CN201053205Y - Postposition type stainless steel settlement observation structure - Google Patents

Postposition type stainless steel settlement observation structure Download PDF

Info

Publication number
CN201053205Y
CN201053205Y CNU2007201112118U CN200720111211U CN201053205Y CN 201053205 Y CN201053205 Y CN 201053205Y CN U2007201112118 U CNU2007201112118 U CN U2007201112118U CN 200720111211 U CN200720111211 U CN 200720111211U CN 201053205 Y CN201053205 Y CN 201053205Y
Authority
CN
China
Prior art keywords
stainless steel
stainless
settlement observation
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201112118U
Other languages
Chinese (zh)
Inventor
董利华
宋国台
徐年福
董育健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Original Assignee
ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd filed Critical ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Priority to CNU2007201112118U priority Critical patent/CN201053205Y/en
Application granted granted Critical
Publication of CN201053205Y publication Critical patent/CN201053205Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The utility model relates to a rear-set type stainless steel settlement observation structure; pylomes arranged in a main body structure are connected with a stainless thread sleeve through a cemented layer; an inside hexagonal bolt is arranged inside and matched with the stainless thread sleeve by screw threads. Stainless panels are arranged on the pylomes of the main body structure and the outer sidewall of the stainless thread sleeve; the surfaces of the stainless panels are marked with settlement point numbers and are attractive in appearance and bring convenience for the recording and sorting of measuring results. The utility model has the advantages of simple structure, attractive appearance, firmness, stability, uneasy deformation, no rust and corrosion and high measuring precision. When the settling amount is measured, the inside hexagonal bolt is screwed out by 15 mm to 30 mm; after the measurement is finished, the inside hexagonal bolt is tightly screwed, therefore the measuring accuracy can be ensured and the observing point can be prevented from being destroyed in a non-measuring period.

Description

Rear-mounted stainless steel settlement observation structure
Technical field
The utility model relates to the workmanship detection range, mainly is a kind of rear-mounted stainless steel settlement observation structure.
Background technology
In the prior art, designing unit, unit in charge of construction often adopt steel bar end, band iron or galvanizing steel to do processing slightly as the settlement observation point device in design or construction.In construction and use, these settlement observation points tend to suffer destroy, lose or corrosion owing to lack effectively protection, cause settlement measurement inaccurate or can't carry out settlement observation, have had a strong impact on the monitoring to workmanship.
Summary of the invention
The utility model will solve above-mentioned existing shortcoming, and a kind of rear-mounted stainless steel settlement observation structure is provided, come into operation from constructing to a kind of rear-mounted stainless steel observation point of stage settlement observation of industry and civilian construction agent structure.
The utility model solves the technical scheme that its technical problem adopts: this rear-mounted stainless steel settlement observation structure, be connected with the stainless steel screw shell by glued layer in the through hole in the described agent structure, be provided with the hexagon socket head cap screw that is threaded engagement with it in the stainless steel screw shell.
The lateral wall of described agent structure through hole and stainless steel screw shell is provided with stainless steel faceplate, and the surface indicates the settlement point numbering, and good looking appearance offers convenience to measurement result record and arrangement simultaneously.
All devices all adopt stainless steel to make in the settlement observation structure, and in natural environment, observation point can not influence accuracy of observation because of corrosion.
The stainless steel screw shell adopts the chemically-planted steel bar formula to be connected with agent structure, as bridging agent, guarantees screw shell and structure firm and reliable connection with the epoxy radicals anchor adhesive.
The utility model beneficial effect is: the utility model simple structure, and good looking appearance, firm stable, not yielding can corrosion, the certainty of measurement height.When settling amount is measured, hexagon socket head cap screw is screwed out 15~30mm, measurement finishes, and hexagon socket head cap screw is screwed, and has so both guaranteed the accuracy measured, protects observation point not wreck in the non-measurement phase again.
Description of drawings
Fig. 1 is the utility model cross-sectional view;
Fig. 2 is a stainless steel settlement observation point assembly front elevation view in the utility model.
Description of symbols: the 1-glued layer, 2-stainless steel screw shell, the 3-stainless steel faceplate, 4-hexagon socket head cap screw, 5-are agent structures.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
As shown in the figure, this rear-mounted stainless steel settlement observation structure, be connected with stainless steel screw shell 2 by glued layer 1 in the through hole in the described agent structure 5, the stainless steel screw shell adopts the chemically-planted steel bar formula to be connected with agent structure, as adhesive material, guarantee stainless steel screw shell 2 and agent structure 5 firm and reliable connection with the epoxy radicals anchor adhesive.Agent structure 5 is structural column or brick wall, is provided with the hexagon socket head cap screw 4 that is threaded engagement with it in the stainless steel screw shell 2, and promptly settlement point hexagon socket head cap screw 4 adopts long 50mm silk mouth to be connected with stainless steel screw shell 2.
The lateral wall of described agent structure 5 through holes and stainless steel screw shell 2 is provided with stainless steel faceplate 3, and the surface indicates the settlement point numbering, good looking appearance, and record when being convenient to measure is difficult for survey data is misremembered.
After major structure of construction construction extremely to a certain degree (generally being that first floor structure construction finishes), getting diameter with Churn drill on the post (brick wall) of design attitude is 45~50mm, the horizontal circular hole of dark 80mm, earlier foreign material in the hole are cleaned out, insert an amount of epoxy radicals anchor adhesive then, implant stainless steel screw shell 2, note keeping stainless steel screw shell 2 levels; After treating that anchor adhesive reaches certain intensity, hexagon socket head cap screw 4 precession screw shells can be loaded onto stainless steel faceplate 3 simultaneously.During settlement observation, hexagon socket head cap screw 4 (observation point) is screwed out 15~30mm, measure the peak of observation point, and carry out record (comprising the observation point numbering, measured value etc.) measurement and finish, observation point is screwed with hexagon socket head cap screw 4.So both guaranteed the accuracy measured, and protected observation point not wreck again in the non-measurement phase.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.

Claims (2)

1. rear-mounted stainless steel settlement observation structure, it is characterized in that: be connected with stainless steel screw shell (2) by glued layer (1) in the through hole in the described agent structure (5), be provided with the hexagon socket head cap screw (4) that is threaded engagement with it in the stainless steel screw shell (2).
2. rear-mounted stainless steel settlement observation structure according to claim 1 is characterized in that: the lateral wall of described agent structure (5) through hole and stainless steel screw shell (2) is provided with stainless steel faceplate (3).
CNU2007201112118U 2007-06-27 2007-06-27 Postposition type stainless steel settlement observation structure Expired - Fee Related CN201053205Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201112118U CN201053205Y (en) 2007-06-27 2007-06-27 Postposition type stainless steel settlement observation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201112118U CN201053205Y (en) 2007-06-27 2007-06-27 Postposition type stainless steel settlement observation structure

Publications (1)

Publication Number Publication Date
CN201053205Y true CN201053205Y (en) 2008-04-30

Family

ID=39392870

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201112118U Expired - Fee Related CN201053205Y (en) 2007-06-27 2007-06-27 Postposition type stainless steel settlement observation structure

Country Status (1)

Country Link
CN (1) CN201053205Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545271B (en) * 2009-03-21 2011-01-26 标力建设集团有限公司 Telescopic type settlement observer
CN104060715A (en) * 2014-06-24 2014-09-24 山东万斯达建筑工业化研究院有限公司 On-site construction method for sandwich composite wall
CN105698753A (en) * 2016-03-14 2016-06-22 江苏建筑职业技术学院 Settlement observation device capable of preventing collision damage and use and safekeeping method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545271B (en) * 2009-03-21 2011-01-26 标力建设集团有限公司 Telescopic type settlement observer
CN104060715A (en) * 2014-06-24 2014-09-24 山东万斯达建筑工业化研究院有限公司 On-site construction method for sandwich composite wall
CN105698753A (en) * 2016-03-14 2016-06-22 江苏建筑职业技术学院 Settlement observation device capable of preventing collision damage and use and safekeeping method

Similar Documents

Publication Publication Date Title
CN207123254U (en) A kind of steel pipe end surface detection tool for detecting verticality of internal expansion type positioning
CN201053205Y (en) Postposition type stainless steel settlement observation structure
CN204612719U (en) A kind of settlement observer
CN206208887U (en) Many depth multi objective soil properties detect bar
CN210141839U (en) Embedded type crack meter for geotechnical engineering
CN216433758U (en) Portable material strength detector
CN106370818A (en) Multi-depth multi-index soil property detection rod
CN201233238Y (en) Settlement observation device for buildings
CN206989941U (en) A kind of measurement apparatus for being used to measure seam structure on two sides thing height difference
CN211505501U (en) Portable soil detector
CN205982396U (en) Many specifications of breakdown electrography
CN206056480U (en) Thread measurement instrument
CN210893229U (en) A can assembled detection device for rain sewage well pipeline
CN207502276U (en) A kind of reisilometer
CN212109859U (en) Threaded hole depth detection device
CN206709824U (en) A kind of building subsidence observation point device assembly
CN208998714U (en) A kind of chassis stone, chuck stone bury detecting structure
CN204007588U (en) The servicing unit of levelling pole
CN109489528B (en) Threaded hole depth detection device
CN205483392U (en) Pressure transducer
CN210922582U (en) Level mark
CN205784997U (en) A kind of inspection deep hole internal diameter facilitates appliance special for detecting
CN207379430U (en) A kind of detecting tool of output shaft screw
CN215639353U (en) Wall thickness monitoring device for building monitoring
CN210922414U (en) Threaded hole inspection rod for inspecting position of extended tolerance zone

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080430

Termination date: 20140627

EXPY Termination of patent right or utility model