CN200948753Y - DC1500V three-rail mounting structure - Google Patents

DC1500V three-rail mounting structure Download PDF

Info

Publication number
CN200948753Y
CN200948753Y CN 200620064035 CN200620064035U CN200948753Y CN 200948753 Y CN200948753 Y CN 200948753Y CN 200620064035 CN200620064035 CN 200620064035 CN 200620064035 U CN200620064035 U CN 200620064035U CN 200948753 Y CN200948753 Y CN 200948753Y
Authority
CN
China
Prior art keywords
bracket base
dc1500v
utility
vertical portion
transverse part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620064035
Other languages
Chinese (zh)
Inventor
赵印军
卢光霖
王立天
陈韶章
李金华
蔡昌俊
张彦民
黄德亮
冯栓友
马德强
高鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Corp
Original Assignee
ZHONGTIE ELECTRIFICATION SURVEY AND DESIGN INST
Guangzhou Metro Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGTIE ELECTRIFICATION SURVEY AND DESIGN INST, Guangzhou Metro Corp filed Critical ZHONGTIE ELECTRIFICATION SURVEY AND DESIGN INST
Priority to CN 200620064035 priority Critical patent/CN200948753Y/en
Application granted granted Critical
Publication of CN200948753Y publication Critical patent/CN200948753Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model discloses a DC1500V three track installation structure. The structure has an integrated insulation bracket, a vertical part, a horizontal part and a bracket base. The vertical part has three track installation position, and the horizontal part of the integrated insulation bracket is connected to the bracket base via connection bolts; the bracket base is fixed on a ballast bed with expansion bolts or chemical bolts. With structure above adopted, the utility model is suitable for installation of various line conditions such as underground tunnels, ground and overhead viaduct. The integrated insulation bracket guarantees the three tracks can move flexibly in the line direction in the case of temperature change and installation is simple and reliable. At the same time, horizontal and vertical adjustment are also allowed with precision up to 1mm.

Description

DC1500V three rail mounting structures
Technical field
The utility model relates to a kind of suspension installation structure of electric power supply system for subway DC1500V three rails.
Background technology
Three rails (conductor rail) DC power-supply system is one of electric power system of present underground engines.And electric power supply system for subway DC1500V third rail system must be fixed on the railway roadbed reliably, also must conveniently install and adjust simultaneously, is convenient to operation maintenance.Yet DC1500V three rails belong to China to be adopted first, does not all have the experience that can use for reference both at home and abroad.
Summary of the invention
The purpose of this utility model is at the problems referred to above, and a kind of DC1500V three rail mounting structures are provided, and it makes simple, and is easy for installation, and safeguards easily, can be applicable to the metro construction of China better.
For achieving the above object, the technical solution of the utility model is as follows: DC1500V three rail mounting structures, an integral insulation support is arranged, and it has a vertical portion and a transverse part, and vertical portion is provided with three rail installation positions; And a bracket base is arranged, the transverse part of integral insulation support is attached thereto by tie bolt; Bracket base is fixed on the railway roadbed by expanded anchor bolt or chemical bolt.
Angle between above-mentioned vertical portion and the transverse part is 90 degree.
Pass through arc transition between above-mentioned vertical portion and the transverse part.
The utility model is applicable to the installation under the various line conditions such as subterranean tunnel, ground and overpass owing to adopt said structure.The integral insulation support can guarantee that when temperature traverse three rails road along the line direction moves flexibly, and installs simple and reliablely, can carry out the adjustment of level, vertical direction simultaneously, and adjusting accuracy can reach 1mm.
Description of drawings
Fig. 1 is underground solid bed linear portion three rail mounting means scheme drawings;
Fig. 2 is underground solid bed segment of curve three rail mounting means scheme drawings;
Fig. 3 is the ballast bed three rail mounting means scheme drawings in ground;
Fig. 4 is the board-like railway roadbed three rail mounting means scheme drawings of overpass;
Fig. 5 is overpass resin sleeper section three rail mounting means scheme drawings.
Now the utility model is described in further detail in conjunction with the accompanying drawings and embodiments:
The specific embodiment
Embodiment 1
As shown in Figure 1, three rails 5 of DC1500V third rail system are installed in a side of underground solid bed linear portion rail 6 by the utility model.The utility model comprises integral insulation support 1 and bracket base 2, and integral insulation support 1 has a vertical portion 12 and a transverse part 11, passes through circular arc 13 transition between vertical portion 12 and the transverse part 11.Vertical portion 12 is provided with three rail installation positions, 121, three rails 5 and is installed on the three rail installation positions 121.The transverse part 11 of integral insulation support 1 is fixed on the bracket base 2 by tie bolt 4, and bracket base 2 is fixed on the linear portion of underground solid bed by expanded anchor bolt 31.Bracket base 2 also is provided with ground connection flat copper 7.
The utility model can adjust accordingly three rails according to the superelevation situation of track, and the integral insulation support is used for the vertical direction adjustment, and bracket base is used for the horizontal direction adjustment.
Embodiment 2
As shown in Figure 2, three rails 5 of DC1500V third rail system are installed in a side of underground solid bed segment of curve rail 6 by the utility model.The utility model comprises integral insulation support 1 and bracket base 2, and integral insulation support 1 has a vertical portion 12 and a transverse part 11, passes through circular arc 13 transition between vertical portion 12 and the transverse part 11.Vertical portion 12 is provided with three rail installation positions, 121, three rails 5 and is installed on the three rail installation positions 121.The transverse part 11 of integral insulation support 1 is fixed on the bracket base 2 by tie bolt 4, and bracket base 2 is fixed on the segment of curve of underground solid bed by expanded anchor bolt 31.Bracket base 2 also is provided with ground connection flat copper 7.
The utility model can adjust accordingly three rails according to the superelevation situation of track, and the integral insulation support is used for the vertical direction adjustment, and bracket base is used for the horizontal direction adjustment.
Embodiment 3
As shown in Figure 3, three rails 5 of DC1500V third rail system are installed in a side of the ballast bed rail 6 in ground by the utility model.The utility model comprises integral insulation support 1 and bracket base 2, and integral insulation support 1 has a vertical portion 12 and a transverse part 11, passes through circular arc 13 transition between vertical portion 12 and the transverse part 11.Vertical portion 12 is provided with three rail installation positions, 121, three rails 5 and is installed on the three rail installation positions 121.The transverse part 11 of integral insulation support 1 is fixed on the bracket base 2 by tie bolt 4, bracket base 2 by expanded anchor bolt 31 be fixed on ground ballast bed on.Bracket base 2 also is provided with ground connection flat copper 7.
The utility model can adjust accordingly three rails according to the superelevation situation of track, and the integral insulation support is used for the vertical direction adjustment, and bracket base is used for the horizontal direction adjustment.
Embodiment 4
As shown in Figure 4, three rails 5 of DC1500V third rail system are installed in a side of the board-like railway roadbed rail 6 of overpass by the utility model.The utility model comprises integral insulation support 1 and bracket base 2, and integral insulation support 1 has a vertical portion 12 and a transverse part 11, passes through circular arc 13 transition between vertical portion 12 and the transverse part 11.Vertical portion 12 is provided with three rail installation positions, 121, three rails 5 and is installed on the three rail installation positions 121.The transverse part 11 of integral insulation support 1 is fixed on the bracket base 2 by tie bolt 4, and bracket base 2 is fixed on the board-like railway roadbed of overpass by chemical bolt 32.Bracket base 2 also is provided with ground connection flat copper 7.
The utility model can adjust accordingly three rails according to the superelevation situation of track, and the integral insulation support is used for the vertical direction adjustment, and bracket base is used for the horizontal direction adjustment.
Embodiment 5
As shown in Figure 5, three rails 5 of DC1500V third rail system are installed in a side of overpass resin sleeper section railway roadbed rail 6 by the utility model.The utility model comprises integral insulation support 1 and bracket base 2, and integral insulation support 1 has a vertical portion 12 and a transverse part 11, passes through circular arc 13 transition between vertical portion 12 and the transverse part 11.Vertical portion 12 is provided with three rail installation positions, 121, three rails 5 and is installed on the three rail installation positions 121.The transverse part 11 of integral insulation support 1 is fixed on the bracket base 2 by tie bolt 4, and bracket base 2 is fixed on the overpass resin sleeper section railway roadbed by chemical bolt 32.Bracket base 2 also is provided with ground connection flat copper 7.
The utility model can adjust accordingly three rails according to the superelevation situation of track, and the integral insulation support is used for the vertical direction adjustment, and bracket base is used for the horizontal direction adjustment.

Claims (3)

1, DC1500V three rail mounting structures is characterized in that: an integral insulation support is arranged, and it has a vertical portion and a transverse part, and vertical portion is provided with three rail installation positions; And a bracket base is arranged, the transverse part of integral insulation support is attached thereto by tie bolt; Bracket base is fixed on the railway roadbed by expanded anchor bolt or chemical bolt.
2, DC1500V three rail mounting structures according to claim 1 is characterized in that: the angle between described vertical portion and the transverse part is 90 degree.
3, DC1500V three rail mounting structures according to claim 1 is characterized in that: pass through arc transition between described vertical portion and the transverse part.
CN 200620064035 2006-09-08 2006-09-08 DC1500V three-rail mounting structure Expired - Lifetime CN200948753Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620064035 CN200948753Y (en) 2006-09-08 2006-09-08 DC1500V three-rail mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620064035 CN200948753Y (en) 2006-09-08 2006-09-08 DC1500V three-rail mounting structure

Publications (1)

Publication Number Publication Date
CN200948753Y true CN200948753Y (en) 2007-09-19

Family

ID=38891293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620064035 Expired - Lifetime CN200948753Y (en) 2006-09-08 2006-09-08 DC1500V three-rail mounting structure

Country Status (1)

Country Link
CN (1) CN200948753Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104359690A (en) * 2014-11-11 2015-02-18 南车青岛四方机车车辆股份有限公司 Simulation system for current collecting surfaces of C-type contact rails

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104359690A (en) * 2014-11-11 2015-02-18 南车青岛四方机车车辆股份有限公司 Simulation system for current collecting surfaces of C-type contact rails
CN104359690B (en) * 2014-11-11 2017-01-18 中车青岛四方机车车辆股份有限公司 Simulation system for current collecting surfaces of C-type contact rails
US9891140B2 (en) 2014-11-11 2018-02-13 Crrc Qingdao Sifang Co., Ltd. Simulation system for current collecting surface of C-type contact rail

Similar Documents

Publication Publication Date Title
CN219547454U (en) Subway rail mounting device
CN207062660U (en) Streetcar track state adjustment support pedestal
CN103898833A (en) Long-span ballastless track bridge beam end structure
CN200948753Y (en) DC1500V three-rail mounting structure
JP5894675B2 (en) Vehicle track
CN2758310Y (en) Biblock type rail bearing
CN2683442Y (en) Suspension arrangement for overhead rigid suspension contacting net
KR100942793B1 (en) Railway track block sleeper with position fixture
CN203716004U (en) Special equipment sleeper for railway vehicle
CN1882746A (en) Method for the precise positioning of a carrier for a track, and corresponding track
JP2950983B2 (en) Track rails for maglev vehicles
CN210481916U (en) Medium-low speed magnetic levitation track with variable track pitch
CN113668295A (en) Z-shaped steel rail tunnel rail structure and application method thereof
CN103290746A (en) Permanent-magnet-driven maglev track
CN205231680U (en) Urban rail transit engineering cable support
CN2170873Y (en) Bearer carrier struction for conductor rail
CN2758311Y (en) Overhead I type beam rail system of train
CN2518747Y (en) Railway protecting cover support
CN1837468A (en) Bearing platform type track slab
CN213804658U (en) Magnetic suspension track supporting device and magnetic suspension track system
CN112030619B (en) Rail structure capable of lifting at three-dimensional crossing of railway line
CN218492164U (en) Single rail installed by utilizing insulating gauge rod
CN202658516U (en) Viaduct evacuation platform
KR950025198A (en) How to install track of maglev train
CN219033457U (en) Ditch template connection structure suitable for urban rail transit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY ELECTRIFICATION SURVEY AND DESIGN IN

Free format text: FORMER NAME OR ADDRESS: ZHONGTIE ELECTRIFICATION SURVEY AND DESIGN INST; PATENTEE

CP03 Change of name, title or address

Address after: No. 33, Jiangdu Road, Hedong District, Tianjin, China: 300250

Co-patentee after: Guangzhou Metro Corporation

Patentee after: China iron electrification survey and Design Research Institute Co., Ltd.

Address before: No. 33, Jiangdu Road, Hedong District, Tianjin, China: 300250

Co-patentee before: Guangzhou Metro Corporation

Patentee before: China iron electrification survey and Design Research Institute

CX01 Expiry of patent term

Granted publication date: 20070919

EXPY Termination of patent right or utility model