CN201136848Y - Powdered coke cooling jacket - Google Patents

Powdered coke cooling jacket Download PDF

Info

Publication number
CN201136848Y
CN201136848Y CNU2007201381519U CN200720138151U CN201136848Y CN 201136848 Y CN201136848 Y CN 201136848Y CN U2007201381519 U CNU2007201381519 U CN U2007201381519U CN 200720138151 U CN200720138151 U CN 200720138151U CN 201136848 Y CN201136848 Y CN 201136848Y
Authority
CN
China
Prior art keywords
water jacket
coke powder
layer
coke breeze
layer water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201381519U
Other languages
Chinese (zh)
Inventor
张玉林
刘广礼
王秀敏
何小锴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Co Ltd
Original Assignee
Tangshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Iron and Steel Co Ltd filed Critical Tangshan Iron and Steel Co Ltd
Priority to CNU2007201381519U priority Critical patent/CN201136848Y/en
Application granted granted Critical
Publication of CN201136848Y publication Critical patent/CN201136848Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The utility model relates to a coke powder cooling sleeve which can eliminate the thermal stress of the present equipment, avoid the inner leakage and the damage of the coke powder cooling sleeve, and prolong the service life of the equipment, and belongs to the technical field of the coking mechanical equipment. The coke powder cooling sleeve comprises an outer-layer water jacket, a coke powder layer, and an inner-layer water jacket, the inner-layer water jacket adopts an integral steel tube structure, the pipe wall of the water outlet pipe of the inner-layer water jacket is glidingly connected with the outer-layer water jacket and the coke powder layer, the outer part is sealed by adopting high temperature packing material. Because the slip connection structure is adopted among the inner-layer water jacket, the outer-layer water jacket and the coke powder layer, the hidden trouble of cracking because the coke powder cooling sleeve is fixed and welded under thermal stress is eliminated; a spherical inward concave sealing head is adopted to plug the top of the inner sleeve, thereby reducing the heating deformation of the top plate and the decline of the mechanical strength, providing the margin for the deformation of the water jacket, and avoiding the water jacket from being damaged. The coke powder cooling sleeve solves the problem of the inner leakage of the coke powder cooling sleeve generally existing in the coking industry, the service life of the coke powder cooling sleeve is enhanced, and the long period stable operation of the system is ensured.

Description

A kind of coke breeze cooling jacket
Technical field
The utility model relates to cork dry quenching disposable dust remover coke breeze cooling apparatus, belongs to the coking machinery apparatus field.
Technical background:
In coking equipment, coke breeze cooling jacket is the important auxiliary facility of dry quenching system, is installed on the disposable dust remover bottom, is connected with fork-shaped ash storehouse with disposable dust remover, mainly act as eliminating by the collected coke ashes of cork dry quenching disposable dust remover, and it is cooled off.
The ubiquitous problem of the coke breeze cooling jacket that present domestic dry coke quenching adopted is: aborning, the coke breeze cooling jacket adopts the mode of intermittently ash discharge to turn round, cooling temperature is reduced to about 200 ℃ by nearly 1000 ℃, because rapid suddenly cold and hot, cause frequent expanding with heat and contract with cold, connect the position at inside and outside cover and produce thermal stresses, because currently used coke breeze cooling jacket adopts full weldprocedure, adopt between each parts fixedly connected, weld seam weak part cracking easily under the thermal stresses effect; The inner sleeve top is flat-top and builds with pouring material that the expansion space is minimum, and stress is easily concentrated, and causes this position very easily to damage; Be provided with water-stop sheet in the middle of the inner sleeve, water inlet is directly by the top water inlet, discharged at last by the influent side water outlet side of flowing through through water-stop sheet, causes the difference of inner sleeve water-stop sheet both sides heat exchange mode, produces thermal stresses, also is the reason that causes water jacket to damage.The problems referred to above have influenced dry quenching system direct motion and running safety, have seriously restricted development of Dry Quenching Technology and application, and the technician is necessary these positions are redesigned.
Problem to be solved in the utility model provides a kind of thermal stresses that can eliminate present equipment, avoid the coke breeze cooling jacket that leakage loss in the coke breeze cooling jacket is bad, prolong equipment life.
The technical scheme that solves the problems of the technologies described above is:
A kind of coke breeze cooling jacket, it is made up of outer water jacket, coke breeze layer, internal layer water jacket, the rising pipe of internal layer water jacket and water inlet pipe all pass outer water jacket, coke breeze layer, its improvements are: the internal layer water jacket adopts whole steel-tube construction, the rising pipe tube wall of internal layer water jacket and outer water jacket, coke breeze layer are for being slidingly connected the packing seal of outside employing high temperature.
Above-mentioned coke breeze cooling jacket, spherical indent end socket is adopted in the top shutoff of internal layer water jacket, and the outside is equipped with refractory felt and fire-resistant pouring material successively.
Above-mentioned coke breeze cooling jacket, the water inlet pipe that the water inlet connects is deep into the bottom of internal layer water jacket.
Above-mentioned coke breeze cooling jacket, rising pipe adopts two oblique cut grafting slide constructions at the wearings plate of coke breeze layer, the high temperature resistant packing seal of the outside employing of rising pipe.
Adopt the coke breeze cooling jacket of this structure, internal layer water jacket and outer water jacket, coke breeze layer are sliding connection structure, have eliminated to be fixedly welded on rimose hidden danger under the thermal stresses; Spherical indent end socket is adopted in the top shutoff of interior cover, can reduce the decline that top board is subjected to thermal deformation and physical strength, and for the deformation of water jacket provides surplus, avoid the damage of water jacket; Water coolant and the complete countercurrent flow of coke powder were realized in the cover bottom in water-in skirt road was deep into, and strengthened the heat exchange effect, and each position heat exchange homogeneous of interior cover avoids producing thermal stresses.Adopt present technique, solve leakage problem in the ubiquitous coke breeze cooling jacket of dry coke quenching industry, improved the work-ing life of coke breeze cooling jacket, guaranteed system's long-period stable operation, effectively improve in the quench system safe reliability, reduced dry coke quenching technology running cost simultaneously.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Number in the figure is as follows: outer water jacket 1, coke breeze layer 2, internal layer water jacket 3, rising pipe 4, water-in 5, spherical indent end socket 6, wearings plate 7, sleeve pipe 8, water inlet pipe 9
Embodiment
The utility model is made up of outer water jacket 1, coke breeze layer 2, internal layer water jacket 3.The rising pipe 4 of internal layer water jacket 3 and water-in 5 all pass outer water jacket 1 and coke breeze layer 2.Outer water jacket 1, coke breeze layer 2 are sleeve pipes 8 with the junction end face of rising pipe 4, and the tube wall of this sleeve pipe 8 and rising pipe 4 is for being slidingly connected, and promptly the tube wall of rising pipe 4 can move forward and backward along the inwall of sleeve pipe 8.When internal layer water jacket 3 expanded by heating, its rising pipe 4 can outwards move like this, has avoided rising pipe 4 and outer water jacket 1, coke breeze layer 2 because of being fixedly welded on the rimose phenomenon to take place under the thermal stresses.Water-in 5 adopts two oblique cut grafting slide constructions at the wearings plate 7 of ash discharge layer, and high temperature resistant packing seal is used in the outside, can prevent the gas trains leakage.
Spherical indent end socket 6 is adopted in the top shutoff of internal layer water jacket 3, and the outside refractory felt of laying is built fire-resistant pouring material again.This measure can be avoided producing gas at internal layer water jacket 3 tops and retain, and guarantees the top board cooling performance, reduces the decline that top board is subjected to thermal deformation and physical strength; The spherical indent end socket 6 of rubber-like can provide surplus for the deformation of internal layer water jacket 3, avoids the damage of internal layer water jacket 3.Internal layer water jacket 3 is whole steel-tube construction, and 5 places are connected with water inlet pipe 9 at water-in, and water inlet pipe 9 is deep into the bottom of internal layer water jacket 3, realize water coolant and the complete countercurrent flow of coke powder, strengthen the heat exchange effect, internal layer water jacket 3 each position heat exchange homogeneous avoid producing thermal stresses.
The utility model has following characteristics:
1, adopts sliding connection structure, eliminate because the thermal stress that structure problem causes.
2, each position heat exchange efficiency reaches unanimity, and good effect of heat exchange is eliminated because the heat that the heat exchange inequality causes should Power.
3, water journey top does not have air gap, eliminates because thermogenetic thermal stress is crossed at the air gap position.
4, provide sufficient surplus for expanding with heat and contract with cold of equipment.
The utility model has solved leakage problem in the ubiquitous coke breeze cooling jacket of dry coke quenching industry, improves powder Guaranteed system's long-period stable operation the service life of burnt cooling collar, Effective Raise dry quenching system peace Full reliability has reduced dry coke quenching process operation cost simultaneously.

Claims (4)

1. coke breeze cooling jacket, it is made up of outer water jacket [1], coke breeze layer [2], internal layer water jacket [3], the rising pipe [4] of internal layer water jacket [3] and water-in [5] all pass outer water jacket [1], coke breeze layer [2], it is characterized in that: internal layer water jacket [3] adopts whole steel-tube construction, rising pipe [4] tube wall of internal layer water jacket [3] and outer water jacket [1], coke breeze layer [2] are for being slidingly connected the packing seal of outside employing high temperature.
2. coke breeze cooling jacket according to claim 1 is characterized in that: spherical indent end socket [6] is adopted in the top shutoff of internal layer water jacket [3], and the outside is equipped with refractory felt and fire-resistant pouring material successively.
3. coke breeze cooling jacket according to claim 2 is characterized in that: the water inlet pipe [9] that water-in [5] is located to connect is deep into the bottom of internal layer water jacket [3].
4. coke breeze cooling jacket according to claim 3 is characterized in that: rising pipe [4] adopts two oblique cut grafting slide constructions at the wearings plate [7] of coke breeze layer [2], the high temperature resistant packing seal of the outside employing of rising pipe [4].
CNU2007201381519U 2007-12-04 2007-12-04 Powdered coke cooling jacket Expired - Fee Related CN201136848Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201381519U CN201136848Y (en) 2007-12-04 2007-12-04 Powdered coke cooling jacket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201381519U CN201136848Y (en) 2007-12-04 2007-12-04 Powdered coke cooling jacket

Publications (1)

Publication Number Publication Date
CN201136848Y true CN201136848Y (en) 2008-10-22

Family

ID=40037539

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201381519U Expired - Fee Related CN201136848Y (en) 2007-12-04 2007-12-04 Powdered coke cooling jacket

Country Status (1)

Country Link
CN (1) CN201136848Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104152160A (en) * 2014-08-06 2014-11-19 攀钢集团西昌钢钒有限公司 Dry quenching coke powder cooling device
CN107478076A (en) * 2017-08-11 2017-12-15 中冶焦耐(大连)工程技术有限公司 A kind of coke powder cooler and its method of work

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104152160A (en) * 2014-08-06 2014-11-19 攀钢集团西昌钢钒有限公司 Dry quenching coke powder cooling device
CN104152160B (en) * 2014-08-06 2016-06-01 攀钢集团西昌钢钒有限公司 Dry coke quenching coke powder cooling device
CN107478076A (en) * 2017-08-11 2017-12-15 中冶焦耐(大连)工程技术有限公司 A kind of coke powder cooler and its method of work
CN107478076B (en) * 2017-08-11 2023-08-25 中冶焦耐(大连)工程技术有限公司 Coke powder cooler and working method thereof

Similar Documents

Publication Publication Date Title
CN102976312A (en) Heat exchanger structure capable of prolonging service life of calcined coke heat exchanger
CN203530218U (en) Heat transfer device of raw coke oven gas ascension pipe of coke oven
CN201136848Y (en) Powdered coke cooling jacket
CN201306476Y (en) 2-position 3-way air reversing valve
CN102838997A (en) Raw coke oven gas waste-heat utilization method and raw coke oven gas waste-heat utilization equipment
CN203605217U (en) CFB (circulating fluidized bed) boiler slag discharging device for burning coal gangue
CN107014225A (en) A kind of annular multi-airway formula tedge absorbing and cooling temperature device
CN201145411Y (en) Waste heat boiler
CN210772141U (en) Automatic slag poking device of circulating fluidized bed boiler
CN107120993B (en) A kind of radial pattern multi-airway formula tedge absorbing and cooling temperature device
CN101943417A (en) Flue system of waste heat boiler
CN203163468U (en) Novel cast iron hot-air smelting furnace
CN206695649U (en) A kind of modularized combination type tedge absorbing and cooling temperature device
CN201897229U (en) Flue system of waste heat boiler
CN102434875A (en) Method for treating high-temperature smoke at opening of waste heat boiler of converter
CN207313639U (en) Converter Residual Heat Boiler movable gas hood
CN210340783U (en) External heat collector device for coke burning tank of biofuel device
CN202226811U (en) Water-cooling sleeve at bottom of primary dust remover for coke dry quenching system
CN206670385U (en) The carbon dioxide energy storage equipment of high temperature heat in a kind of accumulation kiln hood
CN101451768B (en) Exhaust-heating boiler
CN104764338A (en) Heat pipe type smoke pulverized coal heating device
CN221146580U (en) High-temperature fuel nozzle
CN206739934U (en) A kind of Omnidirectional radiation type tedge absorbing and cooling temperature device
CN213237464U (en) Shell and tube heat exchanger with sleeve for recovering waste heat of ascending tube of coke oven
CN214582545U (en) Expansion joint for water tank of circular cooler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HEBEI IRON + STEEL CO.,LTD.

Free format text: FORMER OWNER: TANGSHAN IRON AND STEEL CO., LTD.

Effective date: 20100401

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 063016 INTELLECTUAL PROPERTY DIVISION, TANGSHAN STEEL TECHNOLOGY CENTER, NO.9, BINHE ROAD, TANGSHAN CITY, HEBEI PROVINCE TO: 050000 NO.40, YUHUA WEST ROAD, SHIJIAZHUANG CITY, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100401

Address after: Yuhua city of Shijiazhuang province Hebei 050000 West Road No. 40

Patentee after: Hebei Iron & Steel Co., Ltd.

Address before: 063016 Hebei province Tangshan City No. 9 Binhe Road, Tangshan Iron and steel technology center of Intellectual Property Department

Patentee before: Tangshan Iron & Steel Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081022

Termination date: 20111204