-place concrete base, the cast-in-place concrete base and a longitudinal section of the upper cast-in-place concrete base are in big end down trapezoid. The driven cast-in-place belled pile is wide in application range, obviously increases material strength usage, strengthens bearing capacity and anti-impact force in using process of the pedestal pile body, and increases stability.

Description

Immersed tube bored expanded bore pile
Technical field
The utility model relates to a kind of expanded bore pile for building, particularly relates to a kind ofly being applicable in the highrise building foundation engineering and being applicable to immersed tube bored expanded bore pile in the building of other any ground soil properties, safe class.
Background technology
The pile foundation engineering that is used for the high building lot of highrise building and requirement for bearing capacity at present is general to adopt three kinds of immersed tube bored expanded bore pile, preformed pile and large diameter bored piles.Wherein the large diameter bored pile bearing capacity is the highest, but its involve great expense, work efficiency is low, and is and seriously polluted during construction; The quality of preformed pile is good, bearing capacity is also higher, but the cost of preformed pile is also high at present, generally is used for the higher building of safe class.What wherein be most widely used is ram-expanded pile, and this pile body is a cast-in-situ steel concrete, and pile crown is prefabricated; When executing, earlier the prefabricated pile crown of immersed tube is imbedded the hardpan in the ground, irritate concrete cast pile then; But because the soil property age difference that the earth's crust forms, soft foundation is soft usually with the increase of the crust layer degree of depth, hardpan is alternately state, like this when continuous piling construction, after execute stake and can produce extruding soil layer, the stake that will have influence on perfusion formerly and not solidify fully as yet, especially especially serious at the intersection of weak soil layer and hardpan, broken pile often appears, necking, thereby cause having approximately can't meet the quality requirement of tube-sinking cast-in-situ pile about 20%, force the designer to reduce the standard of bearing capacity of single pile, cause down stake to be gathered, cause soil body gross distortion, even jeopardize the quality of pile body; This another shortcoming is that bearing capacity is low, be to increase bearing capacity, the general way that adopts at the bottom of after irritating concrete cast pile body, adding companding, but because of its utilization add companding at the bottom of mode make the uncertain and standard of its shape size, its application is limited to.
In addition, the pile body junction of expanded bore pile, in actual use the ability of bearing capacity and anti-impact force relative a little less than, steadiness is relatively poor.
The utility model content
The problem that the utility model exists at prior art, and provide a kind of scope of application wide, obviously improve strength of materials utilization rate, bearing capacity of single pile is higher and reach the immersed tube bored expanded bore pile of the Expected Results of design, has solved the existing expanded bore pile pile body junction problem of relative weak, the steadiness difference with anti-impact force of bearing capacity in use.
The technical scheme that the utility model technical solution problem is adopted is: a kind of immersed tube bored expanded bore pile, it is to be made of following structure: epimere is set to steel pipe, hypomere is the scraggly cast-in-place pile body of external surface, by last Cast-in-place concrete base epimere steel pipe and the cast-in-place pile body anchoring of hypomere are fused, the internal connection of epimere steel pipe and the cast-in-place pile body of hypomere is provided with the firm muscle of chiasma type, the joint bar of the cast-in-place pile body of the cast-in-place pile body of hypomere is to be provided with usually, the lower end of the cast-in-place pile body of hypomere is provided with the Cast-in-place concrete base, the vertical section of Cast-in-place concrete base and last Cast-in-place concrete base be down big little trapezoidal.
The center of described Cast-in-place concrete base and last Cast-in-place concrete base is coaxial with the center of epimere steel pipe and the cast-in-place pile body of hypomere.
The utility model adopts plurality of sections of steel pipes to be connected with pile body and expands base more than two, because the performance to the lower bottom base bearing capacity of upper bed-plate produces good influence, being provided with the performance of each section pile body frictional resistance of each base is favourable, make stake be in the state work down of economical rationality all the time, obviously improve the bearing capacity of single pile and the utilization rate of the strength of materials, reach the Expected Results of design easily, satisfy the needs of construction work better, no matter simultaneously applied widely is high level or low-rise building, safe class and ground soil property situation can both be combined into the immersed tube prefabricated multistage under-reamed pile that is complementary with it.And the epimere of expanded bore pile adopts steel pipe, has strengthened expanded bore pile bearing capacity and anti-impact force in use.The pile body junction is provided with firm muscle, has strengthened steadiness.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model.
Among the figure: 1, Cast-in-place concrete base; 2, go up the Cast-in-place concrete base; 3, epimere steel pipe; 5, the joint bar of cast-in-place pile body; 7, the cast-in-place pile body of hypomere, 9, firm muscle.
The specific embodiment
Embodiment of the present utility model is described in detail in conjunction with the accompanying drawings, but protection domain of the present utility model is not limit by embodiment.
As shown in Figure 1, epimere is a steel pipe 3, hypomere is cast-in-place pile body 7, by last Cast-in-place concrete base 2 epimere steel pipe 3 and cast-in-place pile body 7 anchorings of hypomere are fused, the internal connection of the cast-in-place pile body 7 of epimere steel pipe 3 and hypomere is provided with the firm muscle 9 of chiasma type, the joint bar 5 of the cast-in-place pile body of the cast-in-place pile body 7 of hypomere is to be provided with usually, and the lower end of the cast-in-place pile body 7 of hypomere is provided with Cast-in-place concrete base 1.Make the external surface of the cast-in-place pile body 7 of its hypomere form scraggly surface with the soil compaction method, can also be provided with two-stage or multistage prefabricated or cast-in-place pile body as required in the upper end of epimere steel pipe 4; The vertical section of Cast-in-place concrete base 1 and last Cast-in-place concrete base 2 be down big little trapezoidal.
The shape of Cast-in-place concrete base 1 and last Cast-in-place concrete base 2 is not limit, and its vertical section is a kind of in the up-small and down-big trapezoidal or sharpening triangle.

Claims (2)

1, a kind of immersed tube bored expanded bore pile, it is characterized in that it is to be made of following structure: epimere is set to steel pipe (3), hypomere is the scraggly cast-in-place pile body of external surface (7), by last Cast-in-place concrete base (2) epimere steel pipe (3) and the cast-in-place pile body of hypomere (7) anchoring are fused, the internal connection of epimere steel pipe (3) and the cast-in-place pile body of hypomere (7) is provided with the firm muscle of chiasma type (9), the joint bar (5) of the cast-in-place pile body of the cast-in-place pile body of hypomere (7) is to be provided with usually, the lower end of the cast-in-place pile body of hypomere (7) is provided with Cast-in-place concrete base (1), the vertical section of Cast-in-place concrete base (1) and last Cast-in-place concrete base (2) be down big little trapezoidal.
2, immersed tube bored expanded bore pile according to claim 1 is characterized in that the center of described Cast-in-place concrete base (1) and last Cast-in-place concrete base (2) is coaxial with the center of cast-in-place pile body of epimere (3) and the cast-in-place pile body of hypomere (7).
CNU2007200157643U 2007-11-09 2007-11-09 Pipe caisson pouring club-footed pile Expired - Fee Related CN201137062Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200157643U CN201137062Y (en) 2007-11-09 2007-11-09 Pipe caisson pouring club-footed pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200157643U CN201137062Y (en) 2007-11-09 2007-11-09 Pipe caisson pouring club-footed pile

Publications (1)

Publication Number Publication Date
CN201137062Y true CN201137062Y (en) 2008-10-22

Family

ID=40037748

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200157643U Expired - Fee Related CN201137062Y (en) 2007-11-09 2007-11-09 Pipe caisson pouring club-footed pile

Country Status (1)

Country Link
CN (1) CN201137062Y (en)

Similar Documents

Publication Publication Date Title
CN201137063Y (en) High bearing capacity pipe caisson pouring club-footed pile
CN201137065Y (en) Impact force resistant pipe caisson prefabricated club-footed pile for high-rise building
CN201087400Y (en) High bearing ability immersed tube filling pedestal pile
CN201137062Y (en) Pipe caisson pouring club-footed pile
CN201087410Y (en) Pedestal pile suitable for high-rise building foundation construction
CN200964587Y (en) Sinking pipe perfusion bottom-expanding pile
CN201137061Y (en) High-rise building club-footed pile
CN201137096Y (en) Impact force resistant pipe caisson filling club-footed pile
CN201137112Y (en) Impact force resistant architecture base club-footed pile
CN201087399Y (en) Immersed tube filling pedestal pile
CN201137088Y (en) Pipe caisson pouring club-footed pile
CN201087351Y (en) Anti-impact immersed tube filling pedestal pile for construction
CN201137075Y (en) Pipe caisson club-footed pile
CN201137110Y (en) Impact force resistant club-footed pile for high-rise building
CN201137074Y (en) Impact force resistant pipe caisson filling pile for building
CN201137083Y (en) High bearing capacity high-rise building club-footed pile
CN201137091Y (en) Impact force resistant architecture base club-footed pile
CN201144417Y (en) Anti-impact force sinking pipe perfusion pedestal pile for construction
CN201087403Y (en) Anti-impact immersed tube filling pedestal pile
CN201087411Y (en) Immersed tube filling pedestal pile for construction
CN201137105Y (en) Club-footed pile suitable for high-rise building basic construction
CN201087349Y (en) Anti-impact immersed tube pedestal pile suitable for high-rise building
CN201137106Y (en) High bearing capacity club-footed pile suitable for high-rise building basic construction
CN201087406Y (en) Immersed tube pedestal pile
CN201137090Y (en) Pipe caisson club-footed pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081022

Termination date: 20091209