CN101937347A - Method for managing automatic updating in special networked terminal equipment - Google Patents

Method for managing automatic updating in special networked terminal equipment Download PDF

Info

Publication number
CN101937347A
CN101937347A CN2010102478325A CN201010247832A CN101937347A CN 101937347 A CN101937347 A CN 101937347A CN 2010102478325 A CN2010102478325 A CN 2010102478325A CN 201010247832 A CN201010247832 A CN 201010247832A CN 101937347 A CN101937347 A CN 101937347A
Authority
CN
China
Prior art keywords
unit
hardware logic
storage unit
content
logic unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102478325A
Other languages
Chinese (zh)
Inventor
郭小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongjin Electronics Co Ltd
Original Assignee
Shenzhen Gongjin Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongjin Electronics Co Ltd filed Critical Shenzhen Gongjin Electronics Co Ltd
Priority to CN2010102478325A priority Critical patent/CN101937347A/en
Publication of CN101937347A publication Critical patent/CN101937347A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Small-Scale Networks (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a method for managing automatic updating in special networked terminal equipment. The method is implemented by downloading the application program updating content through a passive optical fiber network and by means of a hardware logic unit and replacing and storing the original application program content stored in an internal memory unit of the hardware logic unit, and mainly solves the problems of unreliability, instability and non-traceability of updating software. The adopted technical scheme is that: an external memory unit, in which the original application program content is stored, is increased; the external memory unit is connected with the hardware logic unit; and thus the hardware logic unit can be started from an internal memory region and an external memory region, and two memory units are mutually used as a main memory region and a backup memory region to realize backup by setting the priorities of the internal memory unit and the external memory unit. The method has the advantage that the original content is stored by another memory unit during each updating, so that reversible operation can be realized, and the software updating has traceability.

Description

The method of management auto-update in the specialized network terminal device
Technical field
The invention belongs to the method that promotes specialized network-termination device management auto-update by means of communication, specifically, is a kind of by redundant memory cell in the terminal device and supervisory routine, realizes the method for specialized network-termination device management auto-update.
Background technology
Along with applying of the optical fiber access technology of passive optical-fiber network point-to-multipoint, the one preferred technique scheme of become not only in recent years that Fiber to the home FTTH, FTTB FTTB etc., and adopt for Internet of Things field more widely rapidly, aspect industrial circles such as the power distribution automation in the intelligent power system field in preparing construction, the robotization of checking meter.Along with the development of optical fiber communication technology, and the amplification day by day of user side network application demand, the function of optical network unit ONU also needs from strength to strength and its structure page becomes increasingly complex.
Along with the widespread use of optical network unit ONU, the continuous increase of the complicacy of hardware and concrete individual demand needs constantly upgrading PON network at user's request, at the beginning of the PON network design, its software consideration upgradability.It is very difficult that but it gets up for the transformation that disperses, spreads all over the hardware in the terminal device everywhere, needs the staff to go to unpack to the scene, finishes the updating operation of hardware by platform.Like this, caused sizable difficulty for the upgrading and the maintenance of PON network, the large tracts of land that is unfavorable for present PON equipment is promoted the use of, and function is subjected to the limitation that hardware logic designs in earlier stage, extensive more its limitation of usable range is just big more, fails really the due dirigibility of hardware logic to be given full play of, therefore, optical network unit more needs a kind of upgrade method of hardware logic easily, satisfies the constantly needs of the various hardware capabilitys of upgrading.
Because propelling to industrial applications, its reliability of products, stability and trackability require page or leaf more and more higher, its complicacy of hardware and concrete personalization constantly increase, at the customer demand continuous upgrade software of requirement not only, and the reliability that needs consideration to upgrade, stability and trackability, make product new can not using occur in order to avoid cause upgrading, problems such as perhaps wrong upgrading, feasible backup to hardware logic seems more and more important, to reduce risk of any one the upgrading action in the product maintenance process.
Summary of the invention
Problem to be solved by this invention is not only the method that promotes specialized network-termination device management auto-update by means of communication, further purpose will be considered the adaptability problem of hardware logic unit based on overcoming under the high occasion of reliability requirements such as communication and industry, after the supervisory routine upgrading after having realized upgrading.For the instability that may in terminal operating, produce, as problems such as crashing or do not work, for the demand that realizes trackability provides a reliable technique scheme
The present invention for realizing the technical scheme that goal of the invention adopts is:
The method of management auto-update in the specialized network terminal device, the realization of the method is by passive optical-fiber network down load application program upgrade content by the hardware logic unit, and will be stored in the internal storage unit of hardware logic unit original application content and replace storage, key is: increase the external memory unit that stores original application content in terminal device, external memory unit is connected with the hardware logic unit, carries out following steps on this basis:
1), set the priority of two storage unit, is respectively high priority storage unit and low priority storage unit by the hardware logic unit;
2), the hardware logic unit is by passive optical-fiber network down load application program upgrade content, is stored in the low priority storage unit;
3), attempt the application content after upgrading is upgraded in the above low priority storage unit of operation, if move successfully, then carry out step 4); If step 5) is then directly carried out in the operation failure;
4), the priority of two storage unit in the transposing step 1);
5), start and call application content in the high priority storage unit, repeating step 2) with 3), carry out the content of upgrade applications next time.
Implement a kind of method that realizes the remote upgrade application program by the double copies storage unit of the present invention, increase the external memory unit that stores original application content, external memory unit is connected with the hardware logic unit, like this hardware logic unit both internally storage unit start and also can start from external memory unit, by setting inside, the priority of external memory unit, make two storage unit realize backup as active and standby storage unit mutually, this just makes each upgrading all have another storage unit to preserve original content, but can realize inverse operation, make software upgrading have trackability, enhance product performance, maintain easily, make optical network unit not only can satisfy the requirement of communication situation, also can satisfy the technical grade occasion fully to the product high reliability, the requirement of high maintenance enlarges the application of optical network unit greatly.
The present invention is described in detail below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is that the optical network unit system of the inventive method connects block diagram.
Fig. 2 is the embodiment process flow diagram of the inventive method.
In the accompanying drawing, the 1st, PON module, the 2nd, hardware logic unit, the 3rd, internal storage unit, the 4th, external memory unit, the 5th, optical network unit.
Embodiment
The method of management auto-update in the specialized network terminal device, the realization of above method is by passive optical-fiber network 1 down load application program upgrade content by hardware logic unit 2, and will be stored in the internal storage unit 3 of hardware logic unit 2 original application content and replace storage, key is: increase the external memory unit 4 that stores original application content in terminal device, external memory unit 4 is connected with hardware logic unit 2, carries out following steps on this basis:
1), set the priority of two storage unit, is respectively high priority storage unit and low priority storage unit by the control module of hardware logic unit 2;
2), hardware logic unit 2 is by passive optical-fiber network 1 down load application program upgrade content, is stored in the low priority storage unit;
3), attempt the application content after upgrading is upgraded in the above low priority storage unit of operation, if move successfully, then carry out step 4); If step 5) is then directly carried out in the operation failure;
4), the priority of two storage unit in the transposing step 1);
5), start and call application content in the high priority storage unit, repeating step 2) with 3), carry out the content of upgrade applications next time.
Wherein external memory unit 4 is serial line interface FLASH storeies; The control module of hardware logic unit 2 is CPLD device or FPGA device.
The key of the inventive method is, increase the external memory unit that stores original application content, external memory unit is connected with the hardware logic unit, like this hardware logic unit both internally storage unit start and also can start from external memory unit, by setting the priority of inside, external memory unit, make two storage unit realize backup as active and standby storage unit mutually, this just makes each upgrading all have another storage unit to preserve original content, but can realize inverse operation.
When this method was specifically implemented, as shown in Figure 1, the inventive method was based on optical network unit 5, and this network element 5 comprises: hardware logic unit, 1, one outer memory module 4 of PON module.Referring to Fig. 2, in at first the hardware logic unit is set, the priority of outer two storage unit, for example, at first set internal storage unit 3 and be the high priority storage unit, external memory unit is the low priority storage unit, hardware logic unit 2 by with the upgrading content of the download interface down load application program of PON module 1, the content stores of will upgrading then is in external memory unit 4, try this ROMPaq then out, if move successfully, just be made as the priority of internal storage unit 3 low, the priority of external memory unit 4 is made as height, the control module of hardware logic unit 2 will call external memory unit 4 startup operations all the time later on, until the loading of application program updating content next time; If operation failure, the control module of hardware logic unit 2 will be called internal storage unit all the time and be started operation, until the loading of application program updating content next time.Like this, the application content of the memory block that priority is high can not be capped, and is kept always, like this, has improved reliability of products, stability, trackability greatly, has greatly widened the application and the application scenario of product.

Claims (3)

1. manage the method for auto-update in the specialized network terminal device, the realization of above method is by passive optical-fiber network (1) down load application program upgrade content by hardware logic unit (2), and will be stored in the internal storage unit (3) of hardware logic unit (2) original application content and replace storage, it is characterized in that: in terminal device, increase the external memory unit (4) that stores original application content, external memory unit (4) is connected with hardware logic unit (2), carries out following steps on this basis:
1), set the priority of two storage unit, is respectively high priority storage unit and low priority storage unit by the control module of hardware logic unit (2);
2), hardware logic unit (2) by passive optical-fiber network (1) down load application program upgrade content, is stored in the low priority storage unit;
3), attempt the application content after upgrading is upgraded in the above low priority storage unit of operation, if move successfully, then carry out step 4); If step 5) is then directly carried out in the operation failure;
4), the priority of two storage unit in the transposing step 1);
5), start and call application content in the high priority storage unit, repeating step 2) with 3), carry out the content of upgrade applications next time.
2. the method for management auto-update in the specialized network terminal device according to claim 1, it is characterized in that: described external memory unit (4) is a serial line interface FLASH storer.
3. the method for management auto-update in the specialized network terminal device according to claim 1, it is characterized in that: the control module of described hardware logic unit (2) is CPLD device or FPGA device.
CN2010102478325A 2010-08-06 2010-08-06 Method for managing automatic updating in special networked terminal equipment Pending CN101937347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102478325A CN101937347A (en) 2010-08-06 2010-08-06 Method for managing automatic updating in special networked terminal equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102478325A CN101937347A (en) 2010-08-06 2010-08-06 Method for managing automatic updating in special networked terminal equipment

Publications (1)

Publication Number Publication Date
CN101937347A true CN101937347A (en) 2011-01-05

Family

ID=43390694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102478325A Pending CN101937347A (en) 2010-08-06 2010-08-06 Method for managing automatic updating in special networked terminal equipment

Country Status (1)

Country Link
CN (1) CN101937347A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103338450A (en) * 2013-06-26 2013-10-02 华为技术有限公司 Verification method and equipment
CN105335200A (en) * 2015-11-24 2016-02-17 小米科技有限责任公司 System upgrading method and device
CN111095342A (en) * 2017-05-30 2020-05-01 法国电力公司 Updating of device firmware and/or configuration for power distribution networks
CN113242145A (en) * 2021-04-30 2021-08-10 合肥移瑞通信技术有限公司 Wireless device, firmware upgrading method, firmware server and readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1889041A (en) * 2006-08-02 2007-01-03 华为技术有限公司 Software staging and back spacing method
CN1992639A (en) * 2005-12-27 2007-07-04 中兴通讯股份有限公司 Method for remote updating software and data of network equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1992639A (en) * 2005-12-27 2007-07-04 中兴通讯股份有限公司 Method for remote updating software and data of network equipment
CN1889041A (en) * 2006-08-02 2007-01-03 华为技术有限公司 Software staging and back spacing method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103338450A (en) * 2013-06-26 2013-10-02 华为技术有限公司 Verification method and equipment
WO2014206170A1 (en) * 2013-06-26 2014-12-31 华为技术有限公司 Verification method and device
CN105335200A (en) * 2015-11-24 2016-02-17 小米科技有限责任公司 System upgrading method and device
CN105335200B (en) * 2015-11-24 2019-05-07 小米科技有限责任公司 Method for upgrading system and device
CN111095342A (en) * 2017-05-30 2020-05-01 法国电力公司 Updating of device firmware and/or configuration for power distribution networks
CN113242145A (en) * 2021-04-30 2021-08-10 合肥移瑞通信技术有限公司 Wireless device, firmware upgrading method, firmware server and readable storage medium

Similar Documents

Publication Publication Date Title
CN103108262B (en) The method of optical network unit configuration file upgrading in GPON system
CN101950253B (en) Method for upgrading optical module firmware in optical network unit by utilizing WEB webpage interface
CN103036956B (en) A kind of distributed configuration mass data filing system and implementation method
CN102609281B (en) Distributed software patch update method and system
CN100459499C (en) Method for transmitting upgrade software to optical network unit in Ethernet passive optical network
CN102098590A (en) Automatic upgrading method and system of firmware version of optical network unit
CN102023876A (en) Embedded system capable of upgrading software on line and online upgrading method
CN101950254B (en) Software updating method and system thereof
CN102014320B (en) Method for uploading and downloading local side device configuration data in PON (passive optical network) system
CN102546796A (en) Data updating system and method of service server
CN102195798B (en) A kind of method and system of optical network unit of upgrading
CN101937347A (en) Method for managing automatic updating in special networked terminal equipment
CN103297275A (en) Dynamic discovery and loading system and method for Web network management client module
CN103995755A (en) Server optimizing method based on mobile terminal and server system
CN104270688A (en) System and method for upgrading ONUs (optical network units) on EPON (Ethernet passive optical network) in batch
CN101673295A (en) Data synchronization control method, device and single-point logging-in system
CN103997523A (en) Smart city service system based on cloud services and implementation method thereof
CN109102273A (en) A kind of realization method and system of distributed intelligence payment routing
CN104954482A (en) Configuration management system and method
CN102567419A (en) Mass data storage device and method based on tree structure
CN105429805A (en) Distributed network management system and information processing method
CN103853561A (en) Embedded satellite-born software refactoring system and method
CN102255657B (en) Method for managing service configuration data in passive optical network service management system
CN101075914B (en) RACF system and equipment with dynamic discovery function in NGN
CN103684825A (en) Multi-system communication system and maintenance method for same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 518000, Shenzhen, Guangdong province Nanshan District Shekou Nanhai Road 1019, 100 surplus medical instrument Park, two floor

Applicant after: Shenzhen Gongjin Electronics Co., Ltd.

Address before: 518000 Nanshan medical equipment Industrial Park, No. 1019 Nanhai Road, Shenzhen, Guangdong, Nanshan District B411-413

Applicant before: Shenzhen Gongjin Electronics Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHENZHEN GONGJIN ELECTRONICS CO., LTD. TO: SHENZHEN GONGJIN ELECTRONIC CO., LTD.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110105