CN201071503Y - Giant frame structure conduit rack - Google Patents
Giant frame structure conduit rack Download PDFInfo
- Publication number
- CN201071503Y CN201071503Y CNU2007200256634U CN200720025663U CN201071503Y CN 201071503 Y CN201071503 Y CN 201071503Y CN U2007200256634 U CNU2007200256634 U CN U2007200256634U CN 200720025663 U CN200720025663 U CN 200720025663U CN 201071503 Y CN201071503 Y CN 201071503Y
- Authority
- CN
- China
- Prior art keywords
- huge
- giant
- post
- platform
- frame structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model relates to a supporting structure of a fixing type sea platform, more particularly a giant frame structure guide pipe frame of the fixing type sea platform in the deep sea. The guide pipe frame consists of a main frame and a sub frame; wherein, the main frame consists of a vertical post structure and 2-6 layers of girder structures, the vertical post structure consists of 6-20 vertical giant posts, and the girder structure consists of a giant beam welded on the giant post and vertical thereto; the sub frame is a platform positioned on the girder structure. The utility model has the advantages of(1) structural integrity with high rigidity, obvious force transmission, relatively huge lateral force resistance capacity, (2) even rigidity distribution, (3) simple structure, convenient construction, (4) relatively high wind resistance and vibration resistance, (5) high stability and comprehensiveness, material saving, cost reduction and economic and durable structure.
Description
(1) technical field
The utility model relates to a kind of braced structures of fixed offshore platform, particularly a kind of giant frame structure conduit rack of deep-sea fixed offshore platform.
(2) background technology
Giant frame structure is that the simple and huge truss formed with huge member or frame construction are as agent structure, the cooperative a kind of structural system of aggregated(particle) structure with other structural element compositions, its main structure is main lateral resisting system, aggregated(particle) structure is only born vertical load, and is responsible for its load of bearing is passed to main structure by huge beam.Therefore, giant frame structure is a kind of unconventional large scale structure with huge lateral resisting rigidity and integral working.Because giant frame structure has good performance, is used widely in the highrise building of land, obtains good economic and social benefit.
In recent years, because expanding economy, the demand of oil is cumulative year after year also.In order to adapt to the social development and the supply of the energy, many countries invest resourceful ocean to the sight of oil development, have built many offshore oil platforms.The platform building is subjected to the effect of multiple load in the abominable ocean of environment.Summary is got up, and causes that platform vibration and the load of destroying mainly contain following several: earthquake, wave, wind-force, ice carry and platform on the excitation load that produces of machine and equipment running.As a rule, the load that platform is subjected to is not single, but the synergy of multiple load.Under the synergy of multiple load, platform structure will produce violent vibration.The lighter allows the workman produce fear, and weight person can cause the fatigue failure of platform structure, the disaster that causes platform to collapse.
Fixed platform is the most frequently used a kind of ocean platform, and braced structures is a steel jacket, generally is the space rigid structure that is welded with the high-quality steel.Its function mainly is that the superstructure for ocean platform provides support.Electromechanical equipment has a good and lasting working environment on the platform in order to make, and just must make jacket have enough strength and stiffness, so that keep safety and stable under the effect of bearing huge superstructure gravity and environmental load.
China builds up first fixed jacket platform from 1966 in Bohai Sea Gulf, has the history in more than 40 year.The ocean platform that has completed for use in the meantime has tens, and structural shape mainly is a steel jacket formula fixed platform, is mainly used in the more shallow marine site of the depth of water.Along with oil exploration and exploitation to than deepwater field development, the development of jacket platform faces many difficulties and insoluble problem.
(1) along with the increase of the depth of water, the cost of steel conduit body panel structure can sharply rise, and marine transportation and activity duration prolong, and is subjected to the influence of environment to become big.
(2) ocean platform is vertically arranged semi girder generally, and along with increasing of structure becomes big, bending rigidity descends, and the lateral resisting ability reduces, and increase natural vibration period, moves closer to the vibration frequency of wave, therefore can cause resonance.
(3) increase of structure can make the long-pending increase of fluoran stream surface of constitution water lower part.The increase that fluoran stream surface is long-pending, drag force, inertia force and diffraction force that wave is acted on the platform increase, and increase the weight of the horizontal loading that platform bears, and cause the vibratory response that platform and integrally is excessive, finally cause the fatigue failure of platform structure.
(3) summary of the invention
The utility model is in order to overcome the deficiency of above technology, provides that a kind of each spud leg is stressed littler, and is more even under non-homogeneous level and vertical load effect, has the giant frame structure conduit rack of reasonable static characteristic.
The utility model is realized by following measure:
Giant frame structure conduit rack of the present utility model, form by main frame and time framework, its special feature is: described main frame is made up of pillar construction and 2-6 layer trussed construction, described pillar construction is that the huge post by 6~20 settings constitutes, and described trussed construction is by being welded on the huge post and constituting with the perpendicular huge beam of huge post; Inferior framework is the platform that is placed in the trussed construction top.
Giant frame structure conduit rack of the present utility model, the height of described huge post are 60-500m, and described trussed construction is a height 4-20m space lattice truss, and the floor height of trussed construction is 20-60m.Preferred version is: the height of described huge post is 100-300m, and described trussed construction is a height 5-15m space lattice truss, and the floor height of trussed construction is 30-50m.
Giant frame structure conduit rack of the present utility model, described huge post are that diameter 1000~3000mm, wall thickness are the steel pipe of 15~30mm, and described huge beam is that diameter 500~2000mm, wall thickness are the steel pipe of 10~25mm.Preferred version is: described huge post is that diameter 1500~2500mm, wall thickness are the steel pipe of 15~30mm, and described huge beam is that diameter 500~1500mm, wall thickness are the steel pipe of 10~25mm.
This utility model is introduced giant frame structure in the design of deep-sea jacket, the anti-side ability of shaking of jacket is improved greatly.This jacket is made up of main frame and time framework; Main frame is made of huge post and huge beam, is main bearing structure, has very strong anti-side rigidity, can effectively bear vertical load and opposing horizontal load; Platform superstructure and jacket main frame connect, and form time framework or aggregated(particle) structure.Inferior framework or aggregated(particle) structure are only born the load of itself and are given main frame loading transfer.The work of primary and secondary structural coordination, it is even, rational in infrastructure to constitute rigidity, the mechanical structure system that power transmission is clear and definite.This jacket is under non-homogeneous level and the effect of vertical static load lotus, and each spud leg is stressed littler, and is more even, has reasonable static characteristic; Little and the coordination of first three first order mode distortion has reasonable rigidity quality matches, does not have vibration shape distortion phenomenon to produce, and has reasonable dynamic property.
Effect of the present utility model: giant frame structure has good compliance and stock utilization efficiently, receives increasing concern.Summarize in fact, giant frame structure has following salient feature:
(1) structural entity rigidity is big, and power transmission is clear and definite, has stronger lateral resisting ability.
(2) Stiffness Distribution is even, has reasonable reconciling spatial scale.
(3) simple in structure, easy construction is convenient to shorten construction period.
(4) have reasonable wind resistance, anti-seismic performance.
(5) have bigger stability and higher combination property, can save material, reduce cost, make the works economy and durability.
(4) description of drawings
Fig. 1 is the structural representation of the utility model embodiment 1
Fig. 2 is the structural representation of the utility model embodiment 2
Fig. 3 is the structural representation of the utility model embodiment 3
(5) specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is made specific description.
Embodiment 1:
The huge shelf structure jacket of this example as shown in Figure 1, is made up of main frame and time framework, described main frame is made up of pillar construction and 3 layers of trussed construction, described pillar construction is that the huge post by 6 settings constitutes, and 6 huge posts divide two rows, 3 of every rows.Described trussed construction is by being welded on the huge post and constituting with the perpendicular huge beam of huge post, and upper brace is placed in the trussed construction top as time framework.
The height of mud line upper conduit frame is 70m, and the huge post of jacket is diameter 1397mm, the steel pipe of wall thickness 20mm; Huge beam is diameter 635mm, the space lattice truss that the steel pipe of wall thickness 19.05mm constitutes, and totally three layers, be arranged in 25m, 50m and 70m place (as shown in Figure 1) on the mud face, the floor height of the huge beam in three roads is respectively 5m, 5m and 4m; The steel pipe of upper brace employing and same material of huge post and size is as column.Girder H1200 * 350 shaped steel that connect each column.
Embodiment 2:
The huge shelf structure jacket of this example as shown in Figure 2, is made up of main frame and time framework, described main frame is made up of pillar construction and 3 layers of trussed construction, described pillar construction is that the huge post by 16 settings constitutes, and 16 huge posts divide four rows, 4 of every rows.Described trussed construction is by being welded on the huge post and constituting with the perpendicular huge beam of huge post, and upper brace is placed in the trussed construction top as time framework.
The height of mud line upper conduit frame is 110m, and the huge post of jacket is diameter 1524mm, the steel pipe of wall thickness 20mm; Huge beam is diameter 660.4mm, the space lattice truss that the steel pipe of wall thickness 19.05mm constitutes, and totally three layers, be arranged in 37.5m, 75m and 110m place (as shown in Figure 2) on the mud face, the floor height of the huge beam in three roads is respectively 12.5m, 12.5m and 7m; The steel pipe of upper brace employing and same material of huge post and size is as column.Girder H1200 * 350 shaped steel that connect each column.
Embodiment 3:
The huge shelf structure jacket of this example as shown in Figure 3, is made up of main frame and time framework, described main frame is made up of pillar construction and 5 layers of trussed construction, described pillar construction is that the huge post by 20 settings constitutes, and 20 huge posts divide five rows, 4 of every rows.Described trussed construction is by being welded on the huge post and constituting with the perpendicular huge beam of huge post, and upper brace is placed in the trussed construction top as time framework.
The height of mud line upper conduit frame is 300m, and the huge post of jacket is diameter 2794mm, the steel pipe of wall thickness 25.4mm; Huge beam is diameter 1524mm, the space lattice truss that the steel pipe of wall thickness 20mm constitutes, totally five layers, the floor height that is arranged in the huge beam in following four roads in 60m, 120m on the mud face, 180m, 240m and 300m place (as shown in Figure 3) is 20m, and going up together most, the floor height of huge beam is 15m; The steel pipe of upper brace employing and same material of huge post and size is as column.Girder H1200 * 350 shaped steel that connect each column.
Claims (5)
1. giant frame structure conduit rack, form by main frame and time framework, it is characterized in that: described main frame is made up of pillar construction and 2-6 layer trussed construction, described pillar construction is that the huge post by 6~20 settings constitutes, and described trussed construction is by being welded on the huge post and constituting with the perpendicular huge beam of huge post; Inferior framework is the platform that is placed in the trussed construction top.
2. giant frame structure conduit rack according to claim 1 is characterized in that: the height of the huge post of described exhibition is 60-360m, and described trussed construction is a height 4-20m space lattice truss, and the floor height of trussed construction is 20-60m.
3. giant frame structure conduit rack according to claim 2 is characterized in that: the height of described huge post is 100-300m, and described trussed construction is a height 5-15m space lattice truss, and the floor height of trussed construction is 30-50m.
4. according to claim 1,2 or 3 described giant frame structure conduit racks, it is characterized in that: described huge post is that diameter 1000-3000mm, wall thickness are the steel pipe of 15-30mm, and described huge beam is that diameter 500-2000mm, wall thickness are the steel pipe of 10-25mm.
5. giant frame structure conduit rack according to claim 4 is characterized in that: described huge post is that diameter 1500-2500mm, wall thickness are the steel pipe of 15-30mm, and described huge beam is that diameter 500-1500mm, wall thickness are the steel pipe of 10-25mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200256634U CN201071503Y (en) | 2007-08-01 | 2007-08-01 | Giant frame structure conduit rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200256634U CN201071503Y (en) | 2007-08-01 | 2007-08-01 | Giant frame structure conduit rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201071503Y true CN201071503Y (en) | 2008-06-11 |
Family
ID=39550059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200256634U Expired - Fee Related CN201071503Y (en) | 2007-08-01 | 2007-08-01 | Giant frame structure conduit rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201071503Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102235548A (en) * | 2010-05-07 | 2011-11-09 | 中国海洋石油总公司 | Installation device for deepwater stand pipes and underwater facilities |
CN102235549A (en) * | 2010-05-07 | 2011-11-09 | 中国海洋石油总公司 | Main body tower of pipe-laying ship |
CN109281307A (en) * | 2018-11-10 | 2019-01-29 | 重庆大学 | A kind of offshore jacket platforms anti-seismic structure new system containing buckling restrained brace |
CN113236141A (en) * | 2021-06-08 | 2021-08-10 | 中国海洋石油集团有限公司 | Surface layer conduit bearing capacity reinforcing device and operation method thereof |
-
2007
- 2007-08-01 CN CNU2007200256634U patent/CN201071503Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102235548A (en) * | 2010-05-07 | 2011-11-09 | 中国海洋石油总公司 | Installation device for deepwater stand pipes and underwater facilities |
CN102235549A (en) * | 2010-05-07 | 2011-11-09 | 中国海洋石油总公司 | Main body tower of pipe-laying ship |
CN102235548B (en) * | 2010-05-07 | 2013-04-24 | 中国海洋石油总公司 | Installation device for deepwater stand pipes and underwater facilities |
CN109281307A (en) * | 2018-11-10 | 2019-01-29 | 重庆大学 | A kind of offshore jacket platforms anti-seismic structure new system containing buckling restrained brace |
CN113236141A (en) * | 2021-06-08 | 2021-08-10 | 中国海洋石油集团有限公司 | Surface layer conduit bearing capacity reinforcing device and operation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | Numerical analysis of a vessel-shaped offshore fish farm | |
Ren et al. | Hydrodynamic analysis of a modular multi-purpose floating structure system with different outermost connector types | |
Chu et al. | Hydrodynamic response analysis of combined spar wind turbine and fish cage for offshore fish farms | |
CN109914593A (en) | A kind of Self-resetting beam column friction energy-dissipating node structure and its construction method | |
CN102535672B (en) | Novel hybrid huge anti-seismic structure and construction method thereof | |
CN201071503Y (en) | Giant frame structure conduit rack | |
ES2387342A1 (en) | Semi-submersible triangular platform for use in the open sea | |
CN202202410U (en) | Cross-shaped abnormal joint formed by connection of steel structure box column, box beam and I beam | |
Copple et al. | Tension leg wind turbine (TLWT) conceptual design suitable for a wide range of water depths | |
Yue et al. | Analysis of the wave load and dynamic response of a new semi-submersible wave-energy-powered aquaculture platform | |
CN202466883U (en) | Novel combined type large-size anti-seismic structure | |
Bai et al. | Conceptual design, parameter optimization and performance investigation of a 10MW semi-submersible floating wind turbine in shallow water | |
Le et al. | Air-floating towing behaviors of multi-bucket foundation platform | |
CN201962801U (en) | Shock-reducing and isolating rubber support of steel-lead combined core | |
Cheng et al. | Hydrodynamic investigation on a single-point moored offshore cage-wave energy converter hybrid system | |
Ruzzo et al. | Analysis of the Coupled Dynamics of an Offshore Floating Multi-Purpose Platform: Part B—Hydro-Elastic Analysis with Flexible Support Platform | |
CN205777792U (en) | The T-shaped antivibrator of precast construction node energy-dissipating and shock-absorbing | |
CN201738231U (en) | Post plate type hollow high pier | |
CN101101084A (en) | Giant frame structure conduit rack | |
Wang et al. | Concept design of a new Non-Ship-Shaped FPSO | |
CN210636844U (en) | Reinforced supporting structure for constructional engineering | |
CN206485531U (en) | A kind of many floating body semi-submersible lng floating platforms of ultra-large type | |
Sinsabvarodom et al. | The innovative hybrid Cell-Truss Spar Buoy Platform for moderate water depth | |
Demirbilek | Design formulae for offset, set down and tether loads of a tension leg platform (TLP) | |
CN111379458B (en) | Design method and structure of concrete rectangular liquid storage structure with large height-width ratio |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080611 Termination date: 20100801 |