- CN1952260A CN1952260A CN 200510031040 CN200510031040A CN1952260A CN 1952260 A CN1952260 A CN 1952260A CN 200510031040 CN200510031040 CN 200510031040 CN 200510031040 A CN200510031040 A CN 200510031040A CN 1952260 A CN1952260 A CN 1952260A
- Authority
- CN
- China
- Prior art keywords
- reinforced plastic
- fiber reinforced
- reinforcing steel
- presstressed reinforcing
- muscle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Road Signs Or Road Markings (AREA)
- Road Paving Structures (AREA)
Abstract
一种整体式全纤维增强塑料轨道交通结构,它包括整体式承重主梁和预应力筋;整体式承重主梁由顶板、腹板和转向装置,构成一整体结构,用玻璃纤维增强塑料制作,一次加工成型,成型前预留预应力筋孔道,顶板与腹板固连;预应力筋由碳纤维增强塑料制作,预应力筋分为体内筋与体外筋两种,体内筋穿过预留预应力筋孔道,从两个“T”形端截面伸出,张拉后锚固;体外筋通过转向装置从两个“T”形端截面伸出,张拉后锚固,形成折线形布筋。本发明具有截面面积小,整体刚度大,轻质、高强、耐腐蚀及施工方便,易于精加工和机械化大批量制作等优点。
Description
技术领域
本发明涉及一种轨道交通结构,具体涉及一种整体式全纤维增强塑料(FRP)轨道交通结构。
背景技术
目前城市交通正在向多元化和立体化方向发展,轨道交通已成为人们出行的重要交通工具,因此轻轨、准高速客运专线、磁悬浮已呈现出迅猛发展之势,人们对交通工具的要求也越来越高,并正在向更安全、舒适和高速化方向发展。但迄今为止,轨道交通多采用混凝土结构,而混凝土材料本身自重大,抗拉强度低,抗裂性能差,徐变变形大,且预应力钢筋易腐蚀,要在这种材料和结构下对其进行技术改进,以实现安全性能和高速化,困难很大。由于混凝土材料本身的易老化、开裂、变形、施工难度大和预应力筋腐蚀等问题的存在,研究者们把目标投向了新材料和新结构。近年来随着材料科学的高速发展,一种全纤维增强塑料(FRP)为科技人员所关注。试验研究表明,FRP材料的比重仅为钢材的1/5,热膨胀系数低,抗震性、电磁绝缘性好,耐腐蚀性能强,其中碳(CFRP)的抗拉强度可达普通碳素钢的十几倍,高弹模纤维的弹模可达钢材的2-3倍;玻璃纤维增强塑料GFRP的强度与钢铁相当,抗压、拉、弯和冲击的性能强,设计自由度大。在此之前,人们还没有把这种材料应用于轨道交通。
发明内容
为克服目前轨道交通存在的不足之处,本发明提出了一种全新的轨道交通结构,它采用全纤维增强塑料(FRP)替代混凝土材料,制作出一段段整体式轨道承重梁,然后沿轨道长度方向进行段与段的拼装。
该结构具有截面面积小,整体刚度大,轻质、高强、耐腐蚀及施工方便,易于精加工和机械化大批量制作等优点。同时可实现对整体式承重主梁的外形、尺寸和变形的高精度控制,达到使交通工具运行平稳、安全和高速化目标。
一种整体式全纤维增强塑料(FRP)轨道交通结构,它包括整体式承重主梁和预应力筋,预应力筋分体内筋和体外筋两种方式,整体式承重主梁是由玻璃纤维增强塑料(GFRP)制作;预应力筋是由碳纤维增强塑料(CFRP)制作;整体式承重主梁由顶板、腹板和转向装置构成一整体式结构,并一次加工成型;成型前,内部预留预应力筋孔道;整体式承重主梁的顶板和腹板固连,在支座附近沿纵向有段平滑过渡曲面,以实现截面型式的平滑过渡。
转向装置为转向块和/或转向肋,转向块和转向肋上预留有预应力弯孔,一弯管嵌入其中;
在整体式承重主梁的双侧,每侧至少有一个转向装置;体外预应力筋穿过转向装置并从两个“T”形端截面伸出后张拉、锚固;体外预应力筋的布筋方式为折线形;体内预应力筋穿过腹板中预留的预应力筋孔道,并从两个“T”形端截面伸出后张拉、锚固;可采用塑料锚具;待锚固后,所有预应力筋孔道灌注砂浆。
附图说明
图1是本发明结构示意图;
图2是本发明转向块结构示意图;
图3是本发明转向肋结构示意图;
图4是本发明截面示意图。
1.整体式承重主梁,2.顶板,3.腹板,4.转向装置,5.预应力筋,6.预应力筋孔道,7.平滑过渡曲面。
具体实施方案
下面结合附图和实施例对本发明作进一步详细说明。
实施例1:本发明的整体式全纤维增强塑料轨道交通结构,它包括整体式承重主梁(1)和预应力筋(5),预应力筋(5)分体内筋和体外筋两种方式,整体式承重主梁(1)是由玻璃纤维增强塑料(GFRP)制作;预应力筋(5)是由碳纤维增强塑料(CFRP)制作;整体式承重主梁(1)由顶板(2)、腹板(3)和转向装置(4)构成一整体式结构,并一次加工成型;成型前,腹板(3)内部预留预应力筋孔道(6),孔道为螺纹孔道;整体式承重主梁(1)在支座附近沿纵向有段平滑过渡曲面(7),以实现支座截面与标准截面的平滑过渡;
转向装置为转向块,转向块在整体式承重主梁的两侧,每侧各为两块,成型前预留预应力筋弯孔,一弯管嵌入其中,转向块采用棱柱体形状;体外预应力筋穿过两个转向块,并从两个“T”形端截面伸出,然后张拉、锚固;其布筋方式为三折线形;体内预应力筋采用直线布筋,体内预应力筋穿过预应力孔道和两个“T”形端截面后张拉、锚固;预应力筋穿过的孔道全部用环氧树脂或环氧砂浆灌注。
实施例2:与实施例1不同之处是,转向装置采用转向肋。转向肋是将转向块上端延伸并与顶板固连,转向肋上预留有预应力筋弯孔,内置弯管,本实施例是在整体式承重主梁的两侧各布置三根转向肋,体外预应力筋其布筋方式为四折线。
显然本发明还有其他形式的实施例,但都没有脱离发明应用的范围,它们可结合专利在确定的范围内进行调整。
本发明可广泛应用于城市轻轨、准高速客运专线和磁悬浮等轨道交通结构。
Claims (3)
1、一种整体式全纤维增强塑料(FRP)轨道交通结构,它包括整体式承重主梁和预应力筋,预应力筋分体内筋和体外筋两种方式,其特征在于:整体式承重主梁是由玻璃纤维增强塑料(GFRP)制作;预应力筋是由碳纤维增强塑料(CFRP)制作;整体式承重主梁由顶板、腹板和转向装置构成一整体式结构,并一次加工成型;成型前,腹板内部预留预应力筋孔道;整体式承重主梁在支座附近沿纵向有段平滑过渡曲面,以实现截面形状的平滑过渡。
2、根据权利要求1所述的一种整体式全纤维增强塑料(FRP)轨道交通结构,其特征在于:转向装置为转向块和/或转向肋,转向块和转向肋上预留有预应力筋弯孔,一弯管嵌入其中。
3、根据权利要求1所述的一种整体式全纤维增强塑料(FRP)轨道交通结构,其特征在于:在腹板的双侧,每侧至少有一个转向装置;体外预应力筋穿过转向装置并从两个“T”形端截面伸出后张拉、锚固;体外预应力筋的布筋方式为折线形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2005100310403A CN1952260B (zh) | 2005-10-21 | 2005-10-21 | 一种整体式全纤维增强塑料轨道交通结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2005100310403A CN1952260B (zh) | 2005-10-21 | 2005-10-21 | 一种整体式全纤维增强塑料轨道交通结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1952260A true CN1952260A (zh) | 2007-04-25 |
CN1952260B CN1952260B (zh) | 2010-08-18 |
Family
ID=38058803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2005100310403A Expired - Fee Related CN1952260B (zh) | 2005-10-21 | 2005-10-21 | 一种整体式全纤维增强塑料轨道交通结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1952260B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103216036A (zh) * | 2013-04-03 | 2013-07-24 | 哈尔滨工程大学 | 弯曲承载轻量化钢筋混凝土梁结构 |
CN114319719A (zh) * | 2021-12-24 | 2022-04-12 | 中核华辰工程管理有限公司 | 一种预应力梁结构及其施工方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1168880C (zh) * | 2002-09-28 | 2004-09-29 | 卓静 | 预应力纤维增强型钢混凝土结构及其预应力施工方法 |
CN1519433A (zh) * | 2003-01-24 | 2004-08-11 | 深圳市海川实业股份有限公司 | 芳纶索在体外预应力桥梁加固工程中的应用 |
CN2642894Y (zh) * | 2003-07-14 | 2004-09-22 | 上海港口设计研究院 | 含碳纤维增强塑料的钢筋混凝土预制件 |
-
2005
- 2005-10-21 CN CN2005100310403A patent/CN1952260B/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103216036A (zh) * | 2013-04-03 | 2013-07-24 | 哈尔滨工程大学 | 弯曲承载轻量化钢筋混凝土梁结构 |
CN103216036B (zh) * | 2013-04-03 | 2015-05-20 | 哈尔滨工程大学 | 弯曲承载轻量化钢筋混凝土梁结构 |
CN114319719A (zh) * | 2021-12-24 | 2022-04-12 | 中核华辰工程管理有限公司 | 一种预应力梁结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN1952260B (zh) | 2010-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Van Den Einde et al. | Use of FRP composites in civil structural applications | |
Bakis et al. | Fiber-reinforced polymer composites for construction—State-of-the-art review | |
Hollaway | The evolution of and the way forward for advanced polymer composites in the civil infrastructure | |
CN106638274B (zh) | 一种单向预应力超高性能混凝土薄壁箱梁标准节段 | |
CN101158143A (zh) | 双层桥面组合桁梁桥 | |
CN103215886A (zh) | 一种新型的短节段钢箱-混凝土组合梁 | |
CN1955376B (zh) | 一种迭合式全纤维增强塑料轨道交通结构 | |
CN201695573U (zh) | 一种新型预应力frp复合筋混凝土梁 | |
CN203559329U (zh) | 一种钢-rpc组合桥梁 | |
CN202090275U (zh) | 自锚上承式钢筋混凝土拱桥 | |
CN110409712B (zh) | 预应力复材-超高性能混凝土组合梁 | |
CN1952260B (zh) | 一种整体式全纤维增强塑料轨道交通结构 | |
CN113652948A (zh) | 一种提高刚度的高速铁路斜拉桥 | |
CN107268889A (zh) | 预应力铝‑混组合桁架梁及其施工方法 | |
CN110512922A (zh) | 装配式检修立柱、列车检修平台及其施工方法 | |
CN103556563B (zh) | 钢-rpc组合桥梁 | |
CN201891068U (zh) | 预应力混凝土u形连续梁桥 | |
CN204703055U (zh) | 基于肋板式桥面的钢-超高性能混凝土组合梁结构 | |
CN217556726U (zh) | 一种基于frp型材的混凝土箱梁桥加固结构 | |
CN1995547A (zh) | 预应力混凝土声屏障单元结构 | |
CN101768915B (zh) | 复合材料弓形结构梁 | |
CN206337497U (zh) | 一种单向预应力超高性能混凝土薄壁箱梁标准节段 | |
Kossakowski et al. | Fiber-Reinforced Polymer Composites in the Construction of Bridges: Opportunities, Problems and Challenges. Fibers 2022, 10, 37 | |
CN215926476U (zh) | 一种装配式frp型材-混凝土组合梁 | |
CN106193288B (zh) | 一种浇筑ecc层的预制混凝土节点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100818 Termination date: 20121021 |