CN208720507U - A kind of condensing plug and play boiled water machine - Google Patents

A kind of condensing plug and play boiled water machine Download PDF

Info

Publication number
CN208720507U
CN208720507U CN201820409902.4U CN201820409902U CN208720507U CN 208720507 U CN208720507 U CN 208720507U CN 201820409902 U CN201820409902 U CN 201820409902U CN 208720507 U CN208720507 U CN 208720507U
Authority
CN
China
Prior art keywords
water
solenoid valve
plc controller
play
outlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820409902.4U
Other languages
Chinese (zh)
Inventor
谭博仁
何宁斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengyang Zhongying Environmental Protection Technology Development Co., Ltd
Original Assignee
Hengyang Zhong Ying Environmental Protection Technology Development Co Ltd Zhong Ying Kitchenware Equipment Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengyang Zhong Ying Environmental Protection Technology Development Co Ltd Zhong Ying Kitchenware Equipment Factory filed Critical Hengyang Zhong Ying Environmental Protection Technology Development Co Ltd Zhong Ying Kitchenware Equipment Factory
Priority to CN201820409902.4U priority Critical patent/CN208720507U/en
Application granted granted Critical
Publication of CN208720507U publication Critical patent/CN208720507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of condensing plug and play boiled water machines, including casing and PLC controller, and the water inlet system, gas handling system, combustion system, the outlet system that connect respectively with PLC controller, and the water inlet system includes the first triple valve;The outlet system includes outlet pipe, and temp probe is provided on outlet pipe, and outlet pipe is connect with water solenoid valve II and water solenoid valve III respectively by the second triple valve, and water solenoid valve III is connected to depotition cock, and water solenoid valve II is connected to the first triple valve by connecting tube.The utility model detects the water temperature whether water temperature in outlet pipe reaches setting by temp probe, judges that the water in outlet pipe is to be expelled directly out, or enter next heat cycles, so that the water for guaranteeing that depotition cock is released all is the primary boiled water that only boils.The condensing plug and play boiled water machine heat production speed of the utility model is fast, can produce boiled water within normal use 5 seconds or so, realizes plug and play, energy saving, health environment-friendly.

Description

A kind of condensing plug and play boiled water machine
Technical field
The utility model belongs to the gas-fired equipment field of life, and in particular to arrives a kind of condensing plug and play boiled water Machine.
Background technique
Currently, the tradition electricity of life, the generally existing following defect of combustion gas boiled water machine:
1. heat production is slow, generally requiring 5min or so could be boiled by water, often due to people is more, using frequently resulting in generation Hot water temperature is unstable, and boiling point is not achieved, and cannot continue to provide boiled water;2. the thermal efficiency is low, energy consumption is high, with 100L gas heater For, the boiled 100L water of 1h needs to consume liquefied petroleum gas 2.3Kg or so;3. the discharge amount of exhaust carbon dioxide is more than country Standard;4. common electricity, gas burning water heater largely use storage-type, the water in boiled water tank cannot all release (because being afraid of dry combustion method, The position of tap is relatively high), outmoded remaining boiled water is always housed in boiled water tank, health is unfavorable for.
Such as application No. is 201420281279.0 utility model patents to disclose a kind of full-automatic instant boiling type forced-ventilated condensation Formula combustion gas boiled water machine, including water inlet system, gas handling system, combustion system and outlet system, above-mentioned each system are controlled with computer Device connection.Wherein, outlet system includes water tank and depotition cock, and water tank upper is provided with level electrode and muffler, in water tank Portion is provided with temp probe and auxiliary electrical heater stick, level electrode, temp probe, auxiliary electrical heater stick respectively with computer controller Connection, water tank lower part connect depotition cock.Anti-dry burning device is set in the combustion system of the utility model, is guaranteed when combustion chamber Temperature disconnects water, electricity, gas when reaching certain requirement, i.e., the anti-dry burning device only prevents from carrying out the indoor pipeline that burns Dry combustion method.The utility model stores boiled water by setting water tank, is provided with temp probe and auxiliary electrical heater stick on water tank, but by In fearness to water tank dry combustion method, therefore the water in water tank cannot be released all, and outmoded remaining boiled water is constantly present in water tank, is burnt repeatedly It opens, forms thousand boiling water for being unfavorable for health.
Utility model content
The technical problem to be solved by the present invention is to provide it is a kind of go out water speed is fast, energy conservation and environmental protection, healthy and safe cold Solidifying formula plug and play boiled water machine.
The content of the utility model includes casing, PLC controller, and connect respectively with PLC controller water inlet system, into Gas system, combustion system, outlet system, which is characterized in that the water inlet system includes the water inlet being linked in sequence by connecting tube Mouth, water solenoid valve I, the first triple valve, water pump, water proportioning valve, water flow sensor and condenser, wherein water solenoid valve I, water Pump, water proportioning valve, water flow sensor are connect with PLC controller respectively;
The outlet system includes outlet pipe, and temp probe is provided on outlet pipe, and outlet pipe passes through the second triple valve point It is not connect with water solenoid valve II and water solenoid valve III, water solenoid valve III is connected to depotition cock, and water solenoid valve II is connected by connecting tube Logical first triple valve, wherein temp probe, water solenoid valve II, water solenoid valve III are connect with PLC controller respectively.
The utility model is by the second triple valve of setting, so that outlet pipe connects II He of water solenoid valve by connecting tube respectively Water solenoid valve III, when the temperature that the temp probe on outlet pipe detects water in outlet pipe reaches set temperature, PLC controller The on-off for controlling the second triple valve and water solenoid valve II, water solenoid valve III prevents water from the company that flow between water solenoid valve II Adapter tube, but by the connecting tube between water solenoid valve III, while water solenoid valve III is opened, opening depotition cock can release Boiled water;When the temperature that the temp probe on outlet pipe detects water in outlet pipe is not up to set temperature, PLC controller control The on-off of second triple valve and water solenoid valve II, water solenoid valve III prevents water from by the connecting tube between water solenoid valve III, But by the connecting tube between water solenoid valve II, while water solenoid valve II is opened, and the below standard water of temperature passes through connection Pipe and the first triple valve enter next heat cycles together with the cold water of water inlet, until the temp probe detection on outlet pipe To water temperature reach set temperature just from depotition cock release.
The gas handling system includes air inlet, gas ratio valve and the air inlet pipe that sequence is connected by connecting tube, air inlet pipe The combustion chamber of combustion system is connected, the gas ratio valve is connect with PLC controller.
The combustion system includes successively from the bottom up combustion chamber, heat exchanger, exhaust gas forced-drainage device, and the combustion chamber is set It is equipped with protector of accident extinguishing and pulse ignition device, anti-dry burning device is provided on the heat exchanger, heat exchanger The connection of one end of water inlet and water inlet pipe, the other end of water inlet pipe are connect with condenser, the water outlet and outlet pipe of heat exchanger It connects, anti-flue blocking device, the protector of accident extinguishing, pulse firing dress is provided on the exhaust gas forced-drainage device It sets, anti-dry burning device, exhaust gas forced-drainage device and anti-flue blocking device are connect with PLC controller respectively.
Preferably, the exhaust gas forced-drainage device is exhaust fan.
Preferably, the anti-dry burning device is temperature controller.
Preferably, the protector of accident extinguishing is inductive needle.
Preferably, the anti-flue blocking device is blast switch.
Preferably, display screen is provided on the casing.
In use, pressing the start key on display screen, after setting temperature, system delivers a signal to PLC controller, PLC Controller controls the starting of exhaust gas forced-drainage device, while PLC controller control water solenoid valve II is closed, and water solenoid valve I, water pump are controlled It is opened with water proportioning valve, cold water passes sequentially through water inlet, the first triple valve, water pump, water proportioning valve, water flow sensor and connection Pipe enters condenser.At the same time, when water flow sensor has sensed that water flow is out-of-date, water flow sensor is delivered a signal to PLC controller, PLC controller control pulse ignition device immediately and light a fire, if loss of ignition or accident extinguishing, accident extinguishing Protective device delivers a signal to PLC controller, and PLC controller controls gas ratio valve closing immediately, stops air inlet;If putting igneous Function, then PLC controller control gas ratio valve is opened, and combustion gas passes sequentially through air inlet, gas ratio valve and air inlet pipe and enters combustion It burns room to burn, the high heat flue gas generated during fuel gas buring is extracted out by exhaust gas forced-drainage device, and cold in condenser Water carries out heat exchange, and the cold water in condenser obtains preheating for the first time, is handed over later by the heat that water inlet pipe enters combustion system Parallel operation, while cooling is discharged at low-temperature flue gas from exhaust outlet after the cold water heat exchange in high-temperature flue gas and condenser;Fuel gas buring The flue gas of the high heat generated in the process carries out reheating to enter the water in heat exchanger from condenser and water inlet pipe, thus Realize the quick heating to water.
After water is discharged out of heat exchanger, outlet pipe is flowed into, is provided with temp probe on outlet pipe.When temp probe detects After water temperature reaches at or above the water temperature of setting in outlet pipe, temp probe delivers a signal to PLC controller, PLC control Device then controls water solenoid valve II and remains off, while controlling the opening of water solenoid valve III, and boiled water flows successively through outlet pipe, second Triple valve and water solenoid valve III, boiled water can be released by opening depotition cock.It is not reached when temp probe detects water temperature in outlet pipe To setting water temperature when, temp probe delivers a signal to PLC controller, PLC controller then control water solenoid valve III close, Water solenoid valve II is opened, while being controlled water proportioning valve and being reduced water flow automatically, and water passes sequentially through outlet pipe, the second triple valve and water Solenoid valve II enters next heat cycles by the first triple valve and the cold water entered from the inlet later together, until temperature Water temperature reaches the water temperature Shi Caicong depotition cock discharge of setting in degree probe detection to outlet pipe.
When no longer needing boiled water, the close key on display screen need to be only pressed, system will deliver a signal to PLC control Device, the electrical component that the control of PLC controller is electrically connected are shut down, then control the opening of water solenoid valve III, by connecting tube and water outlet Remained water discharge in pipe is clean, water when ensuring that next time uses in pipeline be it is fresh, the remaining for avoiding using last time Outmoded boiled water heats use again, unhealthful.
The utility model has the beneficial effects that
1. the condensing plug and play boiled water machine heat production speed of the utility model is fast, can produce within normal use 5 seconds or so Raw boiled water realizes plug and play, energy saving, meanwhile, the utility model is without water reservoir, so as to avoid remaining to retaining Boiled water heats repeatedly leads to the case where being not conducive to good health.
2. the utility model is by setting triple valve, water solenoid valve and temp probe, when temp probe detection water temperature not When reaching set temperature, water is heated in pipeline internal circulation flow, until just releasing from depotition cock after temperature is up to standard;When temperature is visited When the water temperature of head detection reaches set temperature, water is directly released from depotition cock, so that it is guaranteed that the water released from depotition cock is all It is temperature boiled water up to standard.
3. the utility model is by setting water proportioning valve and gas ratio valve, although originally water temperature throughout the year is different, But by the cooperation between water proportioning valve and gas ratio valve, water flow and gas flow are automatically adjusted, to ensure that out Coolant-temperature gage is constant.
Detailed description of the invention
Fig. 1 is the shell mechanism schematic diagram of the utility model.
Fig. 2 is the schematic diagram of internal structure of the utility model.
1 anti-flue blocking device in the figure, 2 heat exchangers, 3 protector of accident extinguishing, 4 pulse ignition devices, 5 temperature Degree probe, 6 combustion chambers, 7 water solenoid valves III, 8 second triple valves, 9 water solenoid valves II, 10 first triple valves, 11 water solenoid valves I, 12 water inlets, 13 water pumps, 14 water proportioning valves, 15 gas ratio valves, 16 air inlets, 17PLC controller, 18 water flow sensors, 19 depotition cocks, 20 air inlet pipe, 21 anti-dry burning devices, 22 condensers, 23 exhaust gas forced-drainage devices, 24 exhaust outlets, 25 water inlet pipes, 26 outlet pipes, 27 casings, 28 display screens.
Specific embodiment
As shown in Figs. 1-2, the condensing plug and play boiled water machine of the utility model includes casing 27, PLC controller 17, and Water inlet system, gas handling system, combustion system and the outlet system connecting respectively with PLC controller 17, the water inlet system include Water inlet 12, the water solenoid valve I 11, the first triple valve 10, water pump 13, water proportioning valve 14, water flow being linked in sequence by connecting tube Quantity sensor 18 and condenser 22, wherein water solenoid valve I 11, water pump 13, water proportioning valve 14, water flow sensor 18 respectively with PLC controller 17 connects;
The outlet system includes outlet pipe 26, and temp probe 5 is provided on outlet pipe 26, and outlet pipe 26 passes through the two or three Port valve 8 is connect with water solenoid valve II 9 and water solenoid valve III 7 respectively, and water solenoid valve III 7 is connected to depotition cock 19, water solenoid valve II 9 It is connected to the first triple valve 10 by connecting tube, wherein temp probe 5, water solenoid valve II 9, water solenoid valve III 7 are controlled with PLC respectively Device 17 connects.
Preferably, the metal bellows for having S type to arrange in the condenser 22, preferably copper pipe, heat absorption is fast, can be quick Heat is absorbed, is preheated for the cold water in pipeline, realizes quickly heat transmitting.
The PLC controller of the utility model, control be attached thereto each component when on-off and close be existing skill Art does not illustrate individually.
The utility model is by the second triple valve 8 of setting, so that outlet pipe 26 connects water solenoid valve by connecting tube respectively II 9 and water solenoid valve III 7, when the temperature that the temp probe 5 on outlet pipe 26 detects water in outlet pipe 26 reaches opening for setting When coolant-temperature gage, PLC controller 17 controls the closing of water solenoid valve II 9, water solenoid valve III 7 is opened, and prevents boiled water from flowing to water power magnetic II 9 direction of valve, but the connecting tube between water solenoid valve III 7 is flowed to, boiled water can be released by opening depotition cock 19;When out When the temperature that temp probe 5 on water pipe 26 detects water in outlet pipe 26 is not up to the water temperature set, PLC controller 17 control water solenoid valves II 9 are opened, water solenoid valve III 7 is closed, and prevent water from flowing to III 7 direction of water solenoid valve, but flow to Connecting tube between water solenoid valve II 9, while PLC controller 17 controls water proportioning valve 14 and reduces water flow, temperature is below standard Water is to pass through connecting tube and the first triple valve 10 to add together with from the cold water that water inlet 12 and solenoid valve I 11 enter into next Thermal cycle reaches the water temperature water of setting just until the temp probe 5 on outlet pipe 26 detects the water temperature in outlet pipe 26 It is released from depotition cock 19.
The gas handling system includes air inlet 16, gas ratio valve 15 and the air inlet pipe 20 that sequence is connected by connecting tube, Air inlet pipe 20 connects the combustion chamber 6 of combustion system, and the gas ratio valve 15 is connect with PLC controller 17.
The combustion system successively includes combustion chamber 6, heat exchanger 2, exhaust gas forced-drainage device 23, the burning from the bottom up Room 6 is provided with protector of accident extinguishing 3 and pulse ignition device 4, is provided with anti-dry burning device 21 on the heat exchanger 2, The water inlet of heat exchanger 2 is connect with one end of water inlet pipe 25, and the other end of water inlet pipe 25 is connect with condenser 22, i.e. heat exchange The water inlet of device 2 connects condenser by water inlet pipe 25;The water outlet of heat exchanger 2 is connect with outlet pipe 26, and the exhaust gas is strong Anti- flue blocking device 1, the protector of accident extinguishing 3, pulse ignition device 4, anti-dry dress are provided on arranging device 23 It sets 21, exhaust gas forced-drainage device 23 and anti-flue blocking device 1 is connect with PLC controller 17 respectively.
Preferably, the exhaust gas forced-drainage device 23 is exhaust fan, for be discharged fuel gas buring in combustion chamber 6 generate it is useless Gas, carbon dioxide in waste gas content is very low at this time, and far below the discharge standard of country, the feature of environmental protection is good.
The heat exchanger 2 of the utility model is fin heat exchanger, is bought from Hunan Chu Neng Environmental Protection Technology Co., Ltd, model SRZ type.It is the contact area increased with high-temperature flue gas in combustion chamber 3 using the purpose of fin heat exchanger, heat absorption is fast, can be quick Heat is absorbed, is heated for the water in pipeline, realizes quickly heat transmitting.
Preferably, the anti-dry burning device 21 is temperature controller, for monitoring the temperature of water in heat exchanger 2, when temperature reaches When arriving or being more than set temperature, PLC controller 17 is delivered a signal to automatically, and PLC controller 17 controls water solenoid valve I 11, water pump 13, water proportioning valve 14 and gas ratio valve 15 are closed.
Preferably, the protector of accident extinguishing 3 is inductive needle, if accident extinguishing in loss of ignition or combustion process, Inductive needle incudes less than flame, and protector of accident extinguishing 3 just delivers a signal to PLC controller 17, and PLC controller 17 is controlled immediately Gas ratio valve 15 processed is closed, and air inlet is stopped.
Preferably, the anti-flue blocking device 1 is blast switch, is mounted near exhaust gas forced-drainage device 23, with PLC controller 17 is electrically connected, for detecting whether exhaust gas forced-drainage device 23 normally starts, if event occurs in exhaust gas forced-drainage device 23 Barrier does not start normally, and anti-flue blocking device 1 then delivers a signal to PLC controller 17, and PLC controller 17 controls entirely immediately Thus device powers down is avoided due to continuous high temperature bring security risk in combustion chamber.
Preferably, it is provided with display screen 28 on the casing 27, start key, close key is provided on display screen 28, and Heat up key, cooling key, convenient for operation.
Preparation before use:
The air inlet 16 of combustion gas is connected to extraneous gas source (or liquefaction gas source), and water inlet 12 is connected to running water pipe, PLC controller 17 is electrically connected by attaching plug with external power supply.
The course of work of the utility model is as follows:
The start key on display screen 28 is pressed, while utilizing heating key, the good required water temperature of cooling key assignments, start key After starting, PLC controller 17 controls exhaust gas forced-drainage device 23 and starts, and remaining combustion gas, prevents subsequent igniting in pump drainage combustion chamber 6 Appearance fires phenomenon.
PLC controller 17 controls water solenoid valve II 9 and closes, and water solenoid valve I 11, water pump 13 and water proportioning valve 14 are opened.It is cold Water enters from water inlet 12, and water flow can only be flowed away by the first triple valve 10 to 13 direction of water pump, and cold water passes through water proportioning valve 14, enter condenser 22 after water flow sensor 18 and connecting tube.
At the same time, when water flow sensor 18 has sensed that water flow is out-of-date, water flow sensor 18 delivers a signal to PLC Controller 17, PLC controller 17 controls pulse ignition device 4 immediately and lights a fire, if loss of ignition or accident extinguishing, surprisingly put out Fiery protective device 3 delivers a signal to PLC controller 17, and PLC controller 17 controls the closing of gas ratio valve 15 immediately, stop into Gas;If lighting a fire successfully, PLC controller 17 controls gas ratio valve 15 and opens, and combustion gas passes through air inlet 16, gas ratio valve 15 And air inlet pipe 20 is burnt into combustion chamber 6, combustion gas combustion process produces exhaust gas forced-drainage device 23 in pump drainage combustion chamber 6 always Raw high heat flue gas is that the cold water that the cold water in condenser 22 carries out in first time preheating, with condenser 22 carries out heat Become low-temperature flue gas after exchange, is discharged in air by exhaust outlet 24 later;When water is discharged from condenser 22, pass through water inlet pipe 25 enter the heat exchanger 2 of combustion system, and the flue gas of the high heat generated during fuel gas buring is into heat exchanger 2 Water carries out reheating, to realize the quick heating to water.
After water is discharged out of heat exchanger 2, outlet pipe 26 is flowed into, is provided with temp probe 5 on outlet pipe 26.
When temp probe 5 detects water temperature reaches at or above the water temperature of setting in outlet pipe 26 after, PLC controller 17 Control water solenoid valve II 9 remains off, while water solenoid valve III 7 is opened, and boiled water passes sequentially through outlet pipe 26, the second threeway Valve 8 and water solenoid valve III 7, boiled water can be released by opening depotition cock 19.
When temp probe 5 detects the water temperature that water temperature is not up to set in outlet pipe 26, PLC controller 17 is controlled Water solenoid valve III 7 is closed, while water solenoid valve II 9 is opened, and water proportioning valve 14 reduces water flow automatically, and water passes sequentially through outlet pipe 26, the second triple valve 8 and water solenoid valve II 9, later by the first triple valve 10 and from water inlet 12 enter cold water together into Enter next heat cycles, until temp probe 5 detects when water temperature in outlet pipe 26 reaches the water temperature of setting just from out Tap 19 is discharged.
When no longer needing boiled water, the close key on display screen 28 need to be only pressed, the control of PLC controller 17 is electrically connected Electrical component shut down, then control water solenoid valve III 7 opening, the remained water discharge in connecting tube and outlet pipe 26 is clean, with true Protect water when using next time in pipeline be it is fresh, the outmoded boiled water for the remaining for avoiding using last time heats again to be used, shadow Ring health.
In the utility model, PLC controller 17 controls 15 air inlet of gas ratio valve by the water temperature that temp probe 5 detects The size of amount carries out high fire burning when water temperature is not up to the water temperature set, when water temperature reaches the water temperature of setting The automatic throughput that reduces carries out small fire burning, to guarantee the constant of leaving water temperature.

Claims (8)

1. a kind of condensing plug and play boiled water machine, including casing (27), PLC controller (17), and respectively with PLC controller (17) water inlet system of connection, gas handling system, combustion system, outlet system, which is characterized in that the water inlet system includes passing through Water inlet (12), the water solenoid valve I (11), the first triple valve (10), water pump (13), water proportioning valve of connecting tube sequential connection (14), water flow sensor (18) and condenser (22), wherein water solenoid valve I (11), water pump (13), water proportioning valve (14), water Flow sensor (18) is connect with PLC controller (17) respectively;
The outlet system includes outlet pipe (26), is provided on outlet pipe (26) temp probe (5), and outlet pipe (26) passes through the Two triple valves (8) are connect with water solenoid valve II (9) and water solenoid valve III (7) respectively, and water solenoid valve III (7) is connected to depotition cock (19), water solenoid valve II (9) by connecting tube be connected to the first triple valve (10), wherein temp probe (5), water solenoid valve II (9), Water solenoid valve III (7) is connect with PLC controller (17) respectively.
2. condensing plug and play boiled water machine as described in claim 1, which is characterized in that the gas handling system includes passing through company Air inlet (16), gas ratio valve (15) and the air inlet pipe (20) being linked in sequence are taken over, air inlet pipe (20) connects combustion system Combustion chamber (6), the gas ratio valve (15) connect with PLC controller (17).
3. condensing plug and play boiled water machine as described in claim 1, which is characterized in that the combustion system from the bottom up according to Secondary includes combustion chamber (6), heat exchanger (2), exhaust gas forced-drainage device (23), and the combustion chamber (6) is provided with accident extinguishing protection Device (3) and pulse ignition device (4) are provided with anti-dry burning device (21) on the heat exchanger (2), heat exchanger (2) Water inlet is connect by water inlet pipe (25) connection condenser (22), the water outlet of heat exchanger (2) with outlet pipe (26), and exhaust gas is strong Be provided with anti-flue blocking device (1) on arranging device (23), the protector of accident extinguishing (3), pulse ignition device (4), Anti-dry burning device (21), exhaust gas forced-drainage device (23) and anti-flue blocking device (1) are connect with PLC controller (17) respectively.
4. condensing plug and play boiled water machine as claimed in claim 3, which is characterized in that the exhaust gas forced-drainage device (23) is Exhaust fan.
5. condensing plug and play boiled water machine as claimed in claim 3, which is characterized in that the anti-dry burning device (21) is temperature Control device.
6. condensing plug and play boiled water machine as claimed in claim 3, which is characterized in that the protector of accident extinguishing It (3) is inductive needle.
7. condensing plug and play boiled water machine as claimed in claim 3, which is characterized in that the anti-flue blocking device (1) For blast switch.
8. such as the described in any item condensing plug and play boiled water machines of claim 1-7, which is characterized in that on the casing (27) It is provided with the display screen (28) connecting with PLC controller (17).
CN201820409902.4U 2018-03-26 2018-03-26 A kind of condensing plug and play boiled water machine Active CN208720507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820409902.4U CN208720507U (en) 2018-03-26 2018-03-26 A kind of condensing plug and play boiled water machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820409902.4U CN208720507U (en) 2018-03-26 2018-03-26 A kind of condensing plug and play boiled water machine

Publications (1)

Publication Number Publication Date
CN208720507U true CN208720507U (en) 2019-04-09

Family

ID=65969466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820409902.4U Active CN208720507U (en) 2018-03-26 2018-03-26 A kind of condensing plug and play boiled water machine

Country Status (1)

Country Link
CN (1) CN208720507U (en)

Similar Documents

Publication Publication Date Title
CN201517840U (en) Household gas-fired wall-mounted dual purpose boiler for heating and bathing
CN201875806U (en) Dual-purpose wall-hung furnace for plate-type heat exchanger
CN201662226U (en) Condensation-type gas-fired heating water heater
CN105674578B (en) A kind of gas heater and its control method of a pressure self-adjusting section
CN106642646A (en) Gas water heater and control method thereof
CN203010927U (en) Novel sleeve type gas heating water heater
CN201852197U (en) Single heating wall-mounted furnace
CN101726108A (en) Condensing dual-purpose stove for supplying water and heat
CN208720507U (en) A kind of condensing plug and play boiled water machine
CN208720365U (en) A kind of plug and play boiled water machine
CN209263380U (en) A kind of novel low nitrogen condensing gas-fired fast water heater
CN201615538U (en) Double-source wall-mounted boiler
CN206449855U (en) A kind of energy-saving efficient boiler
CN201837053U (en) Household automatic-control dual-purpose stove for heat supply and hot water supply
CN205170811U (en) Pot at bottom of energy -conserving direct combustion formula of making wine gas
CN101338944A (en) Condensing type gas water heater
CN209623110U (en) A kind of burnt gas wall hanging furnace
CN207527858U (en) A kind of wall-hung boiler of anti-dry
CN208042200U (en) A kind of steam and hot water energy-saving stove
CN207599960U (en) A kind of wall-hung boiler by wireless signal intellectual monitoring internal information
CN207230651U (en) A kind of heat integration gas-cooker
CN201874529U (en) Control system for well-mouth fuel-gas heating furnace
CN207438868U (en) A kind of boiler of temperature-control energy-saving
CN207162699U (en) A kind of warm bath dual-purpose stove of full pre-mix condensing combustion gas
CN204100566U (en) Energy-conservationly boil boiling hot stove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200407

Address after: No.168, Zhengyang Avenue, Zhengxiang District, Hengyang City, Hunan Province

Patentee after: Hengyang Zhongying Environmental Protection Technology Development Co., Ltd

Address before: 421000 Hunan Province, Hengyang Zhengxiang District daiyingling Town Village chicken steamed Yang Road No. 168

Patentee before: ZHONGYING KITCHEN TOOLS EQUIPMENT FACTORY, HENGYANG ZHONGYING ENVIRONMENTAL PROTECTION TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right