CN201060217Y - Electrical energy meter multifunctional wiring box - Google Patents

Electrical energy meter multifunctional wiring box Download PDF

Info

Publication number
CN201060217Y
CN201060217Y CNU2007201229920U CN200720122992U CN201060217Y CN 201060217 Y CN201060217 Y CN 201060217Y CN U2007201229920 U CNU2007201229920 U CN U2007201229920U CN 200720122992 U CN200720122992 U CN 200720122992U CN 201060217 Y CN201060217 Y CN 201060217Y
Authority
CN
China
Prior art keywords
terminal
voltage
energy meter
electric current
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201229920U
Other languages
Chinese (zh)
Inventor
姜琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201229920U priority Critical patent/CN201060217Y/en
Application granted granted Critical
Publication of CN201060217Y publication Critical patent/CN201060217Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

The utility model discloses an electrical energy meter multifunctional junction box, which belongs to the junction box. The utility model aims at providing a junction box with convenient operation and effective work for spot verification and changing a three-phase electrical energy meter. The utility model includes a box body, a terminal, and a connecting piece. Three large cavities and a small cavity are arranged in the box body 3. A current wire incoming terminal 13 and a current wire outgoing terminal 5, a voltage wire incoming terminal 10 and a voltage wire outgoing terminal 7, and a current terminal 9 are arranged in the large cavity. The voltage wire incoming terminal 10 and the voltage wire outgoing terminal 7 are arranged in the small cavity. A current connecting piece 14, a voltage connecting piece 8, and a connecting piece 12 are respectively communicated with the current wire incoming and outgoing terminals, the voltage wire incoming and outgoing terminals, and the current wire incoming terminal 13 and the current terminal 9. The utility model is used in conjunction with various electrical energy meters, and is an ideal electrical energy meter junction box.

Description

The multi-functional wiring box of electric energy meter
Technical field:
The utility model relates to a kind of terminal box, relates in particular to a kind of terminal box that is used for field-checking, changes three-phase electric energy meter.
Background technology:
At present, the three-phase electric energy meter that electric system adopts adopts mostly through mutual inductor access type electric energy meter, its mounting means is: with screw electric energy meter is fixed on the measuring screen panel, and the secondary circuit of electric current, voltage drawn by mutual inductor be connected on the secondary terminal row or associating terminal box that is positioned at measuring screen, and then secondary terminal row or associating terminal box are connected with the electric current of electric energy meter, the ramp of voltage end with lead.Because the electric current secondary loop of mutual inductor allows open circuit anything but, the voltage secondary circuit allows short-circuit conditions anything but and takes place, therefore verification at the scene, very inconvenient when changing three-phase electric energy meter, major defect is:
1. must finish jointly by three people, the one man operation calibration equipment, a people carries out the connection of standard electric energy meter secondary circuit, people monitoring;
When 2. carrying out the connection of standard electric energy meter secondary circuit, must can operate around behind to measuring screen, cumbersome;
3. find out exactly by the pairing connection terminal of verification electric energy meter in must be from the measuring screen numerous connection box of electric energy meter terminals, adopt the switching of wiring fork then, make mistakes easily and inefficiency.
Summary of the invention:
At the above-mentioned defective that exists in the prior art, the utility model aims to provide a kind of electric energy meter below, multi-functional wiring box of electric energy meter easy to operate, high efficiency of being installed in.
To achieve these goals, the utility model by the following technical solutions: it comprises box body, connection terminal and brace; Be provided with three big die cavities and a little die cavity in the box body, be provided with an electric current input terminal and electric current outlet terminal, voltage input terminal and voltage outlet terminal and a current terminal in described each big die cavity, in described little die cavity, be provided with a voltage input terminal and voltage outlet terminal; Electric current is into and out of between the line terminals, and voltage is into and out of between the line terminals, and is communicated with by electric current brace, voltage brace and brace respectively between electric current input terminal and the current terminal.
Top at box body is provided with binding post corresponding to each connection terminal place, and each binding post connects with corresponding connection terminal respectively; Bottom at electric current input terminal, voltage input terminal and current terminal is equipped with wiring hole; On electric current input terminal, electric current outlet terminal and voltage input terminal, be respectively equipped with a jack screw.
Compared with the prior art, the utility model is owing to directly be inserted into the below of electric energy meter by binding post, therefore before table, can realize the operation of verification, replacing electric energy meter, not only can increase work efficiency greatly, reduce the accident risk that causes the secondary circuit open circuit to be caused because of the wrong circuit, but also reduce the operation number effectively.
Description of drawings:
Fig. 1 is the scheme of installation of traditional electric energy meter;
Fig. 2 is the scheme of installation of the utility model and electric energy meter;
Fig. 3 is the side view of Fig. 2;
Fig. 4 is a structural representation of the present utility model;
Fig. 5 is the A-A cut-open view among Fig. 4;
Fig. 6 is the B-B cut-open view among Fig. 4;
Fig. 7 is the C-C cut-open view among Fig. 4.
Among the figure: electric energy meter 1 measuring screen 2 box bodys 3 terminal rows 4 electric current outlet terminals 5 binding posts 6 voltage outlet terminals 7 voltage braces 8 current terminals 9 voltage input terminals 10 jack screw 11 braces 12 electric current input terminals 13 electric current braces 14 wiring holes 15
Embodiment:
The utility model is described in further detail below in conjunction with accompanying drawing and specific embodiment:
In Fig. 4~7: be provided with a little die cavity and three big die cavities that structure is identical in the box body 3, in described each big die cavity, be provided with an electric current input terminal 13 and electric current outlet terminal 5, voltage input terminal 10 and a voltage outlet terminal 7 and a current terminal 9, in described little die cavity, be provided with a voltage input terminal 10 and a voltage outlet terminal 7.Electric current input terminal 13 is positioned at the below of electric current outlet terminal 5, and electric current brace 14 is communicated with by be installed on the electric current input terminal 13 slidably by screw between the two-terminal; Voltage input terminal 10 is positioned at the below of voltage outlet terminal 7, and voltage brace 8 is communicated with by be installed on the voltage input terminal 10 slidably by screw between the two-terminal; Brace 12 is communicated with by be installed on the current terminal 9 slidably by screw between current terminal 9 and the electric current input terminal 13.
For easy to use, the position on the top of box body 3 corresponding to each connection terminal is provided with binding post 6, each binding post 6 respectively with corresponding connection terminal by being threaded; For the ease of wiring, be equipped with wiring hole 15 in the bottom of electric current input terminal 13, voltage input terminal 10 and current terminal 9.For the ease of the connection of standard scale, on each electric current input terminal 13, electric current outlet terminal 5 and voltage input terminal 10, be respectively equipped with a jack screw 11.
Be not difficult to find out that from Fig. 1 traditional mounting means is all cumbersome for verification, replacing electric energy meter 1, must can carry out around the back to measuring screen 2; Mounting means shown in employing Fig. 2,3 is then very simple, only needs binding post 6 of the present utility model is directly inserted in the wiring hole of electric energy meter 1 correspondence, by lead the utility model is connected with the terminal row 4 that is positioned at measuring screen 2 then to get final product; The all working of verification, replacing electric energy meter 1 all can be finished before table, and is very convenient.
Because the principle of work of A, the B of electric energy meter, C three-phase measuring sensor is identical, be example only therefore with the A phase measuring sensor of electric energy meter, principle of work of the present utility model is illustrated:
During operate as normal, upwards promote electric current brace 14, make being communicated with of electric current input terminal 13 and electric current outlet terminal 5; Upwards promote voltage brace 8, voltage input terminal 10 is communicated with voltage outlet terminal 7; Promote brace 12 to the right, current terminal 9 and electric current input terminal 13 are disconnected.At this moment, electric current enters the A phase current coil of electric energy meter 1 by electric current input terminal 13, electric current outlet terminal 5 from the binding post 6 that is connected with this terminal, then by another root binding post 6, current terminal 9 outflows from being connected with this binding post 6; The A phase voltage enters the A phase voltage coil of electric energy meter 1 by voltage input terminal 10, voltage outlet terminal 7 and the binding post 6 that is connected with voltage outlet terminal 7.
At the scene during the verification electric energy meter, with in the jack screw 11 on the current return inlet wire plug insertion electric current input terminal 13 of standard electric energy meter A phase measuring sensor, with in the jack screw 11 on the current return outlet plug insertion electric current outlet terminal 5, with in the jack screw 11 on the voltage circuit plug insertion voltage outlet terminal 7, promote electric current brace 14 then downwards, electric current input terminal 13 and electric current outlet terminal 5 are disconnected; At this moment, standard electric energy meter with worked under same electric current, voltage by verification electric energy meter 1.After verification finishes, upwards promote electric current brace 14, electric current input terminal 13 is communicated with electric current outlet terminal 5, extract standard electric energy meter A phase measuring sensor electric current, the voltage circuit plug gets final product.
Carry out electric energy meter when changing, promote brace 12 left, current terminal 9 is communicated with electric current input terminal 13 sons, owing to current return by short circuit, the A phase current coil of electric energy meter 1 does not have electric current to be passed through; Promote to connect the voltage brace 8 of voltage input terminal 10 and voltage outlet terminal 7 then downwards, voltage circuit is disconnected, unscrew the housing screw of electric energy meter 1 connection terminal, take off electric energy meter 1 and change new electric energy meter, tighten the housing screw of connection terminal; Upwards promote voltage brace 8 then, disconnect the brace 12 that connects current terminal 9 and electric current input terminal 13 and get final product.

Claims (3)

1. the multi-functional wiring box of electric energy meter comprises box body, connection terminal and brace; It is characterized in that: be provided with three big die cavities and a little die cavity in the box body (3), be provided with an electric current input terminal (13) and electric current outlet terminal (5), a voltage input terminal (10) and voltage outlet terminal (7) and a current terminal (9) in described each big die cavity, in described little die cavity, be provided with a voltage input terminal (10) and voltage outlet terminal (7); Electric current is into and out of between line terminals (13), (5), voltage is into and out of between line terminals (10), (7), and is communicated with by electric current brace (14), voltage brace (8) and brace (12) respectively between electric current input terminal (13) and the current terminal (9).
2. the multi-functional wiring box of electric energy meter according to claim 1 is characterized in that: the top at box body (3) is provided with binding post (6) corresponding to each connection terminal place, and each binding post (6) connects with corresponding connection terminal respectively; Bottom at electric current input terminal (13), voltage input terminal (10) and current terminal (9) is equipped with wiring hole (15).
3. the multi-functional wiring box of electric energy meter according to claim 1 and 2 is characterized in that: be respectively equipped with a jack screw (11) on electric current input terminal (13), electric current outlet terminal (5) and voltage input terminal (10).
CNU2007201229920U 2007-06-01 2007-06-01 Electrical energy meter multifunctional wiring box Expired - Fee Related CN201060217Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201229920U CN201060217Y (en) 2007-06-01 2007-06-01 Electrical energy meter multifunctional wiring box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201229920U CN201060217Y (en) 2007-06-01 2007-06-01 Electrical energy meter multifunctional wiring box

Publications (1)

Publication Number Publication Date
CN201060217Y true CN201060217Y (en) 2008-05-14

Family

ID=39408699

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201229920U Expired - Fee Related CN201060217Y (en) 2007-06-01 2007-06-01 Electrical energy meter multifunctional wiring box

Country Status (1)

Country Link
CN (1) CN201060217Y (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102798743A (en) * 2012-08-29 2012-11-28 重庆市电力公司电力科学研究院 Wiring terminal box for electric energy meter
CN102798838A (en) * 2012-08-29 2012-11-28 重庆市电力公司电力科学研究院 Pluggable safety junction box for site calibration of electric energy meter
CN102998499A (en) * 2012-12-11 2013-03-27 上海市电力公司 Electric measuring instrument wiring combined device suitable for operation on pole
CN103163342A (en) * 2013-02-01 2013-06-19 中南仪表有限公司 Power supply connection box of electric energy meter
CN103616538A (en) * 2013-12-20 2014-03-05 华威博奥电力设备有限公司 Combined module for plug electric connection of intelligent electricity meter
WO2014040523A2 (en) * 2012-09-13 2014-03-20 国家电网公司 Composite intelligent terminal wiring device and plug device
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN103941060A (en) * 2014-05-16 2014-07-23 国家电网公司 Connection terminal box and connector
CN103969480A (en) * 2014-05-06 2014-08-06 国网上海市电力公司 Junction box special for 35kV and over 35kV metering device
CN104793029A (en) * 2015-05-05 2015-07-22 国家电网公司 Spring compression type electric energy measuring and wiring device with control loop access function
CN105375120A (en) * 2015-11-30 2016-03-02 国网北京市电力公司 Junction box
CN105375416A (en) * 2015-11-30 2016-03-02 国网北京市电力公司 Junction box
CN105391010A (en) * 2015-11-30 2016-03-09 国网北京市电力公司 Junction box
CN108490231A (en) * 2018-03-30 2018-09-04 上海电力学院 One kind dividing rod-type electric energy metering combined wiring box
CN110247207A (en) * 2019-01-16 2019-09-17 国网浙江省电力有限公司宁波供电公司 It is a kind of for measuring and the connecting terminal of afterflow
CN110361575A (en) * 2019-08-28 2019-10-22 广东电网有限责任公司 A kind of terminal box
CN112924734A (en) * 2021-02-01 2021-06-08 宁夏隆基宁光仪表股份有限公司 Intelligent ammeter with anti-oxidation function and installation method thereof

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102798743A (en) * 2012-08-29 2012-11-28 重庆市电力公司电力科学研究院 Wiring terminal box for electric energy meter
CN102798838A (en) * 2012-08-29 2012-11-28 重庆市电力公司电力科学研究院 Pluggable safety junction box for site calibration of electric energy meter
CN102798838B (en) * 2012-08-29 2015-06-10 重庆市电力公司电力科学研究院 Pluggable safety junction box for site calibration of electric energy meter
WO2014040523A2 (en) * 2012-09-13 2014-03-20 国家电网公司 Composite intelligent terminal wiring device and plug device
US9385445B2 (en) 2012-09-13 2016-07-05 State Grid Corporation Of China (Sgcc) Composite intelligent terminal wiring device and plug device
WO2014040523A3 (en) * 2012-09-13 2014-05-08 国家电网公司 Composite intelligent terminal wiring device and plug device
CN102998499A (en) * 2012-12-11 2013-03-27 上海市电力公司 Electric measuring instrument wiring combined device suitable for operation on pole
CN103163342A (en) * 2013-02-01 2013-06-19 中南仪表有限公司 Power supply connection box of electric energy meter
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN103698733B (en) * 2013-09-18 2016-08-17 国家电网公司 A kind of test connection terminal assemblies for electric energy metrical
CN103616538A (en) * 2013-12-20 2014-03-05 华威博奥电力设备有限公司 Combined module for plug electric connection of intelligent electricity meter
CN103969480A (en) * 2014-05-06 2014-08-06 国网上海市电力公司 Junction box special for 35kV and over 35kV metering device
CN103941060A (en) * 2014-05-16 2014-07-23 国家电网公司 Connection terminal box and connector
CN104793029A (en) * 2015-05-05 2015-07-22 国家电网公司 Spring compression type electric energy measuring and wiring device with control loop access function
CN105375416A (en) * 2015-11-30 2016-03-02 国网北京市电力公司 Junction box
CN105391010A (en) * 2015-11-30 2016-03-09 国网北京市电力公司 Junction box
CN105375120A (en) * 2015-11-30 2016-03-02 国网北京市电力公司 Junction box
CN105375120B (en) * 2015-11-30 2018-04-03 国网北京市电力公司 Terminal box
CN105391010B (en) * 2015-11-30 2018-11-06 国网北京市电力公司 Terminal box
CN108490231A (en) * 2018-03-30 2018-09-04 上海电力学院 One kind dividing rod-type electric energy metering combined wiring box
CN110247207A (en) * 2019-01-16 2019-09-17 国网浙江省电力有限公司宁波供电公司 It is a kind of for measuring and the connecting terminal of afterflow
CN110361575A (en) * 2019-08-28 2019-10-22 广东电网有限责任公司 A kind of terminal box
CN112924734A (en) * 2021-02-01 2021-06-08 宁夏隆基宁光仪表股份有限公司 Intelligent ammeter with anti-oxidation function and installation method thereof

Similar Documents

Publication Publication Date Title
CN201060217Y (en) Electrical energy meter multifunctional wiring box
CN207650253U (en) A kind of Multifunctional measuring special junction box
CN109001511B (en) Micro-ammeter
CN104749548A (en) Dual-purpose quick wiring testing meter rack of three-phase electric energy meter
CN106249045A (en) A kind of wide-range electric power meter and metering method thereof
CN202854191U (en) Composite-type intelligent terminal wiring device
CN2824059Y (en) Test connecting box for single phase electric energy meter with mutual inductor
CN2810027Y (en) Intelligent energy-saving motor control cabinet
CN204761391U (en) Photovoltaic collector shoe gear
CN201307144Y (en) Switch cabinet electrical test bench
CN201075334Y (en) Three-phase zero sequence mutual inductor
CN202362371U (en) Anti-electricity-theft electric energy meter
CN207318604U (en) A kind of load monitoring device for power distribution network
CN112366527A (en) Miniaturized module integrated 400V low-voltage switch cabinet
CN202383216U (en) Detection tooling for transformer and rectifier
CN201966557U (en) High-capacity jack box
CN206283127U (en) The highly integrated high-voltage DC power supply cabinet of data center
CN204705662U (en) Multi-functionally connect box soon
CN204668734U (en) Compact-type high-pressure metering cabinet
CN205069355U (en) Three -phase low pressure voltage transformer
CN211351713U (en) No-load switching reactive compensation capacity adjusting device
CN203551657U (en) Electric energy meter with built-in transformers
CN215600213U (en) Novel three-phase common-body voltage transformer secondary measurement and protection winding wiring structure
CN211856691U (en) U-shaped manganin shunt
CN213240289U (en) Three-phase four-wire electric energy meter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080514

Termination date: 20130601