CN200985218Y - Reel for winding machine - Google Patents

Reel for winding machine Download PDF

Info

Publication number
CN200985218Y
CN200985218Y CN 200620134915 CN200620134915U CN200985218Y CN 200985218 Y CN200985218 Y CN 200985218Y CN 200620134915 CN200620134915 CN 200620134915 CN 200620134915 U CN200620134915 U CN 200620134915U CN 200985218 Y CN200985218 Y CN 200985218Y
Authority
CN
China
Prior art keywords
wedge
cushion block
reel
quadrant
reeler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620134915
Other languages
Chinese (zh)
Inventor
郑红专
赵林珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620134915 priority Critical patent/CN200985218Y/en
Application granted granted Critical
Publication of CN200985218Y publication Critical patent/CN200985218Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Storage Of Web-Like Or Filamentary Materials (AREA)

Abstract

The utility model relates to a reeling drum of recoiler, which comprises a pyramid axis. A plurality of fisrt slanting wedge is arranged outside of the pyramid axis. The utility model also comprises a plurality of fanlike plates, and a plurality of second slanting wedge are arranged on inner wall of the fanlike plates; a cushion block is arranged between the first slanting wedge and the second slanting wedge, which is mutually balanced out through the cushion block. The cushion block is fixed at the second slanting wedge, and is mutually balanced out with the first slanting wedge of the pyramid axis; each first slanting wedge bottom of a plurality of first slanting wedges is all provided with a first concave part. Or the cushion block is fixed at the first slanting wedge top, and is balanced out with the second slanting wedge of the fanlike plate, each second slanting wedge bottom of a plurality of second slanting wedges is all provided with a second concave part. Thus the utility model reel block in effect prevents the cross part of the fanlike plate and the pyramid axis from shape changing.

Description

The reel of reeler
Technical field
The utility model relates to a kind of reel of reeler, especially a kind ofly can prevent the quadrant of reel and the reel of pyramid axle intersection generation deformation.
Background technology
In modern steel rolling was produced, the purposes of reeler was to collect the overlength rolled piece, it was batched rolling so that produce, transport and store.Reeler is the important accessory equipment that steel rolling is produced, and makes imperative equipment in the coil rolling master binding, all is widely used in band and wire production.In modern cold rolling workshop, reeler also generally is used for shearing, pickling, reconditioning and cuts open auxiliary units such as light, heat treatment, zinc-plated and coating.
Reel is the core of reeler, as depicted in figs. 1 and 2, the existing reel quadrant 2 that the reeler that rises comprises that mostly a rib vertebra axle 1 and its outside are replaced that can contract, some has also replaced panel 3.Before batching steel plate, at first to rise directly as shown in Figure 3, i.e. pyramid post 1 and quadrant 2 relative motion vertically, relative displacemenies take place in first wedge 10 of second wedge 20 of quadrant 2 and pyramid post like this, thereby make quadrant 2 that radial displacements take place.As shown in Figure 4, when batching steel plate 4, because squeese pressure radially is very large, interface branch at second wedge 20 and first wedge 10 squeezes out protuberance 200 and 100, therefore in undergauge, can produce very big resistance, and may make protuberance 100 and 200 become bigger, even pyramid axle 1 is broken.Even without breaking, also can reduce the service life of reel.
Therefore, existing reel can't prevent that the boundary of second wedge and first wedge from partly producing protuberance.
The utility model content
The purpose of this utility model provides a kind of reel of reeler, can prevent quadrant and pyramid axle intersection generation deformation.
For achieving the above object, the utility model provides a kind of reel of reeler, comprising: a rib vertebra axle, and its outside has several first wedges; Several quadrants, its inboard have several second wedges; Have cushion block between described first wedge and second wedge, replace mutually by cushion block between first wedge and second wedge.
Described cushion block is fixed in the top of second wedge, replaces mutually with first wedge of described pyramid axle; Each first wedge bottom of described several first wedges all has one first notch, and at the footpath state that rises, the top of described first wedge is positioned at the outside of cushion block or the edge of cushion block, and the top of described cushion block is positioned on first notch or the first notch edge.Perhaps described cushion block is fixed in the top of first wedge, replace mutually with second wedge of described quadrant, the bottom of each second wedge of described several second wedges all has one second notch, at the footpath state that rises, the top of described second wedge is positioned at the outside of cushion block or the edge of cushion block, and the top of described cushion block is positioned on second notch or the second notch edge.The described cushion block of replacing between described in addition first wedge and second wedge is two cushion blocks, wherein first cushion block is fixed in the described second wedge top, second cushion block is fixed in the described first wedge top, at the footpath state that rises, the top of first cushion block on described second wedge is positioned at the outside of second cushion block on described first wedge or the edge of second cushion block, and the top of second cushion block on described first wedge is positioned at the outside of first cushion block on described second wedge or the edge of first cushion block.
Described pyramid axle is the rectangular pyramid axle, and described several quadrants are four; Replace mutually by cushion block between first wedge of described pyramid axle and second wedge of described quadrant.Described pyramid axle is the hexagonal pyramid axle, and described several quadrants are six; Replace mutually by cushion block between first wedge of described pyramid axle and second wedge of described quadrant.Described pyramid axle is the triangular axis of cone, and described several quadrants are three; Replace mutually by cushion block between first wedge of described pyramid axle and second wedge of described quadrant.Described pyramid axle has two pyramidal surfaces and a sector, and the described pyramidal surface outside has first wedge, and described several quadrants are two; Replace mutually by cushion block between first wedge of described pyramidal surface and second wedge of described quadrant.
Therefore, the reel of the utility model reeler has prevented quadrant and pyramid axle intersection generation deformation effectively.
Below in conjunction with drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is the structural representation of existing reel.
Fig. 2 is the generalized section figure of existing reel.
Structural representation when Fig. 3 rises by the footpath for existing reel.
Fig. 4 is the structural representation after existing reel batches steel plate.
Structural representation when Fig. 5 opens the footpath for an embodiment of the reel of the utility model reeler.
Fig. 6 is the generalized section of an embodiment of the reel of the utility model reeler.
Fig. 7 is the structural representation after an embodiment of the reel of the utility model reeler batches steel plate.
Structural representation when Fig. 8 opens the footpath for another embodiment of the reel of the utility model reeler.
Fig. 9 is the generalized section of another embodiment of the reel of the utility model reeler.
Figure 10 is the structural representation after another embodiment of the reel of the utility model reeler batches steel plate.
Structural representation when Figure 11 opens the footpath for another embodiment of the reel of the utility model reeler.
Figure 12 is the generalized section of another embodiment of the reel of the utility model reeler.
Figure 13 is the structural representation after another embodiment of the reel of the utility model reeler batches steel plate.
Figure 14 is one of the generalized section of the reel of the utility model reeler.
Figure 15 be the utility model reeler reel generalized section two.
Figure 16 be the utility model reeler reel generalized section three.
The specific embodiment
The utility model is to have notch or be lined with cushion block on second wedge of the quadrant of existing reel and pyramid axle first wedge, make the top of second wedge not contact with first wedge of pyramid axle, and the top of first wedge does not contact with second wedge of quadrant, can't produce deformation.
As shown in Figure 5 and Figure 6, for the reel of the utility model reeler the footpath state that rises structural representation and generalized section, comprise a rectangular pyramid axle 1 and four quadrants 2, pyramid axle 1 has four first wedges 10, the bottom of each first wedge 10 has first notch 101, each quadrant 2 all has four second wedges 20, and the top of each second wedge 20 all is fixed with cushion block 202, and cushion block 202 is replaced mutually with first wedge 10 of pyramid axle 1.
As shown in Figure 7, for the reel of the utility model reeler at the structural representation of footpath state that rises, at the footpath state that rises, the top of first wedge 10 is positioned at the edge of cushion block 202, the top of cushion block 202 is positioned at the edge of first notch 101.Perhaps the top of first wedge 10 is positioned at the outside of cushion block 202, also can in the top that the top of cushion block 202 is positioned at first notch 101, its objective is the top that makes the wedge 10 of winning and second wedge 20 of quadrant 2, perhaps the cushion block 202 on second wedge 20 does not contact, and make the top of second wedge 20 of quadrant 2, perhaps the top of the cushion block 202 on second wedge 20 does not contact with first wedge 10.As shown in Figure 7, for reel batches structural representation behind the steel plate, after batching steel plate 4, though steel plate 4 can produce very large squeese pressure radially, make quadrant 2 be subjected to very large radial pressure, pressure between second wedge 20 and first wedge 10 is very big, but, because the existence of first notch 101 of first wedge, 10 bottoms, make the cushion block 202 on second wedge 20 the top not and 10 extruding of first wedge, so can not make the top of cushion block 202 of second wedge 20 and the intersection of first wedge 10 produce deformation, same because the top of first wedge 10 not with second wedge 20 on cushion block 202 extruding, so can not make the top of the wedge 10 of winning and the intersection generation deformation of cushion block 202.Finish the back during undergauge collecting steel, smoothly undergauge.
As Fig. 8 and shown in Figure 9, for another embodiment of the utility model reeler the footpath state that rises structural representation and generalized section, comprise a rectangular pyramid axle 1 and four quadrants 2, pyramid axle 1 has four first wedges 10, the top of each first wedge 10 all is fixed with cushion block 102, each quadrant 2 all has four second wedges 20, and the bottom of each second wedge 20 all has second notch 201, and cushion block 102 is replaced with second wedge, 20 homogeneous phases of quadrant 2.
Again as shown in Figure 8, at the footpath state that rises, the top of second wedge 20 is positioned at the edge of cushion block 102, and the top of cushion block 102 is positioned at the edge of second notch 201.Perhaps the top of second wedge 20 is positioned at the outside of cushion block 102, also can in the top that the top of cushion block 102 is positioned at second notch 201, its objective is to make the top of second wedge 20 not contact, and the top of the wedge 10 of winning or the top of the cushion block 102 on first wedge 10 are not contacted with second wedge 20 with cushion block 102 on first wedge 10 or first wedge 10.As shown in figure 10, for reel batches structural representation behind the steel plate, after batching steel plate 4, though steel plate 4 can produce very large squeese pressure radially, make quadrant 2 be subjected to very large radial pressure, pressure between second wedge 20 and first wedge 10 is very big, but, because the existence of second notch 201 of second wedge, 20 bottoms, the top of the cushion block 102 on the wedge 10 of winning is not pushed with second wedge 20, so can not make the top of cushion block 102 of the wedge 10 of winning and the intersection of second wedge 20 produce deformation, same because the top of second wedge 20 not with first wedge 10 on cushion block 102 extruding, so can not make the top of second wedge 20 and the intersection generation deformation of cushion block 102.Finish the back during undergauge collecting steel, smoothly undergauge.
As Figure 11 and shown in Figure 12, for another embodiment of the utility model reeler in the rise structural representation and the generalized section of footpath state, comprise a rectangular pyramid axle 1 and four quadrants 2, pyramid axle 1 has four first wedges 10, the top of each first wedge 10 is fixed with first cushion block 103, each quadrant 2 all has four second wedges 20, first cushion block 103 that the top of each second wedge 20 all is fixed with on second cushion block, 203, the first wedges 10 is replaced mutually with second cushion block 203 on second wedge 20.
Again as shown in figure 11, at the footpath state that rises, the top of first cushion block 103 is positioned at the edge of second cushion block 203, and the top of second cushion block 203 is positioned at the edge of first cushion block 103.Perhaps the top of first cushion block 103 is positioned at the outside of second cushion block 203, also can in the outside that the top of second cushion block 203 is positioned at first cushion block 103, its objective is that the top that makes the cushion block 103 of winning does not contact with second cushion block 203, and make the top of second cushion block 203 not contact with first cushion block, 103 tops.As shown in figure 13, for reel batches structural representation behind the steel plate, after batching steel plate 4, though steel plate 4 can produce very large squeese pressure radially, make quadrant 2 be subjected to very large radial pressure, pressure between second wedge 20 and first wedge 10 is very big, but, because the top of first cushion block 103 does not contact with second cushion block 203, the top of the cushion block 103 of winning is not pushed with ground two cushion blocks 203, so can not make the top of the cushion block 103 of winning and the intersection of second cushion block 203 produce deformation, it is same because the top of second cushion block 203 does not contact with first cushion block, 103 tops, make the top and first cushion block, 103 tops of second cushion block 203 not overstock, so can not make the top of second cushion block 203 and the junction on first cushion block, 103 tops produce deformation.Finish the back during undergauge collecting steel, smoothly undergauge.Therefore, the reel of the utility model reeler has prevented quadrant and pyramid axle intersection generation deformation effectively.
As shown in figure 14, be one of generalized section of the reel of the utility model reeler, pyramid axle 1 is the hexagonal pyramid axle, and quadrant 2 is 6, and first wedge 10 of pyramid axle 1 is replaced mutually with second wedge 20 of quadrant 2.As shown in figure 15, be two of the generalized section of the reel of the utility model reeler, pyramid axle 1 is the triangular axis of cone, and quadrant 2 is 3, and first wedge 10 of pyramid axle 1 is replaced mutually with second wedge 20 of quadrant 2.As shown in figure 16, be three of the generalized section of the reel of the utility model reeler, pyramid axle 1 has two pyramidal surfaces 11 and a sector 12, pyramidal surface 11 outsides have first wedge 10, quadrant 2 is two, and first wedge 10 of pyramidal surface 11 is replaced mutually with second wedge 20 of quadrant 2.
In like manner, can on second wedge of the quadrant of above-mentioned reel and pyramid axle first wedge, can have notch or be lined with cushion block, make the top of second wedge not contact with first wedge of pyramid axle, and the top of first wedge does not contact with second wedge of quadrant, can't produce deformation.
It should be noted last that, above embodiment is only unrestricted in order to the explanation the technical solution of the utility model, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement the technical solution of the utility model, and not break away from the spirit and scope of technical solutions of the utility model.

Claims (8)

1, a kind of reel of reeler is characterized in that comprising:
A rib vertebra axle, its outside has several first wedges;
Several quadrants, its inboard have several second wedges;
Have cushion block between described first wedge and second wedge, replace mutually by cushion block between first wedge and second wedge.
2, the reel of reeler according to claim 1 is characterized in that described cushion block is fixed in the top of second wedge, replaces mutually with first wedge of described pyramid axle; Each first wedge bottom of described several first wedges all has one first notch.
3, the reel of reeler according to claim 1 is characterized in that described cushion block is fixed in the top of first wedge, replaces mutually with second wedge of described quadrant, and the bottom of each second wedge of described several second wedges all has one second notch.
4, the reel of reeler according to claim 1 is characterized in that the described cushion block of replacing between first wedge and second wedge is two cushion blocks, and wherein first cushion block is fixed in the described second wedge top, and second cushion block is fixed in the described first wedge top.
5, the reel of reeler according to claim 1 is characterized in that described pyramid axle is the rectangular pyramid axle, and described several quadrants are four; Replace mutually by cushion block between first wedge of described pyramid axle and second wedge of described quadrant.
6, the reel of reeler according to claim 1 is characterized in that described pyramid axle is the hexagonal pyramid axle, and described several quadrants are six; Replace mutually by cushion block between first wedge of described pyramid axle and second wedge of described quadrant.
7, the reel of reeler according to claim 1 is characterized in that described pyramid axle is the triangular axis of cone, and described several quadrants are three; Replace mutually by cushion block between first wedge of described pyramid axle and second wedge of described quadrant.
8, the reel of reeler according to claim 1 is characterized in that described pyramid axle has two pyramidal surfaces and a sector, and the described pyramidal surface outside has first wedge, and described several quadrants are two; Replace mutually by cushion block between first wedge of described pyramidal surface and second wedge of described quadrant.
CN 200620134915 2006-12-06 2006-12-06 Reel for winding machine Expired - Fee Related CN200985218Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620134915 CN200985218Y (en) 2006-12-06 2006-12-06 Reel for winding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620134915 CN200985218Y (en) 2006-12-06 2006-12-06 Reel for winding machine

Publications (1)

Publication Number Publication Date
CN200985218Y true CN200985218Y (en) 2007-12-05

Family

ID=38914677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620134915 Expired - Fee Related CN200985218Y (en) 2006-12-06 2006-12-06 Reel for winding machine

Country Status (1)

Country Link
CN (1) CN200985218Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259734A (en) * 2014-08-20 2015-01-07 张家港浦项不锈钢有限公司 Technique for repairing wedged copper member of uncoiler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104259734A (en) * 2014-08-20 2015-01-07 张家港浦项不锈钢有限公司 Technique for repairing wedged copper member of uncoiler
CN104259734B (en) * 2014-08-20 2017-11-07 张家港浦项不锈钢有限公司 A kind of wedge-shaped copper piece renovation technique of uncoiler

Similar Documents

Publication Publication Date Title
CN201361864Y (en) Material support
CN100478264C (en) Drum of reeling machine
CN200985218Y (en) Reel for winding machine
CN102728657B (en) Uncoiler reel device with sleeve
CN201105407Y (en) Surface residues cleaning device after shot blasting of rod and wire
CN200985219Y (en) Reel for winding machine
CN100542919C (en) The reel of reeler
CN208051322U (en) A kind of draw-off gear
CN201508731U (en) Silk covering machine
CN101099981A (en) Composite board leveling machine
CN111042188A (en) Supporting-free template for reserved bolt holes of roughing mill body and construction method
CN202174127U (en) Radial expansion reel
CN103252384B (en) A kind of bundling skin pass mill group coiler mandrel
CN202428599U (en) Equal-segmental-arc window cushion mold core
CN205096242U (en) Battery sheet rolling mill unreels dop device
CN203002842U (en) Horizontal coiler coil core collapsible mechanism
CN106149536A (en) Milling wheel and milling machine
CN202638957U (en) Disc type positioning uncoiler winding drum device
CN216157684U (en) Back-lapping type lining trolley for tunnel widening section
CN214424873U (en) Hook bolt hot plate
CN204602884U (en) Sour rolling mill mandrel of uncoiler conical sleeve device
CN202180108U (en) Lining board device for sector plate of unwinder
CN211568173U (en) Detachable saddle for assembling large-scale equipment
CN216654917U (en) Magnetic core fixing device of iron removing machine and iron removing machine
CN210389155U (en) Intermediate storage device of turbocharger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071205

Termination date: 20141206

EXPY Termination of patent right or utility model