CN201038658Y - 门型抢修塔导线提升机构 - Google Patents
门型抢修塔导线提升机构 Download PDFInfo
- Publication number
- CN201038658Y CN201038658Y CNU2007201053181U CN200720105318U CN201038658Y CN 201038658 Y CN201038658 Y CN 201038658Y CN U2007201053181 U CNU2007201053181 U CN U2007201053181U CN 200720105318 U CN200720105318 U CN 200720105318U CN 201038658 Y CN201038658 Y CN 201038658Y
- Authority
- CN
- China
- Prior art keywords
- arm
- cross
- cross arm
- frame
- repairing tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种门型抢修塔导线提升机构,用作电力系统线路抢修中的提升导线,包括由左右立柱和横担组成的门型抢修塔,左右立柱间及各立柱与横担间有拉索补强,所说的横担包括边横担与中横担,分别与左右立柱固定,其特征是,还包括一临时横梁,该临时横梁可置于中横担下,一端与立柱固定,另一端与立柱间有丝杆联接,通过调节丝杆可改变两立柱间距;所说的中横担至少由三段构架梁组成,在组成中横担的相邻构架梁之间,通过在构架梁端头插接销轴形成两段构架梁的可拆离联接。本实用新型能使中相导线方便地穿越中横担,在抢修过程中减少工作量,实现快速安装,以迅速处理事故恢复供电。
Description
技术领域
本实用新型涉及专用于安装、维护、修理或拆卸电缆或电线的设备技术领域,尤其是涉及电力系统线路抢修中的门型抢修塔导线提升机构。
背景技术
在电力系统中,架空输电线路的倒杆塔事故时有发生,造成供电中断,必须快速抢修,在尽可能短的时间内恢复供电。而输电线路中的杆塔一般都较高,要吊装抢修,需有高度相当或更高的临时杆塔作抢修塔,也有直接用临时杆塔暂时代替所倒的杆塔;常用抢修塔有门型、上字型两种,门型抢修塔用得更普遍;当发生倒塔后,三根输电导线往往不会断,在抢修线路时需要将随杆塔倒下的导线提升架设到抢修塔上,其中提升中相导线难度很大,传统的抢修塔上没有导线提升机构的设置,得增加多层临时拉线来加固抢修塔的两立柱,去掉横担,再把中相导线提升安装,导致抢修速度缓慢,延误恢复供电时间。
发明内容
本实用新型的目的是为克服上述现有技术之不足,提供一种门型抢修塔导线提升机构,能在抢修过程中减少工作量,通过吊装和提升导线,实现快速安装,以迅速处理事故恢复供电。
为实现上述目的,本实用新型技术方案是这样的:一种门型抢修塔导线提升机构,包括由构架柱式的左右立柱和构架梁式的横担组成的门型抢修塔,左右立柱间及各立柱与横担间有拉索补强,所说的横担包括边横担与中横担,分别与左右立柱固定,其特征是,还包括一临时横梁,该临时横梁可置于中横担下,一端与立柱固定,另一端与立柱间有丝杆联接,通过调节丝杆可改变两立柱间距;所说的中横担至少由三段构架梁组成,在组成中横担的相邻构架梁之间,通过在构架梁端头插接销轴形成两段构架梁的可拆离联接,其中销轴与两构架梁端头的销轴孔间有一定的间隙,各段构架梁平时连成一体组成中横担,承担门型抢修塔在此间的支撑负荷,当调整临时横梁的丝杆,微微改变两立柱间距后,由临时横梁承担起中横担的负荷,此时可将销轴从构架梁端头拔出,使组成中横担的构架梁相互脱离,把一段构架梁打开,处于立柱间的中相导线可从打开的横担中穿越过。
具体操作过程如下:在输电线路方向立起抢修塔,此时中相导线处于抢修塔的门形内部,要想把导线吊装到抢修塔上,中相导线必须穿越抢修塔的中横担,然后吊装到抢修塔的绝缘子上;所以在提升中相导线时需分两步进行,即先把中相导线提升到抢修塔的中横担下,再安装临时横梁,调整丝杆,使负荷落到临时横梁上,拆开中横担,把导线提升到中横担之上,连接中横担,完成中相导线的提升。
在导线需穿越中横担的其他场合也可按此方式进行可操作。
由于采用了上述技术方案,本实用新型的一种门型抢修塔导线提升机构,能使中相导线方便地穿越中横担,在抢修过程中减少工作量,实现快速安装,以迅速处理事故恢复供电。
附图说明
下面结合附图和实施例对本实用新型作进一步的说明。
图1为本实用新型上部的结构示意图。
图2是图1的A处局部放大视图。
图3是图1的B处局部放大视图。
图中:1、右立柱,2、右边横担,3、拉索,4、左边横担,5、左立柱,6、中横担,601、构架梁,602、构架梁,603、构架梁,7、销轴,8、临时横梁,9、丝杆,10、手柄。
具体实施方式
实施例1:
由图1--图3所示,本实用新型的一种门型抢修塔导线提升机构,包括由构架柱式的左右立柱5、1和构架梁式的横担组成的门型抢修塔,左右立柱间及各立柱与横担间有拉索3补强,所说的横担包括左右边横担4、2与中横担6,分别与左右立柱固定,其特征是,还包括一临时横梁8,该临时横梁8可置于中横担6下,一端与左立柱5固定,另一端与右立柱1间由丝杆9联接,通过手柄10调节丝杆可改变两立柱间距;所说的中横担6由三段构架梁601、602、603组成,在组成中横担的相邻构架梁601、602及602、603之间,通过在构架梁端头插接销轴7形成两段构架梁的可拆离联接,其中销轴7与两构架梁端头的销轴孔间有一定的间隙,各段构架梁平时连成一体组成中横担6,承担门型抢修塔在此间的负荷,当调整临时横梁8的丝杆9,微微改变两立柱间距后,由临时横梁承担起中横担的负荷,此时可将销轴从构架梁端头拔出,使组成横担的构架梁相互脱离,把一段构架梁打开,处于立柱间的中相导线可从打开的中横担中穿越过。
实施例2:
将实施例1中的中横担6改由五段构架梁组成,其余重复实施例1。
Claims (2)
1.一种门型抢修塔导线提升机构,包括由构架柱式的左右立柱(5、1)和构架梁式的横担组成的门型抢修塔,左右立柱间及各立柱与横担间有拉索(3)补强,所说的横担包括左右边横担(4、2)与中横担(6),分别与左右立柱固定,其特征是:还包括一临时横梁(8),该临时横梁(8)可置于中横担(6)下,一端与一立柱固定,另一端与另一立柱间由丝杆(9)联接;所说的中横担(6)至少由三段构架梁组成,在组成中横担(6)的相邻构架梁之间,通过在构架梁端头插接销轴(7)形成两段构架梁的可拆离联接。
2.根据权利要求1所述的一种门型抢修塔导线提升机构,其特征是:在所说的丝杆(9)上还设有调节丝杆的手柄(10)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201053181U CN201038658Y (zh) | 2007-01-05 | 2007-01-05 | 门型抢修塔导线提升机构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201053181U CN201038658Y (zh) | 2007-01-05 | 2007-01-05 | 门型抢修塔导线提升机构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201038658Y true CN201038658Y (zh) | 2008-03-19 |
Family
ID=39211182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201053181U Expired - Lifetime CN201038658Y (zh) | 2007-01-05 | 2007-01-05 | 门型抢修塔导线提升机构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201038658Y (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100446366C (zh) * | 2007-01-05 | 2008-12-24 | 宁波天弘电力器具有限公司 | 门型抢修塔导线提升机构 |
-
2007
- 2007-01-05 CN CNU2007201053181U patent/CN201038658Y/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100446366C (zh) * | 2007-01-05 | 2008-12-24 | 宁波天弘电力器具有限公司 | 门型抢修塔导线提升机构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109231006B (zh) | 一种钢结构桁架下挂结构的施工方法 | |
CN100446366C (zh) | 门型抢修塔导线提升机构 | |
CN106702909A (zh) | 一种双幅钢箱梁整体转体结构及施工方法 | |
CN101736936A (zh) | 新型模块化应急抢修塔 | |
CN101463629A (zh) | 大跨度钢屋架分体吊装方法 | |
CN201038658Y (zh) | 门型抢修塔导线提升机构 | |
CN110242042A (zh) | 一种适用于装配式建筑的柱角模板及施工方法 | |
CN101397814A (zh) | 超大抽柱柱距处厂房屋面系统的支撑方法 | |
CN211368423U (zh) | 斜拉索塔顶提升牵引操作平台 | |
KR101232704B1 (ko) | 교량 가설용 메인 거더 설치 및 해체 방법 | |
CN201635014U (zh) | 免调索长平台斜拉挂篮 | |
WO2007097640A2 (en) | A method for installing and dismantling a wind power structure, and a wind turbine assembly | |
CN105672672A (zh) | 一种墩柱施工系统及施工方法 | |
CN105863261A (zh) | 一种万向可调式悬挂模板系统 | |
CN201771239U (zh) | 新型模块化应急抢修塔 | |
CN105932602B (zh) | 三相导线带电提升器及采用该提升器更换绝缘子的方法 | |
CN219860068U (zh) | 一种应用于钢结构模块吊装的专用吊具 | |
CN101701498A (zh) | 一种跨越既有铁路线钢管套接防护棚施工方法 | |
CN220673104U (zh) | 一种330kV C型HGIS配电装置多向出线联合构架 | |
CN211895898U (zh) | 一种应用于钢桁架悬挂式的整体提升装置 | |
CN216504912U (zh) | 一种适用于各种结构形式钢箱梁制造的工装胎架系统 | |
CN215947904U (zh) | 一种用于桥梁施工用的墩柱抬升装置 | |
CN2534161Y (zh) | 带有变频变压变速微机控制、采用串行通讯的微型控制柜的曳引机装置 | |
CN212475941U (zh) | 一种高空吊装装置 | |
CN220415006U (zh) | 一种电力铁塔用钢结构拼接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Effective date of abandoning: 20070105 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |