CN1962498A - Silica glass continuous melting oven - Google Patents

Silica glass continuous melting oven Download PDF

Info

Publication number
CN1962498A
CN1962498A CN 200510095382 CN200510095382A CN1962498A CN 1962498 A CN1962498 A CN 1962498A CN 200510095382 CN200510095382 CN 200510095382 CN 200510095382 A CN200510095382 A CN 200510095382A CN 1962498 A CN1962498 A CN 1962498A
Authority
CN
China
Prior art keywords
housed
tegillum
crucible
hole
boss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510095382
Other languages
Chinese (zh)
Other versions
CN1962498B (en
Inventor
黄春雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudong Lighting LLC
Original Assignee
濮晓明
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 濮晓明 filed Critical 濮晓明
Priority to CN2005100953821A priority Critical patent/CN1962498B/en
Publication of CN1962498A publication Critical patent/CN1962498A/en
Application granted granted Critical
Publication of CN1962498B publication Critical patent/CN1962498B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a quartz continuous-melting furnace, which consists of furnace and copple in the furnace, wherein the insulating layer is loaded between copple and furnace wall; the heating device is set between the copple periphery and insulating layer; the upper lid is placed on the furnace with through-out hole in the middle; one small lid is set on the through-out hole; the bottom of small lid possesses boss to mate sliding through-out hole; the sealing coil is set between boss periphery and through-out hole; the upper hole of copple connects boss of small lid; the lifting device is set between small lid and upper lid; 3-5 screw rods are fixed around small lid on the upper lid of lifting device, which loads planet lifting gear with big inner gear coil.

Description

Quartz glass continuous induction melting furnace
Technical field
The present invention relates to a kind of silica glass production technology, what relate generally to is the continuous smelting production unit that is used for quartzy common tube, quartz pushrod and big specification silica tube.
Background technology
Being used at present all kinds of quartz glass tube production and the resistance heating continuous induction melting furnace of specification both at home and abroad all is to adopt the crucible that fixed fused quartz is housed.The heating element that the excircle of crucible has tungsten and molybdenum material to make, its common ground is that arbitrary cross section of heating element all equates, this shows that temperature that heating element in process of production sends is certain substantially in vertical distribution, can't adjust the longitudinal temperature of crucible.The production of quartz glass tube is in crucible and the process that goes out the mouth of pot moulding---melting zone---exhaust area---the shaping area several sections that is the preheating zone.When the quartz glass tube of production different varieties specification or bar, temperature index to whole process has different requirements, particularly the temperature requirement of shaping area is higher, as change heating element power and then can change the temperature of preheating zone, melting zone, exhaust area, thereby make the production of quartz glass tube or rod major defect occur.Before the cooling that stops production,, need heat, guarantee that crucible is harmless when cooling the silica glass fusing disengaging crucible on crucible top because silica glass is very big at its expansion coefficient difference of different temperature sections with crucible.What take at present is to add high-power raising heating element temperature, will just can finish in the suitable time simultaneously.
Summary of the invention
The technical problem to be solved in the present invention is at the deficiencies in the prior art, has proposed a kind of novel quartz glass continuous induction melting furnace, and it can change the temperature of shaping area under the constant condition of total power.
The technical problem to be solved in the present invention is achieved through the following technical solutions, a kind of quartz continuous melting furnace, it comprises body of heater and is located at the intravital crucible of stove, between crucible and the furnace body wall thermal insulation layer is housed, be provided with heating unit between the periphery of crucible and the thermal insulation layer, loam cake is housed on the body of heater, be characterized in: have a through hole in the center of loam cake, a tegillum is housed on the through hole, the tegillum bottom is provided with the boss that is slidingly matched with through hole, between boss outer rim and the through hole sealing-ring is housed, the boss of the suitable for reading and tegillum of crucible is fixedlyed connected, and between tegillum and the loam cake lifting device is housed.
The technical problem to be solved in the present invention can also come further to realize by the following technical programs, described lifting device is vertically fixed with 3~5 screw mandrels last covering around tegillum, the planet lifter wheel is housed on the screw mandrel, the planet lifter wheel is equipped with big ring gear outward, and the lifter wheel top joins by surface bearing and tegillum.
The technical problem to be solved in the present invention can also come further to realize by the following technical programs, in the screw mandrel upper end set nut is housed.
The present invention compared with prior art, on cover tegillum be housed, crucible is fixedlyed connected with tegillum, tegillum with cover greatly between the lifting device that can make the stepless lifting of crucible is housed.Lifting device comprises fixedly little body of heater, elevating screw, ring gear, planet lifter wheel, sealing-ring, the pressure ring of crucible.Thereby change the moulding offset and reach the quartz glass tube of production different varieties and specification, excellent requirement from changing the shaping area temperature.Before the cooling that stops production, crucible is reduced, can guarantee that crucible is harmless when cooling with the silica glass fusing disengaging crucible on crucible top in very short time.
Description of drawings
Fig. 1 is a structure diagram of the present invention.
Fig. 2 is the lifting device part sectioned view.
Embodiment
A kind of quartz continuous melting furnace, it comprises body of heater 3 and the crucible 4 that is located in the body of heater 3, between crucible 4 and body of heater 3 walls thermal insulation layer 2 is housed, be provided with heating unit 1 between the periphery of crucible 4 and the thermal insulation layer 2, the bottom of crucible 4 is the moulding outlet, core bar is equipped with in crucible 4 centers, loam cake 6 is housed on body of heater 3, have a through hole in the center of loam cake 6, a tegillum 9 is housed on the through hole, and tegillum 9 bottoms are provided with the boss 5 that is slidingly matched with through hole, between boss 5 outer rims and the through hole sealing-ring 12 are housed, the boss 5 of the suitable for reading and tegillum 6 of crucible 4 is fixedlyed connected, and between tegillum 9 and the loam cake 6 lifting device is housed.Described lifting device is vertically fixed with 3~5 screw mandrels 7 around tegillum 9 on loam cake 6, planet lifter wheel 10 is housed on the screw mandrel 7, outside the planet lifter wheel 10 big ring gear 11 is housed, and lifter wheel 10 tops join by surface bearing and tegillum 9.In screw mandrel 7 upper ends set nut 8 is housed.

Claims (3)

1. quartz continuous melting furnace, it comprises body of heater (3) and is located at the interior crucible (4) of body of heater (3), between crucible (4) and body of heater (3) wall thermal insulation layer (2) is housed, be provided with heating unit (1) between the periphery of crucible (4) and the thermal insulation layer (2), loam cake (6) is housed on the body of heater (3), it is characterized in that: have a through hole in the center of loam cake (6), a tegillum (9) is housed on the through hole, tegillum (9) bottom is provided with the boss (5) that is slidingly matched with through hole, sealing-ring (12) is housed between boss (5) outer rim and the through hole, the boss (5) of the suitable for reading and tegillum (9) of crucible (4) is fixedlyed connected, and between tegillum (9) and the loam cake (6) lifting device is housed.
2. quartz continuous melting furnace according to claim 1, it is characterized in that: described lifting device is gone up at loam cake (6) and is vertically fixed with 3~5 screw mandrels (7) all around around tegillum (9), planet lifter wheel (10) is housed on the screw mandrel (7), the outer big ring gear (11) that is equipped with of planet lifter wheel (10), planet lifter wheel (10) top joins by surface bearing and tegillum (9).
3. quartz continuous melting furnace according to claim 2 is characterized in that: in screw mandrel (7) upper end set nut (8) is housed.
CN2005100953821A 2005-11-11 2005-11-11 Silica glass continuous melting oven Active CN1962498B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2005100953821A CN1962498B (en) 2005-11-11 2005-11-11 Silica glass continuous melting oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2005100953821A CN1962498B (en) 2005-11-11 2005-11-11 Silica glass continuous melting oven

Publications (2)

Publication Number Publication Date
CN1962498A true CN1962498A (en) 2007-05-16
CN1962498B CN1962498B (en) 2011-03-16

Family

ID=38081754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2005100953821A Active CN1962498B (en) 2005-11-11 2005-11-11 Silica glass continuous melting oven

Country Status (1)

Country Link
CN (1) CN1962498B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101712527B (en) * 2009-05-21 2012-07-04 余姚市晶英电弧坩埚有限公司 Stainless steel molding rod, manufacturing method and application thereof
CN103319071A (en) * 2012-03-20 2013-09-25 东海县圣达石英制品有限公司 Quart continuous melting furnace
US8978419B2 (en) 2009-11-30 2015-03-17 Corning Incorporated Devices for controlling atmosphere over molten-glass free-surfaces

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101712527B (en) * 2009-05-21 2012-07-04 余姚市晶英电弧坩埚有限公司 Stainless steel molding rod, manufacturing method and application thereof
US8978419B2 (en) 2009-11-30 2015-03-17 Corning Incorporated Devices for controlling atmosphere over molten-glass free-surfaces
CN103319071A (en) * 2012-03-20 2013-09-25 东海县圣达石英制品有限公司 Quart continuous melting furnace

Also Published As

Publication number Publication date
CN1962498B (en) 2011-03-16

Similar Documents

Publication Publication Date Title
CN1962498B (en) Silica glass continuous melting oven
CN103924046B (en) Vacuum annealing furnace
CN104534868B (en) Heat stamping and shaping plate heating furnace
CN107010813A (en) The adjustable crucible lifting formula quartz glass continuous induction melting furnace of molding zone temperatures
CN206375813U (en) Non-contact type quartz pushrod, quartz ampoule drawing device
CN102965724A (en) Single crystal furnace with double-layer quartz tube sealing structure by crystal pulling method
CN206247848U (en) The lift noble metal smelting furnace of rotatable crucible
CN111977940A (en) Multifunctional quartz glass continuous melting furnace
CN103937944B (en) A kind of vacuum annealing furnace
CN206970453U (en) The adjustable crucible lifting formula quartz glass continuous induction melting furnace of molding zone temperatures
CN107176783A (en) Glass forming furnace
CN101054257B (en) Energy-saving quartz continuous melting furnace, energy-saving method and method for adjusting tube pulling specification
CN102795620B (en) A kind of hot pressure sintering stove for producing high purity graphite
CN203495188U (en) Heat holding furnace intrusive type heating thermal insulation system of low-pressure casting machine
CN212532732U (en) Multifunctional quartz glass continuous melting furnace
CN102920348B (en) Automatically adjustable type pot support
CN202246376U (en) Continuous melting furnace capable of controlling large-caliber ultra-thick quartz glass tubes
CN205275442U (en) Novel energy -efficient continuous smelting stove
CN203155748U (en) Electromagnetic induction heating furnace
CN206799716U (en) A kind of turbine blade steel production vacuum smelting device
CN101585080B (en) Liquid level levitation type low-pressure casting technique for aluminum section bar
CN203922991U (en) Quartz glass continuous induction melting furnace
CN2424433Y (en) High vacuum fritting furnace
CN200992517Y (en) Continuous melting furnace for drawing colored quartz glass pipe
CN215162120U (en) Temperature control device for quartz glass continuous melting furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIANYUNGANG FUDONG LIGHTING LLC

Free format text: FORMER OWNER: PU XIAOMING

Effective date: 20111018

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lv Derun

Inventor after: Pu Xiaoming

Inventor after: Pu Yangkun

Inventor after: Huang Chunyu

Inventor after: Li Yongwang

Inventor after: Tao Mingdun

Inventor after: Zhang Yao

Inventor before: Huang Chunyu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG CHUNYU TO: LV DERUN PU XIAOMING PU YANGKUN HUANG CHUNYU LI YONGWANG YAO MINGDUN ZHANG YAO

TR01 Transfer of patent right

Effective date of registration: 20111018

Address after: 222300 Jiangsu Province Liu Zhen Donghai County Shiquan Road No. 3

Patentee after: Fudong Lighting LLC

Address before: 222300 Jiangsu Province Liu Zhen Donghai County Shiquan Road No. 3, faudon

Patentee before: Pu Xiaoming