CN201043271Y - Sink preventing and leveling device for installation of offshore platform pile pipe frame - Google Patents

Sink preventing and leveling device for installation of offshore platform pile pipe frame Download PDF

Info

Publication number
CN201043271Y
CN201043271Y CNU2007201488713U CN200720148871U CN201043271Y CN 201043271 Y CN201043271 Y CN 201043271Y CN U2007201488713 U CNU2007201488713 U CN U2007201488713U CN 200720148871 U CN200720148871 U CN 200720148871U CN 201043271 Y CN201043271 Y CN 201043271Y
Authority
CN
China
Prior art keywords
chassis
skirtboard
offshore platform
apron board
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007201488713U
Other languages
Chinese (zh)
Inventor
王翎羽
侯金林
王丽勤
崔玉军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT Co Ltd
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
HAIWANGXING OCEAN ENGINEERING TECHNOLOGY Co LTD TIANJIN CITY
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIWANGXING OCEAN ENGINEERING TECHNOLOGY Co LTD TIANJIN CITY, China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical HAIWANGXING OCEAN ENGINEERING TECHNOLOGY Co LTD TIANJIN CITY
Priority to CNU2007201488713U priority Critical patent/CN201043271Y/en
Application granted granted Critical
Publication of CN201043271Y publication Critical patent/CN201043271Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to an antisettling leveling boot used to install offshore platform pile foundation conduit supports, and is characterized in that the utility model comprises an apron board chassis and a draining pump. The apron board chassis comprises a top tray, which is provided with a hole. A loop of outer apron board is arranged on the fringe of the top tray; a loop of inner apron board is arranged around the top tray to form a conduit hole; a plurality of radiate ribbed plates are arranged between the inner apron board and the outer apron board; a loop of deep floors which are connected with each other are arranged between the radiate ribbed plates; drain holes are arranged on the top and side face of each of the radiate ribbed plates and deep floors; cavities enclosed by the inner apron board and the outer apron board are communicated with each other; the top of the top tray of the apron board chassis is connected with the draining pump in a sealed way. The utility model has the three functions of resisting settlement, leveling, grouting and isolation, and can be used in the course of installation of various offshore platform pile foundation conduit supports.

Description

A kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket
Technical field
The utility model relates to a kind of servicing unit of ocean engineering platform, particularly about a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket.
Background technology
At present, the ocean engineering platform generally is by being provided with and mud mat is installed, is grabbed methods such as a device and packer device in marine pile foundation jacket process is installed, and solves jacket interim anti-heavy, leveling and three problems of grouting packing in the seabed.Mud mat, grab a device and these three kinds of devices of packer are separate, install and regulate cumbersome, particularly grab the complex structure of a device and packer, complex operation, cost height, need import, delivery cycle is longer, therefore exists the limitation in the use.
Summary of the invention
At the problems referred to above, the purpose of this utility model provides a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket that have interim anti-heavy, leveling and three functions of grouting packing simultaneously.
For achieving the above object, the utility model is taked following technical scheme: a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket, it is characterized in that: it comprises a skirtboard chassis and a drainage pump, described skirtboard chassis comprises a top board, described top board is provided with a hole, edge around described top board is provided with the outer side skirt of a circle, be provided with side skirt in the circle around described roof hole, form a guide hole, in described, be provided with some radial floors between the outer side skirt, be provided with the interconnective deep floor of a circle between the described radial floor, top-side at each described radial floor and deep floor is provided with drain hole, make by in described, be interconnected in the cavity that outer side skirt surrounds, the top board top seal on described skirtboard chassis connects described drainage pump.
Described guide hole is the upright opening that is arranged on described skirtboard chassis central authorities.
Described guide hole is the angling hole that is arranged on described skirtboard chassis central authorities.
Described guide hole is the eccentric upright opening that is arranged on the described skirtboard chassis.
Described guide hole is the eccentric angling hole that is arranged on the described skirtboard chassis.
The utility model is owing to take above technical scheme, it has the following advantages: 1, the utility model is provided with the box-like skirtboard chassis of a back-off, and be provided with drainage pump at the top, chassis, therefore operating process of the present utility model is equivalent to a suction pile, in not needing when it is installed the suction pile monkey buried, only need drainage pump suction water, can play the effect of grabbing a device so that the skirtboard chassis produces negative pressure and sinks by being provided with.2, the utility model can rely on the frictional resistance of suction pile pile lining and end bearing power to bear big load aspect carrying; After piling construction is finished, can carry out the leveling of integral duct frame simultaneously by the drainage pump that is connected each skirt pile sleeve or top, supravasal skirtboard chassis.3, the utility model can substitute original mud mat, grab a device and three kinds of independent structures of packer or device, has jacket simultaneously required interim anti-heavy, leveling and three functions of grouting packing are installed, and reduces cost purpose simple to operate thereby reach.4, the utility model is provided with different structures such as standard type, eccentric type, taper pile type according to the different situations of skirt pile sleeve or conduit, uses very flexible.The utility model by adopt conventional ordinary steel structure, substituted need import grab a device and grouting packer etc., it can be widely used in the process of various installation offshore platform pile foundation jackets.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 is the A-A generalized section of Fig. 1
Fig. 3 is the utility model user mode schematic diagram
Fig. 4 is a standard type connection diagram of the present utility model
Fig. 5 is an eccentric type connection diagram of the present utility model
Fig. 6 is the utility model structural representation in the B-B section of Fig. 5
Fig. 7 is a taper pile type connection diagram of the present utility model
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described in detail.
As shown in Figure 1 and Figure 2, the utility model comprises a skirtboard chassis 1 and a drainage pump 9.Skirtboard chassis 1 comprises a top board 2, and top board 2 central authorities have a upright opening, and the edge that centers on top board 2 is provided with the outer side skirt 3 of a circle, and the centre bore that centers on top board 2 is provided with side skirt 4 in the circle, makes formation one guide hole 5 in the interior side skirt.Be provided with some radial floors 6 outside between side skirt 3 and the interior side skirt 4, between radial floor 6, be provided with the interconnective deep floor 7 of a circle.Top-side at each radial floor 6 and deep floor 7 is provided with drain hole 8, makes in the cavity that is surrounded by medial and lateral skirtboard 4,3 to be interconnected.Top board 2 top seals on skirtboard chassis 1 connect drainage pump 9, and drainage pump 9 can be submersible pump or air-powered pump, the power source of control cable 91 connection control system of drainage pump 9.
As shown in Figure 3, Figure 4, when the utility model uses, may further comprise the steps:
1, a plurality of the utility model is enclosed within on each skirt pile sleeve 11 or conduit 12 of offshore platform pile foundation jacket 10 by the guide hole that is surrounded by interior side skirt 4 respectively, and be fixed in skirt pile sleeve 11 or conduit 12 bottoms respectively, the control cable 91 of drainage pump 9 is extended to along jacket 10 connect power source more than the water surface;
2, jacket 10 lifting entry are transferred in place, the skirtboard chassis 1 that is installed on skirt pile sleeve 11 or conduit 12 bottoms is by in the mud layer of gravity injection seabed;
3, start drainage pump 9, water in the annular housing that medial and lateral skirtboard 4,3 and top board 2 are surrounded is discharged to beyond the top board 2, produce negative pressure in the annular housing, make jacket 10 rely on the suction injection on skirtboard chassis 1 to reach design altitude, because the mud layer pressure of the utility model bottom is greater than jacket 10 gravity, so jacket 10 can keep stable state;
4, piling 13 constructions (are pointed in the skirt pile sleeve 11 or in the conduit 12 and are squeezed into piling bar, insert it in the mud layer of seabed) finish after, start drainage pump 9 and carry out jacket 10 leveling, the process of leveling is, by producing malleation or negative pressure in the different annular housings of being pumped in of drainage pump 9, make the leveling boots produce relative lifting, thereby make jacket 10 leveling;
5, after jacket 10 reaches the design level degree, be in the milk in the hoop space between skirt pile sleeve 11 or conduit 12 and stake 13, because the stake 13 and the bottom in skirt pile sleeve 11 or 12 spaces of main pipe are sealed by the seabed mud layer, so can not leak during the cement injection mortar.
In the process of above installation jacket 10, adopt the alternative mud mat of the prior art of the utility model, grab a device and packer device, have interim anti-heavy, leveling and three functions of grouting packing simultaneously.According to whether factor such as waterproof casing 14 is arranged near the difference of jacket 10 piling modes and the conduit 12, anti-heavy leveling boots can be selected a kind of in installation code type, eccentric type and three kinds of patterns of taper pile type:
1, as shown in Figure 4, for skirt pile sleeve 11 piling 13, and be plumb pile 13 along jacket 10, near do not have the situation of waterproof casing 14 influences, adopt guide hole 5 to be vertically set on the anti-heavy leveling boots of the The One On The Chassis standard type of skirtboard of central authorities;
2, as Fig. 5, shown in Figure 6, for piling 13 in conduit 12, conduit 12 is vertical, but near the situation of waterproof casing 14 influence is arranged, then adopt guide hole 5 vertically to be eccentrically set on the anti-heavy leveling boots of the The One On The Chassis eccentric type of skirtboard;
3, as shown in Figure 7, for piling 13 in conduit 12, conduit 12 has the situation at certain angle of inclination, then adopt guide hole 5 to be obliquely installed at the anti-heavy leveling boots of the taper pile type of skirtboard chassis 1 central authorities, at this moment, the skirtboard chassis 1 of the anti-heavy leveling boots of taper pile type, the angle of inclination of its annular inboard skirtboard 4 axis is consistent with the angle of inclination of conduit 12.
On the basis of above-mentioned three kinds of forms, can also have the 4th kind of form of structure according to actual conditions, promptly guide hole 5 tilts to be eccentrically set on the skirtboard chassis 1.These should not got rid of outside protection domain of the present utility model according to the form of structure of using needs to change.

Claims (5)

1. anti-heavy leveling boots that are used to install offshore platform pile foundation jacket, it is characterized in that: it comprises a skirtboard chassis and a drainage pump, described skirtboard chassis comprises a top board, described top board is provided with a hole, edge around described top board is provided with the outer side skirt of a circle, be provided with side skirt in the circle around described roof hole, form a guide hole, in described, be provided with some radial floors between the outer side skirt, be provided with the interconnective deep floor of a circle between the described radial floor, top-side at each described radial floor and deep floor is provided with drain hole, make by in described, be interconnected in the cavity that outer side skirt surrounds, the top board top seal on described skirtboard chassis connects described drainage pump.
2. a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket as claimed in claim 1, it is characterized in that: described guide hole is the upright opening that is arranged on described skirtboard chassis central authorities.
3. a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket as claimed in claim 1, it is characterized in that: described guide hole is the angling hole that is arranged on described skirtboard chassis central authorities.
4. a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket as claimed in claim 1, it is characterized in that: described guide hole is the eccentric upright opening that is arranged on the described skirtboard chassis.
5. a kind of anti-heavy leveling boots that are used to install offshore platform pile foundation jacket as claimed in claim 1, it is characterized in that: described guide hole is the eccentric angling hole that is arranged on the described skirtboard chassis.
CNU2007201488713U 2007-04-23 2007-04-23 Sink preventing and leveling device for installation of offshore platform pile pipe frame Expired - Lifetime CN201043271Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201488713U CN201043271Y (en) 2007-04-23 2007-04-23 Sink preventing and leveling device for installation of offshore platform pile pipe frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201488713U CN201043271Y (en) 2007-04-23 2007-04-23 Sink preventing and leveling device for installation of offshore platform pile pipe frame

Publications (1)

Publication Number Publication Date
CN201043271Y true CN201043271Y (en) 2008-04-02

Family

ID=39258163

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201488713U Expired - Lifetime CN201043271Y (en) 2007-04-23 2007-04-23 Sink preventing and leveling device for installation of offshore platform pile pipe frame

Country Status (1)

Country Link
CN (1) CN201043271Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286986A (en) * 2011-06-30 2011-12-21 天津大学 Five-horse foundation structure and construction method thereof
CN102322074A (en) * 2011-06-30 2012-01-18 天津大学 A kind of jacket foundation structure and job practices
CN103195041A (en) * 2013-04-25 2013-07-10 浙江海洋学院 Anti-sedimentation pile for ocean wave power generation platform
CN105401577A (en) * 2014-09-10 2016-03-16 天津市海王星海上工程技术股份有限公司 Suction type pile shoe suitable for self-lifting platform and mounting method
CN105672231A (en) * 2016-02-17 2016-06-15 上海外高桥造船有限公司 Pile shoe structure for self-elevating drilling platform
CN107191138A (en) * 2017-06-29 2017-09-22 中国石油天然气股份有限公司 Deep water composite conduit running string and its under water installation method
CN110985754A (en) * 2019-12-19 2020-04-10 南通泰胜蓝岛海洋工程有限公司 Jacket anti-sinking plate with reinforcing structure and integral reinforcing process thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286986A (en) * 2011-06-30 2011-12-21 天津大学 Five-horse foundation structure and construction method thereof
CN102322074A (en) * 2011-06-30 2012-01-18 天津大学 A kind of jacket foundation structure and job practices
CN102286986B (en) * 2011-06-30 2013-07-17 天津大学 Five-horse foundation structure and construction method thereof
CN102322074B (en) * 2011-06-30 2013-09-04 天津大学 Jacket frame foundation structure and construction method thereof
CN103195041A (en) * 2013-04-25 2013-07-10 浙江海洋学院 Anti-sedimentation pile for ocean wave power generation platform
CN105401577A (en) * 2014-09-10 2016-03-16 天津市海王星海上工程技术股份有限公司 Suction type pile shoe suitable for self-lifting platform and mounting method
CN105401577B (en) * 2014-09-10 2017-09-01 天津市海王星海上工程技术股份有限公司 Suction type shoe and installation method suitable for self elevating platform
CN105672231A (en) * 2016-02-17 2016-06-15 上海外高桥造船有限公司 Pile shoe structure for self-elevating drilling platform
CN105672231B (en) * 2016-02-17 2017-09-15 上海外高桥造船有限公司 A kind of self-elevating drilling platform pile shoe structure
CN107191138A (en) * 2017-06-29 2017-09-22 中国石油天然气股份有限公司 Deep water composite conduit running string and its under water installation method
CN110985754A (en) * 2019-12-19 2020-04-10 南通泰胜蓝岛海洋工程有限公司 Jacket anti-sinking plate with reinforcing structure and integral reinforcing process thereof

Similar Documents

Publication Publication Date Title
CN201043271Y (en) Sink preventing and leveling device for installation of offshore platform pile pipe frame
CN105421500B (en) It is a kind of based on low-level curtain and the basement anti-floating system of blood pressure lowering of drawing water
CN100547178C (en) Bridge foundation construction method in the water
CN105155569A (en) Construction device and method for offshore wind turbine foundation with piling performed later
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN102296629B (en) Tower-drum structure suitable for ocean engineering and installation method thereof
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN103015455B (en) Bridge pile-bucket combined foundation and construction method thereof
CN203654309U (en) Pile-caisson hydraulic structure
CN103031853B (en) Seabed oil storage system
CN107989054A (en) It is a kind of applied to underwater flush type cushion cap without bottom concrete steel lifted trunk structure
CN102888847A (en) Construction method free from lowering water level for local deep foundation pit of elevator shaft
CN105350610B (en) It is a kind of to be applied to the integrated pumping plant anti-floating system of fiberglass integral type
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN105525633A (en) Pumping-irrigating self-circulation control system for floating resistance of basement
CN103572770A (en) Pile box hydraulic structure object and building method thereof
JP3918461B2 (en) Construction method for underwater foundation
CN204825955U (en) After drive piles construction equipment on marine fan basis
CN101324061A (en) Mudflat wind electric field fan foundation structure
KR101291098B1 (en) collecting well connector for eternal drainage construction technique
CN104074234A (en) Inland water collecting opening structure of power plant circulating water system and construction method thereof
CN202610819U (en) Foundation pit drainage system
CN103114605A (en) Anti-seepage drainage layer structure and construction method
CN102359117B (en) Concrete gravity type foundation applied to ocean engineering and installation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100027 Beijing city Dongcheng District Dongzhimen Street No. 6

Patentee after: China National Offshore Oil Corporation

Patentee after: CNOOC Research Center

Patentee after: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Address before: 100027 Beijing city Dongcheng District Dongzhimen Street No. 6

Patentee before: China National Offshore Oil Corporation

Patentee before: CNOOC Research Center

Patentee before: Haiwangxing Ocean Engineering Technology Co., Ltd, Tianjin City

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100027 Beijing city Dongcheng District Dongzhimen Street No. 6

Patentee after: China National Offshore Oil Corporation

Patentee after: CNOOC Research Institute

Patentee after: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

Address before: 100027 Beijing city Dongcheng District Dongzhimen Street No. 6

Patentee before: China National Offshore Oil Corporation

Patentee before: CNOOC Research Center

Patentee before: NEPTUNE OFFSHORE ENGINEERING DEVELOPMENT CO., LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20080402