CN200992473Y - Skid-mounted rig integral transfer device - Google Patents
Skid-mounted rig integral transfer device Download PDFInfo
- Publication number
- CN200992473Y CN200992473Y CN 200620166031 CN200620166031U CN200992473Y CN 200992473 Y CN200992473 Y CN 200992473Y CN 200620166031 CN200620166031 CN 200620166031 CN 200620166031 U CN200620166031 U CN 200620166031U CN 200992473 Y CN200992473 Y CN 200992473Y
- Authority
- CN
- China
- Prior art keywords
- steel rope
- rig
- steel wire
- wire rope
- skid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
An integral transporting device for sledge type drilling machine overcomes the shortcomings of the prior art. The device is characterized in that a travelling block group (1) consisted of six pulleys is connected with a base of the drilling machine (4) through a connection steel wire rope (3); a crown block group (2) consisted of six pulleys is connected with an anchor block (6) fixed on the ground through a fixation steel wire rope (5); a steel wire rope (7) surrounds the crown and travelling block group (2.1) in sequence and the two end of the steel wire rope (7) is connected with the base of the drilling machine (4) and a hook block (8). The device has the advantages of low energy consumption, short preparatory period, low labor intensity, low removal cost, stable operation, safety and reliability.
Description
Technical field:
The utility model relates to resettlement device used in the oil drilling field, especially the whole board migration device of skid rig.
Background technology:
Along with Oilfield developing, technology constantly develops, and requires more and more higher to the drilling well operation.In order to improve drilling efficiency, reduce cost of drilling, rig moves the employing integral type.And the whole movement of rig at present needs 12 trac.s to drag, personnel need about 35 people, the manpower and the material resources that so just exist input are many, and setup time is long, and labor strength is big, the migration cost height, running stability is poor, has potential safety hazard, and do not construct night, the problem that construction cycle is long is unfavorable for applying.
The utility model content:
In order to solve the deficiency in the background technology, the utility model provides a kind of skid rig whole board migration device, and the whole board migration device of this skid rig is not only few with manpower and material resources, setup time is short, and labor strength is little, and it is low to have migration cost, operate steadily safe and reliable characteristics.
The technical solution of the utility model is: the whole board migration device of this skid rig comprises fixed pulley group and running block, the running block of being made up of 6 pulleys is connected with rig substructure by connecting steel rope, the fixed pulley group of forming by 6 pulleys by fixing steel rope be fixed on underground earth anchor and be connected, be wound with steel rope in order between fixed, running block, the steel rope two ends is connected with rig substructure and hook block respectively.
The utlity model has following beneficial effect: the whole board migration device of this skid rig is owing to take such scheme, steel rope one end is linked to each other with colluding greatly, by the pulling of the winch on the rig, can reach the purpose that integral body drags rig, thereby reduce manpower and material resources, shortened setup time, reduce labor strength, it is low to reduce migration cost, operates steadily, safe and reliable, help applying.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
1-running block among the figure, 2-fixed pulley group, 3-connects steel rope, the 4-rig substructure, 5-is steel rope fixedly, 6-earth anchor, 7-steel rope, 8-hook block.
The specific embodiment:
The utility model is described in further detail below in conjunction with accompanying drawing:
By shown in Figure 1, the whole board migration device of this skid rig comprises fixed pulley group 2 and running block 1, the running block of being made up of 6 pulleys 1 is connected with rig substructure 4 by connecting steel rope 3, the fixed pulley group of forming by 6 pulleys 2 by fixing steel rope 5 be fixed on underground earth anchor 6 and be connected, fixed, running block (2,1) be wound with steel rope 7 between in order, steel rope 7 two ends are connected with rig substructure 4 and hook block 8 respectively.
During actual the use, at first running block 1 and rig substructure 4 are coupled together by connecting steel rope 3, by fixing steel rope 5 earth anchor 6 and fixed pulley group 2 are coupled together then, by steel rope 7 running block 1 and fixed pulley group 2 are coupled together again, start winch at last by hook block 8 pulling steel ropes 7, steel rope 7 moves by running block 1 pulling rig substructure 4, has realized the whole movement of rig.Because of running block 1 can be laborsaving, simultaneously simple in structure, thus reduced manpower and material resources, reduce labor strength, it is low to reduce migration cost, operates steadily, and safe and reliable, also can construct night, and setup time is few, has shortened construction cycle.The whole board migration device of this skid rig is not only few with manpower and material resources thus, and setup time is short, and labor strength is little, and it is low to have migration cost, operates steadily, and is safe and reliable, and can construct night, the characteristics that construction cycle is short.
Claims (1)
1, the whole board migration device of a kind of skid rig, comprise fixed pulley group (2) and running block (1), it is characterized in that: the running block of being made up of 6 pulleys (1) is connected with rig substructure (4) by connecting steel rope (3), the fixed pulley group of forming by 6 pulleys (2) by fixing steel rope (5) be fixed on underground earth anchor (6) and be connected, fixed, running block (2,1) be wound with steel rope (7) between in order, steel rope (7) two ends is connected with rig substructure (4) and hook block (8) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620166031 CN200992473Y (en) | 2006-12-11 | 2006-12-11 | Skid-mounted rig integral transfer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620166031 CN200992473Y (en) | 2006-12-11 | 2006-12-11 | Skid-mounted rig integral transfer device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN200992473Y true CN200992473Y (en) | 2007-12-19 |
Family
ID=38945548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620166031 Expired - Fee Related CN200992473Y (en) | 2006-12-11 | 2006-12-11 | Skid-mounted rig integral transfer device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN200992473Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101881135A (en) * | 2010-06-28 | 2010-11-10 | 中原特种车辆有限公司 | Understructure of novel drilling machine base |
CN104787710A (en) * | 2015-04-23 | 2015-07-22 | 张伟强 | Linear motion reinforcement module with pulley block |
CN107381461A (en) * | 2017-07-24 | 2017-11-24 | 中国石油集团渤海钻探工程有限公司 | Soft chiltern water zone rig is whole to drag technique |
-
2006
- 2006-12-11 CN CN 200620166031 patent/CN200992473Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101881135A (en) * | 2010-06-28 | 2010-11-10 | 中原特种车辆有限公司 | Understructure of novel drilling machine base |
CN101881135B (en) * | 2010-06-28 | 2015-02-04 | 中原特种车辆有限公司 | Understructure of novel drilling machine base |
CN104787710A (en) * | 2015-04-23 | 2015-07-22 | 张伟强 | Linear motion reinforcement module with pulley block |
CN104787710B (en) * | 2015-04-23 | 2017-02-01 | 张伟强 | Linear motion reinforcement module with pulley block |
CN107381461A (en) * | 2017-07-24 | 2017-11-24 | 中国石油集团渤海钻探工程有限公司 | Soft chiltern water zone rig is whole to drag technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203499574U (en) | Lifting system for petroleum drilling machine | |
CN204251168U (en) | Multi-rope friction hoist head rope changes system without stable car | |
CN201310342Y (en) | Continuous-tube well logging machine | |
CN200992473Y (en) | Skid-mounted rig integral transfer device | |
CN205135406U (en) | Can dash rig of filling thick liquid | |
CN206767425U (en) | A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage | |
CN204609435U (en) | The auxiliary tower that hoists of emergent repairing tower | |
CN201679005U (en) | Steel puller | |
CN103669978A (en) | Multifunctional hoop device for assembling embracing rods | |
CN202578562U (en) | Lifting device of drilling machine | |
CN2880783Y (en) | Driller near distance integrated pulling device | |
CN212127323U (en) | Cableway with hoisting function | |
CN205076774U (en) | Mining underground operation face lifts by crane platform device fast | |
CN202596680U (en) | Fixed type oil fishing machine | |
CN2174560Y (en) | Cable-feeding apparatus for tower type derrick | |
CN207293979U (en) | A kind of mine inclined lifting device | |
CN207999218U (en) | A kind of mast installation and rotary drilling rig | |
CN201843509U (en) | Quick power head lifting device and vehicle-mounted drill using same | |
CN202575684U (en) | Prefabricated-slab hoisting tool | |
CN204782939U (en) | Pumping, well workover car | |
CN201943623U (en) | Oil pipe hydraulic jacking struck releasing device for ocean oil gas producing platform well repairing | |
CN202116206U (en) | Lifting jack for post-tensioned precast box girder | |
CN201665501U (en) | Lifting device used during dismantling fully mechanized mining bracket | |
CN219689085U (en) | Lifting device for moving oil cylinder of underground fully-mechanized mining face of coal mine | |
CN205775665U (en) | Steel rail dragging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |