CN200943205Y - Anchor bar assembly for earth anchor bar construction - Google Patents

Anchor bar assembly for earth anchor bar construction Download PDF

Info

Publication number
CN200943205Y
CN200943205Y CN 200620021147 CN200620021147U CN200943205Y CN 200943205 Y CN200943205 Y CN 200943205Y CN 200620021147 CN200620021147 CN 200620021147 CN 200620021147 U CN200620021147 U CN 200620021147U CN 200943205 Y CN200943205 Y CN 200943205Y
Authority
CN
China
Prior art keywords
drill bit
steel plate
utility
model
anchor bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620021147
Other languages
Chinese (zh)
Inventor
于艳芳
刘明进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620021147 priority Critical patent/CN200943205Y/en
Application granted granted Critical
Publication of CN200943205Y publication Critical patent/CN200943205Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anchor arm assembly used for construction with a soil body anchor arm. The assembly comprises a drill head, and the rear end of the drill head is detachably connected with the drill rod. A water feeder is arranged at the drill head. The anchoring end with the inherent stress thread is a square steel plate which is diagonally provided with grout injection pipes. The steel plate of the anchoring end is welded with a positioning steel plate. The utility model can ensure construction quality, improve efficiency and reduce cost. The utility model can be widely used to baffle soil, to dig underground continuous walls and protect foundation ditches.

Description

Soil anchor construction anchor pole composite member
Technical field
The utility model relates to field of civil engineering, particularly relates to retaining soil, diaphragm wall, and pattern foundation pit supporting structure is used, tension, resistance to plucking in soil layer and form the construction anchor pole composite member of anchor pole.
Background technology
The prior art the most approaching with the utility model is a title: the patent of soil anchor job practices and the anchor pole composite member that adopted thereof, a kind of job practices and anchor pole composite member of soil anchor are disclosed, this invention is adopted grouting when creeping into, is lowered to the construction technology of anchor pole, simplify operation, improved efficient; The problem that exists is that dowel and drilling rod winding often take place in work progress, the back anchor pole takes place can't creep into and should reach the degree of depth, and it is serious and can't remedy to produce consequence, causes in the design process safety factor excessive, and waste seriously.Drilling rod slip casting in addition, when drilling rod proposed, cement paste was spoilt and is contracted, and the disappearance amount is with carrying with benefit, and mass effect can't check that artificial governing factor is excessive, causes the quality situation uncertain, and the cement paste waste is huge.Addressing this problem becomes urgent need.
The content of utility model
The purpose of this utility model is to overcome the deficiency that prior art exists, a kind of soil anchor construction anchor pole composite member is provided, this composite member comprises drill bit, but the rear portion of drill bit adopts disengagement type to be connected with drilling rod, the drill bit place is provided with water filling port, and drill bit is a sawtooth pattern, and the pore area Grouting Pipe is established at the diagonal angle on the prestressing force twisted wire anchored end employing square steel plate, the anchored end steel plate fixing steel plate of burn-oning, drill bit adopts key to be connected with drilling rod.Use the utility model in boring procedure,, make current reach high pressure at the place of creeping into speed and efficient are advanced in soil layer formation shear action raising commentaries on classics, can guarantee construction quality more reliably, raise the efficiency, thereby reduce cost by drilling rod self high-pressure feed water; Owing to have sawtooth on the drill bit, therefore making and downcutting soil layer is bar shaped, and more easy-to-discharge slag improves rate of penetration; Can propose once grouting behind the drilling rod because drill bit creeps into Grouting Pipe, make grouting amount obtain metering and confirm and can bring two Grouting Pipe into, carry out splitting and mend slurry, improve by force, make construction means more flexible, quality is easier to control.
Description of drawings
Fig. 1 is a front view of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
The specific embodiment
Give an actual example below this utility model is described in detail.
Soil anchor construction anchor pole composite member, comprise drill bit 6, but the rear portion of drill bit adopts disengagement type to be connected with drilling rod 7, the drill bit place is provided with water filling port 9, the surface of sawtooth pattern drill bit 1 is a sawtooth pattern, prestressing force twisted wire 4 anchored end 3 adopt on the square steel plates diagonal angle to establish pore area Grouting Pipe 5, the anchored end steel plate fixing steel plate 2 of burn-oning, and drill bit 6 adopts keys 8 to be connected with drilling rod 7.
Adopt the utility model construction to comprise the steps:
A utilizes roof-bolter boring, and by drilling rod self high-pressure feed water, current reach high pressure soil layer is formed cutting at the place of creeping in the boring procedure;
B, drill bit are that serration type makes that to downcut soil layer be bar shaped, easier discharge, and drill bit adopts plain bearing or pressure bearing to be connected with prestressing force twisted wire anchored end, and attaches a Grouting Pipe, creeps into projected depth with drill bit;
C, after drilling rod took out, prestressing force twisted wire anchored end was stayed foot of hole with Grouting Pipe and drill bit, carries out slip casting (can be cement paste or cement mortar) by Grouting Pipe then, after slip casting reaches designing requirement, formed prestressed anchor.

Claims (2)

1, a kind of soil anchor construction anchor pole composite member, it is characterized in that: it comprises drill bit, but the rear portion of drill bit adopts disengagement type to be connected with drilling rod, the drill bit place is provided with water filling port, drill bit is a sawtooth pattern, prestressing force twisted wire anchored end adopts on the square steel plate diagonal angle to establish the pore area Grouting Pipe, the anchored end steel plate fixing steel plate of burn-oning.
2, the anchor pole composite member is used in soil anchor construction according to claim 1, it is characterized in that: drill bit adopts key to be connected with drilling rod.
CN 200620021147 2006-07-03 2006-07-03 Anchor bar assembly for earth anchor bar construction Expired - Fee Related CN200943205Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620021147 CN200943205Y (en) 2006-07-03 2006-07-03 Anchor bar assembly for earth anchor bar construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620021147 CN200943205Y (en) 2006-07-03 2006-07-03 Anchor bar assembly for earth anchor bar construction

Publications (1)

Publication Number Publication Date
CN200943205Y true CN200943205Y (en) 2007-09-05

Family

ID=38717839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620021147 Expired - Fee Related CN200943205Y (en) 2006-07-03 2006-07-03 Anchor bar assembly for earth anchor bar construction

Country Status (1)

Country Link
CN (1) CN200943205Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974904A (en) * 2010-11-05 2011-02-16 王景军 Screw anchor rod and processing method using screw anchor rod
CN101925721B (en) * 2008-01-25 2013-03-13 弗雷德尔.伊谢贝克有限责任公司 Anchor tube and method for production thereof
CN103031842A (en) * 2011-10-08 2013-04-10 长江大学 Soil-squeezing type soil anchor
CN103758539A (en) * 2014-01-26 2014-04-30 河南大有能源股份有限公司常村煤矿 Steel belt for bolt-grouting supporting
CN110409436A (en) * 2019-07-25 2019-11-05 北京中润宝成工程技术有限公司 A kind of anchor structure and its construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101925721B (en) * 2008-01-25 2013-03-13 弗雷德尔.伊谢贝克有限责任公司 Anchor tube and method for production thereof
CN101974904A (en) * 2010-11-05 2011-02-16 王景军 Screw anchor rod and processing method using screw anchor rod
CN101974904B (en) * 2010-11-05 2011-12-28 王景军 Screw anchor rod and processing method using screw anchor rod
CN103031842A (en) * 2011-10-08 2013-04-10 长江大学 Soil-squeezing type soil anchor
CN103758539A (en) * 2014-01-26 2014-04-30 河南大有能源股份有限公司常村煤矿 Steel belt for bolt-grouting supporting
CN110409436A (en) * 2019-07-25 2019-11-05 北京中润宝成工程技术有限公司 A kind of anchor structure and its construction method
CN110409436B (en) * 2019-07-25 2021-09-07 北京中润宝成工程技术有限公司 Anchor rod structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN202509532U (en) Multi-rib tension type anti-floating anchor
CN100501011C (en) Hole drilling mudjack pile construction method
CN102518135A (en) Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN108330764B (en) Shallow layer solidified pile bearing type embankment and construction method
CN202509533U (en) Single reinforcement pulling force type anti-floating anchor rod
CN200943205Y (en) Anchor bar assembly for earth anchor bar construction
CN101812843A (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN101560775A (en) Composite soil nailing wall structure
CN102587366A (en) Self-drilling type spiral anchor rod and construction process using self-drilling type spiral anchor rod for grouting along with drilling, stirring and curing
CN2652998Y (en) Bundled steel twisted wire anchor with rotary spray drill bit
CN102626946A (en) Manufacture method for concrete irregular fender post
CN202482860U (en) Self-drilling helical anchor rod
CN101096849A (en) Soil body anchor rod construction process and anchor rod member thereof
CN201649076U (en) Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN205576957U (en) Stake end pilework
CN201095767Y (en) Combination component for soil body anchor shaft construction
CN201502065U (en) Anchor rod joint excavation compound basis
CN101545257A (en) Novel anchor rod construction process and spare and accessory parts thereof
CN201095768Y (en) Combination component for soil body anchor shaft construction
CN107447775A (en) Landslide disaster body makes ground draining reinforced earth retaining wall structure
CN1514073A (en) Supporitng structure of breast wall
CN206844129U (en) A kind of new diagonal brace composite support device
CN201567574U (en) Prestressed anchorage anchor pier slope reinforcing and fixing structure
CN111910671A (en) Prestressed anchor rod combined excavation composite foundation and construction method thereof
CN104727305A (en) Drilling and high-pressure grouting construction method for uplift pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee