CN200949809Y - Boiler header closing machine - Google Patents

Boiler header closing machine Download PDF

Info

Publication number
CN200949809Y
CN200949809Y CN200620010610.0U CN200620010610U CN200949809Y CN 200949809 Y CN200949809 Y CN 200949809Y CN 200620010610 U CN200620010610 U CN 200620010610U CN 200949809 Y CN200949809 Y CN 200949809Y
Authority
CN
China
Prior art keywords
header
closing
mold
machine
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200620010610.0U
Other languages
Chinese (zh)
Inventor
束平
孙金厂
程群
邵晓玲
徐以丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINAN BOILER GROUP CO Ltd
Original Assignee
JINAN BOILER GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN BOILER GROUP CO Ltd filed Critical JINAN BOILER GROUP CO Ltd
Priority to CN200620010610.0U priority Critical patent/CN200949809Y/en
Application granted granted Critical
Publication of CN200949809Y publication Critical patent/CN200949809Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Landscapes

  • General Induction Heating (AREA)

Abstract

The utility model relates to a boiler header closing-up machine comprising a hydraulic machine, a mould, a mandrill, an inductive furnace, an adjusting bolt, a suspension arm, a controlling cabinet, a bed body, a header pipe, a supporting seat, a fixed seat and a tail seat, which is characterized in that the inductive furnace is connected with the mould through the adjusting bolt to realize the integration of the furnace and the machine, which controls the pollution and particularly overcomes the deviation of the ball caused by the deformation of the top of the header pipe when the length of the header pipe is more than five meters; improves the closing-up quality of the end surface without heating for a plurality of times; compared to other header closing-up machines, the utility model has the advantages of fast temperature increasing, high heating efficiency, pollution free, small land and person consumption, low cost and high working efficiency.

Description

锅炉集箱收口机Boiler header closing machine

所属技术领域:Technical field:

本实用新型属于锅炉设备的配套机械,特别涉及的是一种加工锅炉的受压元件专用机床锅炉集箱收口机。The utility model belongs to the supporting machinery of boiler equipment, in particular to a special machine tool for processing pressure components of boilers, and a boiler header closing machine.

背景技术:Background technique:

集箱收口机在锅炉中的主要作用是进行汽、水的混合、流量的分配、阻力的分配和便于受热面的布置,集箱收E1就是集箱管端部加热后,用模具将其端部挤压成球形并形成适于装炉手孔加强或管接头的开孔。目前所用的集箱收口机由加热炉和收口机两部分组成,由于炉机分离,需先将集箱管吊到加热炉上用油、气、煤等作为燃料进行端部加热,有大量热损耗,成本很高,安全性差,热透性不好,尤其加热厚壁管效果极差,常需多次加热,容易产生过烧和起皱等缺陷,影响产品质量,生产效率低。另外,当集箱管长度>5米时,容易将集箱管顶拱变形,收口时产生“歪头”,并影响球面开口质量。The main function of the header closing machine in the boiler is to mix steam and water, distribute the flow, distribute the resistance and facilitate the arrangement of the heating surface. The part is extruded into a spherical shape and forms an opening suitable for furnace hand hole reinforcement or pipe joints. The currently used header closing machine is composed of a heating furnace and a closing machine. Since the furnace and machine are separated, the header pipe needs to be hoisted to the heating furnace for end heating with oil, gas, coal, etc. as fuel, and there is a lot of heat. Loss, high cost, poor safety, poor heat permeability, especially the effect of heating thick-walled tubes is extremely poor, often needs to be heated many times, prone to defects such as overburning and wrinkling, affecting product quality, and low production efficiency. In addition, when the length of the header pipe is greater than 5 meters, it is easy to deform the top arch of the header pipe, causing "tilted head" when closing, and affecting the quality of the spherical opening.

发明内容:Invention content:

本实用新型的目的是提供一种中频加热方式,实现炉机一体,能一次成型的锅炉集箱收口机。The purpose of the utility model is to provide an intermediate frequency heating method, which realizes the integration of furnace and machine, and can be formed at one time.

本实用新型的目的是这样实现的,具体说明如下:The purpose of this utility model is achieved in that, specifically described as follows:

一种锅炉集箱收口机,是由液压机、机座、模具、加热器组成,其特点是感应炉悬挂在模具上。A boiler header closing machine is composed of a hydraulic press, a machine base, a mold and a heater, and is characterized in that the induction furnace is suspended on the mold.

本实用新型的优点很明显,由于采用了全新的中频加热方式,采用感应加热,提高热效率,实现炉机一体,集箱在收口机上装夹后,悬挂在模具上的感应器在收口机主轴(与模具相连)驱动下,前行至设定位置开始加热,达到设定温度后,时间继电器动作,加热停止,主轴再次前进驱动模具项压集箱收口结束;实现了温控准确,收口质量好,减少了占地面积,控制了污染,一次成型,不需多次加热,不仅改善了工人的劳动条件,还提高了生产效率和产品质量,减低了成本,实现文明生产。The advantages of the utility model are obvious. Because of the adoption of a brand-new intermediate frequency heating method and induction heating, the thermal efficiency is improved, and the furnace and machine are integrated. connected with the mould), it moves forward to the set position to start heating, and when the set temperature is reached, the time relay acts, the heating stops, and the main shaft advances again to drive the mold to finish the closing of the pressure header box; the temperature control is accurate and the closing quality is good , Reduced floor space, controlled pollution, one-time molding, no need for multiple heating, not only improved the working conditions of workers, but also improved production efficiency and product quality, reduced costs, and realized civilized production.

附图说明:Description of drawings:

图1为锅炉集箱收口机结构示意图Figure 1 is a schematic diagram of the structure of the boiler header closing machine

图2为锅炉集箱收口机中频加热炉和模具结构示意图Figure 2 is a schematic diagram of the intermediate frequency heating furnace and mold structure of the boiler header closing machine

图3为模具剖面放大示意图Figure 3 is an enlarged schematic diagram of the mold section

图中:1是模具,2是感应炉,3是控制柜,4是固定座,5是集箱管,6是尾座,7是床身,支座8是,9是液压机,10是调节螺栓,11是悬臂,12是主轴,13是芯子,14是螺栓。In the figure: 1 is the mold, 2 is the induction furnace, 3 is the control cabinet, 4 is the fixed seat, 5 is the header pipe, 6 is the tailstock, 7 is the bed, 8 is the support, 9 is the hydraulic machine, 10 is the adjustment Bolt, 11 is a cantilever, 12 is a main shaft, 13 is a core, and 14 is a bolt.

由图1可知,集箱收口机是由模具1、感应炉2、床身7、液压机9、集箱管5、尾座6、支座8、固定座4、液压机9组成;尾座6支座8、固定座4、液压机9固定在床身7上,液压机9主轴的右端与模具1的左壁(后壁)连接;集箱管5卡入床身7上后,其右端与尾座6靠接,其前端穿过感应炉2后与模具1模口靠接,实现了炉机一体。It can be seen from Figure 1 that the header closing machine is composed of a mold 1, an induction furnace 2, a bed 7, a hydraulic press 9, a header pipe 5, a tailstock 6, a support 8, a fixing seat 4, and a hydraulic press 9; Seat 8, fixed seat 4, and hydraulic press 9 are fixed on the bed 7, and the right end of the main shaft of hydraulic press 9 is connected with the left wall (rear wall) of mold 1; 6 abutment, its front end passes through the induction furnace 2 and abuts with the die opening of the mold 1, realizing the integration of the furnace and machine.

由于在床身7上增加了固定座4以及支座8,克服了当集箱管长度>5米时,容易将集箱管顶拱变形所致球头产生“歪头”现象,提高了端面的收151质量。Due to the addition of the fixed seat 4 and the support 8 on the bed 7, when the length of the header pipe is greater than 5 meters, the phenomenon of "twisting" of the ball head caused by the deformation of the top arch of the header pipe is easily overcome, and the end face is improved. The received 151 quality.

由图2可知,与感应炉2固定连接的悬臂11与模具1之间由调节螺栓10连接在一起,这就能完成对不同管径的集箱管5进行对中调节。It can be seen from Fig. 2 that the cantilever 11 fixedly connected with the induction furnace 2 and the mold 1 are connected together by the adjusting bolt 10, which can complete the centering adjustment of the header pipes 5 with different pipe diameters.

由图3可知,模具的芯子与液压机主轴端由螺栓连接在一起,即液压机9主轴的右端与模具1左端芯子13由螺栓连接,实现了对不同管径的集箱管可以调换相匹配的模具。It can be seen from Figure 3 that the core of the mold and the main shaft end of the hydraulic press are connected together by bolts, that is, the right end of the main shaft of the hydraulic press 9 is connected with the core 13 at the left end of the mold 1 by bolts, so that header pipes of different diameters can be exchanged and matched mold.

具体实施方式:Detailed ways:

由上述可知锅炉集箱收口机中感应炉与收口模具采用悬挂式连接。装配中要保证感应圈与模具同心,以免在收口过程中集箱管撞坏感应炉的隔热层。且集箱管在进入感应炉后应使感应炉内壁与集箱管外壁之间距离不大于20mm且间隙均匀。It can be seen from the above that the induction furnace and the closing mold in the boiler header closing machine are connected by suspension. During assembly, it is necessary to ensure that the induction coil is concentric with the mold, so as not to damage the heat insulation layer of the induction furnace by the header pipe during the closing process. And after the header tube enters the induction furnace, the distance between the inner wall of the induction furnace and the outer wall of the header tube should be no more than 20mm and the gap should be uniform.

集箱管5装夹在床身7上后,集箱管5的右端顶在尾座6上,其前部由支座8支撑,其中部被固定座4卡住,集箱管5的左端穿过中频感应炉2进入模具1中,这时,开启控制柜3接通电源,悬挂在模具1上的感应炉2在液压机9主轴驱动下,前行至设定位置开始对集箱管5左端加热达到设定温度后,时间继电器动作,加热停止,主轴再次前进驱动模具1顶压集箱管至收口结束。After the header pipe 5 is clamped on the bed 7, the right end of the header pipe 5 is pushed on the tailstock 6, and its front part is supported by the support 8, and the middle part is blocked by the fixing seat 4, and the left end of the header pipe 5 Pass through the intermediate frequency induction furnace 2 and enter the mold 1. At this time, open the control cabinet 3 and turn on the power supply. The induction furnace 2 suspended on the mold 1 is driven by the main shaft of the hydraulic machine 9. It moves forward to the set position and starts to adjust the header pipe 5. After the heating at the left end reaches the set temperature, the time relay operates, the heating stops, and the main shaft advances again to drive the mold 1 to press the header pipe to the end of closing.

本设计在原来收口模的基础上,增加了芯模,(如图3),不仅能形成圆形管孔,还能形成椭圆形手孔,更加满足了产品结构的需要;控制柜还将中频电源与收口机电控组合,实现了两者的自动联动。This design adds a mandrel on the basis of the original closing mould, (as shown in Figure 3), which can not only form a round tube hole, but also an oval hand hole, which better meets the needs of the product structure; the control cabinet will also The combination of the power supply and the electronic control of the mouth closing machine realizes the automatic linkage of the two.

Claims (4)

1、一种锅炉集箱收口机是由液压机、感应炉、模具、床身组成,其特征在于:感应炉与模具通过调节螺栓连接在一起。1. A boiler header closing machine is composed of a hydraulic press, an induction furnace, a mold, and a bed, and is characterized in that the induction furnace and the mold are connected together by adjusting bolts. 2、根据权利要求1所述的锅炉集箱收口机,其特征在于:固定在床身中部的固定座卡在集箱管中部的外壁上;固定在床身前部的支座支撑着集箱管前部。2. The boiler header closing machine according to claim 1, characterized in that: the fixed seat fixed in the middle of the bed is stuck on the outer wall of the middle of the header tube; the support fixed in the front of the bed supports the header Tube front. 3、根据权利要求1所述的锅炉集箱收口机,其特征在于:模具的芯子与液压机主轴端由螺栓连接在一起。3. The boiler header closing machine according to claim 1, characterized in that: the core of the mold and the main shaft end of the hydraulic press are connected together by bolts. 4、根据权利要求1所述的锅炉集箱收口机,其特征在于:感应炉与悬臂连接,悬臂通过螺栓与模具连接在一起。4. The boiler header closing machine according to claim 1, characterized in that: the induction furnace is connected with the cantilever, and the cantilever is connected with the mold through bolts.
CN200620010610.0U 2006-10-09 2006-10-09 Boiler header closing machine Expired - Fee Related CN200949809Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200620010610.0U CN200949809Y (en) 2006-10-09 2006-10-09 Boiler header closing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200620010610.0U CN200949809Y (en) 2006-10-09 2006-10-09 Boiler header closing machine

Publications (1)

Publication Number Publication Date
CN200949809Y true CN200949809Y (en) 2007-09-19

Family

ID=38892352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200620010610.0U Expired - Fee Related CN200949809Y (en) 2006-10-09 2006-10-09 Boiler header closing machine

Country Status (1)

Country Link
CN (1) CN200949809Y (en)

Similar Documents

Publication Publication Date Title
CN106735009B (en) Casting roll, casting system and casting roll based on the same
CN208646086U (en) Mold is used in bellows production
CN103357696A (en) Production manufacturing process of large-diameter copper-nickel alloy seamless pipe
CN201404962Y (en) Ten-die tungsten and molybdenum wire drawing machine
CN101700542A (en) Production process of elbow with great caliber and small bending radius
CN200949809Y (en) Boiler header closing machine
CN2883362Y (en) A medical glass tube forming device
CN109773421A (en) The manufacturing method of angle valve valve body
CN200986399Y (en) Prewarming mixture mine slot heater
CN201433228Y (en) A Gradient Induction Heating Furnace for Aluminum Alloy Tube and Rod
CN205685692U (en) A debug-free sheath extruder head
CN209113753U (en) Suitable for producing the big bushing water cooling plate-inserting structure of continuous basalt fiber
CN208373856U (en) A kind of square tube molding machine
CN216826125U (en) Quick slurry melting device
CN204196060U (en) Oil tank cooling structure of a mold temperature machine
CN213732442U (en) Energy-saving maintenance device
CN205798326U (en) A kind of forge furnace
CN205576232U (en) Thermal treatment anti -deformation device of heavy -calibre light -wall pipe
CN202224489U (en) Semiautomatic pipe bending machine
CN203472124U (en) Cooling device of extruder
CN208495753U (en) A high-pressure cooling mechanism for extremely thin parts of a die-casting mold
CN206810997U (en) The equipment for cooling die of bending furnace
CN108790107A (en) A kind of heavy caliber PE pipes cooling and shaping device and method
CN206418001U (en) A kind of glass melter turning pool wall cooling wind structure for conveying
CN113814677B (en) Reducing pipe forming method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070919

Termination date: 20141009

EXPY Termination of patent right or utility model