CN200993008Y - Horizontal well looped pipeline testing device - Google Patents

Horizontal well looped pipeline testing device Download PDF

Info

Publication number
CN200993008Y
CN200993008Y CNU2006202010598U CN200620201059U CN200993008Y CN 200993008 Y CN200993008 Y CN 200993008Y CN U2006202010598 U CNU2006202010598 U CN U2006202010598U CN 200620201059 U CN200620201059 U CN 200620201059U CN 200993008 Y CN200993008 Y CN 200993008Y
Authority
CN
China
Prior art keywords
horizontal well
looped pipeline
sucker rod
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2006202010598U
Other languages
Chinese (zh)
Inventor
王存江
韩吉声
努尔买买提
袁新生
艾尼瓦尔
吴志凯
刘建荣
李新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG PETROLEUM ADMINISTRATION OIL-PRODUCTION TECHNOLOGY INST
Original Assignee
XINJIANG PETROLEUM ADMINISTRATION OIL-PRODUCTION TECHNOLOGY INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG PETROLEUM ADMINISTRATION OIL-PRODUCTION TECHNOLOGY INST filed Critical XINJIANG PETROLEUM ADMINISTRATION OIL-PRODUCTION TECHNOLOGY INST
Priority to CNU2006202010598U priority Critical patent/CN200993008Y/en
Application granted granted Critical
Publication of CN200993008Y publication Critical patent/CN200993008Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a testing device of oil field and oil well, which is a horizontal well looped pipeline device, and comprises a regular service rig of oil field, a regular sucker rod, an idler wheel centralizer unit and an underground electronic formula pressure gauge. The outer end of the regular sucker rod is arranged on the regular service rig of oil field, and the idler wheel centralizer unit is arranged on the end of the regular sucker rod. The underground electronic formula pressure gauge is arranged on end of the idler wheel centralizer unit. The utility model has the advantages of reasonable and compact structure. By utilizing the horizontal well looped pipeline device, under the condition of not destroying the stratum temperature and pressure, the utility model can realize to conveniently test the temperature and the pressure of the horizontal well.

Description

Horizontal well looped pipeline testing arrangement
One, technical field:
The utility model relates to the testing arrangement of oilfield, is a kind of horizontal well looped pipeline testing arrangement.
Two, background technology:
The testing arrangement of oil field existing level well downhole production phase temperature has three kinds.First kind is that winch wire send the tester formula, and its existence can't enter the drawback of horizontal segment; Second kind is the pumping instrumentation style, and it influences test result because of employed pumped liquid to the destruction of formation temperature, pressure field; The third is that the coiled tubing car is tested, and its expense is higher.
Three, summary of the invention:
The utility model provides a kind of horizontal well looped pipeline testing arrangement, and it efficiently solves the problem that above-mentioned prior art exists, and can realize the test to horizontal well easily.
The technical solution of the utility model realizes by following measure: a kind of horizontal well looped pipeline testing arrangement, it comprises the conventional workover rig in oil field, conventional sucker rod, rolling wheel centralizer group and down-hole electronic pressure meter, the outer end of conventional sucker rod is installed on the conventional workover rig in oil field, the rolling wheel centralizer group is installed in the end of conventional sucker rod, and down-hole electronic pressure meter is installed in the end of rolling wheel centralizer group.
Be further optimization and/or improvements below to above-mentioned technical solutions of the utility model:
Above-mentioned down-hole electronic pressure meter can be installed in the end of rolling wheel centralizer group by crossover sub.
The end of above-mentioned down-hole electronic pressure meter can be equipped with guide head.
The utility model reasonable and compact in structure utilizes this horizontal well looped pipeline testing arrangement can be conveniently implemented under the situation of not destroying formation temperature, pressure field, horizontal well is carried out the test of temperature, pressure.
Four, description of drawings:
Accompanying drawing 1 is the main TV structure schematic diagram of the utility model most preferred embodiment,
Coding in the accompanying drawing is respectively: 1 is the conventional workover rig in oil field, and 2 is conventional sucker rod, and 3 is the rolling wheel centralizer group, and 4 is down-hole electronic pressure meter, and 5 for being responsible for, and 6 is looped pipeline.
Five, the specific embodiment:
The utility model is not subjected to the restriction of following embodiment, can determine concrete embodiment according to the technical solution of the utility model and actual conditions.
Below in conjunction with most preferred embodiment and accompanying drawing the utility model is further described:
As shown in Figure 1, this horizontal well looped pipeline testing arrangement comprises the conventional workover rig 1 in oil field, conventional sucker rod 2, rolling wheel centralizer group 3 and down-hole electronic pressure meter 4, the outer end of conventional sucker rod 2 is installed on the conventional workover rig 1 in oil field, rolling wheel centralizer group 3 is installed in the end of conventional sucker rod 2, and down-hole electronic pressure meter 4 is installed in the end of rolling wheel centralizer group 3.
Can according to actual needs above-mentioned horizontal well looped pipeline testing arrangement be made further optimization and/or improvements:
As shown in Figure 1, down-hole electronic pressure meter 4 is installed in the end of rolling wheel centralizer group 3 by crossover sub, and the end of down-hole electronic pressure meter 4 is equipped with guide head.
In the utility model: the conventional workover rig 1 in oil field, conventional sucker rod 2, rolling wheel centralizer group 3 and down-hole electronic pressure meter 4 all adopt known technology.
Above technical characterictic has constituted most preferred embodiment of the present utility model, and it has stronger compliance and best implementation result, can increase and decrease non-essential technical characterictic according to actual needs, satisfies the demand of different situations.
The course of work of the utility model most preferred embodiment is as follows: generally after the oil well blowing finishes, before changing pumping over to, utilize this horizontal well looped pipeline testing arrangement to rely on conventional sucker rod 2 deadweights that down-hole electronic pressure meter 4 is sent into the different test layers of horizontal well looped pipeline position, realize the test of temperature, pressure.

Claims (3)

1, a kind of horizontal well looped pipeline testing arrangement, comprise the conventional workover rig in oil field, conventional sucker rod, rolling wheel centralizer group and down-hole electronic pressure meter, the outer end that it is characterized in that conventional sucker rod is installed on the conventional workover rig in oil field, the rolling wheel centralizer group is installed in the end of conventional sucker rod, and down-hole electronic pressure meter is installed in the end of rolling wheel centralizer group.
2, horizontal well looped pipeline testing arrangement according to claim 1 is characterized in that down-hole electronic pressure meter is installed in the end of rolling wheel centralizer group by crossover sub.
3, horizontal well looped pipeline testing arrangement according to claim 1 and 2 is characterized in that the end of down-hole electronic pressure meter is equipped with guide head.
CNU2006202010598U 2006-12-18 2006-12-18 Horizontal well looped pipeline testing device Expired - Lifetime CN200993008Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006202010598U CN200993008Y (en) 2006-12-18 2006-12-18 Horizontal well looped pipeline testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006202010598U CN200993008Y (en) 2006-12-18 2006-12-18 Horizontal well looped pipeline testing device

Publications (1)

Publication Number Publication Date
CN200993008Y true CN200993008Y (en) 2007-12-19

Family

ID=38946085

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006202010598U Expired - Lifetime CN200993008Y (en) 2006-12-18 2006-12-18 Horizontal well looped pipeline testing device

Country Status (1)

Country Link
CN (1) CN200993008Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793146A (en) * 2010-03-19 2010-08-04 中国石油天然气股份有限公司 Method for testing strata of horizontal well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793146A (en) * 2010-03-19 2010-08-04 中国石油天然气股份有限公司 Method for testing strata of horizontal well
CN101793146B (en) * 2010-03-19 2013-02-20 中国石油天然气股份有限公司 Method for testing strata of horizontal well

Similar Documents

Publication Publication Date Title
CN202596684U (en) Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN104100254A (en) Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof
CN105041298A (en) Device and method for wirelessly positioning depths of strings in real time during coiled tubing operation
CN103590811B (en) A kind of extended reach well drill string stuck point detection experimental facilities and method
CN202064936U (en) Wireless-transmission borehole shutin pressure measuring device
CN205977204U (en) Concertina type mechanical type collar locator
CN201288544Y (en) Combined test instrument for flow seal inspection
CN200993008Y (en) Horizontal well looped pipeline testing device
CN203685169U (en) Offshore pressure measurement system with capillary tube
CN201620785U (en) Pressure-controlled hydraulic pushing tool
CN203321507U (en) Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well
CN207598230U (en) A kind of shaft bottom negative pressure monitoring device
US11952887B2 (en) Plunger lift systems and related methods
CN203394513U (en) Pressure-control damping waterpower pushing device
CN208950572U (en) The wriggling test device of down-hole string
CN202256121U (en) Device for testing and contrasting corrosion of underground oil pipe
CN203531835U (en) High-temperature high-pressure full-drift-diameter shear pin packer
CN203547716U (en) Measurement experiment device for drill column clamping point of large-displacement well
CN2929159Y (en) Hot production wellhead device
CN114458274A (en) Rock capacity expansion method
CN2793299Y (en) Drawn driller
CN202755957U (en) Constant proportion dropping-fishing-free seperated layer water injection technique tubular pipe
CN109424355B (en) Method and device for acquiring collapse state of oil well
CN205677593U (en) A kind of coiled tubing sandblasting pressure break test string
CN201778767U (en) Integrated pipe string for looking for water proofing, water plugging, acidification and plugging breaking

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20071219

EXPY Termination of patent right or utility model