CN1913559A - Method and system of data service - Google Patents

Method and system of data service Download PDF

Info

Publication number
CN1913559A
CN1913559A CN 200610127720 CN200610127720A CN1913559A CN 1913559 A CN1913559 A CN 1913559A CN 200610127720 CN200610127720 CN 200610127720 CN 200610127720 A CN200610127720 A CN 200610127720A CN 1913559 A CN1913559 A CN 1913559A
Authority
CN
China
Prior art keywords
order
business datum
cutover
core environment
image district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610127720
Other languages
Chinese (zh)
Other versions
CN100571304C (en
Inventor
杨加龙
严雪松
望岳
吴文魁
张卫星
李强
赵林华
宦宣颐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB200610127720XA priority Critical patent/CN100571304C/en
Publication of CN1913559A publication Critical patent/CN1913559A/en
Application granted granted Critical
Publication of CN100571304C publication Critical patent/CN100571304C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

This invention discloses a method for realizing cut-joint of data service including the following steps: inducing service data of a being cut-joint service into a preset data image region and accessing said unit to a data service management platform, which gets the service data of the unit to test the unit and inducing the service data of the unit having passed through the test into a database of the platform. This invention also provides a system for realizing it.

Description

A kind of method and system that realize the data service cutover
Technical field
The present invention relates to the telecommunication management technical field, relate in particular to a kind of method and system that realize the data service cutover.
Background technology
Service Provisioning Administration Core Environment (Data Service Management Platform, DSMP) be on communication network, to realize the unified plateform system that inserts of business datum integrated management, can can run for common carrier provides, manage, open Business Management Platform, and carry out rich and varied business service by this platform.
DSMP has open operation business platform, finishes unified management, unified certification, unified authentication and unified charging of business datum.
In communication service project construction implementation process, some new systems need insert in the existing network and move, and in order to realize unified management, charging, often run into the existing operation system of new system and existing network and carry out cut over.In order to realize the cut over of new system and existing network, need treat the cutover unit and comprehensively test, after test is passed through, can finish cutover.
At present, general direct test cutover of being engaged in the enterprising industry of Service Provisioning Administration Core Environment.Below the cutover flow process that needs the business datum test is described:
1, by Service Provisioning Administration Core Environment the business datum of all order to be cut units is imported to the database of Service Provisioning Administration Core Environment;
2, insert an order to be cut unit, the system that inserts is comprehensively tested;
3, EOT, this system is that cutover is finished;
4, repeat 2~3 steps, finish up to the first cutover of all orders to be cut.
Referring to shown in Figure 1, during order to be cut unit 101 cutovers, the business datum of the 10l of order to be cut unit is imported database, and Service Provisioning Administration Core Environment 100 inserts order to be cut unit 101 and treats the cutover unit according to the business datum of order to be cut unit in the database and test, and test finishes and promptly finishes cutover.
If it is a plurality of that order to be cut unit has, then on testing after order to be cut unit, insert next order to be cut unit and test, finish up to all orders to be cut unit tests, finish cutover.
As can be seen from the above technical solutions, this scheme will be not after tested data directly import Service Provisioning Administration Core Environment and test, this causes serious threat to stability and the very high Service Provisioning Administration Core Environment of reliability requirement undoubtedly.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of method and system that realize the data service cutover, to strengthen the stability and the fail safe of Service Provisioning Administration Core Environment in the cut-over process.
For solving the problems of the technologies described above, the objective of the invention is to be achieved through the following technical solutions:
A kind of method that realizes the data service cutover, this method may further comprise the steps:
The business datum of order to be cut unit is imported default data image district, and order to be cut unit is inserted Service Provisioning Administration Core Environment;
Service Provisioning Administration Core Environment obtains order to be cut unit from the data image district business datum is treated the cutover unit and is tested;
Test finishes, and the business datum of the order to be cut unit by test in the data image district is imported the database of Service Provisioning Administration Core Environment.
Alternatively, described data image district is disk file or database.
Alternatively, described Service Provisioning Administration Core Environment is treated the cutover unit testing or one by one simultaneously to the test of at least two order to be cut units.
Alternatively, the business datum of order to be cut unit being imported the data image district takes a step forward and comprises: the business datum of order to be cut unit is derived from order to be cut unit.
Alternatively, the business datum of described derivation is preserved with text or Microsoft Excel mode.
Alternatively, the database of Service Provisioning Administration Core Environment will be imported in the data image district in the automatized script mode by the business datum of test.
A kind of system that realizes the data service cutover, this system comprise, Service Provisioning Administration Core Environment, data image district:
The data image district is used to store the business datum of order to be cut unit, and the business datum of order to be cut unit is provided for Service Provisioning Administration Core Environment during the system cutover;
Service Provisioning Administration Core Environment obtains order to be cut unit from the data image district business datum is treated the cutover unit and is tested; Test finishes, and the business datum of the order to be cut unit by test in the data image district is imported the database of Service Provisioning Administration Core Environment.
Alternatively, described data image district is internal or external at Service Provisioning Administration Core Environment.
Alternatively, to offer the business datum of the order to be cut unit of Service Provisioning Administration Core Environment be that text or Microsoft Excel mode are preserved in described data image district.
Alternatively, it is characterized in that: described data image district is disk file or database.
Above technical scheme as can be seen, the present invention is provided with and Service Provisioning Administration Core Environment database data image district independently, after tested business datum is not sent to the database of Service Provisioning Administration Core Environment after data image district test, avoided the destruction of dangerous data, improved the fail safe and the stability of Service Provisioning Administration Core Environment in the cut-over process the data Business Management Platform.
Description of drawings
Fig. 1 is the existing data service cutover system block diagram of realizing;
Fig. 2 realizes data service cutover system block diagram for the present invention;
Fig. 3 is another embodiment block diagram of system of the present invention;
Fig. 4 is the flow chart of data service method for cutting over of the present invention;
Fig. 5 is another embodiment flow chart of the inventive method.
Embodiment
Basic thought of the present invention is, set up a data image district that isolates with the Service Provisioning Administration Core Environment database, the test of order to be cut unit is finished in the data image district, after test finishes, to arrive formal Service Provisioning Administration Core Environment database by the safety service data importing of test, finish cutover.
In order to make those skilled in the art person understand the present invention program better, at first introduce the several basic conceptions among the present invention below:
Cutover is meant and will be deployed to new system testing in the existing network and the process that brings into operation.For example: certain company has designed a kind of new switch, and this switch need be deployed to and moves in the existing communication net, surveys from being installed to transfer, and the process to formal input network operation is called cutover again; And for example: certain telecom operators has designed a brand-new intelligent net system, need replace original old system, install from new system, to debugging or trial run, again to formally business being switched to new system and the process that old system removes from network just is called cutover.
Before test is meant that new system formally puts into operation, the signaling process test between new system and the existing network equipment, can test new system operate as normal.For example: added a switch in network, needed examination to make a phone call, whether the test switch can make telephone set normally put through etc.; For another example: whether have a new system to replace former system of haveing been friends in the past, need the new system of test can operate as normal, whether normal as user's flow process of opening an account, whether user's clearing be normal etc., in the cutover of different system, concrete method of testing is relevant with concrete application.
For making technical scheme of the present invention clearer, below with reference to the accompanying drawing embodiment that develops simultaneously, the present invention is described in more detail.
Referring to shown in Figure 2, be system block diagram of the present invention, this system comprises: Service Provisioning Administration Core Environment 200, data image district 20l, Service Provisioning Administration Core Environment 200 itself carries a database, the data memory block of described data image district 201 for opening up in the Service Provisioning Administration Core Environment database.
Described data image district has two kinds of forms usually: database and disk file.Database promptly is to set up a database as the data image district; Disk file promptly is that business datum is stored in hard disk, and the memory block of the data of depositing on the hard disk to be tested is exactly the data image district.
In the present embodiment, what the data image district used is the disk file form, promptly opens up a subregion as the data image district at the former database of Service Provisioning Administration Core Environment.The final purpose that the present invention sets up the data image district be will storage without the database isolation of data storage area with the Service Provisioning Administration Core Environment itself of test data, the dangerous data that may contain in the data after tested can not damaged the database of data service management.
During the data service cutover, Service Provisioning Administration Core Environment 200 imports data image district 201 with the business datum of order to be cut unit 202, insert this system, Service Provisioning Administration Core Environment 200 is treated the cutover unit according to the business datum in the data image district and is carried out operational trials, test finishes, if test is passed through, Service Provisioning Administration Core Environment 200 is finished cutover with this system business data importing Service Provisioning Administration Core Environment database.
Wherein, Service Provisioning Administration Core Environment can adopt the Artificial Control mode to finish the database that the business datum by test in the data image district imports Service Provisioning Administration Core Environment, also can finish automatically by the embedded software of Service Provisioning Administration Core Environment.
Wherein, the business datum of order to be cut unit can be provided by order to be cut unit for textual form or Microsoft Excel form.The first function that self possesses this with the business datum derivation of common order to be cut.In addition, obtain the business datum of order to be cut unit after, Service Provisioning Administration Core Environment imports to the data image district with the business datum of order to be cut unit.The general data base management system all can provide the order of data importing, and the process that therefore business datum of order to be cut unit is imported the data image district generally all adopts command mode.
Wherein, will adopt the automatized script mode to import to the Service Provisioning Administration Core Environment database with cutover software by the business datum of test.
In other embodiment of the present invention, also have a plurality of order to be cut unit to need the situation of business datum cutover, in this case, Service Provisioning Administration Core Environment is with the related service data importing data image district of all order to be cut units, insert an order to be cut unit, Service Provisioning Administration Core Environment carries out operational trials according to business datum in the MIRROR SITE to this system, test finishes and inserts next order to be cut unit and test, finish up to the first test of all orders to be cut, Service Provisioning Administration Core Environment imports to the Service Provisioning Administration Core Environment database with all business datums by test, finishes cutover.The order of order to be cut unit test can insert test one by one by the good sequence order of artificial row, also can generate a sequence at random, inserts order to be cut unit one by one according to this sequence and tests; Can also test a plurality of order to be cut unit simultaneously, the aim of present embodiment is will import the database of Service Provisioning Administration Core Environment by the business datum of test after order to be cut unit is tested, derivative according to the mode of Pretesting and order to realization did not influence of the present invention.
Be example with switch of cutover more below, the process of cutover be described:
The business of supposing switch is a telephone service, business datum in the switch is exactly some user's telephone number so, we at first will derive these user's telephone number come, with text or EXCEL it is preserved and import the data image district again, then switch is inserted Service Provisioning Administration Core Environment, promptly be connected in the network, then test whether normally forward call of switch, at this moment Service Provisioning Administration Core Environment need obtain business datum from the data image district, it is user's telephone number, according to this telephone number dialing, whether test telephone can be got through, if it is working properly to get through the explanation switch, these telephone numbers are imported Service Provisioning Administration Core Environment, switch cutover success.
Referring to shown in Figure 3, be another embodiment block diagram of system of the present invention, this system comprises: Service Provisioning Administration Core Environment 300, data image district 301, this system operating mode is identical with a last embodiment, in the system among each parts and the last embodiment each corresponding component function also identical, difference only is that the data image district sets up with the database form among this embodiment, the external production system of this database.In other embodiment of the present invention, all right built-in production system of database does not influence realization of the present invention.
Referring to shown in Figure 4, the flow process of data mirror image method for cutting over is described:
Step 401: Service Provisioning Administration Core Environment is with the related service data importing data image district of an order to be cut unit;
Step 402: Service Provisioning Administration Core Environment inserts this order to be cut unit, according to the business datum of this order to be cut unit in the data image district this unit is carried out operational trials;
Step 403: this unit testing finishes, if test is passed through, Service Provisioning Administration Core Environment imports to the Service Provisioning Administration Core Environment database with the business datum of this unit from the data image district.
Among this embodiment, Service Provisioning Administration Core Environment inserts order to be cut unit and also can import and should carry out before the first business datum of order to be cut.
Import the data image district in business datum and take a step forward and comprise, business datum is derived from order to be cut unit order to be cut unit.
Wherein, in step 40l, the business datum of order to be cut unit can provide with text mode, also can provide in the EXCEL mode, in addition, derivative might not be carried out by Service Provisioning Administration Core Environment according to action, as: choose a server with derivative according to function, itself and data image district are established a communications link, in the business datum importing data image district of server end text or Microsoft Excel mode.
Step 402 is specially: Service Provisioning Administration Core Environment insert should be to be cut order unit, Service Provisioning Administration Core Environment finds the business datum of access order to be cut unit from the data image district, treat the cutover unit according to business datum and do corresponding test.
Referring to shown in Figure 5, another embodiment flow process of data mirror image method for cutting over is described:
Step 501: Service Provisioning Administration Core Environment imports the data image district with the business datum of cutover to be measured unit;
Step 502: insert an order to be cut unit, Service Provisioning Administration Core Environment carries out operational trials according to the business datum of this order to be cut unit in the data image district to this unit;
Step 503: this unit testing finishes, and inserts next order to be cut unit, and repeating step 502 to 503 like this finishes up to all orders to be cut unit tests;
Step 504: Service Provisioning Administration Core Environment imports to the Service Provisioning Administration Core Environment database with all business datums by test in the data image district.
The identical replacement with a last embodiment is also arranged in the present embodiment, be not repeated in this description here.
In other embodiments, also can insert an order to be cut unit earlier, and then importing business datum, in the present invention during in system testing, Service Provisioning Administration Core Environment extracts the business datum of corresponding order to be cut unit from the data image district, the first unified test of finishing of order to be cut, unification will import in the database of Service Provisioning Administration Core Environment by the business datum of test again.As long as can provide the business datum that needs test for Service Provisioning Administration Core Environment, and when data importing data image district specifically do not influenced realization of the present invention.Among the present invention, also can be simultaneously two or three order to be cut units be tested, be not limited to carry out one by one.
More than a kind of method and system of data service cutover that realize provided by the present invention are described in detail, used specific case herein principle of the present invention and execution mode are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, the part that all can change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention.

Claims (10)

1, a kind of method that realizes the data service cutover is characterized in that, this method may further comprise the steps:
The business datum of order to be cut unit is imported default data image district, and order to be cut unit is inserted Service Provisioning Administration Core Environment;
Service Provisioning Administration Core Environment obtains order to be cut unit from the data image district business datum is treated the cutover unit and is tested;
Test finishes, and the business datum of the order to be cut unit by test in the data image district is imported the database of Service Provisioning Administration Core Environment.
2, the method for realization data service cutover according to claim 1 is characterized in that, described data image district is disk file or database.
3, the method for realization data service cutover according to claim 1 is characterized in that, described Service Provisioning Administration Core Environment is treated the cutover unit testing or one by one simultaneously to the test of at least two order to be cut units.
4, the method for realization data service cutover according to claim 1 is characterized in that, the business datum of order to be cut unit is imported the data image district take a step forward and comprise: the business datum of order to be cut unit is derived from order to be cut unit.
5, the method for realization data service cutover according to claim 4 is characterized in that, the business datum of described derivation is preserved with text or Microsoft Excel mode.
6, the method for realization data service cutover according to claim 1 is characterized in that, will import the database of Service Provisioning Administration Core Environment in the data image district in the automatized script mode by the business datum of test.
7, a kind of system that realizes the data service cutover is characterized in that, this system comprises, Service Provisioning Administration Core Environment, data image district:
The data image district is used to store the business datum of order to be cut unit, and the business datum of order to be cut unit is provided for Service Provisioning Administration Core Environment during the system cutover;
Service Provisioning Administration Core Environment obtains order to be cut unit from the data image district business datum is treated the cutover unit and is tested; Test finishes, and the business datum of the order to be cut unit by test in the data image district is imported the database of Service Provisioning Administration Core Environment.
8, the system of realization data service cutover according to claim 7 is characterized in that: described data image district is internal or external at Service Provisioning Administration Core Environment.
9, the system of realization data service cutover according to claim 7 is characterized in that: the business datum that described data image district offers the order to be cut unit of Service Provisioning Administration Core Environment is that text or Microsoft Excel mode are preserved.
10, according to the system of the arbitrary described realization data service cutover of claim 7 to 9, it is characterized in that: described data image district is disk file or database.
CNB200610127720XA 2006-08-30 2006-08-30 A kind of method and system that realize the data service cutover Expired - Fee Related CN100571304C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200610127720XA CN100571304C (en) 2006-08-30 2006-08-30 A kind of method and system that realize the data service cutover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200610127720XA CN100571304C (en) 2006-08-30 2006-08-30 A kind of method and system that realize the data service cutover

Publications (2)

Publication Number Publication Date
CN1913559A true CN1913559A (en) 2007-02-14
CN100571304C CN100571304C (en) 2009-12-16

Family

ID=37722325

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200610127720XA Expired - Fee Related CN100571304C (en) 2006-08-30 2006-08-30 A kind of method and system that realize the data service cutover

Country Status (1)

Country Link
CN (1) CN100571304C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101867892A (en) * 2010-06-18 2010-10-20 中兴通讯股份有限公司 Polyphonic ringtone data cut over method and system thereof
CN101499924B (en) * 2008-01-31 2011-04-20 杭州美创科技有限公司 On-line switchover method for computer production system
CN107665181A (en) * 2016-07-27 2018-02-06 中兴通讯股份有限公司 A kind of method and system of centralized configuration equipment
CN110457064A (en) * 2019-07-16 2019-11-15 中盈优创资讯科技有限公司 The generation method and device of network cutover script
CN115129579A (en) * 2021-03-26 2022-09-30 阿里巴巴新加坡控股有限公司 Data auditing method and device based on data cutover

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101499924B (en) * 2008-01-31 2011-04-20 杭州美创科技有限公司 On-line switchover method for computer production system
CN101867892A (en) * 2010-06-18 2010-10-20 中兴通讯股份有限公司 Polyphonic ringtone data cut over method and system thereof
WO2011157002A1 (en) * 2010-06-18 2011-12-22 中兴通讯股份有限公司 Cutover method and system of coloring ring back tone (crbt) data
CN101867892B (en) * 2010-06-18 2015-01-28 中兴通讯股份有限公司 Polyphonic ringtone data cut over method and system thereof
CN107665181A (en) * 2016-07-27 2018-02-06 中兴通讯股份有限公司 A kind of method and system of centralized configuration equipment
CN110457064A (en) * 2019-07-16 2019-11-15 中盈优创资讯科技有限公司 The generation method and device of network cutover script
CN110457064B (en) * 2019-07-16 2023-05-30 中盈优创资讯科技有限公司 Method and device for generating network cutover script
CN115129579A (en) * 2021-03-26 2022-09-30 阿里巴巴新加坡控股有限公司 Data auditing method and device based on data cutover

Also Published As

Publication number Publication date
CN100571304C (en) 2009-12-16

Similar Documents

Publication Publication Date Title
CN1276636C (en) Method and equipment for executing common calling management by common software platform
CN1913559A (en) Method and system of data service
CN1901464A (en) Automatic configurating method for EPON net element device
CN1731878A (en) Method for carrying out protection on user information in mobile terminal
CN109614106A (en) A kind of C++ program compiling method and device
CN1083193C (en) Data storage device
CN101047896A (en) Value-added service allocation method and value-added service system based on package
CN1158812C (en) Method and system for network domain management
CN1889462A (en) Method and system for realizing network management and network element configuration operation
CN1946035A (en) Method for managing net element data configuration and net element
CN1290101A (en) Automatic protocol test system and its test method
CN1306755C (en) Service testing device and method
CN1145317C (en) Method for realizing business phonetic dynamic loading in intelligent network and system network establishment
CN1300979C (en) Fully dynamic distributed network service management system and service method thereof
CN1235151C (en) Method of control system safety management
CN1859463A (en) Analogue realizing method and its system for calling center artificial seat resource
CN101060679A (en) Event insertion method
CN1516503A (en) Method for limiting illegal mobile telephone
CN1808993A (en) Communication network management and processing system and method
CN1968127A (en) Method for multi-objective configuration in telecommunication network system
CN100337440C (en) Method and system for testing intercommunity between equipments
CN111367647A (en) Task assignment method and device
CN1976377A (en) Method for realizing intelligent business flexible trigger in soft exchange system
CN1297096C (en) Method for selective and collective transmission of messages in TMA network
CN107820222B (en) Method and device for managing multiple tenants

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091216

Termination date: 20170830