CN201024419Y - 部分粘接预应力抗拔抗浮桩的钢绞线笼 - Google Patents

部分粘接预应力抗拔抗浮桩的钢绞线笼 Download PDF

Info

Publication number
CN201024419Y
CN201024419Y CNU2007201042562U CN200720104256U CN201024419Y CN 201024419 Y CN201024419 Y CN 201024419Y CN U2007201042562 U CNU2007201042562 U CN U2007201042562U CN 200720104256 U CN200720104256 U CN 200720104256U CN 201024419 Y CN201024419 Y CN 201024419Y
Authority
CN
China
Prior art keywords
steel strand
pile
steel bar
floating
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007201042562U
Other languages
English (en)
Inventor
何世鸣
李江
田震远
张明中
王之军
贾城
陈辉
曹风学
李长生
司呈庆
杨敏
杜高恒
李德江
周与诚
王建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Material and Geological Engineering Co.
Beijing Urban Construction Science and Technology Promotion Association
Co., Ltd of SINOMA Geological Engineering Survey Institute
Original Assignee
Beijing Urban Construction Science And Technology Promotion Association
Central African Geological Engineering Investigation Institute
BEIJING CONSTRUCTION MATERIAL AND GEOLOGICAL ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Science And Technology Promotion Association, Central African Geological Engineering Investigation Institute, BEIJING CONSTRUCTION MATERIAL AND GEOLOGICAL ENGINEERING Co filed Critical Beijing Urban Construction Science And Technology Promotion Association
Priority to CNU2007201042562U priority Critical patent/CN201024419Y/zh
Application granted granted Critical
Publication of CN201024419Y publication Critical patent/CN201024419Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种部分粘接预应力抗拔抗浮桩的钢绞线笼,包括钢筋笼骨架,其特征在于:在所述的钢筋笼骨架内设有钢绞线,该钢绞线的下端与钢筋笼骨架的下端连接,或与钢筋笼骨架下部内的加强钢筋连接;在所述的钢绞线上施加预应力。本实用新型的优点是:其预应力桩可广泛适用于抗拔(浮)桩、基础桩、护坡桩,适用范围广;可以节省钢筋,钢绞线抗拉强度(1860MPa)远大于钢筋抗拉强度(310MPa),节省成本;可以解决混凝土抗裂问题,在混凝土桩上施加预应力,桩受力着力点是在桩的下端,桩工作时混凝土受压,而不是受拉,能满足一级抗裂缝设计要求,能用于重要建筑物抗拔(浮)桩,延长其上建筑物寿命。

Description

部分粘接预应力抗拔抗浮桩的钢绞线笼
技术领域
本实用新型涉及一种建筑地基基础桩构件,特别涉及一种部分粘接预应力抗拔浮桩的钢绞线笼,适用于抗拔(浮)桩、基础桩、护坡桩。
背景技术
在电力、石油、通讯、交通设施及高层建筑中,往往采用桩基以承受较大的上拔荷载,典型的结构物有:
1、地下建筑物诸如地下车库、飞机库、地下室、船坞、泵房、船闸等,在这些构筑物下设置的桩,往往承受较大的浮托力。
2、承受巨大水平荷载的叉桩结构,如码头、桥台、挡土墙下的斜桩。
3、塔式结构物,包括电视塔、通讯塔、高层建筑物等高耸结构物桩基、高压输电线路杆塔基础、海洋平台桩基等。
4、特殊地区建筑物,如地震荷载作用下的桩基,膨胀土及冻胀土上的建筑物桩基。
对于承受拔力的桩基,应验算群桩基础及其基桩的抗拔承载力,并按现行《混凝土结构设计规范》(GB50010.2002)验算桩基材料的受拉承载力,当桩身有抗裂缝要求时,还需进行抗裂缝性能验算。
目前的抗拔桩设计大部分都是用钢筋混凝土灌注桩,少数采用了预应力抗拔锚杆,预应力抗拔桩还较为少用。目前用预应力抗拔桩的做法大都是在桩端设置反力盘(如北京电视台抗拔桩)。用锚具将全长无粘结钢绞线锁定在反力盘上,由此提供预应力反力,由此决定了桩成孔要采用正循环,冲击成孔或旋挖成孔等传统的泥浆护壁的方法,效率低,有泥浆污染,泥浆处理费用高,工期长,桩质量不易保证,拉拔锁定预应力有限,有时锁定装置不可靠,钢绞线位移偏大。
发明内容
本实用新型的目的就是提供一种部分粘接预应力抗拔抗浮桩的钢绞线笼,以解决现有技术存在的施工效率低,有泥浆污染,泥浆处理费用高,工期长,桩质量不易保证,拉拔锁定预应力有限,有时锁定装置不可靠,钢绞线位移偏大的问题。
本实用新型的技术方案是:包括钢筋笼骨架,在所述的钢筋笼骨架内设有与其相同方向的钢绞线,该钢绞线的下端与钢筋笼骨架的下端连接,或与钢筋笼骨架下部内的加强钢筋连接;在所述的钢绞线上施加预应力。
所述的钢绞线采用无粘接钢绞线,或采用普通钢绞线涂抹油脂后穿皮套形成无粘接钢绞线,或采用部分粘接钢绞线,其粘结部分在下部,粘结长度为笼长的1/5~1/4。
所述的钢绞线的下端用一个或多个U形卡与所述的钢筋笼骨架锁住。
本实用新型的优点是:其预应力桩可广泛适用于抗拔(浮)桩、基础桩、护坡桩,适用范围广;可以节省钢筋,钢绞线抗拉强度(1860MPa)远大于钢筋抗拉强度(310MPa),节省成本;可以解决混凝土抗裂问题,在混凝土桩上施加预应力,桩受力着力点是在桩的下端,桩工作时混凝土受压,而不是受拉,能满足一级抗裂缝设计要求,能用于重要建筑物抗拔(浮)桩,延长其上建筑物寿命。提高了施工效率,现场无泥浆污染,降低了泥浆处理费用,缩短了工期。
附图说明
图1是本实用新型一组钢绞线的下端与筋笼骨架的下端锁定的实施例结构示意图;
图2是本实用新型两组钢绞线的下端分别穿过筋笼骨架下端并分别锁定的实施例结构示意图;
图3是本实用新型钢绞线的下端在筋笼骨架内部的下部锁定的实施例结构示意图;
图4是本实用新型钢绞线的下端分别在筋笼骨架下端的上方和下端锁定的实施例结构示意图;
图5是本实用新型钢绞线的下端分别与筋笼骨架下部的加强筋及下端斜筋锁定的实施例结构示意图;
图6是本实用新型钢绞线的下端与筋笼骨架下部的加强筋锁定的实施例结构示意图;
图7是本实用新型钢绞线的下端与筋笼骨架下部向上的斜筋锁定的实施例结构示意图;
图8是用本实用新型制成的桩体的结构剖视图。
具体实施方式
参见图1~图7,本实用新型包括在钢筋笼骨架1内设有与其同方向设置的钢绞线2,该钢绞线2的下端通过U形卡3与钢筋笼骨架1的下端锁定连接,或与钢筋笼骨架下部内的加强钢筋连接,其连接结构采用以下多种形式:
1、一组钢绞线2从钢筋笼骨架1内部纵向穿过,并在筋笼骨架1的下端用U形卡3锁定,如图1所示。
2、两组(两根或三根)钢绞线2的下端分别穿过钢筋笼骨架1,并在下端分别通过U形卡3锁定,如图2所示。
3、钢绞线2的下端在钢筋笼骨架1内部的下部通过U形卡3锁定,如图3所示。
4、钢绞线2的下端分别在钢筋笼骨架1下端的上方和下端用U形卡3锁定,如图4所示。
5、几根钢绞线2的下端分别与钢筋笼骨架1下部的加强筋6(如图6所示)及下端斜筋7用U形卡3锁定(如图5所示)。
6、如图7所示,钢绞线2的下端与钢筋笼骨架1下部向上的斜筋8用U形卡3锁定。还可采用其他各种口内的连接形式。
所述的钢绞线2采用无粘接钢绞线,或采用普通钢绞线涂抹油脂后穿皮套形成无粘接钢绞线,或采用部分粘接钢绞线,其粘结部分在下部,粘结长度为笼长的1/5~1/4,一般不少于2m,常用长度3~4m。
本实用新型的成桩方法是(参见图8),首先将所述的钢绞线2穿入所述的筋笼骨架1内,并将其下端用U形卡3相互连接制成钢筋-钢绞线笼;采用中空式长螺旋钻具成孔,并向孔内泵送混凝土4,然后将所述的钢筋-钢绞线笼插入混凝土4;当底板5达到一定强度后,在所述的钢绞线2上施加预应力锁定在底板预留位置。
本实用新型上述的成桩方法的特点是:效率高,不用泥浆护壁,无泥浆污染,节约钢筋,成本低,质量极易保证。该预应力抗拔(浮)桩与普通抗拔(浮)桩相比,一是可以节省钢筋,钢绞线抗拉强度远大于钢筋抗拉强度,节省成本,二是可以解决混凝土抗裂问题,在混凝土桩上施加预应力,桩受力着力点是在桩的下端,桩工作时混凝土受压,而不是受拉,能满足一级抗裂缝设计要求,能用于重要建筑物抗拔(浮)桩,延长其上建筑物寿命。
本实用新型的筋笼骨架1选择Ф12~Ф14的钢筋;钢绞线2选择1470级以上,无粘结或普通钢绞线穿保护套。输送装置为振动锤连接大刚度芯管。
本实用新型不仅有混凝土及人机费的节约,同时由于效率提高,施工文明,无泥浆运输费用等优势,仅材料的节约可占总成本约20%以上。经济效益显著,社会效益和环保效益明显。

Claims (3)

1.一种部分粘接预应力抗拔抗浮桩的钢绞线笼,包括钢筋笼骨架,其特征在于:在所述的钢筋笼骨架内设有与其相同方向的钢绞线,该钢绞线的下端与钢筋笼骨架的下端连接,或与钢筋笼骨架下部内的加强钢筋连接;在所述的钢绞线上施加预应力。
2.根据权利要求1所述的部分粘接预应力抗拔抗浮桩的钢绞线笼,其特征在于:所述的钢绞线采用无粘接钢绞线,或采用普通钢绞线涂抹油脂后穿皮套形成无粘接钢绞线,或采用部分粘接钢绞线,其粘结部分在下部,粘结长度为笼长的1/5~1/4。
3.根据权利要求1或2所述的部分粘接预应力抗拔抗浮桩的钢绞线笼,其特征在于:所述的钢绞线的下端用一个或多个U形卡与所述的钢筋笼骨架锁住。
CNU2007201042562U 2007-04-13 2007-04-13 部分粘接预应力抗拔抗浮桩的钢绞线笼 Expired - Lifetime CN201024419Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201042562U CN201024419Y (zh) 2007-04-13 2007-04-13 部分粘接预应力抗拔抗浮桩的钢绞线笼

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201042562U CN201024419Y (zh) 2007-04-13 2007-04-13 部分粘接预应力抗拔抗浮桩的钢绞线笼

Publications (1)

Publication Number Publication Date
CN201024419Y true CN201024419Y (zh) 2008-02-20

Family

ID=39098273

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201042562U Expired - Lifetime CN201024419Y (zh) 2007-04-13 2007-04-13 部分粘接预应力抗拔抗浮桩的钢绞线笼

Country Status (1)

Country Link
CN (1) CN201024419Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561317A (zh) * 2012-02-24 2012-07-11 山东同圆设计集团有限公司 一种芯部设置高强抗拉筋的抗拔桩
CN103526752A (zh) * 2013-11-05 2014-01-22 北京建材地质工程公司 应力分散型预应力抗拔抗浮桩成桩方法及其钢筋钢绞线笼
CN103526751A (zh) * 2013-10-11 2014-01-22 北京建材地质工程公司 压力分散型预应力抗拔抗浮桩及施工方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561317A (zh) * 2012-02-24 2012-07-11 山东同圆设计集团有限公司 一种芯部设置高强抗拉筋的抗拔桩
CN103526751A (zh) * 2013-10-11 2014-01-22 北京建材地质工程公司 压力分散型预应力抗拔抗浮桩及施工方法
CN103526752A (zh) * 2013-11-05 2014-01-22 北京建材地质工程公司 应力分散型预应力抗拔抗浮桩成桩方法及其钢筋钢绞线笼
CN103526752B (zh) * 2013-11-05 2015-10-21 北京建材地质工程公司 应力分散型预应力抗拔抗浮桩成桩方法及其钢筋钢绞线笼

Similar Documents

Publication Publication Date Title
US11427975B2 (en) Precast segmental pier reinforced with both conventional steel bars and high-strength steel bars
CN108978449B (zh) 一种接头采用灌浆套筒的承插式构造预制拼装桥墩
CN104153287B (zh) 具有自复位能力的节段拼装混凝土框架桥墩系统及方法
CN201459716U (zh) 缓粘结或无粘结后张预应力灌注桩
CN202509532U (zh) 多筋拉力型抗浮锚杆
CN101629418A (zh) 后张预应力灌注桩及施工方法
KR20090006910A (ko) 기존 콘크리트 기초구조물로의 새로운 마이크로파일 두부의정착 방법 및 이를 이용한 기초 및 기둥 구조물의 보강공법 및 그 보강 구조
CN102330427B (zh) 一种高抗拔力的加劲桩
CN203200751U (zh) 一种预应力抗浮桩
CN202595728U (zh) 预应力混凝土支护桩墙
CN201024419Y (zh) 部分粘接预应力抗拔抗浮桩的钢绞线笼
CN205557512U (zh) 可回收预应力抗拔桩
CN212200490U (zh) 抗倾覆大刚度桩柱一体构件
CN112095586A (zh) 一种预应力后插复合锚索抗拔桩及其制备方法
CN112095585A (zh) 一种预应力复合锚索抗拔桩及其制备方法
CN100535259C (zh) 部分粘接预应力抗拔抗浮桩及其施工方法
CN113123373A (zh) 后插无粘结钢绞线u型管承压型抗拔桩及其施工方法
CN201016169Y (zh) 偏心预应力锚索抗滑桩
CN112049158A (zh) 一种扩底式预应力复合锚索抗拔桩及其制备方法
CN211340824U (zh) 桩身受压的混凝土抗拔桩
CN113585246A (zh) 加固型建筑桩基
CN107859017A (zh) 一种装配式的海洋工程混凝土建筑结构体系
CN203429632U (zh) 拉压分散型锚索
CN202450520U (zh) 一种高抗拔力的应力分散式加砂抗浮桩
CN212427069U (zh) 带扩大头的部分粘结预应力抗拔桩

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Nanhu canal, Dongzhi gate, Chaoyang District, Beijing, zip code: 100102

Co-patentee after: SINOMA Geological Engineering Exploration Academy

Patentee after: Beijing Building Materials Geological Engineering Company

Co-patentee after: Beijing Urban Construction Science and Technology Promotion Association

Address before: Nanhu canal, Dongzhi gate, Chaoyang District, Beijing, zip code: 100102

Co-patentee before: Central African Geological Engineering Investigation Institute

Patentee before: Beijing Building Materials Geological Engineering Company

Co-patentee before: Beijing Urban Construction Science and Technology Promotion Association

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100102 Beijing city Chaoyang District Dongzhimen drainage

Patentee after: Beijing Construction Material and Geological Engineering Co.

Patentee after: Co., Ltd of SINOMA Geological Engineering Survey Institute

Patentee after: Beijing Urban Construction Science and Technology Promotion Association

Address before: 100102 Beijing city Chaoyang District Dongzhimen drainage

Patentee before: Beijing Construction Material and Geological Engineering Co.

Patentee before: SINOMA Geological Engineering Exploration Academy

Patentee before: Beijing Urban Construction Science and Technology Promotion Association

EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Geotechnical Engineering Association

Assignor: Beijing building material geological engineering company|Sinoma Geology Engineering Exploration Research Institute Co Ltd|Beijing urban construction science and Technology Promotion Association

Contract record no.: 2015990000884

Denomination of utility model: Partial adhesion prestressed anti-pulling anti-floating pile stranded wire cage

Granted publication date: 20080220

License type: Exclusive License

Record date: 20160129

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term

Granted publication date: 20080220

CX01 Expiry of patent term