CN201117088Y - Electric cable air pressure collecting equipment - Google Patents
Electric cable air pressure collecting equipment Download PDFInfo
- Publication number
- CN201117088Y CN201117088Y CNU200720044809XU CN200720044809U CN201117088Y CN 201117088 Y CN201117088 Y CN 201117088Y CN U200720044809X U CNU200720044809X U CN U200720044809XU CN 200720044809 U CN200720044809 U CN 200720044809U CN 201117088 Y CN201117088 Y CN 201117088Y
- Authority
- CN
- China
- Prior art keywords
- air pressure
- cable
- board
- pressure collector
- collector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200720044809XU CN201117088Y (en) | 2007-11-12 | 2007-11-12 | Electric cable air pressure collecting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200720044809XU CN201117088Y (en) | 2007-11-12 | 2007-11-12 | Electric cable air pressure collecting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201117088Y true CN201117088Y (en) | 2008-09-17 |
Family
ID=39991664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200720044809XU Expired - Fee Related CN201117088Y (en) | 2007-11-12 | 2007-11-12 | Electric cable air pressure collecting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201117088Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110007363A (en) * | 2019-05-13 | 2019-07-12 | 国网冀北电力有限公司承德供电公司 | A kind of underground cable report damage system |
-
2007
- 2007-11-12 CN CNU200720044809XU patent/CN201117088Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110007363A (en) * | 2019-05-13 | 2019-07-12 | 国网冀北电力有限公司承德供电公司 | A kind of underground cable report damage system |
CN110007363B (en) * | 2019-05-13 | 2024-05-17 | 国网冀北电力有限公司承德供电公司 | Buried cable loss reporting system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206060359U (en) | A kind of Centralized Monitoring operational system of photovoltaic power station | |
CN101788593A (en) | State monitoring and analysis system of power cable sheath grounding current and method thereof | |
CN101231526A (en) | Distributed monitoring system for running state of induction machine | |
CN203719782U (en) | Temperature monitoring device for large-scale bus duct | |
CN111077463A (en) | Balanced maintenance system for online monitoring of storage battery | |
CN204649927U (en) | A kind of primary cut-out state monitoring device | |
CN212623717U (en) | Remote energy consumption monitoring system based on raspberry group | |
CN103868564B (en) | On-line water level monitoring method and system for underground high-voltage power tunnel | |
CN201117088Y (en) | Electric cable air pressure collecting equipment | |
CN105553761A (en) | IEC61850 conformance testing hardware platform | |
CN105277903A (en) | Method for performing remote monitoring on UPS | |
CN103618563A (en) | Remote digital signal wire distribution system | |
CN207573313U (en) | A kind of photovoltaic string formation fault diagnosis and monitoring device based on resistance calculations | |
CN102411361A (en) | Acquisition and control system of engineering security automation equipment | |
CN101034027A (en) | Intelligent pressure sensor | |
CN205537770U (en) | Underground piping monitor terminal | |
CN211856784U (en) | Partial discharge distributed monitoring system | |
CN205847199U (en) | A kind of photovoltaic module on-line detecting system | |
CN102891536B (en) | Integrated electric energy management platform | |
CN202353323U (en) | Direct current monitoring system for transformer substations | |
CN104316829A (en) | Transmission line OPGW lightning locating and monitoring device | |
CN203071650U (en) | Integrated electric energy management platform | |
CN202094699U (en) | Intelligent management case for online monitoring system of distributed substation | |
CN211629933U (en) | Communication management unit and micro-grid management system | |
CN209657148U (en) | A kind of fault detection means of the automatically controlled PLC input terminal of drilling well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SUZHOU INDUSTRIAL PARK DACHENG TELECOMMUNICATION S Free format text: FORMER OWNER: SUZHOU INDUSTRIAL PARK NEW DACHENG SCIENCE AND TECHNOLOGY DEVELOPMENT CO., LTD. Effective date: 20100122 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20100122 Address after: Building 5, Luen Fat Industrial Park, 199 Tong Tao Road, Suzhou Industrial Park, Jiangsu, China: 215021 Patentee after: Dacheng Telecommunication Technology Co., Ltd. of Suzhou Industry Zone Address before: 152C, international science and Technology Park, 328 Airport Road, Suzhou Industrial Park, Jiangsu, 215021 Patentee before: Suzhou Industry Zone Xindacheng Technology Development Co., Ltd. |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080917 Termination date: 20091214 |