CN201089930Y - Pile-forming sink pipe - Google Patents

Pile-forming sink pipe Download PDF

Info

Publication number
CN201089930Y
CN201089930Y CNU2007200149609U CN200720014960U CN201089930Y CN 201089930 Y CN201089930 Y CN 201089930Y CN U2007200149609 U CNU2007200149609 U CN U2007200149609U CN 200720014960 U CN200720014960 U CN 200720014960U CN 201089930 Y CN201089930 Y CN 201089930Y
Authority
CN
China
Prior art keywords
pipe
metal
pile head
pile
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200149609U
Other languages
Chinese (zh)
Inventor
杨国龙
徐志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200149609U priority Critical patent/CN201089930Y/en
Application granted granted Critical
Publication of CN201089930Y publication Critical patent/CN201089930Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses pile-forming equipment for an immersed pipe prefabricated steel concrete pedestal pile, in particular a piling immersed pipe which is a supporting immersed pipe for various immersed pipe prefabricated steel concrete pedestal piles. The utility model is formed by a hollow pipe shaped pipe body (1), a bottom (2) circumferentially provided with at least two guide vanes (3) and a metal pile head (4), the bottom (2) is arranged on the lower end of the pipe body (1), the metal pile head (4) is arranged inside the lower end of the bottom (2), the front end of the metal pile head (4) is provided with a metal detecting stick (5), the section of the pipe body (1) is of a circle, the pipe body (1) has a multi-section type structure, two sections of adjoining pipe bodies (1) are riveted through rivets. The front end of the metal pile head is provided with one metal detecting stick, so the utility model can be used as a hard clay layer detector, and can also extrude out a very small space in the hard clay layer to contribute to the metal pile head to be extracted from the immersed pipe.

Description

Pile-formation sunken tube
Technical field
The utility model relates to a kind of pile-forming equipment of pipe sinking prefabricated steel concrete club-footed pile, and particularly a kind of pile-formation sunken tube is the supporting immersed tube of various precast reinforced concrete piles.
Background technology
In the pile foundation engineering of soft foundation, generally adopt tube-sinking cast-in-situ pile, three kinds of preformed pile and large diameter bored piles at present.And what be most widely used is tube-sinking cast-in-situ pile, when executing immersed tube is passed the weak soil layer, takes out metal pile head after reaching the design elevation hardpan, the bottom-expanding equipment of expanded bore pile is lowered to digs the scholar in the immersed tube again, fetching earth forms the expanded bore pile base cavity pocket.Can't detect immersed tube when present immersed tube is constructed at the scene and whether arrive hardpan, also there is a kind of pile-formation sunken tube at present, between the pipe shaft of this immersed tube by being threaded, but find that in practice the connection of thread between this immersed tube multisection type pipe shaft causes the junction insecure because falling into of soil arranged after use a period of time especially easily, and then influence the stability of entire equipment.For these reasons, immersed tube in the past has further improved necessity.
The utility model content
The utility model is at the problem that above-mentioned prior art exists, provide a kind of rational in infrastructure, can detect immersed tube and arrived the pile-formation sunken tube that hardpan, convenient construction and pipe shaft are connected firmly.
The utility model realizes that the technical scheme of purpose is: a kind of pile-formation sunken tube, it is by the pipe shaft of hollow tubular, along circumferentially the bottom and the metal pile head of at least two guide vanes of setting constitute, the pipe shaft lower end is located in the bottom, metal pile head is arranged on the inside, lower end of bottom, the front end of metal pile head is provided with a metal probe, the cross section of pipe shaft is circular, and pipe shaft is a multi-segment structure, passes through rivet between adjacent two sections pipe shafts.
The utility model compared with prior art, pipe shaft is a multi-segment structure, by rivet, processing technology is simple between adjacent two sections pipe shafts, cost of production is low, the good stability of equipment during use.And being provided with a metal probe at the front end of metal pile head, it both can make ground hardpan survey meter, can extrude an individual very little space again in hardpan, was beneficial to metal pile head and extracted in immersed tube.
Below in conjunction with the drawings and specific embodiments the utility model is described in further details.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model.
Among the figure 1, pipe shaft; 2, bottom; 3, guide vane; 4, metal pile head; 5, metal probe; 6, rivet.
The specific embodiment
Below embodiment of the present utility model is described in detail in conjunction with the accompanying drawings, but protection domain of the present utility model is not limit by embodiment.
As shown in Figure 1, the structure of the utility model pile-formation sunken tube is as follows, it is made of the pipe shaft 1 of hollow tubular, bottom 2 and the metal pile head 4 that the edge circumferentially is provided with two guide vanes 3 at least, and pipe shaft 1 is a multi-segment structure, rivets by rivet 6 between adjacent two sections pipe shafts 1.Pipe shaft 1 lower end is located in bottom 2, and metal pile head 4 is arranged on the inside, lower end of bottom 2, and the cross section of pipe shaft 1 is circular, and the front end of metal pile head 5 is provided with a metal probe 5.

Claims (1)

1. pile-formation sunken tube, it is by the pipe shaft (1) of hollow tubular, along circumferentially the bottom (2) and the metal pile head (4) of at least two guide vanes of setting (3) constitute, pipe shaft (1) lower end is located in bottom (2), metal pile head (4) is arranged on the inside, lower end of bottom (2), the front end of metal pile head (4) is provided with a metal probe (5), the cross section of pipe shaft (1) is circular, it is characterized in that pipe shaft (1) is a multi-segment structure, rivets by rivet (6) between adjacent two sections pipe shafts (1).
CNU2007200149609U 2007-09-29 2007-09-29 Pile-forming sink pipe Expired - Fee Related CN201089930Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200149609U CN201089930Y (en) 2007-09-29 2007-09-29 Pile-forming sink pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200149609U CN201089930Y (en) 2007-09-29 2007-09-29 Pile-forming sink pipe

Publications (1)

Publication Number Publication Date
CN201089930Y true CN201089930Y (en) 2008-07-23

Family

ID=39861689

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200149609U Expired - Fee Related CN201089930Y (en) 2007-09-29 2007-09-29 Pile-forming sink pipe

Country Status (1)

Country Link
CN (1) CN201089930Y (en)

Similar Documents

Publication Publication Date Title
CN201089930Y (en) Pile-forming sink pipe
CN201089932Y (en) Pile-forming sink pipe being suitable for coasting area
CN201089931Y (en) Pile-driving sink pipe for foundation construction
CN201121328Y (en) Assorted piling immersed pipe of prefabricated steel concrete pedestal pile
CN201089915Y (en) Pile-forming sink pipe being suitable for coasting area
CN201089938Y (en) Pile-forming sink pipe for club-footed pile
CN201089936Y (en) Pile-driving sink pipe for construction foundation construction
CN201087417Y (en) Piling immersed tube of prefabricated steel concrete bottom expanding pile for foundation construction
CN201089912Y (en) Sink pipe for construction
CN201121329Y (en) Assorted immersed pipe of prefabricated steel concrete pedestal pile
CN201137115Y (en) Positioning accurate pile-forming sinking pipe
CN201089916Y (en) Sink pipe for construction foundation construction
CN201089928Y (en) Pile-driving sink pipe for new type construction foundation construction
CN201089937Y (en) Pile-forming sink pipe for construction
CN201089926Y (en) Pile-forming sink pipe for new type club-footed pile
CN201089929Y (en) Pile-driving sink pipe for new type foundation construction
CN201121325Y (en) Novel piling immersed pipe
CN200978424Y (en) Piling sinking pipe
CN201137137Y (en) Positioning accurate pile-forming sinking pipe
CN200985508Y (en) Pile-forming sinking pipe suitable for coastal area
CN201137138Y (en) Positioning accurate pile-forming sinking pipe
CN201121327Y (en) Novel piling immersed pipe suitable for coastal area
CN201089911Y (en) Sink pipe of club-footed pile
CN200978428Y (en) Piling sinking pipe used in dirt bed
CN201089935Y (en) Sink pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080723

Termination date: 20091029