CN200950008Y - Control system for aluminum alloy gas insulation furnace - Google Patents

Control system for aluminum alloy gas insulation furnace Download PDF

Info

Publication number
CN200950008Y
CN200950008Y CN 200620045832 CN200620045832U CN200950008Y CN 200950008 Y CN200950008 Y CN 200950008Y CN 200620045832 CN200620045832 CN 200620045832 CN 200620045832 U CN200620045832 U CN 200620045832U CN 200950008 Y CN200950008 Y CN 200950008Y
Authority
CN
China
Prior art keywords
lower position
temperature controller
temperature
aluminium
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620045832
Other languages
Chinese (zh)
Inventor
刘荣章
王祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ALM INDUSTRIAL FURNACE MANUFACTURE SHANGHAI Co Ltd
Original Assignee
ALM INDUSTRIAL FURNACE MANUFACTURE SHANGHAI Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ALM INDUSTRIAL FURNACE MANUFACTURE SHANGHAI Co Ltd filed Critical ALM INDUSTRIAL FURNACE MANUFACTURE SHANGHAI Co Ltd
Priority to CN 200620045832 priority Critical patent/CN200950008Y/en
Application granted granted Critical
Publication of CN200950008Y publication Critical patent/CN200950008Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Regulation And Control Of Combustion (AREA)

Abstract

An aluminium alloy gas maintaining furnace control system includes an ignition controller7, a temperature control device, a gas pressure protecting device, a low position limit detecting device, a wind pressure protecting device, and a blower activate button. The utility model is characterized in that an aluminium liquid temperature controller31 and an atmosphere temperature controller31'which realize temperature control are arranged in the system, wherein, the temperature controller31 is arranged in an aluminium liquid output chamber30 in a furnace body27 and the temperature controller31'is arranged in the atmosphere of an insulation chamber which can monitor the insulation heating atmosphere temperature in the furnace body27.

Description

A kind of aluminium alloy combustion gas holding furnace control system
Technical field
The utility model relates to a kind of combustion gas holding furnace control system, refers in particular to the combustion gas holding furnace control that is used for the molten aluminium alloy holding furnace, belongs to aluminium alloy and melts the heat preservation technology class.
Background technology
On the domestic conventional combustion gas molten aluminium alloy holding furnace, generally all only establish one and detect the controller that aluminium liquid is scooped out mouthful temperature of aluminum liquid, the result, when after initial use or blowing out, reusing, can't carry out the baker operation to holding furnace heating clamber burner hearth accurately, can only roughly estimate the temperature of holding furnace heating clamber according to the temperature of liquid outlet, do like this and might cause refractory material to grasp the improper cracking that causes because of oven drying temperature; Also have, in normal the use, when the temperature of aluminum liquid that enters holding furnace is crossed when low, control system no matter the temperature of holding furnace heating clamber how, continue high combustion to the heating of holding furnace heating clamber, can cause that the molten aluminium alloy surface is overheated, scaling loss increases and holding furnace heating clamber refractory material damages.Before the igniting of combustion gas holding furnace, need purge burner hearth, with the fuel gas that prevents to exist in the stove, especially behind loss of ignition repeatedly, may gather more fuel gas in the burner hearth, at this moment, to there be imflammable gas to discharge as untimely, when in this relative sealed combustion chamber, lighting a fire once more, very easily blast, detonation is when igniting, for the safety that guarantees to light a fire, gas flow must be minimum during igniting, so when igniting, control system must detect the flow valve servomotor at lower position? in order to prevent the generation of this danger, in general fuel gas combustion system, the time-delay purging adds the chain measure of lower position switch before all having introduced igniting, but the lower position switch of servomotor changes sometimes, and lower position location transfer too low the time, in the time of can causing servomotor to arrive lower position, the lower position switch is not connected, and causes control system to light a fire.So, generally all the lower position switch is connected in advance, in case grasp badly, when very easily causing servomotor also not arrive lower position, because of the lower position switch is connected in advance, right air-flow did not also cause advanced ignition to minimum flow and caused danger this moment; There has been the colleague that this reason took place and caused blast.
The utility model content
The purpose of the present utility model: be intended to propose that a kind of serviceability is good, energy consumption is low, have the aluminium alloy combustion gas preservation and controlling system of security reliability.
This aluminium alloy combustion gas holding furnace control system, comprise ignition controller 7, attemperating unit and gas pressure protective device, lower position limit detection device, blast protective device, fan starting button, it is characterized in that: in this system, be provided with two realize temperature controlled aluminium liquid temperature controllers 31 and atmosphere temperature controller 31 ', an aluminium liquid temperature controller 31 wherein is located in the aluminium water liquid outtake chamber 30 of body of heater 27, another atmosphere temperature controller 31 ' then be located in the atmosphere space that can monitor the moist closet 29 that is incubated the heating atmosphere temperature of body of heater 27; In electrical control operating system, the lower position switch is transferred to simultaneously in advance about 15 degree, and between lower position switch and burner, inserts a delayer of 30 seconds.
Three interfaces of described ignition controller 7 are connected on the magnetic valve 8 of burner 1 with ignition transformer 2, flame detector 3 and one group respectively; Described aluminium liquid temperature controller 31 and atmosphere temperature controller 31 ' and connect together and control motor 22 and be connected; Described gas pressure protective device is formed by ball valve 7 and with the Pressure gauge 10 of this ball valve coupling and pressure switch 11 and is arranged in the connecting line of proportioning valve 9 and another ball valve 12; Described lower position limit detection device is made up of lower position switch and control motor 22; Described blast protective device is by placing pressure switch 11 and Pressure gauge 10 on burning blower fan 21 export pipelines to form; Described fan starting button then is installed in the power supply circuits of burning blower fan.
This aluminium alloy combustion gas holding furnace control system according to above technical scheme proposition, because aluminium water liquid outtake chamber and moist closet at body of heater are provided with aluminium liquid temperature controller and atmosphere temperature controller respectively, therefore can both keep the required temperature of aluminium water liquid outtake chamber by in good time temperature adjusting very goodly, made the temperature maintenance of moist closet again in appropriate scope simultaneously; And shift to an earlier date about 15 degree by the lower position switch in the electrical control operating system is transferred to again, between lower position switch and burner, insert a delayer of 30 seconds simultaneously.Abovementioned technology not only keeps the temperature in the stove to be in normal operating conditions all the time, improves the whole service life of body of heater; And provide technical support for the security performance in using.
Description of drawings
Accompanying drawing 1 is a temperature controller scheme of installation of the present utility model;
Accompanying drawing 2 is combustion gas holding furnace system piping diagram.
Among the figure 1, burner, 2, ignition transformer 3, flame monitor 5, Pressure gauge 6, flexible pipe 7, ball valve 8, magnetic valve 9, proportioning valve 10, Pressure gauge 11, pressure switch 12, ball valve 13, pressure-reducing valve 14, filter 15, flowmeter 16, ball valve 17, butterfly valve 18, heat exchanger 19, flexible pipe 20, control butterfly valve 21, burning blower fan 22, control motor 23, butterfly valve 25, nozzle 26, injector 27 bodies of heater 28, molten aluminium chamber 29, moist closet 30, aluminium water liquid outtake chamber 31, aluminium liquid temperature controller 31 ', the atmosphere temperature controller
The specific embodiment
This aluminium alloy combustion gas holding furnace control system shown in Fig. 1-2, it is that existing aluminium alloy combustion gas holding furnace control system is got a kind of inventive improvements, this improvement mainly shows two aspects:
One, in this system, be provided with two temperature controllers 31,31 '; Wherein one is located in the aluminium water liquid outtake chamber 30 of body of heater 27, and another then is located in the moist closet 29 that can monitor insulation heating atmosphere temperature of body of heater 27; When its purpose is normally to use, allow burner accept to be located at the signal of aluminium liquid temperature controller 31 in the aluminium water liquid outtake chamber 30,, the PID ratio is carried out in the burning two of burner regulate according to the mensuration temperature and the design temperature difference of aluminium water in the aluminium water liquid outtake chamber 30; Another atmosphere temperature controller 31 ' be suspended at the moist closet 29 interior spaces of heating furnace is monitored the atmosphere temperature of moist closet; In case the atmosphere temperatures in this moist closet 29 surpass this temperature controller 5 ' design temperature, just send forced burning and instruct to burner, temporarily quantity combusted is controlled to than low degree; In case when moist closet 29 temperature were lower than desirable atmosphere temperature, this temperature controller 31 ' can require again to have burnt and strengthen quantity combusted improved the atmosphere temperature of moist closet.
They are two years old, in electrical control operating system, the lower position switch is transferred in advance about 15 degree, and between lower position switch and burner, insert a delayer of 30 seconds, and to guarantee to wait upon the clothes motor and reach the igniting in 30 seconds of delaying time again behind the lower position, the guarantee point fire safety is reliable.
According to the requirement of aluminium alloy combustion gas holding furnace work, the purging of will delaying time before the burner igniting is in order to guarantee that waiing upon the clothes motor returns lower position automatically.The present invention program for the lower position limit switch that guarantees to control this program accurately and reliably, in the debugging before product export, this lower position limit switch is transferred to setting about 15 degree in advance, and do not allow this lower position limit switch directly connect burner, but insert a timing of 30 seconds (adaptation wait upon clothes motor return maximum duration be 30 seconds function needs) again, after treating the timing arrival of this timer, burner just can be opened by igniting.Like this, though wait upon clothes motor position switch set improper, even when a high position is connected, the burner igniting that also can not be unlocked.Because only after covering 30 seconds perdurabgility of timer, wait upon this moment the clothes motor position certainly naturally the arrival extreme lower position except.Dual setting by lower position limit switch and 30 seconds time-delay mechanisms just, thereby guarantee that burner is igniting in extreme lower position has effectively prevented the generation of blast, deflagration accident having.
The concrete scheme of above-mentioned this inventive improvements is as follows: this aluminium alloy combustion gas holding furnace control system, it is characterized in that: in this system, be provided with two realize temperature controlled aluminium liquid temperature controllers 31 and atmosphere temperature controller 31 ', wherein one is located in the aluminium water liquid outtake chamber 30 of body of heater 1, and another then is located in the atmosphere space of the moist closet 29 that can monitor insulation heating atmosphere temperature of body of heater 27; In electrical control operating system, the lower position switch is transferred to simultaneously in advance about 15 degree, and between lower position switch and burner, inserts a delayer of 30 seconds.
Three interfaces of wherein said ignition controller 7 are connected on the magnetic valve 8 of burner 1 with ignition transformer 2, flame detector 3 and one group respectively; Described aluminium liquid temperature controller 31 and atmosphere temperature controller 31 ' and connect together and control motor 22 and be connected; Described gas pressure protective device is formed by ball valve 7 and with the Pressure gauge 10 of this ball valve coupling and pressure switch 11 and is arranged in the connecting line of proportioning valve 9 and another ball valve 12; Described lower position limit detection device is made up of lower position switch and control motor 22; Described blast protective device is by placing pressure switch 11 and Pressure gauge 10 on burning blower fan 21 export pipelines to form; Described fan starting button then is installed in the power supply circuits of burning blower fan.

Claims (2)

1, a kind of aluminium alloy combustion gas holding furnace control system, comprise ignition controller 7, attemperating unit and gas pressure protective device, lower position limit detection device, blast protective device, fan starting button, it is characterized in that: the attemperating unit that is provided with in this system is made up of aluminium liquid temperature controller (31) and atmosphere temperature controller (31 '), an aluminium liquid temperature controller (31) wherein is located in the aluminium water liquid outtake chamber (30) of body of heater (27), and another atmosphere temperature controller (31 ') then is located in the moist closet (29) that can monitor insulation heating atmosphere temperature of body of heater (27); In electrical control operating system, will wait upon simultaneously clothes motor lower position switch and be transferred in advance about 15 degree, and between lower position switch and burner, insert a delayer of 30 seconds.
2, a kind of aluminium alloy combustion gas holding furnace control system as claimed in claim 1 is characterized in that: three interfaces of described ignition controller (7) are connected on the magnetic valve (8) of burner (1) with ignition transformer (2), flame detector (3) and one group respectively; Described aluminium liquid temperature controller (31) and atmosphere temperature controller (31 ') also connect together and control motor (22) and be connected; Described gas pressure protective device is formed by ball valve (7) and with the Pressure gauge (10) of this ball valve coupling and pressure switch (11) and is arranged in the connecting line of proportioning valve (9) and another ball valve (12); Described lower position limit detection device is made up of lower position switch and control motor (22); Described blast protective device is by placing pressure switch (11) and Pressure gauge (10) on burning blower fan (21) export pipeline to form; Described fan starting button then is installed in the power supply circuits of burning blower fan.
CN 200620045832 2006-09-15 2006-09-15 Control system for aluminum alloy gas insulation furnace Expired - Fee Related CN200950008Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620045832 CN200950008Y (en) 2006-09-15 2006-09-15 Control system for aluminum alloy gas insulation furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620045832 CN200950008Y (en) 2006-09-15 2006-09-15 Control system for aluminum alloy gas insulation furnace

Publications (1)

Publication Number Publication Date
CN200950008Y true CN200950008Y (en) 2007-09-19

Family

ID=38892549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620045832 Expired - Fee Related CN200950008Y (en) 2006-09-15 2006-09-15 Control system for aluminum alloy gas insulation furnace

Country Status (1)

Country Link
CN (1) CN200950008Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105423766A (en) * 2015-12-02 2016-03-23 安徽马钢重型机械制造有限公司 Method for preventing overtemperature of heating furnace under DCS control

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105423766A (en) * 2015-12-02 2016-03-23 安徽马钢重型机械制造有限公司 Method for preventing overtemperature of heating furnace under DCS control

Similar Documents

Publication Publication Date Title
CN101329110B (en) Full-automatic control system of oil field heating furnace
US4371111A (en) Home heating system employing water heater as heating source
CN203687046U (en) Safe and energy-saving proportional fuel gas burner
CN106642646A (en) Gas water heater and control method thereof
CN201837077U (en) Novel energy-saving two-purpose wall-mounted gas boiler
CN205504980U (en) Energy -saving combustor
CN205137852U (en) Gas water heater
CN200950008Y (en) Control system for aluminum alloy gas insulation furnace
CN102401467A (en) Household dual-purpose furnace capable of automatically controlling heat supply and water heating
CN209605198U (en) A kind of hot air type Smoke-heating device
CN102563880B (en) Multi-fuel combustion device and method
CN2890657Y (en) Heat storage type pulse burning nozzle
CN201837053U (en) Household automatic-control dual-purpose stove for heat supply and hot water supply
CN201416888Y (en) Pulse heat accumulating-type burner
CN208253645U (en) Biomass couples pulverized coal combustion system
CN108253447A (en) Biomass couples pulverized coal combustion system and its control method
CN112611110A (en) Full-automatic high-safety low-nitrogen hot air heating combustion system and operation method thereof
CN110701797A (en) Wall-mounted furnace control method for preventing icing and wall-mounted furnace
US20070169513A1 (en) Glass Sheet Heating Surface
CN110873531A (en) Gas type energy-saving crucible furnace
CN201000195Y (en) Heating fan
CN208720507U (en) A kind of condensing plug and play boiled water machine
CN219976489U (en) Natural gas burning operation control device for boiler burner
CN210921831U (en) Heating combustion system of gas wall-mounted boiler and wall-mounted boiler
CN208720365U (en) A kind of plug and play boiled water machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070919

Termination date: 20120915