CN200988740Y - Circular suspension arm container crane - Google Patents

Circular suspension arm container crane Download PDF

Info

Publication number
CN200988740Y
CN200988740Y CN 200620063263 CN200620063263U CN200988740Y CN 200988740 Y CN200988740 Y CN 200988740Y CN 200620063263 CN200620063263 CN 200620063263 CN 200620063263 U CN200620063263 U CN 200620063263U CN 200988740 Y CN200988740 Y CN 200988740Y
Authority
CN
China
Prior art keywords
ring type
dolly
rail
type overhanging
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620063263
Other languages
Chinese (zh)
Inventor
田亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620063263 priority Critical patent/CN200988740Y/en
Application granted granted Critical
Publication of CN200988740Y publication Critical patent/CN200988740Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a ring-cantilever container crane comprising a crane supporting frame (2), a ring-cantilever (1) and a dolly (3). Rollers (8) are arranged on the feet of the crane supporting frame (2); the ring-cantilever (1) is arranged at the top of the crane supporting frame (2) horizontally and appears a close ring, which is circularly formed by two parallel steel beams or a single steel beam; dolly tracks (12) are arranged at the inner sides of the two parallel steel beams opposite to each other or the both sides of the single steel beam; the track (12) is laid along the steel beam to from a close ring; one more dollies (3) are arranged on the track (12) and each dolly (3) is a separate lifting device and comprises a sling shelf and a telescopic sling. The dollies (3) can all perform circular and continuous loading and unloading on the track (12).

Description

A kind of container crane with ring type overhanging rail
Technical field
The utility model relates to the technical field of port and pier with handling equipment, particularly a kind of container crane with ring type overhanging rail device that is applied in efficient loading and unloading container on the port and pier.
Background technology
At present the hoisting crane of loading and unloading container can only each round carrying on ship, every cranage inefficiency.Adopt many hoisting cranes to work simultaneously to realize in order to raise the efficiency to have only, but many hoisting cranes again can't operation in limited space.Along with the maximization of ships that transport, the handling capacity that requires the unit hour in a berth of port and pier should have 350TEV/ hour, this is the target that present hoisting crane is difficult to realize, therefore, wanting to improve handling efficiency has become a global difficult problem.U type basin in order to solve the handling efficiency problem, was once designed in the best largest Amsterdam, the Netherlands port of efficient in the world, respectively disposed many hoisting cranes in the basin both sides, but because boats and ships turnover U type basin very difficulty and withdraw from use.The Shanghai Huagang mouth machinery group of shaking designs the hoisting crane of two casing workings, has improved the loading and unloading benefit relatively, but also is not a kind of actv. solution.
Summary of the invention
The purpose of this utility model has been to overcome the shortcoming of existing hoisting crane poor efficiency, and a kind of new and effective container crane with ring type overhanging rail device is provided, and it can improve handling efficiency and reach more than the several times.
To achieve these goals, the utility model adopts following technical proposals:
A kind of container crane with ring type overhanging rail comprises crane support, ring type overhanging rail, dolly.Foot at crane support is equipped with roller, be provided with the ring type overhanging rail of level on the top of crane support, ring type overhanging rail is closed ringwise, by two parallel girder steels or wall scroll girder steel around forming, both sides at two parallel girder steel opposed inside or wall scroll girder steel are provided with vehicle guide, and guide rail lays closed ringwise along girder steel.Dolly is installed more than one on the guide rail, every dolly is a lifting mechanism independently, comprises that suspender is put on the shelf and telescopic spreader, and these dollies all can be made annular continual handling labor along guide rail.Every dolly will be under the control of operating personal, and each keeps relative safety distance to carry out work simultaneously.Novel container crane with ring type overhanging rail is placed on the track that lays along harbour bank or other place, and the roller of crane support can be come and gone along track and be moved by driven by power.
In order to further specify above-mentioned purpose of the present utility model, constructional feature and effect, the utility model is described in detail below with reference to accompanying drawing.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a plan structure scheme drawing of the present utility model.
The specific embodiment
Referring to Fig. 1, shown in Figure 2, this container crane with ring type overhanging rail comprises crane support (2), ring type overhanging rail (1), dolly (3).Foot at crane support (2) is equipped with roller (8), and ring type overhanging rail (1) is horizontally set on the top of crane support (2), and closed ringwise.Ring type overhanging rail (1) around forming, is provided with vehicle guide (12) in the both sides of two parallel girder steel (13) opposed inside or wall scroll girder steel by two parallel girder steels (13) or wall scroll girder steel, and guide rail (12) lays closed ringwise along girder steel.Dolly (3) is arranged on the guide rail (12), quantity is more than one, every dolly (3), (4), (5), (6), (7) ... be a lifting mechanism independently, all there is suspender to put on the shelf and telescopic spreader, these dollies all can be made annular continual handling labor along guide rail (12), and the electric power of dolly obtains by the conductor rail that is located on the cantilever.Every dolly will be under the control of operating personal, and each keeps relative safety distance to carry out work simultaneously.Container crane with ring type overhanging rail is placed on the track (9) that lays along harbour bank or other place, and the roller (8) of crane support (2) foot can come and go along track (9) and move under the driving of electric power.
The staff controls dolly (3) from boats and ships (10) freight container (11) of slinging during use, hang oneself by boats and ships (10) and to transport on the lorry on bank, in the handling process of dolly (3), the staff can operate dolly (4) simultaneously, (5), (6), (7) keep a safe distance and carry out lifting work respectively, after dolly (3) unloads case, just make way for dolly (4) and unload case, and dolly (3) will be followed in dolly (7) back wait lifting once more, dolly (4) is just followed successively in the wait lifting work of dolly (3) back after unloading case, so operation, all dollies all form successively and do the uninterrupted in the same way handling labor of annular along guide rail (12).
Because container crane with ring type overhanging rail adopts the uninterrupted in the same way handling labor of many dollies, improved the handling efficiency of hoisting crane greatly, can satisfy the loading and unloading needs of large ship freight container fully.

Claims (4)

1, a kind of container crane with ring type overhanging rail, comprise crane support, ring type overhanging rail, dolly, it is characterized in that: the ring type overhanging rail that is provided with level on the top of crane support, ring type overhanging rail by two parallel girder steels around forming, be provided with vehicle guide two parallel girder steel opposed inside, guide rail lays closed ringwise along girder steel, and dolly is installed on guide rail, dolly is a lifting mechanism independently, and it comprises that suspender is put on the shelf and telescopic spreader.
2, according to the described container crane with ring type overhanging rail of claim 1, it is characterized in that: described ring type overhanging rail level is rectangular round, or round, triangle.
3, according to the described container crane with ring type overhanging rail of claim 1, it is characterized in that: described ring type overhanging rail level is closed ringwise, its by two parallel girder steels around forming, or by the wall scroll girder steel around forming.
, according to the described container crane with ring type overhanging rail of claim 1, it is characterized in that: described dolly, its quantity that is installed on the guide rail is more than 1.
CN 200620063263 2006-08-23 2006-08-23 Circular suspension arm container crane Expired - Fee Related CN200988740Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620063263 CN200988740Y (en) 2006-08-23 2006-08-23 Circular suspension arm container crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620063263 CN200988740Y (en) 2006-08-23 2006-08-23 Circular suspension arm container crane

Publications (1)

Publication Number Publication Date
CN200988740Y true CN200988740Y (en) 2007-12-12

Family

ID=38939781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620063263 Expired - Fee Related CN200988740Y (en) 2006-08-23 2006-08-23 Circular suspension arm container crane

Country Status (1)

Country Link
CN (1) CN200988740Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104203800A (en) * 2011-11-29 2014-12-10 Apm终端有限公司 A crane
CN105314545A (en) * 2015-11-30 2016-02-10 华电重工股份有限公司 Control method for operation of double lifting trucks at shore bridge
CN113213328A (en) * 2021-04-30 2021-08-06 郑煤集团(河南)白坪煤业有限公司 Hoisting mechanism for mining equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104203800A (en) * 2011-11-29 2014-12-10 Apm终端有限公司 A crane
CN104203800B (en) * 2011-11-29 2017-04-05 Apm终端有限公司 Crane
US9617124B2 (en) 2011-11-29 2017-04-11 Apm Terminals Bv Crane
CN105314545A (en) * 2015-11-30 2016-02-10 华电重工股份有限公司 Control method for operation of double lifting trucks at shore bridge
CN113213328A (en) * 2021-04-30 2021-08-06 郑煤集团(河南)白坪煤业有限公司 Hoisting mechanism for mining equipment
CN113213328B (en) * 2021-04-30 2022-08-02 郑煤集团(河南)白坪煤业有限公司 Hoisting mechanism for mining equipment

Similar Documents

Publication Publication Date Title
CN101130422A (en) Container crane with ring type overhanging rail
CN205151582U (en) Novel rack and pinion luffing single -boom multipurpose stationary crane
CN201980880U (en) Hoisting device
CN200988740Y (en) Circular suspension arm container crane
CN205419566U (en) Automatic container terminals handling operation system of basin formula
CN205023761U (en) Workshop wall -hanging cantilever crane
CN103790390A (en) Glass plate hoisting system for large-span dome glass curtain wall construction and construction method thereof
CN103318771A (en) Bank crane with three sets of trolleys
CN202848930U (en) Multifunctional tower type crane
CN105384085A (en) Tower column type three-chord-member boom ship crane
CN102887437A (en) Double-super cantilever type electromagnetic gantry crane with large base distance
CN102071652B (en) Method and device for dragging large-tonnage object ashore
CN100341771C (en) Dual-dan container crane capable of hoisting dual 40-foot box
CN205973518U (en) Track portal jib crane
CN104943825A (en) Mechanical anti-sway method for marine weight lifting
CN201284102Y (en) Self-hoisting goods shelves
EP2586735B1 (en) Ship to shore crane with dual trolleys
CN100462298C (en) Double pony truck container crane capable of hoisting two 40-feet containers simultaneously
CN212712406U (en) Electric hoist gantry crane with good stability
CN107933834A (en) A kind of multifunction railway formula crane ship
CN2646112Y (en) Vertically and horizontally moving hydraulic hoisting convey beam trolley
CN211644372U (en) Container lock pad frame hoisting device for quayside container crane
CN100556793C (en) Integrated large loading-unloading volume container shore bridge
CN202465125U (en) Portal crane
CN107253672A (en) A kind of bank bridge and freight transportation method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071212