CN1992639A - Method for remote updating software and data of network equipment - Google Patents
Method for remote updating software and data of network equipment Download PDFInfo
- Publication number
- CN1992639A CN1992639A CN 200510132808 CN200510132808A CN1992639A CN 1992639 A CN1992639 A CN 1992639A CN 200510132808 CN200510132808 CN 200510132808 CN 200510132808 A CN200510132808 A CN 200510132808A CN 1992639 A CN1992639 A CN 1992639A
- Authority
- CN
- China
- Prior art keywords
- data
- software
- load
- data load
- active
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
- Information Transfer Between Computers (AREA)
- Stored Programmes (AREA)
Abstract
The invention discloses a network equipment software and data remote update method, in order to solve that the remote update software and data in the existing network equipment might lead to the failure and so the system operation is unstable. The method of the invention includes: the step to transmit the new version software to the equipment; the step to transmit the new version data to the equipment; processing the data loading of the equipment, and when the data loading failure, alternating the data main and backup switching, and software main and backup switching, and processing data loading, until data loading successful. The method of the invention can do data transmission and data update from the remote, even the new versions data or the new version software transmission error causing the update not successful, according to the switching rule, it can still load the old version software and data, to ensure the system stability, and improve the security of the remote update, and greatly increase work efficiency and reduce the costs.
Description
Technical field
The present invention relates to a kind of electric data processing method, relate in particular to a kind of software and remote data update method of the network equipment.
Background technology
In mobile communication system, equipment such as switch, base station have been generally included.With the 3-G (Generation Three mobile communication system) is example, comprises several radio network controllers (hereinafter to be referred as RNC) and plurality of nodes B (hereinafter to be referred as NodeB).Usually, have active and standby software and a cover and the corresponding data of software version on RNC and the NodeB, RNC and NodeB go up the specific software of operation, use corresponding data to finish the required work of mobile communication system.Simultaneously, finish work such as data configuration to RNC, NodeB, software administration, edition upgrading by network management system.
Open in present 3-G (Generation Three mobile communication system), in the maintenance, upgrade job, at first be that RNC and NodeB finish engineering construction, utilize existing optical fiber or E1 circuit that RNC is connected by network with NodeB; Secondly, the RNC side normally starts RNC by network management system to configure data, download software; At last, to each scene, NodeB base station, use network management system to configure data, download software, NodeB is normally started by the technical staff.In existing scheme, need finish the parameter butt joint of RNC and NodeB, in order to be convenient in the future to safeguard, also need in the data configuration process, configure the AAL5 path that is applied to IPOA.In addition, in maintenance upgrade work subsequently, also need to come synchrodata, download software by network management system.
But, having the following disadvantages in the technology at present:
When 1, opening NodeB, must the technical staff reach the spot and can finish, this has just increased operation cost, and owing to be subjected to factor restrictions such as traffic, geography, will certainly influence the progress of beginning work;
2, after the installation butt joint is finished, can set up the IPOA passage between RNC and the NodeB,, will raise the efficiency greatly and cost saving if can be unified in configuration and the renewal of finishing in the machine room RNC, NodeB by network management system.But, if the software of remote upgrade NodeB can cause the corresponding old data of new software version, causing the data load failure, the IPOA link down so just can't be finished the configuration of new data by the IPOA path.
When 3, in daily maintenance work, needing RNC and NodeB upgraded, in case the upgrading failure occurs occurring in the escalation process, the data situation not corresponding with software version among RNC and the NodeB will appear, can cause RNC and NodeB normally to move, have a strong impact on the stability of mobile communication system, cause great loss.
Summary of the invention
At existing problem and shortage in the above-mentioned prior art, the purpose of this invention is to provide a kind of software and remote data update method of the network equipment, can reduce cost, raise the efficiency by the software and hardware of the remote update network equipment.
The present invention is achieved in that a kind of software and remote data update method of the network equipment, may further comprise the steps:
New version software is transferred to the step of equipment;
With the step of redaction transfer of data to equipment;
Equipment is carried out data load, active and standby switching of the data that when data load is failed, hocket and the active and standby switching of software, the line data of going forward side by side loads, up to the data load success.
Wherein, when data load is failed, carry out following steps in the described method:
(1) carries out the active and standby switching of the data line data of going forward side by side and load, if data load success then step finish, if data load failure then enter step (2);
(2) carry out the active and standby switching of the software line data of going forward side by side and load, if data load success then step finish, if data load failure then return step (1).
Wherein, when at first the redaction transfer of data being arrived equipment, described method is specially:
(I) the redaction data are sent to equipment, the redaction data use data as main, the line data of going forward side by side loads, if data load success then enter step (IV), if data load failure then enter step (II);
(II) carry out active and standby switching of data and loading data, if data load success then enter step (IV), if data load failure then enter step (III);
(III) carry out active and standby switching of software and loading data, if data load success then enter step (IV), if data load failure then enter step (II);
(IV) new version software is sent to equipment, and new version software is used software as main, and loading data, step finishes if data load is successful, if data load is failed then entered step (V);
(V) carry out active and standby switching of data and loading data, step finishes if data load is successful, if data load is failed then entered step (VI);
(VI) carry out active and standby switching of software and loading data, step finishes if data load is successful, if data load is failed then entered step (V).
Wherein, described method is further comprising the steps of:
With preliminary data and the main data sync of using;
With standby software and the main software synchronization of using.
Wherein, when at first new version software being transferred to equipment, described method is specially:
1. new version software is sent to equipment, new version software use data as main, the line data of going forward side by side loads, if data load success then enter step 4., if data load failure then enter step 2.;
2. carry out active and standby switching of data and loading data, if data load success then enter step 4., if data load failure then enter step 3.;
3. carry out active and standby switching of software and loading data, if data load success then enter step 4., if data load failure then enter step 2.;
4. new version software is sent to equipment, and new version software is used software as main, and loading data, step finishes if data load is successful, if data load is failed then entered step 5.;
5. carry out active and standby switching of data and loading data, step finishes if data load is successful, if data load is failed then entered step 6.;
6. carry out active and standby switching of software and loading data, step finishes if data load is successful, if data load is failed then entered step 5..
Wherein, described method is further comprising the steps of:
With preliminary data and the main data sync of using;
With standby software and the main software synchronization of using.
The software and the remote data update method of the network equipment that the present invention proposes are compared with existing device updating method, can be in long-range transfer of data and the Data Update of carrying out, in case the data load failure occurs then the data owner that hockets, be equipped with and switch and the software master, be equipped with and switch, till the data load success, assurance equipment can correctly load redaction data and software, even redaction data or new version software because of error of transmission cause the upgrading can't be successful, still can guarantee the success of device loads legacy version software and data according to switching law, guaranteed the stability of system, make equipment can not occur causing equipment to move because of the upgrading failure by remote update software and data, improve the fail safe of remote update, greatly improved operating efficiency, reduced cost.
Description of drawings
Fig. 1 is the schematic flow sheet of the data load that proposes of the present invention;
Fig. 2 is the schematic flow sheet of the software loading that proposes of the present invention;
Fig. 3 is a preferred embodiment of the present invention schematic flow sheet;
Fig. 4 is another preferred embodiment schematic flow sheet of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
The method that the present invention proposes is when data load is failed, at first carry out active and standby switching of data and loading data, step finishes if data load is successful, if load failure, then carry out the active and standby switching of the software line data of going forward side by side and load, if data load success then step finish, if load failure, then proceed the active and standby switching of data, up to the loading data success.
Be illustrated in figure 1 as the process of data sync.During data sync, at first new data becomes and main use data, and the data of current use become preliminary data, if the data load success, then data sync successfully; If data load failure for a certain reason, then active and standby data are switched, and new data becomes preliminary data, and old data become the master and use data, have so just guaranteed the stability of communication equipment when failure of data synchronization;
Be illustrated in figure 2 as the process of software synchronization.During software synchronization, download software by network management system, new software becomes the master and uses software, and the software of current operation becomes standby software; Carry out data load then, load successfully, software upgrade success then, standby software also is updated to newly downloaded software simultaneously; Load failure, then the master/slave data state switches, this moment, owing to do not carry out data sync, be the data that are applicable to old software in the master/slave data, but new software is to old data, if still data load failure, then switch priority, need carry out the active and standby switching of software again, like this according to state, new software becomes standby software, old software becomes the master and uses software, loads successfully, has so just guaranteed the stability of communication equipment when software synchronization is failed.
The preferred embodiment of the present invention one as shown in Figure 3, this preferred embodiment is the upgrading of advanced line data, carries out software upgrading again, may further comprise the steps:
(I) the redaction data are sent to equipment, as the main data of using, legacy data is as preliminary data with the redaction data, and the line data of going forward side by side loads, and this moment is main to be the redaction data with data, and main is legacy version software with software, the data load failure;
(II) carry out active and standby switching of data and loading data according to rule, this moment, active and standby software was legacy version owing to do not carry out the new version software transmission, and main is the redaction data with data, and the data load success enters step (III);
(III) network management system sends to equipment with new version software, and new version software is used software as main, and legacy version software is as standby software, and loading data, and this moment is main to be legacy version with data, and main is new version software with software, the data load failure,
(IV) carry out the active and standby switching of data according to rule, loading data, this moment is main all to be redaction with data and master with software, the loading data success stops to switch.
New version software loads the redaction data failure in the step (IV) if cause for a certain reason, then according to rule continue to hocket active and standby switching of data and the active and standby switching of software, up to the success of legacy version software loading legacy data, the equipment that can guarantee so also can normally move when the upgrading failure.
The preferred embodiment of the present invention two as shown in Figure 4, this preferred embodiment is for carrying out software upgrading earlier, carries out the data upgrading again, may further comprise the steps:
1. new version software is sent to equipment, new version software is used software as main, legacy version software is as standby software, and loading data, and this moment is main to be legacy data with data, and main is new version software with software, the data load failure;
2. carry out the active and standby switching of data according to rule, the line data of going forward side by side loads, and this moment, active and standby data were legacy version owing to do not carry out the redaction transfer of data, and main is new version software with software, the data load failure;
3. carry out the active and standby switching of software according to rule, the line data of going forward side by side loads, and this moment is main to be legacy data with data, and main is legacy version software with software, and 4. the data load success enters step;
4. network management system sends to equipment with the redaction data, and as the main data of using, legacy data is as preliminary data and loading data with the redaction data, and this moment is main to be redaction with data, and main is legacy version with software, the data load failure;
5. carry out the active and standby switching of data according to rule, the line data of going forward side by side loads, and this moment is main to be legacy data with data, and main is legacy version software with software, and the data load success stops to switch.
Though not success of upgrading this moment, redaction data and new version software all have been transferred to equipment.Network management system is initiated the software version switching, and redaction is switched to the main software of using, and data load failure is at this moment carried out the active and standby switching of data according to rule, and this moment, the master was redaction with data and master with software, the data load success, and upgrading is finished.
New version software loads the redaction data failure in the step (IV) if cause for a certain reason, then according to rule continue to hocket active and standby switching of data and the active and standby switching of software, up to the success of legacy version software loading legacy data, the equipment that can guarantee so also can normally move when the upgrading failure.
As preferably, in the preferred embodiment of the present invention one and preferred embodiment two, system can all be updated to redaction with active and standby data and active and standby software in new version software and the synchronous and software synchronization of the laggard line data of redaction data load success.If do not carry out synchronously, then legacy version software is retained in the preliminary data, can be used as standbyly, and equipment can keep a plurality of preliminary datas and a plurality of standby software.
Claims (6)
1, a kind of software of the network equipment and remote data update method is characterized in that, described method comprises:
New version software is transferred to the step of equipment;
With the step of redaction transfer of data to equipment;
Equipment is carried out data load, active and standby switching of the data that when data load is failed, hocket and the active and standby switching of software, the line data of going forward side by side loads, up to the data load success.
2, the software of the network equipment according to claim 1 and remote data update method is characterized in that, during the data load failure, carry out following steps:
(1) carries out the active and standby switching of the data line data of going forward side by side and load, if data load success then step finish, if data load failure then enter step (2);
(2) carry out the active and standby switching of the software line data of going forward side by side and load, if data load success then step finish, if data load failure then return step (1).
3, the software of described a kind of network equipment according to claim 1 and 2 and remote data update method is characterized in that, described method is specially:
(I) the redaction data are sent to equipment, the redaction data use data as main, the line data of going forward side by side loads, if data load success then enter step (IV), if data load failure then enter step (II);
(II) carry out active and standby switching of data and loading data, if data load success then enter step (IV), if data load failure then enter step (III);
(III) carry out active and standby switching of software and loading data, if data load success then enter step (IV), if data load failure then enter step (II);
(IV) new version software is sent to equipment, and new version software is used software as main, and loading data, step finishes if data load is successful, if data load is failed then entered step (V);
(V) carry out active and standby switching of data and loading data, step finishes if data load is successful, if data load is failed then entered step (VI);
(VI) carry out active and standby switching of software and loading data, step finishes if data load is successful, if data load is failed then entered step (V).
4, the software of the network equipment according to claim 3 and remote data update method is characterized in that, described method is further comprising the steps of:
With preliminary data and the main data sync of using;
With standby software and the main software synchronization of using.
5, the software of a kind of network equipment according to claim 1 and 2 and remote data update method is characterized in that, active and standby switching of the described data that hocket and the active and standby switching of software, and the line data of going forward side by side loads, and is specially up to data load success step:
1. new version software is sent to equipment, new version software use data as main, the line data of going forward side by side loads, if data load success then enter step 4., if data load failure then enter step 2.;
2. carry out active and standby switching of data and loading data, if data load success then enter step 4., if data load failure then enter step 3.;
3. carry out active and standby switching of software and loading data, if data load success then enter step 4., if data load failure then enter step 2.;
4. new version software is sent to equipment, and new version software is used software as main, and loading data, step finishes if data load is successful, if data load is failed then entered step 5.;
5. carry out active and standby switching of data and loading data, step finishes if data load is successful, if data load is failed then entered step 6.;
6. carry out active and standby switching of software and loading data, step finishes if data load is successful, if data load is failed then entered step 5..
6, the software of the network equipment according to claim 5 and remote data update method is characterized in that, described method is further comprising the steps of:
With preliminary data and the main data sync of using;
With standby software and the main software synchronization of using.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2005101328086A CN1992639B (en) | 2005-12-27 | 2005-12-27 | Method for remote updating software and data of network equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2005101328086A CN1992639B (en) | 2005-12-27 | 2005-12-27 | Method for remote updating software and data of network equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1992639A true CN1992639A (en) | 2007-07-04 |
CN1992639B CN1992639B (en) | 2011-08-10 |
Family
ID=38214602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2005101328086A Expired - Fee Related CN1992639B (en) | 2005-12-27 | 2005-12-27 | Method for remote updating software and data of network equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1992639B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009015593A1 (en) * | 2007-07-27 | 2009-02-05 | Huawei Technologies Co., Ltd. | System upgrade method, upgrade system and monitoring entity |
CN101937347A (en) * | 2010-08-06 | 2011-01-05 | 深圳市共进电子有限公司 | Method for managing automatic updating in special networked terminal equipment |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9038053B2 (en) | 2012-08-27 | 2015-05-19 | Lenovo Enterprise Solutions (Singapore) Pte. Ltd | Non-disruptive software updates for servers processing network traffic |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6668304B1 (en) * | 2000-01-18 | 2003-12-23 | International Business Machines Corporation | Transaction support on logical disks |
US7216343B2 (en) * | 2002-09-20 | 2007-05-08 | International Business Machines Corporation | Method and apparatus for automatic updating and testing of software |
CN1225692C (en) * | 2002-11-01 | 2005-11-02 | 英业达股份有限公司 | Distribution type data synchronous system and its method |
-
2005
- 2005-12-27 CN CN2005101328086A patent/CN1992639B/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009015593A1 (en) * | 2007-07-27 | 2009-02-05 | Huawei Technologies Co., Ltd. | System upgrade method, upgrade system and monitoring entity |
CN101937347A (en) * | 2010-08-06 | 2011-01-05 | 深圳市共进电子有限公司 | Method for managing automatic updating in special networked terminal equipment |
Also Published As
Publication number | Publication date |
---|---|
CN1992639B (en) | 2011-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101064670A (en) | Network multi-service processing method and system | |
CN1859125A (en) | System and its method for central remote automatic upgrading software | |
CN1946058A (en) | Soft exchange device allopatric disaster recovery solution system and its method for software exchange network | |
CN1536819A (en) | Method for implementing dual home in next network | |
CN1946226A (en) | Method, device for upgrading telecommunication equipment and upgrading engine unit | |
CN1832610A (en) | Method of updating remote subsystem in mobile communication system | |
CN101043666A (en) | Maintenance system, maintenance access apparatus and maintenance method of base station | |
CN101064643A (en) | Method for updating software of remote terminal RF unit in wireless communication system | |
CN101068374A (en) | Aerial data transmission bearing mode switching method and system | |
CN1992639A (en) | Method for remote updating software and data of network equipment | |
CN100442791C (en) | Method for improving data communication reliability using floating IP address | |
CN1295903C (en) | A safe system starting method | |
CN1917675A (en) | Method for raising reliability of signaling link at Iub port | |
CN1859155A (en) | Link state self consulting method | |
CN1929405A (en) | Off-line configuration management system and method based on client/server structure | |
CN101267435A (en) | An implementation method for address parsing protocol | |
CN1264088C (en) | Singleboard software automatic download method and device | |
CN1878356A (en) | Base station transceiver and controller Abis interface netting method and its link method and system | |
CN1960281A (en) | Virtual internet exchanging system having virtual line card | |
CN1822695A (en) | Method for establishing multiple carrier frequency samll area | |
CN1808997A (en) | System and method for determining a designated connection between components of computing devices | |
CN1756107A (en) | Method for realizing single board switching | |
CN1929402A (en) | Licensing document management server and licensing document management maintenance system and method | |
CN1905480A (en) | Base station starting method | |
CN1787511A (en) | Method and system for realizing off-line application of computer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110810 Termination date: 20141227 |
|
EXPY | Termination of patent right or utility model |