CN201017159Y - Digital light processing projection split-joint wall system - Google Patents

Digital light processing projection split-joint wall system Download PDF

Info

Publication number
CN201017159Y
CN201017159Y CNU2007201188117U CN200720118811U CN201017159Y CN 201017159 Y CN201017159 Y CN 201017159Y CN U2007201188117 U CNU2007201188117 U CN U2007201188117U CN 200720118811 U CN200720118811 U CN 200720118811U CN 201017159 Y CN201017159 Y CN 201017159Y
Authority
CN
China
Prior art keywords
switch
power supply
gauge tap
projecting cell
switching power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201188117U
Other languages
Chinese (zh)
Inventor
李明泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konka Group Co Ltd
Original Assignee
Konka Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konka Group Co Ltd filed Critical Konka Group Co Ltd
Priority to CNU2007201188117U priority Critical patent/CN201017159Y/en
Application granted granted Critical
Publication of CN201017159Y publication Critical patent/CN201017159Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Direct Current Feeding And Distribution (AREA)

Abstract

The utility model discloses a digital optical processing projection tiled display wall comprising a power system and n plus 1 projection units comprising switch power; the number n is an integer more than 1; the power system comprises a general power switch and n control switches equipped with a control end; the input ends of the switch powers of the projection units from the second one to the No. n plus 1 are separately connected with the input end of the first projection by the n control switches; the conjunction is connected with the power by the general power switch; the control end of one of the control switch is connected with the output end of the switch power of the first projection unit and the control ends of the left n minus 1 control switches are separately connected with the output ends of the switch powers of the projection units from the second one to the No. n plus 1. The utility model can reduce the surge current when the switch powers are turned on and simplify the operations of starting the projection units in turn.

Description

Digital light is handled projection combination system
[technical field]
The utility model relates to digital light and handles projection combination system, particularly can realize the digital light processing projection combination system that projecting cell is opened successively automatically.
[background technology]
At present, known DLP (digital light processing) projection combination system is made up of signal processing system, electric power system, projecting cell, electric power system is made up of a total power switch, several independent power source switches, total power switch control independent power source switch, each independent power source switch control one or several projecting cells.Because when the Switching Power Supply in the projecting cell is opened; there is bigger surge current (often reaching tens amperes); if during DLP projection combination system boot all Switching Power Supplies are opened simultaneously; surge current can reach hundreds of even go up kiloampere; the harm of doing like this is: on the one hand electrical network is caused powerful impact; the harm power grid security; excessive on the other hand surge current is easy to total power switch and independent power source switch be burnt or cause trip protection, makes the DLP projection combination system can't operate as normal.For fear of excessive surge current, the step of start is usually: open total power switch earlier, open the switch-dividing power supply then one by one.Because each switch-dividing has been controlled several projecting cells, therefore still there is bigger surge current (the surge current sum of the Switching Power Supply of several projecting cells of switch-dividing control), surge current when only opening together than all Switching Power Supplies is little, but, this start mode complex operation, require Attended mode, be not easy to realize timed power on/off or remote control switch.
[summary of the invention]
The technical problems to be solved in the utility model provides digital light and handles projection combination system, and the surge current when reducing the Switching Power Supply unlatching has been simplified the operation that projecting cell is opened successively.
The technical solution of the utility model is:
Digital light is handled projection combination system, comprises electric power system and n+1 projecting cell that contains Switching Power Supply, and wherein, n is the integer more than or equal to 1;
Described electric power system comprises that 1 total power switch and n has the gauge tap of control end, the input end of the Switching Power Supply in the 2nd to n+1 projecting cell is connected by the input end of the Switching Power Supply in a described n gauge tap and the 1st projecting cell respectively, this tie point links to each other with power supply by described total power switch, wherein the control end of 1 gauge tap connects the output terminal of the Switching Power Supply in described the 1st projecting cell, and the control end of a surplus n-1 gauge tap connects the output terminal of appointing n-1 Switching Power Supply in the 2nd to n+1 the projecting cell respectively.
Described digital light is handled projection combination system, also comprises m independent power source switch, and described m independent power source switch is in parallel with m the gauge tap in the described n gauge tap respectively, and wherein, m is greater than zero and smaller or equal to n.
Described gauge tap is a relay.
The beneficial effects of the utility model are:
The Switching Power Supply of the utility model in the 1st projecting cell is directly with total power switch is connected, Switching Power Supply in all the other n projecting cell all is connected with total power switch by gauge tap respectively, at first controlling one of them gauge tap during Switching Power Supply working stability in the 1st projecting cell connects, make the Switching Power Supply and the power connection of another projecting cell, start one by one then, so just reduce the surge current that produces when projecting cell is opened, improved the reliability of digital light processing projection combination system; N independent power source switch is in parallel with a described n gauge tap respectively in the utility model, break down to control corresponding gauge tap the time in a certain Switching Power Supply like this, the independent power source switch that can answer by manual mode closed pair still can normally start system.
[description of drawings]
Fig. 1 is the circuit connection diagram of electric power system and projecting cell in the utility model.
[embodiment]
Digital light of the present utility model is handled projection combination system, comprises electric power system and n+1 projecting cell that contains Switching Power Supply, and wherein, n is the integer more than or equal to 1; Described electric power system comprises that 1 total power switch and n has the gauge tap of control end, the input end of the Switching Power Supply in the 2nd to n+1 projecting cell is connected by the input end of the Switching Power Supply in a described n gauge tap and the 1st projecting cell respectively, this tie point links to each other with power supply by described total power switch, wherein the control end of 1 gauge tap connects the output terminal of the Switching Power Supply in described the 1st projecting cell, and the control end of a surplus n-1 gauge tap connects the output terminal of appointing n-1 Switching Power Supply in the 2nd to n+1 the projecting cell respectively.
Described digital light is handled projection combination system, also comprises m independent power source switch, and described m independent power source switch is in parallel with m the gauge tap in the described n gauge tap respectively, and wherein, m is greater than zero and smaller or equal to n.
Be example with the relay below, principle of the present utility model further specified:
Fig. 1 is the circuit connection diagram of electric power system and projecting cell in the utility model.In the present embodiment, there is the individual projecting cell of n+1 (n 〉=1) in DLP projection combination system, there is Switching Power Supply T1 first projecting cell inside, there is Switching Power Supply T2 second projecting cell inside, by that analogy, there is Switching Power Supply T (n+1) n+1 projecting cell inside, and this electric power system comprises that n relay J 1 to Jn and n independent power source K switch 1 in parallel with the contact of relay J 1 to Jn respectively are to Kn.The a pair of dc output end of the first Switching Power Supply T1 is connected to the two ends of first relay J, 1 coil, and first relay J 1 is according to this output to dc output end, being electrically connected between control second switch power supply T2 and the AC power.By that analogy, be connected to the two ends of n relay J n coil, so that being electrically connected between control switching T (n+1) and the AC power from a pair of dc output end of n Switching Power Supply T (n).
When opening DLP projection combination system, at first open total power switch S1, the first Switching Power Supply T1 at first works, after its operate as normal (this moment, surge current was over and done with), output DC is pressed onto on the coil of first relay J 1,1 adhesive of first relay J, the closing of contact is connected the incoming line that exchanges between second switch power supply T2 and the AC power.By that analogy, have only n Switching Power Supply operate as normal after, the individual Switching Power Supply of T (n+1) just can be worked, like this, all Switching Power Supplies start successively, have avoided them to start at synchronization and have caused the surge current stack, and electrical network is impacted, causes the total power switch tripping operation even burns.When operate as normal, the 1st all should be in off-state to n independent power source K switch 1 to Kn, the effect of independent power source K switch 1 to Kn is: when the Switching Power Supply of a certain relay of control breaks down cisco unity malfunction, as long as open corresponding independent power source switch, still back one Switching Power Supply can be connected on the AC power, make it still can operate as normal, as: during the first Switching Power Supply T1 fault, can manual closing independent power source K switch 1, directly second switch power supply T2 is received on the AC power, T3 to T (n+1) still can normally be opened, guarantee that the 3rd projecting cell to a n+1 projecting cell can operate as normal; Here it is to be noted that independent power source K switch 1 to Kn can not insert yet, and can realize the purpose of this utility model equally.
In the above-described embodiments, the gauge tap of band control end is not limited to relay, can adopt other known dc controlled switch to connect Switching Power Supply and AC power equally, as photoelectricity coupled circuit, ghyristor circuit etc.And circuit connecting mode is not limited to form shown in Figure 1, when the surge current of single switch power supply is very little, can utilize a gauge tap to control a plurality of Switching Power Supplies respectively, to reach the purpose of faster open system.
It is emphasized that can be from any a pair of dc output end extraction voltage supply control circuit of Switching Power Supply, and this can also continue as the display screen power supply to dc output end simultaneously, that is to say that gauge tap do not monopolize a pair of direct current output port of Switching Power Supply.
Above-mentioned detailed description only is exemplary description, and those skilled in the art can design various embodiments according to different actual needs under the situation that does not break away from the scope and spirit that the utility model protects.

Claims (3)

1. digital light is handled projection combination system, comprises electric power system and n+1 projecting cell that contains Switching Power Supply, and wherein, n is the integer more than or equal to 1; It is characterized in that:
Described electric power system comprises that 1 total power switch and n has the gauge tap of control end, the input end of the Switching Power Supply in the 2nd to n+1 projecting cell is connected by the input end of the Switching Power Supply in a described n gauge tap and the 1st projecting cell respectively, this tie point links to each other with power supply by described total power switch, wherein the control end of 1 gauge tap connects the output terminal of the Switching Power Supply in described the 1st projecting cell, and the control end of a surplus n-1 gauge tap connects the output terminal of appointing n-1 Switching Power Supply in the 2nd to n+1 the projecting cell respectively.
2. digital light according to claim 1 is handled projection combination system, it is characterized in that: also comprise m independent power source switch, described m independent power source switch respectively with a described n gauge tap in appoint m gauge tap in parallel, wherein, m is greater than zero and smaller or equal to n.
3. digital light according to claim 1 and 2 is handled projection combination system, and it is characterized in that: described gauge tap is a relay.
CNU2007201188117U 2007-03-05 2007-03-05 Digital light processing projection split-joint wall system Expired - Fee Related CN201017159Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201188117U CN201017159Y (en) 2007-03-05 2007-03-05 Digital light processing projection split-joint wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201188117U CN201017159Y (en) 2007-03-05 2007-03-05 Digital light processing projection split-joint wall system

Publications (1)

Publication Number Publication Date
CN201017159Y true CN201017159Y (en) 2008-02-06

Family

ID=39057654

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201188117U Expired - Fee Related CN201017159Y (en) 2007-03-05 2007-03-05 Digital light processing projection split-joint wall system

Country Status (1)

Country Link
CN (1) CN201017159Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093718A (en) * 2012-12-19 2013-05-08 广东威创视讯科技股份有限公司 Tiled display system and power-supply method of the same
CN111314678A (en) * 2018-12-12 2020-06-19 深圳光峰科技股份有限公司 Power supply system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093718A (en) * 2012-12-19 2013-05-08 广东威创视讯科技股份有限公司 Tiled display system and power-supply method of the same
CN111314678A (en) * 2018-12-12 2020-06-19 深圳光峰科技股份有限公司 Power supply system

Similar Documents

Publication Publication Date Title
CN104158282B (en) A kind of two-way switching control power circuit and high voltage converter
CN102916409A (en) Voltage-time type feeder automation running method based on parameter adjustment
CN105119372A (en) Station area wire outlet leakage current protection breaker remote closing system and remote closing method
CN205427552U (en) High -voltage switch intelligent control ware
CN1967642B (en) LED display screen and its power supply system
CN103560512A (en) High-reliability closed loop wiring method of medium voltage distribution network
CN204029047U (en) A kind of pre-payment control box
CN201017159Y (en) Digital light processing projection split-joint wall system
CN107845519B (en) Double power supply automatic transfer switch and its control method
CN202678155U (en) A lock-up control circuit between a motor power supply and a control power supply of a knife switch mechanism
CN210927077U (en) Residual current protection device with uninterrupted power supply test function
CN201369179Y (en) Main/standby power supply circuit for digital equipment of nuclear power plant
CN205249258U (en) BYPASS system
CN201717670U (en) Dual-power-supply switching device with overvoltage protection
CN112086868B (en) Outdoor switch box automated complete equipment control circuit
CN114552758A (en) Automatic standby power supply switching method and system suitable for bus multi-path incoming line
CN201616693U (en) Intelligent power supply device
CN201352783Y (en) Electronic switching device
CN206907721U (en) A kind of breaker electric spring operating mechanism separating brake control loop
CN102361352B (en) Change-over switch integration circuit for circuit breaker of intelligent converting station
CN207442421U (en) A kind of microcomputer protecting device
CN202102989U (en) Control system for accessory module of miniature circuit breaker
CN106444605B (en) Permanent magnet switch intelligent controller realized by PLC
CN204989899U (en) Be applied to on -off system of high voltage direct current occasion
CN215835189U (en) Electrical control cabinet used in pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080206