CN201129038Y - Prestressed supporting device - Google Patents

Prestressed supporting device Download PDF

Info

Publication number
CN201129038Y
CN201129038Y CNU2007201901424U CN200720190142U CN201129038Y CN 201129038 Y CN201129038 Y CN 201129038Y CN U2007201901424 U CNU2007201901424 U CN U2007201901424U CN 200720190142 U CN200720190142 U CN 200720190142U CN 201129038 Y CN201129038 Y CN 201129038Y
Authority
CN
China
Prior art keywords
steel column
fixedly connected
top board
prestressed
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007201901424U
Other languages
Chinese (zh)
Inventor
吴明超
尚仁杰
刘刚
宫锡胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jingye Engineering Corp Ltd
Original Assignee
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jingye Engineering Corp Ltd filed Critical China Jingye Engineering Corp Ltd
Priority to CNU2007201901424U priority Critical patent/CN201129038Y/en
Application granted granted Critical
Publication of CN201129038Y publication Critical patent/CN201129038Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility mode relates to a prestressed supporting device, comprising a supporting frame consisting of a bottom plate, a left side plate, a right side plate and a top plate; wherein, both sides of the left side plate and the right side plate are vertically provided with a plurality of connection plates which connect the left side plate and the right side plate; each of the four corners of the top plate is provided with a via hole; a big hole is arranged in the middle of the top plate; a steel column is arranged inside the supporting frame, which goes through the big hole on the top plate of the supporting frame; both ends of the column bases of each steel column are separately provided with a prestressed steel hinge line; the lower end of each prestressed steel hinge line is fixedly connected with an extruding anchorage used for supporting the column base of the steel column; the upper end of the four prestressed steel hinge lines separately goes through the four via holes on the top plate of the supporting frame and is fixedly connected with a clip anchorage. The prestressed supporting device can provide the supporting force with high precision and good stability for the mechanism being supported as well as the prestressed supporting device with easy construction operation.

Description

Prestressed bracing arrangement
Technical field
The utility model relates to the bracing or strutting arrangement in a kind of construction work, refers to a kind of prestressed bracing arrangement especially.
Background technology
Often use bracing or strutting arrangement in the work progress of construction work, bracing or strutting arrangement at present commonly used has the scaffold of setting up to support and jack adds the combined support of steel column.
Wherein, scaffold supports and belongs to passive bracing or strutting arrangement, promptly owing to after the structure stress distortion load is imposed on this device, it is just played a supporting role, this kind support is mainly used in the wet trade process of civil engineering structure, or the structural element that goes wrong is carried out protectiveness support, prevent aspects such as the further expansion of problem, but scaffold supports and can't apply support force accurately to works;
The combined support that jack adds steel column belongs to the Active support device, promptly with the support force effect structurally by jack, this kind bracing or strutting arrangement can be used in the work such as off-load of structural strengthening, but the combined support that jack adds steel column is in accuracy and apply aspect the degree of controllability in the process relatively poor, the support force error that promptly provides is very big, and work progress is not easy to operate; And the jack combined support that adds steel column structure is applied finish support force after, the continuous stability of this support force is difficult to control, deforms at strong point place as structure, support force can take place significantly to slacken.After this situation of generation, if will append support force at the former strong point, how accurately calculating is appended the size of power and how to be realized applying this power and all has very big difficulty.
The utility model content
The purpose of this utility model provides a kind of support force that precision height, good stability can be provided supported structure, and constructing operation is easy to prestressed bracing arrangement.
For achieving the above object, the utility model is taked following design scheme:
A kind of prestressed bracing arrangement is characterized in that, it comprises:
A support frame of forming by base plate, left plate, right plate and top board, the both sides of described left plate and right plate vertically are provided with some junction plates that are connected described left plate and right plate, described top board respectively is provided with a through hole for four jiaos, and described top board middle part is provided with a macropore;
A steel column that is positioned at support frame inside, described steel column is arranged in the macropore of the top board of described support frame, both sides, described steel column lower end are fixedly connected with two steel column foots that are positioned at the described support frame outside by the steel column base plate, the two ends of each steel column foot are equipped with a prestressing force steel hinge line respectively, and the lower end of the described prestressing force steel hinge line of each root is fixedly connected with an Extrusion anchor ground tackle that is used to support described steel column foot; The upper end of four prestressing force steel hinge lines pass respectively described support frame top board four through holes and fixedly connected with the intermediate plate ground tackle.
The top of described steel column is fixedly connected with the gripper shoe of an area greater than described steel column top board area, is fixedly connected with stiffener between described gripper shoe bottom and the described steel column.
The utility model has the advantages that: the utility model is owing to adopt above design scheme, jack pair prestress wire by the support frame top carries out stretch-draw generation stretching force, this power is delivered to steel column foot by prestress wire, pass to steel column by the steel column base plate again, steel column is passed to power supported structure at last.The stretching force on support frame top is passed to ground by support frame.The utility model prestressed bracing arrangement utilizes the prestressing force steel hinge line to provide numerical value accurate support force for prestressed bracing arrangement, and support device structure is simple, good stability, constructing operation are simple and easy.
Description of drawings
Fig. 1 represents the utility model perspective view
Fig. 2 represents the utility model master TV structure schematic diagram
Fig. 3 is the A-A cross-sectional schematic of Fig. 2
Fig. 4 is the B-B sectional drawing of Fig. 2
Fig. 5 is the C-C cross-sectional schematic of Fig. 2
The specific embodiment
As Fig. 1, Fig. 2, Fig. 3, Fig. 4, shown in Figure 5, a kind of prestressed bracing arrangement of the utility model is characterized in that it comprises:
A support frame of forming by base plate 1, left plate 2, right plate 3 and top board 4, the both sides of left plate 2 and right plate 3 vertically are provided with some junction plates 5 that are connected left plate 2 and right plate 3, top board respectively is provided with a through hole 6 for 4 four jiaos, and top board 4 middle parts are provided with a macropore 7;
A steel column 8 that is positioned at support frame inside, steel column 8 is arranged in the macropore 7 of the top board of support frame, both sides, steel column 8 lower end are fixedly connected with two steel column foots 10 that are positioned at the support frame outside by steel column base plate 9, the two ends of each steel column foot 10 are equipped with a prestressing force steel hinge line 11 respectively, and the lower end of each root prestressing force steel hinge line 11 is fixedly connected with an Extrusion anchor ground tackle 12 that is used to support steel column foot 10; The upper end of four prestressing force steel hinge lines 11 pass respectively support frame top board 4 four through holes 6 and fixedly connected with intermediate plate ground tackle 13.
The top of steel column 8 is fixedly connected with the gripper shoe 16 of an area greater than steel column top board area, is fixedly connected with stiffener 14 between gripper shoe 16 bottoms and the steel column 8.
Groundwork step of the present utility model and principle are as follows:
1, calculates the stretching force of every prestress wire 11 according to the needed support force of supported structure;
2, according to the intensity of stretching force and prestress wire 11, the stretch-draw length that modulus of elasticity calculates prestress wire 11;
3, calculate steel column 8 according to support force and support the axial compression distortion of tank bracket under the support force effect, and with this distortion numerical value all add calculate in the 2nd step stretch-draw length, as final stretch-draw length;
4, the utility model bracing or strutting arrangement assembling is finished, carried out stretch-draw (can be divided into several steps finish stretch-draw) by 15 pairs of prestress wires of jack 11.
5, to finish be after support force applies in stretch-draw, adopt the pulling force of vibratory string method at-once monitor prestress wire 11, the pulling force sum of all prestress wires 11 is compared with the required support force of supported structure, judge whether support force slackens, thereby determine whether to take stretch-draw measure once more, guarantee the stable of support force.

Claims (2)

1, a kind of prestressed bracing arrangement is characterized in that, it comprises:
A support frame of forming by base plate, left plate, right plate and top board, the both sides of described left plate and right plate vertically are provided with some junction plates that are connected described left plate and right plate, described top board respectively is provided with a through hole for four jiaos, and described top board middle part is provided with a macropore;
A steel column that is positioned at support frame inside, described steel column is arranged in the macropore of the top board of described support frame, both sides, described steel column lower end are fixedly connected with two steel column foots that are positioned at the described support frame outside by the steel column base plate, the two ends of each steel column foot are equipped with a prestressing force steel hinge line respectively, and the lower end of the described prestressing force steel hinge line of each root is fixedly connected with an Extrusion anchor ground tackle that is used to support described steel column foot; The upper end of four prestressing force steel hinge lines pass respectively described support frame top board four through holes and fixedly connected with the intermediate plate ground tackle.
2, prestressed bracing arrangement according to claim 1 is characterized in that: the top of described steel column is fixedly connected with the gripper shoe of an area greater than described steel column top board area, is fixedly connected with stiffener between described gripper shoe bottom and the described steel column.
CNU2007201901424U 2007-11-13 2007-11-13 Prestressed supporting device Expired - Lifetime CN201129038Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201901424U CN201129038Y (en) 2007-11-13 2007-11-13 Prestressed supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201901424U CN201129038Y (en) 2007-11-13 2007-11-13 Prestressed supporting device

Publications (1)

Publication Number Publication Date
CN201129038Y true CN201129038Y (en) 2008-10-08

Family

ID=40016877

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201901424U Expired - Lifetime CN201129038Y (en) 2007-11-13 2007-11-13 Prestressed supporting device

Country Status (1)

Country Link
CN (1) CN201129038Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397605A (en) * 2013-08-01 2013-11-20 山西尚风科技股份有限公司 Sound barrier supporting column preventing high-speed rail noise
CN107526100A (en) * 2017-08-02 2017-12-29 中国石油天然气集团公司 The prestressed structure of vibrator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397605A (en) * 2013-08-01 2013-11-20 山西尚风科技股份有限公司 Sound barrier supporting column preventing high-speed rail noise
CN107526100A (en) * 2017-08-02 2017-12-29 中国石油天然气集团公司 The prestressed structure of vibrator

Similar Documents

Publication Publication Date Title
CN202509404U (en) High-pier single-column capping beam framework construction support system
CN104533105A (en) Steel-encased reinforcing column pre-tension device
CN201129038Y (en) Prestressed supporting device
CN217106193U (en) Construction device for compressing and pouring reinforced concrete beam and column
CN100513727C (en) Prestressed bracing arrangement
CN103291084A (en) Construction method of building jacking steel reinforced concrete supporting system
CN108316317A (en) A kind of concrete filled steel tube arch perfusion simulator
CN102080383B (en) Suspension type embedded part and hole reserved template fixing method
CN105442840B (en) A kind of building method of supporting frame for overhanging mold plate
CN203701549U (en) High-altitude large-span cantilever formwork
CN204435927U (en) A kind of Strengthening by Steel-Packing post pre-applied force device
CN204212058U (en) For the steel truss girder assembling support in the construction of steel concrete composite truss beam
CN207469744U (en) Platform constructing device
CN202766974U (en) Bent cap bearing frame without full framing
CN103821360A (en) Construction method for high-altitude long-span cantilever formwork
CN102022001A (en) Integrated binding and locating device of single-box double-chamber full span box girder reinforcing steel bar
CN211286215U (en) Assembled coincide floor of removable support
CN211396542U (en) Cantilever scaffold puts up back support system
CN113186840A (en) Combined bracket-based high pier zero-number block counter-force pre-pressing method
CN204492192U (en) A kind of building form tension and compression rod member
CN209066742U (en) A kind of superelevation daughter wall construction
CN208965578U (en) A kind of steel tower concrete pedestal
CN219604164U (en) Variable cross-section special-shaped steel tower crown mounting device
CN206828949U (en) Steel K supports hollow concrete columnar pier
CN206220322U (en) A kind of pre-stress floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20081008

Effective date of abandoning: 20110414

C20 Patent right or utility model deemed to be abandoned or is abandoned