CN200996758Y - Central air-conditioner system of double energy source cold-hot water apparatus set - Google Patents

Central air-conditioner system of double energy source cold-hot water apparatus set Download PDF

Info

Publication number
CN200996758Y
CN200996758Y CN 200620147105 CN200620147105U CN200996758Y CN 200996758 Y CN200996758 Y CN 200996758Y CN 200620147105 CN200620147105 CN 200620147105 CN 200620147105 U CN200620147105 U CN 200620147105U CN 200996758 Y CN200996758 Y CN 200996758Y
Authority
CN
China
Prior art keywords
hot water
cold
evaporimeter
double energy
energy sources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620147105
Other languages
Chinese (zh)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620147105 priority Critical patent/CN200996758Y/en
Application granted granted Critical
Publication of CN200996758Y publication Critical patent/CN200996758Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

A central air conditioning system for a dual-energy cold/hot water unit comprises an outdoor unit and an indoor fan coil pipe, which is characterized in that the outdoor unit is a dual-energy cold/hot water unit, in which a gas boiler and a compressor, a condenser, and an evaporator water tank are installed; in the evaporator water tank, an evaporator is installed; the input/output hot water pipe of the gas boiler, the input/output cold water pipe of the evaporator water tank, as well as the fan coil pipe, a circulation pump and the connecting pipes, etc. form a circulating loop.

Description

Double energy sources cold and hot water unit central air conditioner system
Technical field:
The utility model relates to the HVAC technical field, is specifically related to a kind of double energy sources cold and hot water unit central air conditioner system.
Background technology:
The present widely used freon compacting air-conditioning system of people, in the good refrigeration effect in summer, and in winter, owing to the heat energy that relies on fully in the absorption chamber outer air, be converted into the indoor set heat radiation, winter, outdoor air was low with regard to temperature originally, and heat is few, so the air-conditioning heating effect is poor, and weather is cold more, heating effect is poor more, so that the off-premises station frosting is icing, and can't operate as normal.This winter, the problem of heating effect difference became the technical barrier of freon compacting air-conditioning system.
Summary of the invention:
Technical problem to be solved in the utility model is: solve the problem that above-mentioned prior art exists, and provide a kind of and have power fuel dual intensity source, be not subjected to that temperature influences, winter heat energy abundance, cooling and warming efficient height and transmission system, the simple double energy sources cold and hot water unit of fan coil pipe structure central air conditioner system.
The technical solution adopted in the utility model is: this double energy sources cold and hot water unit central air conditioner system is made up of off-premises station and indoor fan coil pipe two parts, off-premises station is the double energy sources cold and hot water unit, gas fired-boiler and compressor, condenser, evaporimeter water tank are installed in the double energy sources cold and hot water unit, in the evaporimeter water tank evaporimeter is installed, the input of the input of gas fired-boiler, heat outputting waterpipe, evaporimeter water tank, output cold water pipes and fan coil, circulating pump, connecting pipe constitute closed circuit.
In the technique scheme, the input of the input of gas fired-boiler, heat outputting waterpipe and evaporimeter water tank, output cold water pipes are connected in parallel.
In the technique scheme, the external pipe of a plurality of fan coils is parallel with one another, and one group of coil pipe only is installed in each fan coil.
In the technique scheme, two cover compressors, condenser, evaporimeter are installed in the double energy sources cold and hot water unit, the circulatory system of two complete equipments is independent separately, but two evaporimeters are all installed concentratedly in an evaporimeter water tank.
Off-premises station of the present utility model is the double energy sources cold and hot water unit of gas fired-boiler and compressor, condenser, evaporimeter water tank, hot day by the evaporimeter water tank to indoor fan coil pipe cooling, winter by gas fired-boiler to the heat supply of indoor fan coil pipe, Cooling and Heat Source is independent respectively, but output-parallel, cooling and heating type is effective, and the energy abundance, has particularly solved the technical barrier of existing freon compacting air-conditioning system pyrogenicity in winter weak effect.Even more important, the utility model is installed on the evaporimeter of compression-type refrigeration in the water tank dexterously, changed the mode that traditional evaporimeter carries out air heat exchange refrigeration by the blower fan blowing, carry out heat exchange refrigeration by recirculated water in the water tank and evaporimeter, this ingenious design helps to the indoor fan coil pipe unification and carries out the hydrophily circulation, thereby one group of coil pipe only need be set in the fan coil can be cold and hot shared, the medium pipeline of off-premises station and indoor machine wind coiler also only needs two, has greatly simplified fan coil pipe structure and circulating pipeline structure capable.The utility model is a technical much progress with respect to being provided with two groups in the sort of fan coil mutually independently for the coil pipe.So the utility model is skillfully constructed, reasonable in design, simple in structure, not influenced by temperature, the heat energy abundance, cooling and heating type efficient height, technical performance is good.
Description of drawings:
Fig. 1 is the utility model schematic diagram
Fig. 2 is the utility model structure front view
Fig. 3 is the utility model structure rearview
Fig. 4 is the utility model structure right view
Fig. 5 is the utility model structure left view
Fig. 6 is the utility model structure vertical view
Fig. 7 is the utility model structure upward view
The specific embodiment:
Referring to Fig. 1~Fig. 7, this double energy sources cold and hot water unit is made up of off-premises station 1 and indoor fan coil pipe 2 two parts, off-premises station 1 is the double energy sources cold and hot water unit, gas fired-boiler 3 and compressor 4, condenser 5, evaporimeter water tank 6 are installed in the double energy sources cold and hot water unit, evaporimeter 7 is installed in the evaporimeter water tank 6, the input hot water pipeline 8 of gas fired-boiler, heat outputting waterpipe 9 all connect fan coil 2, circulating pump 12 and connecting pipe 13 thereof with input cold water pipes 10, the output cold water pipes 11 of evaporimeter water tank, constitute closed circuit.The input hot water pipeline 8 of above-mentioned gas fired-boiler, heat outputting waterpipe 9 all connect fan coil 2, circulating pump 12 and connecting pipe 13 thereof with input cold water pipes 10, the output cold water pipes 11 of evaporimeter water tank, constitute closed circuit.The input hot water pipeline 8 of above-mentioned gas fired-boiler, heat outputting waterpipe 9 and evaporimeter input cold water pipes 10,11 in parallel connections of output cold water pipes.Fan coil 2 can be for a plurality of, and the external pipe of a plurality of fan coils is parallel with one another.Two cover compressors, condenser, evaporimeter are installed in the above-mentioned double energy sources cold and hot water unit, and the circulatory system of two complete equipments is independent separately, but two evaporimeters are all installed concentratedly in an evaporimeter water tank.

Claims (4)

1, a kind of double energy sources cold and hot water unit central air conditioner system, form by off-premises station and indoor fan coil pipe two parts, it is characterized in that off-premises station is the double energy sources cold and hot water unit, gas fired-boiler and compressor, condenser, evaporimeter water tank are installed in the double energy sources cold and hot water unit, in the evaporimeter water tank evaporimeter is installed, the input of the input of gas fired-boiler, heat outputting waterpipe and evaporimeter water tank, output cold water pipes and fan coil, circulating pump, connecting pipe constitute closed circuit.
2, double energy sources cold and hot water unit central air conditioner system according to claim 1 is characterized in that the input of input, heat outputting waterpipe and the evaporimeter water tank of gas fired-boiler, output cold water pipes are connected in parallel.
3, double energy sources cold and hot water unit central air conditioner system according to claim 1 is characterized in that the external pipe of a plurality of fan coils is parallel with one another, and one group of coil pipe only is installed in each fan coil.
4, double energy sources cold and hot water unit central air conditioner system according to claim 1, it is characterized in that being equipped with in the double energy sources cold and hot water unit two cover compressors, condenser, evaporimeter, the circulatory system of two complete equipments is independent separately, but two evaporimeters are all installed concentratedly in an evaporimeter water tank.
CN 200620147105 2006-12-29 2006-12-29 Central air-conditioner system of double energy source cold-hot water apparatus set Expired - Lifetime CN200996758Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620147105 CN200996758Y (en) 2006-12-29 2006-12-29 Central air-conditioner system of double energy source cold-hot water apparatus set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620147105 CN200996758Y (en) 2006-12-29 2006-12-29 Central air-conditioner system of double energy source cold-hot water apparatus set

Publications (1)

Publication Number Publication Date
CN200996758Y true CN200996758Y (en) 2007-12-26

Family

ID=38995190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620147105 Expired - Lifetime CN200996758Y (en) 2006-12-29 2006-12-29 Central air-conditioner system of double energy source cold-hot water apparatus set

Country Status (1)

Country Link
CN (1) CN200996758Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628601A (en) * 2012-04-26 2012-08-08 山东创尔沃热泵技术股份有限公司 Double-energy-source comfortable air conditioning system
CN102887153A (en) * 2012-09-03 2013-01-23 上海科泰运输制冷设备有限公司 Train air conditioning unit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628601A (en) * 2012-04-26 2012-08-08 山东创尔沃热泵技术股份有限公司 Double-energy-source comfortable air conditioning system
CN102628601B (en) * 2012-04-26 2014-07-16 山东创尔沃热泵技术股份有限公司 Double-energy-source comfortable air conditioning system
CN102887153A (en) * 2012-09-03 2013-01-23 上海科泰运输制冷设备有限公司 Train air conditioning unit
CN102887153B (en) * 2012-09-03 2015-07-22 上海科泰运输制冷设备有限公司 Train air conditioning unit

Similar Documents

Publication Publication Date Title
CN101476760B (en) Multi-heat source dwelling house comfortable integration system based on solar energy
CN100443826C (en) Multifunction geothermal-energy heat pump radiation air-conditioner and water heating system
CN101603715B (en) Ground source heat pump air-conditioning system and air processing method thereof
CN203869369U (en) Cooling and heating combined unit
CN101793449A (en) Multi-heat-source heat pump system
CN102418969A (en) Integral air source and ground source composite heat pump device
CN202853021U (en) Buried tube and tubular indirect and direct three-stage composite type evaporative cooling air conditioning unit
CN101216225A (en) Double temperature cold water/cold air unit
CN104864627A (en) Double heating, refrigerating, water heating and dehumidifying system
CN105627623A (en) Novel solar energy-air energy combined heat pump cold-heat combined supply unit
CN101603716A (en) A kind of geothermal-energy heat pump radiation air-conditioner system and fresh air processing method thereof
CN104154609A (en) Dual-system heat pump roof unit
CN102914012A (en) Solar energy and water-cooling air-cooling air-conditioning unit combined cold and hot domestic hot water integrated unit
CN101210719A (en) Double energy sources cold and hot water set central air-conditioning system
CN102445022A (en) Air-conditioner heat pump hot-water and solar heating integrated system
CN103307674A (en) Heat pump air-conditioning system combining air source heat pump with small temperature difference heat exchange tail end
CN103453691A (en) Three-in-one air conditioner and hot water supply device
CN202452760U (en) Air conditioning system with floor heating and hygiene hot water functions
CN200996758Y (en) Central air-conditioner system of double energy source cold-hot water apparatus set
CN205351573U (en) Air -cooled computer lab air condensing units
CN103292398A (en) Composite air conditioning system integrating air-blowing air conditioner with radiation tail end
CN202403346U (en) Air-conditioner cooling device with refrigerant as intermediate cooling medium
CN102226554A (en) Direct expansion variable air volume air-handing unit using water-cooling refrigerant
CN104675719A (en) Fan
CN201014834Y (en) Earth source heat pump radiation air conditioner and water heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGSHA BROAD HOMES INDUSTRIAL INTERNATIONAL CO.,

Free format text: FORMER OWNER: ZHANG JIAN

Effective date: 20140905

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410000 CHANGSHA, HUNAN PROVINCE TO: 410013 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140905

Address after: 410013 Changsha high tech Development Zone, Yuelu, Hunan Avenue, Changsha Yuanda Industrial Group Co., Ltd.

Patentee after: CHANGSHA BROAD HOMES INDUSTRIAL INTERNATIONAL CO., LTD.

Address before: 410000 Hunan Yuanda road SUZUKI Housing Equipment Co., Ltd., Yuelu, Yuelu District, Changsha, Hunan

Patentee before: Zhang Jian

CX01 Expiry of patent term

Granted publication date: 20071226

EXPY Termination of patent right or utility model