CN200970632Y CN 200620044414 CN200620044414U CN200970632Y CN 200970632 Y CN200970632 Y CN 200970632Y CN 200620044414 CN200620044414 CN 200620044414 CN 200620044414 U CN200620044414 U CN 200620044414U CN 200970632 Y CN200970632 Y CN 200970632Y
Authority
CN
China
Prior art keywords
brick
continuous casting
utility
tundish
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620044414
Other languages
Chinese (zh)
Inventor
施建平
汪宁
郑国平
谢玉红
刘国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN 200620044414 priority Critical patent/CN200970632Y/en
Application granted granted Critical
Publication of CN200970632Y publication Critical patent/CN200970632Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

This utility model relates to a upper water mouth fence brick which is used on the continuous casting pouring box in metallurgy industry, which adopts the integral molding structure with basic plate shape, one hole is provided in the middle, two ends incline upwards, which are contacted with upper water mouth and surrounding fire-resisting material construction structure, and one steel structural frame with one hole in the center is also included, which is installed in the seat brick region of permanent layer. Because the structural support effect of this utility model fence brick is obvious, the replacement of upper water mouth won't influence the inside lining brick structure of pouring box, when the hidden danger of looseness of pouring box inside lining structure is eliminated, the maintenance time of pouring box is greatly shortened, the cost of proof materials is reduced much.

Description

The continuous casting tundish upper nozzle encloses brick
Technical field
The utility model relates to the technical field of continuous casting tundish, relates in particular to a kind of filling pipe end that uses and enclose brick on the continuous casting tundish.
Background technology
Baosteel 1450 continuous casting technological transformation project tundish submersed nozzles are changed (being called for short " quick change ") project fast and were formally put into production at the beginning of 2004 11 months.According to the quick-replaceable former design of submersed nozzle, what adopt in the outer of tundish upper nozzle periphery ramming mass is brick structure, tundish uses once back (being generally 7~8 stoves), because of changing parts and tundish must overturn 180 ° in unsetting anti-unit construction position, the masonry construction that its peripheral refractory material forms takes place to become flexible even come off because of losing inner support, to such an extent as to this anti-material in two positions average life is less than 15 stoves, refractory consumption rises significantly and tundish repairing amount obviously increases, and is once having influence on the coupling of online volume of the circular flow of tundish and continuous casting production demand.When this structure uses the back to disintegrate at tundish at every turn, because filling pipe end and peripheral ramming mass must be replaced, the cavity structure that forms makes the brickwork construction of outer occur inwardly subsiding because of losing to support, basically each tundish of changing all needs to carry out the replacing building construction of outer refractory brick, difficulty of construction is big, repair cycle, long defective was difficult to avoid, when refractory material, cost of labor all rise, each repairing all produces destruction to the compactness of middle ladle-lining, and the security that tundish uses when continuous-casting steel pouring descends gradually.
Summary of the invention
The purpose of this utility model provides and a kind ofly can improve the anti-material life-span of tundish outer, waters the continuous casting tundish upper nozzle that the work of tundish long-life provides support under the condition and encloses brick for height connects.
The utility model utilizes the structure of annular prefabricated section to replace original brickwork construction, at filling pipe end, when ramming mass is changed, continuation provides support brick liner on every side, effectively prevent the loosening of brickwork construction, need constantly dig the harmful effect of repairing because of loosening, melting loss refractory material cost, tundish inner lining structure compactness to eliminate this zone brick.
The purpose of this utility model is achieved in that
A kind of continuous casting tundish upper nozzle encloses brick, its structure that is formed in one, be basic tabular, the centre has a hole, both ends are inclined upwardly, fit with filling pipe end and refractory material masonry construction on every side thereof, the described brick that encloses comprises that also a centre has the steel structure frame in a hole, places permanent layer brick cup zone.
The utility model makes it compared with prior art owing to adopted above-mentioned technical scheme, has following advantage and good effect:
After having adopted the utility model continuous casting tundish upper nozzle to enclose brick, because it is obvious to enclose the support structure effect of brick, filling pipe end does not produce any influence to the brick structure of middle ladle-lining in changing, after having adopted the well behaved aluminium zirconium of anti-molten steel scouring material, reached service life more than 220 stoves, when eliminating the loosening hidden danger of tundish inner lining structure, shortened tundish maintenance time greatly, the cost of anti-the material is also reduced significantly.
Description of drawings
Fig. 1 is the structural representation that the utility model filling pipe end encloses brick;
Fig. 2 is the plane of Fig. 1;
Fig. 3 is that the utility model filling pipe end encloses the position view of brick at tundish.
The specific embodiment
As Fig. 1, Fig. 2, shown in Figure 3, the structure of utilizing the utility model filling pipe end to enclose brick replaces original brickwork construction continuous casting tundish upper nozzle and encloses brick, the utility model filling pipe end encloses brick 1 structure that is formed in one, be basic tabular, the centre has a square hole 2, and both ends 3 are inclined upwardly, and fits with filling pipe end and refractory material masonry construction on every side thereof, enclose brick 1 and comprise that also a centre has the steel structure frame in a hole, places in the permanent layer brick cup zone.The utility model encloses brick and adopts the aluminium zirconium material that can reach the high life, at filling pipe end, when ramming mass is changed, continues brick liner is on every side provided support, and has prevented the loosening of brickwork construction effectively.Before improved tundish is built by laying bricks or stones, lay special-purpose steel construction square frame in permanent layer brick cup zone, require that circular hole exposes fully on the tundish iron-clad; Bag is after permanent layer is finished at the end, and brick cup and enclose the brick position and put the utility model filling pipe end and enclose brick on former requires the hole essentially concentric with iron-clad, enclose between brick and the permanent layer and use high-alumina chamotte, brickwork joint require with working lining build by laying bricks or stones standard (≤2mm); Enclose between brick and filling pipe end and use ramming mass, require from dividing three layers of ramming closely knit; Requirement coating covers around filling pipe end during the coating construction, manually smears coating is seamlessly transitted to filling pipe end.
The utility model filling pipe end encloses brick, and to change standard as follows:
Must change when 1, the crackle that encloses the brick top and bottom occurring running through;
2, enclose in the brick bore edges and unusual melting loss occurs or peel off, the degree of depth is greater than half of operation thickness;
3, unusual with operational layer brick seam crossing melting loss.
After adopting the utility model filling pipe end to enclose brick, when tundish is changed parts and upset, because of enclosing brick, the utility model filling pipe end is not subjected to change of external conditions to keep self structure stable, masonry construction to the periphery provides the good supporting effect simultaneously, no matter tundish overturns in any angle, whole tundish masonry construction can both keep tight, eliminated the loosening defective of bringing low, that the repairing amount is big of receiving a mandate of masonry construction, whole anti-material of building the zone by laying bricks or stones also is increased to present about 250 stoves service life thus, obtains good economic benefit.Result of the test shows, wrap this technology of having used 71 between merely hitting, reached 227 stoves the average life of tundish, successfully solved safety, cost problem that former design may bring for production smoothly, in time satisfied the requirement of continuous casting production the tundish turnover.
Though the utility model is illustrated hereinbefore according to preferred embodiment of the present utility model, but this does not represent that scope of the present utility model is confined to above-mentioned structure, those skilled in the art can be developed the equivalent substitution structure that at an easy rate after reading above-mentioned explanation, and these equivalent alternative structure are also within the scope that this case requires.

Claims (2)

1. a continuous casting tundish upper nozzle encloses brick, it is characterized in that: its structure that is formed in one, be basic tabular, and the centre has a hole, and both ends are inclined upwardly, and fit with filling pipe end and refractory material masonry construction on every side thereof.
2. continuous casting tundish upper nozzle as claimed in claim 1 encloses brick, it is characterized in that: the described brick that encloses comprises that also a centre has the steel structure frame in a hole, places permanent layer brick cup zone.
CN 200620044414 2006-07-31 2006-07-31 Top water gas circular bricks for continuous casting powring ladle Expired - Fee Related CN200970632Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620044414 CN200970632Y (en) 2006-07-31 2006-07-31 Top water gas circular bricks for continuous casting powring ladle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620044414 CN200970632Y (en) 2006-07-31 2006-07-31 Top water gas circular bricks for continuous casting powring ladle

Publications (1)

Publication Number Publication Date
CN200970632Y true CN200970632Y (en) 2007-11-07

Family

ID=38881891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620044414 Expired - Fee Related CN200970632Y (en) 2006-07-31 2006-07-31 Top water gas circular bricks for continuous casting powring ladle

Country Status (1)

Country Link
CN (1) CN200970632Y (en)

Similar Documents

Publication Publication Date Title
CN108971470B (en) Novel steel ladle and masonry method thereof
JP4308288B2 (en) Outlet structure of melting furnace and repair method
CN106435073A (en) Blast furnace liner overall pouring construction method for replacing spraying materials and refractory bricks
CN102151822B (en) Continuous casting tundish and manufacturing method thereof
CN102554201A (en) Large steel ladle and manufacturing method for same
CN106583675B (en) A kind of molten steel continuous casting steel conticaster
CN101509050B (en) Method for producing and mending slag separator
CN201272813Y (en) Inner lining composite structure of blast furnace casting hole
CN104529485B (en) Two-layer compound refractory material and two-layer compound refractory material ditch cover and its manufacture method and application
CN200970632Y (en) Top water gas circular bricks for continuous casting powring ladle
JP5817959B2 (en) Lined structure of vertical furnace refractories
CA2888450C (en) Fireproof ceramic base
CN101392991B (en) Method for building refining furnace bottom
CN214814757U (en) High-stability composite steel ladle edge structure
CN200988099Y (en) Torpeto can lining structure
CN202885542U (en) Dip pipe for RH refining furnace
CN110877100B (en) Method for building bottom of spherical hot metal ladle of blast furnace
CN100528414C (en) Vacuum pouring honeycomb duct
CN206308387U (en) A kind of RH vacuum chambers bottom masonry construction
CN200978292Y (en) Integral pouring iron mixing vehicle splash guard
RU82605U1 (en) FILLING BUCKET
CN204939507U (en) Blast furnace bottom bilge construction
CN203764968U (en) Preformed part used for refined steel ladle slag line
CN109628704A (en) A kind of RH vacuum refining furnace and its building method
CN220393785U (en) Novel precast block of blast furnace main channel skimming device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071107

Termination date: 20150731

EXPY Termination of patent right or utility model