CN1909473A - Method for realizing integrated composite network information managing system based on geography information - Google Patents
Method for realizing integrated composite network information managing system based on geography information Download PDFInfo
- Publication number
- CN1909473A CN1909473A CN 200610030334 CN200610030334A CN1909473A CN 1909473 A CN1909473 A CN 1909473A CN 200610030334 CN200610030334 CN 200610030334 CN 200610030334 A CN200610030334 A CN 200610030334A CN 1909473 A CN1909473 A CN 1909473A
- Authority
- CN
- China
- Prior art keywords
- information
- data
- network
- layer
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention relates to a method for realizing integrated network information managing system, based on geological information, wherein it comprises: distributing space coordinate information for different devices and terminal users, and recording the space coordinates and the devices and terminal user information, into the data memory layer; supporting the laminated management on the edit, display, document conversion and image of kinds of vector data documents, to build one unique data collecting layer, data memory layer and data processing layer; using web services processing technique, to publish, distribute information, and manage user. The invention can combine the integrated information of network and the spatial geological coordinate, to mage, detect, distribute resource and evaluate property on the different devices, access user and environments.
Description
Technical field
What the present invention relates to is a kind of method of communication technical field, specifically is a kind of implementation method of the integrated integrated network information management system based on geography information.
Background technology
Along with the develop rapidly of modern network, teledata net, fiber optic communication network and the fusion of computer network and the update of correlation technique especially at present, network management system has become requisite management tool in the network operation and the maintenance.The basic function of network management is meant the use of planning, monitoring, Control Network resource and the comings and goings of network, so that the performance of network reaches optimum.For strengthening the function of network management, in network management system, need the information of various aspects such as transmission route in network of the operating position of network topology state, network equipment running status, equipment and user's geographical distribution state, equipment and link circuit resource, data, communication service quantitative statistics, various performance index (as packet loss, time-delay) analysis be managed and control.
In network management, because the device type complexity that relates to is various, the device distribution zone is wide, and the equipment of zones of different and user's distribution density difference is bigger, and requires to differ totally different for function, the network bandwidth, network bandwidth utilance, the network service quality of zones of different network.Therefore, how realizing effectively information such as the node in isomery equipment and the network in the network, link, bandwidth are unified integrated management, and adopt directly perceived, lively interface to be shown, is the matter of utmost importance that present network management system need solve.Geography information is the key factor in the network information management, network topology itself exists association with the geographical position, equipment in the network has geography information as monitored target on the one hand, needs to carry out according to geography information intuitively operations such as scheduling decision on the other hand when management.Therefore, design a kind of new method,, realize that incorporate, service-oriented, novel integrated network information management system is very necessary based on geography information.
Find by prior art documents, (Venkatesan Krishnamoorthy such as Venkatesan Krishnamoorthy, Naveen Krishnan Unni, and V.Niranjan.2005. " Event-Driven service oriented architecture for an agile and scalablenetwork management system " .In Proceedings of the first InternationalConference of Next Generation Web Services Practices.Seoul, Korea, August 2005.) in the network management system framework of the SOA that proposes, as driving, realize that the method that growing complex network information is managed has good reusability with event in the network by cooperation mutually between the assembly of a plurality of loose couplings, integration, autgmentability and fail safe.But this method is not considered the geographical distribution of management object and the space dependence between the management object, and it can't describe the locus of each management object, also can't describe the correlation between each management object.Therefore, it can't realize that client layer and service ATM layer relationsATM describe, also can't the location, implementation space, space querying and spatial statistics.
Summary of the invention
The objective of the invention is to overcome deficiency of the prior art, a kind of implementation method of the integrated integrated network information management system based on geography information is provided.It is described each management object with its distinctive space coordinates, describe the client and the service relation of the spatial distribution and the different levels management object of management object by the spatial relation of each object, make simultaneously that the form of expression at interface is more directly perceived, true and lively.
The present invention is achieved through the following technical solutions: the present invention includes following concrete steps:
(1) gives space coordinates information for the equipment of various isomery types and terminal use, based on GIS-Geographic Information System, by unified space coordinates, dissimilar equipment and user are associated in the uniform platform, realize the network equipment and terminal use's attribute information and data association, data-storing and data retrieval between the spatial geographic information, with space identification symbol and the equipment that is positioned at this spatial object and the unified data storage layer that is recorded in of information of terminal user sign of spatial object;
(2) support the multi-zone supervision of editor, demonstration, file conversion and the figure of multiple vector data file (as DXF, SHP etc.), each spatial object (as building, road, access sub-district etc.) has a unique space identification symbol, and each network equipment and terminal use are positioned among the specific spatial object;
(3) based on geography information, make up a unified data management platform, make the isolated data of these isomeries can realize association better, form data collection layer, data storage layer and data analysis layer institutional framework;
Data collection layer mainly finish with network in the equipment real-time data acquisition relevant with the link running status, and to guarantee the integrality of data.Data collection layer communicates by standard snmp protocol or Proprietary MIB protocol mode with each object in the managed object layer, thus the data of obtaining.More than two kinds of modes of obtaining data in same system, can adopt simultaneously according to actual conditions, demonstrate fully its superiority and flexibility.
Described data storage layer is mainly finished the storage to network system data, these data had both comprised network element device information data, equipment running status information, equipment geography information, geography and the device association data etc. that obtain from data collection layer and communicating by letter of managed object, also comprise the required information that self defines and store in the database, for example: the periodic statistics of link utilization, network equipment load data by system.
Described data storage layer is wherein being stored all information in the whole network management, realizes status monitoring, management controlled function to network by the various manipulations to these information, and data storage layer communicates with data collection layer by the JDBC interface.
Described geographic information data is a vector data of representing to comprise basic topographic(al) features such as road, settlement place, floor unit with the irregular geometric figures form corresponding with geographical concrete graphic.GIS-Geographic Information System and network information system shared data.
Described data analysis layer is mainly finished storing data computing, inquiry, renewal processing etc. in the database according to tension management and control.Data analysis layer receives the expression key-course by inquiry and control request that its interface sends, and data Layer is conducted interviews and makes amendment, and realizes the read-write operation to permanent data store.Here the data analysis layer of being done that operates in carries out, and after operation is finished, turns to data storage layer to store by the JDBC interface.
(4) adopt web services processing method, the issue of realization information, information configuration and user management comprise: to equipment and the network configuration related with geography information; Check the network failure alarm, network performance, all kinds statistical report that are associated with network topological information, geographical topology information; According to network state Network Transmission is controlled scheduling.In addition, by security control and authentication, the user can remove or delete alarm, add operations such as geography information and device association information from database.
Under unified geographical information management framework, as driving, realize the growing large amount of complex network information is managed by cooperation mutually between the assembly of a plurality of loose couplings with event in the network.The fail safe that this method not only has reusability, integration, an autgmentability and strengthened, and more closely combine the network equipment of being managed, the geography information that network connects.Making the division of whole network management system by geography information provides multi-level management mode, for user's use provides expression and abundanter information more intuitively, can more reasonably manage decision-making.
The present invention with the integrated information of network (comprise optical fiber link in network element device information, network element device running state information, equipment geography information, user profile, fault warning information, the optical-fiber network road construction, tear road information, link bandwidth information, link utilization information etc. open) be associated together with corresponding space and geographical coordinate information, can realize dissimilar equipment, insert unified management, monitoring, scheduling of resource and the Performance Evaluation of user and surrounding enviroment information.
Embodiment
Below in conjunction with concrete implementation process the solution of the present invention is described in further detail.
The implementation of present embodiment is as follows:
1) when the network equipment, terminal use, the service link that will monitor and manage being carried out the initial parameter configuration, disposes its space and geographical coordinate simultaneously,, the network equipment, terminal use, service link can be associated with corresponding spatial object according to this coordinate.This method can improve the degree of automation configuration effectively.
2) regularly the network equipment, terminal use, the service link of being managed carried out data acquisition and information detection, the relevant entry in the automatic more new database by data collection layer.By adopting notification service, on the web page, realize the real-time release and the demonstration of correlation behavior information based on GIS-Geographic Information System.When the network equipment in needs are inquired about certain regional extent, terminal use, service link information, can be by space index and space querying technology in the GIS-Geographic Information System, retrieve apace and the orientation management object, identifier according to spatial object is submitted inquiry to data Layer, and Query Result is being shown in two dimension or the three-dimensional geographic information intuitively.This method can improve the inquiry and the update efficiency of system effectively, and make the demonstration of system results more lively, true and concrete.
3) in being provided with of warning information, defined multiple detailed alarm event.Alarm event can be by send Email, record in the journal file, carry out external program, send alarm sound etc. responds alarm event.When system receives fault warning, can check the spatial object that it is associated according to the network equipment that breaks down, and further can check the network condition of its geographic location periphery.This method can improve the fault location ability of system effectively, and system maintenance management personnel's maintenance is had great help.
4) according to the state and the service distribution situation of network, system can manually or automatically dispatch system resource.Based on geographic information system technology, we can be on a uniform platform marking equipment, user and professional distribution and resource operating position, and, realize local and overall scheduling of resource according to the information that is obtained.This can't realize in the past based on the network management system of equipment.
It is isolated mutually to have overcome in the past in the management system equipment, user and business information based on the implementation method of the integrated integrated network information management system of geography information, can't carry out the defective of unified management and scheduling, it adopts unified geography information coordinate, has realized unified supervision, management and the cooperative scheduling of dissimilar resources.Based on GIS-Geographic Information System and interface display technology web server technology, strengthened the intuitive and the vividness of system monitoring, also can more effectively realize information inquiry and fault location simultaneously.
Claims (7)
1, a kind of implementation method of the integrated integrated network information management system based on geography information is characterized in that, comprises following concrete steps:
(1) gives space coordinates information for the equipment of various isomery types and terminal use, based on GIS-Geographic Information System, by unified space coordinates, dissimilar equipment and user are associated in the uniform platform, realize the network equipment and terminal use's attribute information and data association, data-storing and data retrieval between the spatial geographic information, with space identification symbol and the equipment that is positioned at this spatial object and the unified data storage layer that is recorded in of information of terminal user sign of spatial object;
(2) multi-zone supervision of editor, demonstration, file conversion and the figure of the multiple vector data file of support, each spatial object have a unique space identification symbol, and each network equipment and terminal use are positioned among the specific spatial object;
(3) based on geography information, make up a unified data management platform, form data collection layer, data storage layer and data analysis layer institutional framework;
(4) adopt web services processing method, the issue of realization information, information configuration and user management comprise: to equipment and the network configuration related with geography information; Check the network failure alarm, network performance, all kinds statistical report that are associated with network topological information, geographical topology information; According to network state Network Transmission is controlled scheduling; By security control and authentication, the user can remove or delete alarm, add geography information and device association information operating from database.
2, the implementation method of the integrated integrated network information management system based on geography information according to claim 1, it is characterized in that, in step (3), described data collection layer finish with network in the equipment real-time data acquisition relevant with the link running status, and to guarantee the integrality of data, data collection layer communicates by standard snmp protocol or Proprietary MIB protocol mode with each object in the managed object layer, thus the data of obtaining.
3, the implementation method of the integrated integrated network information management system based on geography information according to claim 1, it is characterized in that, in step (3), described data storage layer is finished the storage to network system data, these data had both comprised network element device information data, equipment running status information, equipment geography information, geography and the device association data that obtain from data collection layer and communicating by letter of managed object, and self defined and store into the periodic statistics of link utilization in the database, the information of network equipment load data by system is required.
4, the implementation method of the integrated integrated network information management system based on geography information according to claim 1, it is characterized in that, in step (3), described data storage layer, wherein storing all information in the whole network management, realize status monitoring, management controlled function to network by the various manipulations to these information, data storage layer communicates with data collection layer by the JDBC interface.
5, the implementation method of the integrated integrated network information management system based on geography information according to claim 1, it is characterized in that, in step (3), described geographic information data is a vector data of representing to comprise basic topographic(al) features such as road, settlement place, floor unit with the irregular geometric figures form corresponding with geographical concrete graphic.
6, the implementation method of the integrated integrated network information management system based on geography information according to claim 1, it is characterized in that, in step (3), described data analysis layer is finished storing data computing, inquiry, renewal processing in the database according to tension management and control; Data analysis layer receives the expression key-course by inquiry and control request that its interface sends, and data Layer is conducted interviews and makes amendment, and realizes the read-write operation to permanent data store.
7, the implementation method of the integrated integrated network information management system based on geography information according to claim 6, it is characterized in that described operation is carried out at data analysis layer, after operation is finished, turn to data storage layer to store by the JDBC interface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610030334 CN1909473A (en) | 2006-08-24 | 2006-08-24 | Method for realizing integrated composite network information managing system based on geography information |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610030334 CN1909473A (en) | 2006-08-24 | 2006-08-24 | Method for realizing integrated composite network information managing system based on geography information |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1909473A true CN1909473A (en) | 2007-02-07 |
Family
ID=37700468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610030334 Pending CN1909473A (en) | 2006-08-24 | 2006-08-24 | Method for realizing integrated composite network information managing system based on geography information |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1909473A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101419594B (en) * | 2007-10-26 | 2010-08-11 | 上海宝信软件股份有限公司 | GIS map primitive control device |
CN101924773A (en) * | 2010-08-31 | 2010-12-22 | 广州杰赛科技股份有限公司 | Geography informatization management method of cable modem |
WO2011029244A1 (en) * | 2009-09-11 | 2011-03-17 | 中兴通讯股份有限公司 | Method and device for managing association of network resources |
CN102012932A (en) * | 2010-12-01 | 2011-04-13 | 北京建筑工程学院 | Method and device for storing and retrieving measurable streetscape images |
CN101459614B (en) * | 2008-12-24 | 2012-02-22 | 腾讯科技(深圳)有限公司 | Method, system and equipment for network data transmission |
CN102394777A (en) * | 2011-11-04 | 2012-03-28 | 迈普通信技术股份有限公司 | Network management method and system based on geographical position information |
CN102902745A (en) * | 2012-09-17 | 2013-01-30 | 国家基础地理信息中心 | Web service integration method of geographic information |
CN103095504A (en) * | 2013-01-25 | 2013-05-08 | 山东广电网络有限公司济南分公司 | Management system of wired network basic resources |
CN103235867A (en) * | 2013-05-16 | 2013-08-07 | 浪潮通信信息系统有限公司 | Intelligent building distribution network designing method |
CN103580916A (en) * | 2013-09-29 | 2014-02-12 | 苏州中联互通信息科技有限公司 | Network information management method |
CN106100875A (en) * | 2016-06-02 | 2016-11-09 | 浪潮集团有限公司 | NMS based on GIS-Geographic Information System and network management |
CN111431762A (en) * | 2020-03-17 | 2020-07-17 | 中国人民解放军国防科技大学 | Wireless network state monitoring and displaying system |
CN116760768A (en) * | 2023-08-21 | 2023-09-15 | 山东东方智光网络通信有限公司 | Method and system for realizing route inquiry bottom layer |
-
2006
- 2006-08-24 CN CN 200610030334 patent/CN1909473A/en active Pending
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101419594B (en) * | 2007-10-26 | 2010-08-11 | 上海宝信软件股份有限公司 | GIS map primitive control device |
CN101459614B (en) * | 2008-12-24 | 2012-02-22 | 腾讯科技(深圳)有限公司 | Method, system and equipment for network data transmission |
WO2011029244A1 (en) * | 2009-09-11 | 2011-03-17 | 中兴通讯股份有限公司 | Method and device for managing association of network resources |
CN101924773A (en) * | 2010-08-31 | 2010-12-22 | 广州杰赛科技股份有限公司 | Geography informatization management method of cable modem |
CN102012932A (en) * | 2010-12-01 | 2011-04-13 | 北京建筑工程学院 | Method and device for storing and retrieving measurable streetscape images |
CN102012932B (en) * | 2010-12-01 | 2012-12-12 | 北京建筑工程学院 | Method and device for storing and retrieving measurable streetscape images |
CN102394777A (en) * | 2011-11-04 | 2012-03-28 | 迈普通信技术股份有限公司 | Network management method and system based on geographical position information |
CN102902745B (en) * | 2012-09-17 | 2015-09-16 | 国家基础地理信息中心 | A kind of web service integration method of geographic information |
CN102902745A (en) * | 2012-09-17 | 2013-01-30 | 国家基础地理信息中心 | Web service integration method of geographic information |
CN103095504A (en) * | 2013-01-25 | 2013-05-08 | 山东广电网络有限公司济南分公司 | Management system of wired network basic resources |
CN103095504B (en) * | 2013-01-25 | 2016-03-02 | 山东广电网络有限公司济南分公司 | A kind of wired network infrastructure resource management system |
CN103235867A (en) * | 2013-05-16 | 2013-08-07 | 浪潮通信信息系统有限公司 | Intelligent building distribution network designing method |
CN103580916A (en) * | 2013-09-29 | 2014-02-12 | 苏州中联互通信息科技有限公司 | Network information management method |
CN106100875A (en) * | 2016-06-02 | 2016-11-09 | 浪潮集团有限公司 | NMS based on GIS-Geographic Information System and network management |
CN111431762A (en) * | 2020-03-17 | 2020-07-17 | 中国人民解放军国防科技大学 | Wireless network state monitoring and displaying system |
CN111431762B (en) * | 2020-03-17 | 2021-06-22 | 中国人民解放军国防科技大学 | Wireless network state monitoring and displaying system |
CN116760768A (en) * | 2023-08-21 | 2023-09-15 | 山东东方智光网络通信有限公司 | Method and system for realizing route inquiry bottom layer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1909473A (en) | Method for realizing integrated composite network information managing system based on geography information | |
CN103348328B (en) | For monitoring and manage the system and method for data center resource in real time | |
CN105407159B (en) | Logistics transportation position service system | |
CN109784508A (en) | A kind of power grid panorama monitoring operation management method and system based on cloud platform | |
CN106533782A (en) | Method and system for discovering service faults of offline places in real time | |
KR101059061B1 (en) | Facility Integration System and Method for Smart Grid | |
CN103329063A (en) | System and method for monitoring and managing data center resources in real time | |
CN103477326A (en) | Infrastructure control fabric system and method | |
CN107958337A (en) | A kind of information resources visualize mobile management system | |
CN107294764A (en) | Intelligent supervision method and intelligent monitoring system | |
US20060123022A1 (en) | Automated application discovery and analysis system and method | |
CN103329109A (en) | System and method for monitoring and managing data center resources in real time incorporating manageability subsystem | |
CN105282772A (en) | Wireless network data communication equipment monitoring system and equipment monitoring method | |
CN109889358B (en) | 3D visual IT monitoring management system | |
CN110413485A (en) | A kind of one-stop Networked Control and Management System and method for based on Zabbix Open Source Platform | |
CN113179173A (en) | Operation and maintenance monitoring system for highway system | |
CN107609987A (en) | A kind of intelligent power transformation operational system of equipment oriented owner | |
CN104951889A (en) | Monitoring and managing system for data center | |
CN104637265A (en) | Dispatch-automated multilevel integration intelligent watching alarming system | |
CN109302308A (en) | A kind of data center IDC resource management system and management method | |
CN115375172A (en) | BIM-based intelligent operation and maintenance method and system | |
CN115499286A (en) | Hierarchical management system for industrial control network assets | |
CN109800133A (en) | A kind of method, one-stop monitoring alarm platform and the system of unified monitoring alarm | |
CN113888126A (en) | Oil gas pipeline inspection management system | |
CN111082987B (en) | Ubiquitous power Internet of things-oriented wiring network operation and maintenance system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |