CN109302308A - A kind of data center IDC resource management system and management method - Google Patents

A kind of data center IDC resource management system and management method Download PDF

Info

Publication number
CN109302308A
CN109302308A CN201810968944.6A CN201810968944A CN109302308A CN 109302308 A CN109302308 A CN 109302308A CN 201810968944 A CN201810968944 A CN 201810968944A CN 109302308 A CN109302308 A CN 109302308A
Authority
CN
China
Prior art keywords
equipment
management module
seat
plane
resource
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810968944.6A
Other languages
Chinese (zh)
Inventor
李海霞
安海宇
薛成林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qinhuai Data Co ltd
Original Assignee
Xiamen Qinhuai Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Qinhuai Technology Co Ltd filed Critical Xiamen Qinhuai Technology Co Ltd
Priority to CN201810968944.6A priority Critical patent/CN109302308A/en
Publication of CN109302308A publication Critical patent/CN109302308A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/02Standardisation; Integration
    • H04L41/0246Exchanging or transporting network management information using the Internet; Embedding network management web servers in network elements; Web-services-based protocols
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/50Network service management, e.g. ensuring proper service fulfilment according to agreements
    • H04L41/5061Network service management, e.g. ensuring proper service fulfilment according to agreements characterised by the interaction between service providers and their network customers, e.g. customer relationship management
    • H04L41/5074Handling of user complaints or trouble tickets
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/04Processing captured monitoring data, e.g. for logfile generation
    • H04L43/045Processing captured monitoring data, e.g. for logfile generation for graphical visualisation of monitoring data
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0817Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking functioning
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/10Network architectures or network communication protocols for network security for controlling access to devices or network resources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Mining & Analysis (AREA)
  • Business, Economics & Management (AREA)
  • General Business, Economics & Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer And Data Communications (AREA)

Abstract

The invention discloses a kind of data center IDC resource management system and management methods.The system comprises: presentation layer, management level and acquisition layer;The management level include: the data management module for storing and managing the resource service condition of the multiple IDC, for after the work order received, the scheduler module for meeting the target resource of the work order demand is searched from the data management module, the data management module is also used to be updated the resource service condition of the target resource.In this way, electronic management is carried out to work order by scheduler module, by the update of various resources in work order triggering system, to realize the purpose being managed to the multidate information generated during IDC overall operation.

Description

A kind of data center IDC resource management system and management method
Technical field
The present invention relates to information technology field more particularly to a kind of data center IDC resource management system and management methods.
Background technique
Internet data center (Internet Data Center, IDC) is to be received based on Internet network for centralization Collection, storage, processing and the equipment for sending data provide the facility base of operation and maintenance and provide relevant service.What IDC was provided Main business include application domain name, hosting, fictitious host computer hire out, system maintenance and other support, operation services etc..
For business caused by the management daily operation of IDC, IDC management system is come into being.IDC management in the prior art System has plenty of traditional webmastering software, has plenty of comprehensive O&M business external member, and functional module is relatively single, can only generally manage Manage IDC resource essential information.However, can also be related to scheduling of resource, monitoring resource information in the entire operation of IDC The multidate informations such as variation, resource alarm.Existing IDC management system, which cannot achieve, is managed various multidate informations.
Based on this, a kind of data center IDC resource management system is needed at present, to realize the whole Resources Operation to IDC Multidate information involved by process is managed.
Summary of the invention
The embodiment of the present invention provides a kind of data center IDC resource management system and management method, to realize to the whole of IDC Multidate information involved by body Resources Operation process is managed.
The embodiment of the present invention provides a kind of data center IDC resource management system, the system comprises: visit is provided for user Ask the presentation layer of platform, the content providing business logic shown by the presentation layer support management level, be the management level The acquisition layer of architecture is provided;The system is for managing the multiple IDC connecting with the system;The management level include:
Data management module, for storing and managing the resource service condition of the multiple IDC;
Scheduler module, for after the work order received, lookup to meet the work order and needs from the data management module The target resource asked;
The data management module is also used to be updated the resource service condition of the target resource.
In this way, carrying out electronic management to work order by scheduler module, more by various resources in work order triggering system Newly, to realize the purpose being managed to the multidate information generated in IDC operation.Compared with the prior art, of the invention Embodiment realize IDC resource-related data from open, restocking, preemption, use, undercarriage recycle service dynamic life cycle pipe Reason;Further, the embodiment of the present invention can be realized the fusion pipe end to end of Life cycle during IDC overall operation Reason enables to on-line off-line data to keep relevance, avoids the occurrence of the inconsistent situation of on-line off-line data.
In one possible implementation, the resource service condition of each IDC includes the supply of each IDC The information provision of multiple seats in the plane in information and each IDC;
The work order is used to indicate client requirement information;
The scheduler module, for according to the institute stored in the client requirement information and the data management module The resource service condition for stating each IDC determines at least one target seat in the plane in the Target id C and Target id C;
The scheduler module, is also used to send the first instruction to the data management module, and first instruction is used for institute Data management module is stated to be updated the resource service condition of at least one target seat in the plane;
The data management module is specifically used for:
After receiving the first instruction that the scheduler module is sent, each target seat in the plane is labeled as first identifier, it is described First identifier is for indicating that the target seat in the plane is predetermined state.
In the embodiment of the present invention, client requirement information can be managed by scheduler module, so as to rapidly The demand of customer in response;Further, can according to the data provided on Client line in real time to the target resource in system into Row updates, and guarantees that the information in IDC resource management system is consistent with the actual conditions of client.
In one possible implementation, the work order is used to indicate to the mark of restocking equipment and described to upper erection The standby seat in the plane placed;
The scheduler module is specifically used for:
The second instruction is sent to the data management module, second instruction is used to indicate the data management module pair The resource service condition of the seat in the plane placed to restocking equipment is updated;
The data management module is specifically used for:
After receiving the second instruction that the scheduler module is sent, the seat in the plane placed to restocking equipment is labeled as Second identifier, and establish the mark and the corresponding relationship of the seat in the plane placed to restocking equipment to restocking equipment;Institute Second identifier is stated for indicating that the seat in the plane placed to restocking equipment is occupied state.
In one possible implementation, the work order is used to indicate the mark to undercarriage equipment;
The scheduler module is specifically used for:
According to the mark to undercarriage equipment, the mark of equipment and pair of seat in the plane are searched from the data management module It should be related to, determine the seat in the plane placed to undercarriage equipment;And third instruction is sent to the data management module, it is described Third instruction be used to indicate the data management module to the resource service condition of the seat in the plane placed to undercarriage equipment into Row updates;
The data management module is specifically used for:
After receiving the third instruction that the scheduler module is sent, the seat in the plane placed to undercarriage equipment is labeled as Third mark, and delete the mark and the corresponding relationship of the seat in the plane placed to undercarriage equipment to undercarriage equipment;Institute Third mark is stated for indicating that the seat in the plane placed to undercarriage equipment is idle state.
In the embodiment of the present invention, it can be managed by process of the scheduler module to equipment restocking or equipment undercarriage, from And can rapidly corresponding information in more new system, guarantee the reality in the information in IDC resource management system and the IDC under line Border situation is consistent.
In one possible implementation, the management level further include operation management module, are put for storing and managing It is placed in the operating condition of the multiple equipment in the multiple IDC;
The operation management module, is also used to:
Receive the O&M message that mobile terminal is sent, the O&M message includes to the mark of to maintain equipment and described wait tie up Equipment is protected in the O&M information at the first moment;And according to the O&M information to maintain equipment at the first moment, to it is described to The operating condition of to maintain equipment is updated.
In one possible implementation, the operation management module, is also used to:
It is described after to maintain equipment failure determining, work order is generated, the work order includes described to maintain equipment Mark;And the work order is sent to the scheduler module;
The scheduler module is specifically used for:
According to the work order include described in mark to maintain equipment, equipment is searched from the data management module The corresponding relationship of mark and seat in the plane determines the corresponding seat in the plane to be safeguarded of mark to maintain equipment;And to the data Management module sends the 4th instruction, and the 4th instruction is used to indicate the data management module and searches the seat in the plane pair to be safeguarded The responsible person answered;
The data management module is specifically used for:
After receiving the 4th instruction that the scheduler module is sent, the corresponding responsible person in the seat in the plane to be safeguarded is searched, with Safeguard the responsible person to maintain equipment to described.
In the embodiment of the present invention, once equipment breaks down, IDC resource management system can be notified in time with quick response Relevant person in charge is safeguarded, so that relevant manufacturers, client understand the operating condition of equipment in time.
In one possible implementation, the management level further include analysis module, are used for from the operation management mould The operating condition of the multiple equipment is obtained in block, and the multiple equipment is carried out according to the operating condition of the multiple equipment Analysis.
In one possible implementation, the analysis module is also used to:
The resource service condition of the multiple IDC is obtained from the data management module, and according to the multiple IDC's Resource service condition is analyzed the multiple IDC's.
So, on the one hand, from the point of view of client visual angle, analysis module can provide resource information for each client, resource makes It is shown with the Client view of the various dimensions such as rate;On the other hand, and from the point of view of internal resource management angle, analysis module can be pipe The functions such as reconciliation management, capacity management, Energy Efficiency Analysis, specialist paper that reason person provides, thus both convenient for for understanding IDC at any time Much information included in resource management system, but convenient for manager it is more convenient, efficiently to IDC resource management system into Row management.
In one possible implementation, the management level further include visualization model, for determining the management level The corresponding display form of the information stored in middle modules, so that the presentation layer is described each according to display form displaying The information stored in a module.
In this way, visualization model can provide two dimension, the visualization of comprehensive resource of three-dimensional, large-size screen monitors, mobile phone terminal is uniformly in It is existing, all kinds of resources are inquired automatically, and provide customer self-service query function, so as to promote business service level, improve client Satisfaction effectively supports IDC signing efficiency;Further, it can be realized visualization resource management, promote customer service experience, Power-assisted IDC business increases.
In one possible implementation, the acquisition layer includes the network interface for connecting third party system, institute Third party system is stated for providing corresponding information for modules in the management level.
In one possible implementation, the third party system includes ERP system, note system, network flow prison At least one of in control system, information technoloy equipment monitoring system.
In one possible implementation, the acquisition layer includes the network interface for connecting internal platform.
In one possible implementation, described for connect the network interface of internal platform to include following at least one :
Notice bulletin interface, flow engine interface, Report Engine interface, log management interface, claim management interface.
In this way, acquisition layer can be by the above-mentioned network interface for connecting third party system and for connecting internal put down The network interface of platform, under the benchmark of various network protocols, acquisition infrastructure resources, physical resource, platform resource, virtual money The multiple resources such as source, application resource, data resource.Further, acquisition layer can also carry out Resource Modeling, logic association etc. just Beginning chemical industry is made, so as to the running of entire IDC resource management system.
The embodiment of the present invention provides a kind of data center IDC method for managing resource, and the method is applied to described above System, which comprises
Scheduler module searches the target money for meeting the work order demand after receiving work order from data management module Source;The data management module is stored with the resource service condition of the multiple IDC;
The target resource that the data management module is determined according to the scheduler module, makes the resource of the target resource It is updated with situation.
In this way, carrying out electronic management to work order by scheduler module, more by various resources in work order triggering system Newly, to realize the purpose being managed to the multidate information generated in IDC operation.Compared with the prior art, of the invention Embodiment realize IDC resource-related data from open, restocking, preemption, use, undercarriage recycle service dynamic life cycle pipe Reason;Further, the embodiment of the present invention can be realized the fusion pipe end to end of Life cycle during IDC overall operation Reason enables to on-line off-line data to keep relevance, avoids the occurrence of the inconsistent situation of on-line off-line data.
In one possible implementation, the scheduler module is looked into from data management module after receiving work order Look for the target resource for meeting the work order demand, comprising:
The scheduler module receives the first work order that client is sent, and first work order includes client requirement information;
The scheduler module is according to each IDC stored in the client requirement information and the data management module Resource service condition, determine at least one target seat in the plane in the Target id C and Target id C;
The scheduler module sends the first instruction to the data management module, and first instruction includes described at least one A target seat in the plane;
The data management module is updated the resource service condition of the target resource, comprising:
After the data management module receives the first instruction that the scheduler module is sent, each target seat in the plane is marked For first identifier, the first identifier is for indicating that the target seat in the plane is predetermined state.
In the embodiment of the present invention, client requirement information can be managed by scheduler module, so as to rapidly The demand of customer in response;Further, can according to the data provided on Client line in real time to the target resource in system into Row updates, and guarantees that the information in IDC resource management system is consistent with the actual conditions of client.
In one possible implementation, the scheduler module is looked into from data management module after receiving work order Look for the target resource for meeting the work order demand, comprising:
The scheduler module receives the second work order that client is sent, and second work order includes the mark to restocking equipment With the seat in the plane placed to restocking equipment;
The scheduler module sends the second instruction to the data management module, and second instruction includes described to restocking The mark of equipment and the seat in the plane placed to restocking equipment;
The data management module is updated the resource service condition of the target resource, comprising:
It, will be described to restocking equipment institute after the data management module receives the second instruction that the scheduler module is sent The seat in the plane of placement is labeled as second identifier, and establishes the mark to restocking equipment and the machine placed to restocking equipment The corresponding relationship of position;The second identifier is used to indicate that the seat in the plane placed to restocking equipment to be occupied state.
In one possible implementation, the scheduler module is looked into from data management module after receiving work order Look for the target resource for meeting the work order demand, comprising:
The scheduler module receives the third work order that client is sent, and the third work order includes the mark to undercarriage equipment Know;
The scheduler module searches the mark of equipment according to the mark to undercarriage equipment from the data management module Know the corresponding relationship with seat in the plane, determines the seat in the plane placed to undercarriage equipment;
The scheduler module sends third instruction to the data management module, and the third instruction includes described to undercarriage The seat in the plane that equipment is placed;
The data management module is updated the resource service condition of the target resource, comprising:
It, will be described to undercarriage equipment institute after the data management module receives the third instruction that the scheduler module is sent The seat in the plane of placement is identified labeled as third, and deletes the mark to undercarriage equipment and the machine placed to undercarriage equipment The corresponding relationship of position;The third mark is for indicating that the seat in the plane placed to undercarriage equipment is idle state.
In the embodiment of the present invention, it can be managed by process of the scheduler module to equipment restocking or equipment undercarriage, from And can rapidly corresponding information in more new system, guarantee the reality in the information in IDC resource management system and the IDC under line Border situation is consistent.
In one possible implementation, the method also includes:
Operation management module obtains the operating condition of the multiple equipment in the multiple IDC, and to the multiple equipment Operating condition is stored;
The operation management module receives the O&M message that mobile terminal is sent, and the O&M message includes to maintain equipment Mark and it is described to maintain equipment the first moment O&M information;
The operation management module is searched and the mark to maintain equipment from the operating condition of the multiple equipment The corresponding operating condition to maintain equipment;
The operation management module according to it is described to maintain equipment in the O&M information at the first moment, set to described wait safeguard Standby operating condition is updated.
In one possible implementation, it after being updated to the operating condition to maintain equipment, also wraps It includes:
The operation management module is described after to maintain equipment failure in determination, the 4th work order of generation, and the described 4th Work order includes the mark to maintain equipment;
The operation management module sends the 4th work order to the scheduler module;
The scheduler module searches from the data management module after receiving work order and meets the work order demand Target resource, comprising:
After the scheduler module receives the 4th work order that the operation management module is sent, according to the 4th work order packet The mark to maintain equipment included searches the mark of equipment and the corresponding relationship of seat in the plane from the resource management module, Determine the corresponding seat in the plane to be safeguarded of mark to maintain equipment;
The scheduler module sends the 4th instruction to the data management module, and the 4th instruction includes described wait safeguard Seat in the plane;
The data management module is updated the resource service condition of the target resource, comprising:
After the data management module receives the 4th instruction that the scheduler module is sent, the seat in the plane to be safeguarded is searched Corresponding responsible person, so that the responsible person safeguards to described to maintain equipment.
In the embodiment of the present invention, once equipment breaks down, IDC resource management system can be notified in time with quick response Relevant person in charge is safeguarded, so that relevant manufacturers, client understand the operating condition of equipment in time.
The embodiment of the present application also provides a kind of device, which, which has, realizes data center IDC money as described above The function of power supply management method.The function can execute corresponding software realization by hardware, in a kind of possible design, the dress Set includes: processor, transceiver, memory;The memory is for storing computer executed instructions, and the transceiver is for realizing this Device is communicated with other communication entities, which is connect with the memory by the bus, when the apparatus is operative, should Processor executes the computer executed instructions of memory storage, so that the device executes data center as described above IDC method for managing resource.
The embodiment of the present invention also provides a kind of computer storage medium, stores software program in the storage medium, this is soft Part program realizes number described in above-mentioned various possible implementations when being read and executed by one or more processors According to center IDC method for managing resource.
The embodiment of the present invention also provides a kind of computer program product comprising instruction, when run on a computer, So that computer executes data center's IDC method for managing resource described in above-mentioned various possible implementations.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly introduced.
Fig. 1 is the schematic diagram for the system architecture that the embodiment of the present invention is applicable in;
Fig. 2 is a kind of schematic diagram of IDC resource management system provided in an embodiment of the present invention;
Fig. 3 is that the embodiment of the present invention also provides flow diagram corresponding to a kind of data center IDC method for managing resource;
Fig. 4 is one of flow diagram corresponding to IDC method for managing resource provided in an embodiment of the present invention;
Fig. 5 is two of flow diagram corresponding to IDC method for managing resource provided in an embodiment of the present invention;
Fig. 6 is three of flow diagram corresponding to IDC method for managing resource provided in an embodiment of the present invention;
Fig. 7 is four of flow diagram corresponding to IDC method for managing resource provided in an embodiment of the present invention.
Specific embodiment
The application is specifically described with reference to the accompanying drawings of the specification, the concrete operation method in embodiment of the method can also To be applied in Installation practice.
Fig. 1 illustrates the schematic diagram of the applicable system architecture of the embodiment of the present invention.As shown in Figure 1, the present invention is real Apply the applicable system 100 of example may include IDC resource management system 200, multiple IDC (such as IDC301 shown in Fig. 1, IDC302 and IDC303), client 400 and mobile terminal 500.Wherein, IDC resource management system 200 can be used for manage with IDC resource management system 200 connect multiple IDC, specifically, IDC resource management system 200 can by with each IDC Connection is established to be managed IDC, for example, IDC resource management system 200 shown in Fig. 1 can be connect with IDC301, it can also To be connect with IDC302, can also be connect with IDC303.
Further, IDC resource management system 200 can be attached by network and client 400, to realize visitor Interaction between family end and IDC resource management system;IDC resource management system 200 can also pass through network and mobile terminal 500 It is attached, to realize the interaction between mobile terminal and IDC resource management system.
Based on system architecture shown in FIG. 1, as shown in Fig. 2, being a kind of IDC resource management system provided in an embodiment of the present invention The schematic diagram of system.The IDC resource management system 200 may include acquisition layer 201, management level 202 and presentation layer 203.Wherein, it adopts Integrating layer 201 can be used for providing architecture as management level 202;In management level 202 can be used for being shown by presentation layer 203 Hold and service logic support is provided;Presentation layer 203 can be used for providing access platform, each user (operation maintenance personnel, IDC for user Business personnel, client, manager etc.) possess oneself access view (O&M service door, customer service portal, manager door Family, mobile terminal, technical support etc.), it can check the contents such as the resource view that may have access in personal authority, customer information, And it can be shown in client 400 and/or mobile terminal 500, so that operation maintenance personnel carries out order, processing work order etc. at any time Operation.
Specifically, acquisition layer 201 can be located at the bottom of the logical architecture of IDC resource management system 200, to realize Basic data is collected, analysis, is handled and associated IT infrastructure.
Acquisition layer 201 may include the network interface for connecting third party system.Wherein, for connecting third party system Network interface may include a plurality of types of interfaces, also may include JDBC for example, network interface may include IPMI interface Interface can also include Agent/API interface etc., specifically without limitation;Third party system can be used for being each in management level 202 A module provides corresponding information, and third party system can be a plurality of types of systems, for example, ERP system, note system, net Network flux monitoring system, information technoloy equipment monitoring system etc., specifically without limitation.
Further, acquisition layer 201 can also include the network interface for connecting internal platform, for example, for connecting The network interface of internal platform may include notice bulletin API, flow engine API, Report Engine API, log management API, power Item Administration API etc., specifically without limitation.
In this way, acquisition layer 201 can be by the above-mentioned network interface for connecting third party system and in connecting The network interface of portion's platform acquires infrastructure resources, physical resource, platform resource, void under the benchmark of various network protocols The multiple resources such as quasi- resource, application resource, data resource.Further, acquisition layer 201 can also carry out Resource Modeling, logic The initial works such as association, so as to the running of entire IDC resource management system.
Management level 202 may include data management module 2021, scheduler module 2022, operation management module 2023, analysis Module 2024 and visualization model 2025.
Wherein, data management module 2021 can be used for storing and managing the resource service condition of multiple IDC.Each IDC Resource service condition may include IDC business core resource and necessary resources corresponding with IDC core resource.For example, The resource service condition of IDC may include the resource service condition of the space resources such as computer room, rack, seat in the plane;Alternatively, the money of IDC Source service condition may include that the resource of the physical resources such as safety equipment, the network equipment, host equipment, storage equipment uses feelings Condition;Alternatively, the resource that the resource service condition of IDC may include the virtual resources such as IP address, bandwidth, storage, electric power uses feelings Condition;Alternatively, the resource service condition of IDC may include the resource of the building necessary resources such as water pump, fire-fighting, security protection, video, gate inhibition Service condition;Alternatively, the resource service condition of IDC may include the connection resources such as naked fibre, special line resource service condition and The resource service condition of the resource model configuration management on basis.
In this way, the IDC resource management system provided through the embodiment of the present invention, middle resource management is leaned on compared with the prior art Stage makes an inventory and audits, and for not having the manual management mode of closed loop in process, can be realized the resource service condition to IDC The problems such as being managed collectively, effectively avoiding loose layout, information island, low space resources average utilization, so as to whole National data center resource is closed, United Dispatching, promotes fine-grained management and efficient O&M is horizontal, and then is able to ascend resource management Efficiency reduces construction and operation cost.
Further, the resource service condition of IDC may include the information provision of each IDC.Wherein, the supply letter of IDC Breath may include the geographical location information of IDC, the line information of IDC, quantity of seat in the plane etc..It as shown in table 1, is the supply of IDC A kind of example of information.From table 1 it follows that the geographical location information of IDC1 is Beijing, line information is Netcom, in IDC1 The quantity of seat in the plane is 5;The geographical location information of IDC2 is Shanghai, and line information is telecommunications, and the quantity of seat in the plane is 10 in IDC2 It is a;The geographical location information of IDC3 is Guangzhou, and line information is telecommunications, and the quantity of seat in the plane is 20 in IDC3.
A kind of example of the information provision of table 1:IDC
IDC number Geographical location information Line information The quantity of seat in the plane
IDC1 Beijing Netcom 5
IDC2 Shanghai Telecommunications 10
IDC3 Guangzhou Telecommunications 20
Further, it is contemplated that multiple seats in the plane have can be set in each IDC, and the resource service condition of IDC can also include The information provision of multiple seats in the plane in each IDC.Wherein, the information provision of seat in the plane may include that the status information of seat in the plane, seat in the plane exist Location information etc. in IDC.It as shown in table 2, is a kind of example of the information provision of multiple seats in the plane in IDC1.It can be with from table 2 Find out, location information of the seat in the plane 1 in IDC arranges the 1st column for the 1st, and status information is occupied state;Position of the seat in the plane 2 in IDC Information arranges the 2nd column for the 1st, and status information is predetermined state;Location information of the seat in the plane 3 in IDC arranges the 1st column, state letter for the 2nd Breath is idle state;Location information of the seat in the plane 4 in IDC arranges the 2nd column for the 2nd, and status information is idle state;Seat in the plane 5 is in IDC In location information be the 2nd arrange the 3rd column, status information is idle state.
A kind of example of the information provision of seat in the plane in table 2:IDC1
The number of seat in the plane Status information Location information in IDC
Seat in the plane 1 It occupies 1st arranges the 1st column
Seat in the plane 2 It is predetermined 1st arranges the 2nd column
Seat in the plane 3 It is idle 2nd arranges the 1st column
Seat in the plane 4 It is idle 2nd arranges the 2nd column
Seat in the plane 5 It is idle 2nd arranges the 3rd column
Scheduler module 2022 can be used for after the work order received, searches from data management module 2021 and meets work order The target resource of demand.In turn, data management module 2021 can be also used for carrying out more the resource service condition of target resource Newly.
Further, scheduler module 2022 can realize the scheduling operation to multiple IDC in a manner of work order automatic trigger, can To be related to purchasing the resources such as IP Ji Jia bandwidth from suppliers and be put in storage, resource distribution, multiple data centers resource-sharing, and By workform management system carry out line on open, restocking, preemption, use, undercarriage, recycling service dynamic Life cycle stream The function of many aspects such as thread management.
In this way, carrying out electronic management to work order by scheduler module 2022, pass through various resources in work order triggering system Update, to realize the purpose that is managed to the multidate information generated in IDC operation.Compared with the prior art, originally Inventive embodiments realize IDC resource-related data from open, restocking, preemption, use, undercarriage recycle service dynamic Life Cycle Period management;Further, the embodiment of the present invention can be realized providing slave client to IDC for Life cycle in IDC operation The fusion management at source control end enables to on-line off-line data to keep relevance, avoids the occurrence of on-line off-line data not Unanimous circumstances.
In the embodiment of the present invention, if scheduler module 2022 receives different work orders, the target resource found Difference, in turn, the content that data management module 2021 is updated are also different.For example, it according to the source of work order, can will adjust The work order that degree module 2022 receives is divided into external work order and internal work order.Wherein, external work order can refer to external system to The work order that IDC resource management system 200 is sent, for example, client can be provided by client 400 shown in Fig. 1 to IDC Management system 200 sends work order;Internal work order can refer to other modules in IDC resource management system 200 to scheduling mould Block 2022 sends work order, for example, operation management module 2023 can send work order to scheduler module 2022.Had below to this Body description.
(1) external work order
In one example, work order can serve to indicate that client requirement information.Wherein, client requirement information may include client The geographical location information of demand, the line information of customer demand, capacity information of customer demand etc..As shown in table 3, it is needed for client Seek a kind of example of information.From table 3 it is observed that the geographical location information of client's A demand is Beijing, the line information of demand For Netcom, the capacity information of demand is 20T;The geographical location information of client's B demand is Shanghai, and the line information of demand is electricity Letter, the capacity information of demand are 50T;The geographical location information of client's C demand is Guangzhou, and the line information of demand is telecommunications, is needed The capacity information asked is 100T.
A kind of table 3: example of client requirement information
Customer number Geographical location information Line information Capacity information
Client A Beijing Netcom 20T
Client B Shanghai Telecommunications 50T
Client C Guangzhou Telecommunications 100T
In this way, scheduler module 2022 can be used for storing according in client requirement information and data management module 2021 Each IDC resource service condition, determine at least one target seat in the plane in Target id C and Target id C;Further, Scheduler module 2022 can be also used for sending the first instruction to data management module 2021, and first instruction is used for data management Module 2021 is updated the resource service condition of at least one target seat in the plane.In turn, data management module 2021 can be used In receive scheduler module 2022 transmission first instruction after, by each target seat in the plane be labeled as first identifier, described first Mark is for indicating that target seat in the plane is predetermined state.
For being the demand information of client A shown in table 3 indicated by work order, content according to table 1 it is found that The Target id C for meeting client requirement information is IDC1 shown in table 1.Further, if the appearance for each equipment that client provides Amount is 10T, then can determine that client provides altogether 2 equipment, and correspondingly, client needs 2 seats in the plane.In shown in table 2 Hold, shares 5 seats in the plane in IDC1, wherein seat in the plane 1 is in occupied state, and seat in the plane 2 is in predetermined state, therefore, can be from seat in the plane 3, target seat in the plane is determined in seat in the plane 4 and seat in the plane 5, for example, target seat in the plane can be regard seat in the plane 3 and seat in the plane 4 as, and then can be by machine Position 3 and seat in the plane 4 are labeled as first identifier, i.e., label seat in the plane 3 and seat in the plane 4 are predetermined state.
It should be noted that first identifier can be there are many form, for example, can be number, text, symbol, color etc. Diversified forms, those skilled in the art can be rule of thumb determining with actual conditions, specifically without limitation.
In the embodiment of the present invention, client requirement information can be managed by scheduler module 2022, so as to fast The demand of fast ground customer in response;Further, the target in system can be provided in real time according to the data provided on Client line Source is updated, and guarantees that the information in IDC resource management system is consistent with the actual conditions of client.
In another example, work order can serve to indicate that the mark to restocking equipment and described be placed to restocking equipment Seat in the plane.In this way, scheduler module 2022 can be used for sending the second instruction to data management module 2021, second instruction is used for The resource service condition that designation date management module 2021 treats the seat in the plane that restocking equipment is placed is updated.And then data pipe Reason module 2021 can be used for after receiving the second instruction of the transmission of scheduler module 2022, the machine that will be placed to restocking equipment Position is labeled as second identifier, and establishes the mark and the corresponding relationship for the seat in the plane placed to restocking equipment to restocking equipment, institute Stating seat in the plane of the second identifier for indicating to be placed to restocking equipment is occupied state.
, when the seat in the plane of restocking equipment placed when being identified as equipment 1 as seat in the plane 3, to be shown according to table 2 indicated by work order Content out can be by seat in the plane 3 and seat in the plane 4 for the seat in the plane of restocking equipment placed when being identified as equipment 2 is seat in the plane 4 Labeled as second identifier, i.e. label seat in the plane 3 and seat in the plane 4 is occupied state.Further, the mark to restocking equipment can also be established Know the corresponding relationship with the seat in the plane placed to restocking equipment, i.e. equipment 1 is corresponding with seat in the plane 4, and equipment 2 is corresponding with seat in the plane 4.
It should be noted that second identifier can be there are many form, for example, can be number, text, symbol, color etc. Diversified forms, those skilled in the art can be rule of thumb determining with actual conditions, specifically without limitation.
In the embodiment of the present invention, it can be managed by process of the scheduler module 2022 to equipment restocking, so as to Rapidly corresponding information more in new system guarantees the actual conditions in the information in IDC resource management system and the IDC under line It is consistent.
In another example, work order can serve to indicate that the mark to undercarriage equipment.Scheduler module 2022 can be used for root According to the mark to undercarriage equipment, the mark of equipment and the corresponding relationship of seat in the plane are searched from data management module 2021, determine to The seat in the plane that undercarriage equipment is placed;Further, scheduler module 2022 can also send third to data management module 2021 and refer to Show, the third instruction is used to indicate the resource service condition that data management module 2021 treats the seat in the plane that undercarriage equipment is placed It is updated.In turn, data management module 2021 can be used for after receiving the third instruction of the transmission of scheduler module 2022, will The seat in the plane placed to undercarriage equipment is identified labeled as third, and is deleted and placed to the mark of undercarriage equipment with to undercarriage equipment Seat in the plane corresponding relationship, seat in the plane of the third mark for indicating to be placed to undercarriage equipment is idle state.
Indicated by the work order to undercarriage equipment be identified as equipment 1 for, according to the content shown in table 2, can search The mark of equipment and the corresponding relationship of seat in the plane, however, it is determined that the corresponding seat in the plane 3 of equipment 1 can then identify seat in the plane 3 labeled as third, I.e. label seat in the plane 3 is idle state.Further, mark to undercarriage equipment can also be deleted and placed to undercarriage equipment The corresponding relationship of seat in the plane, the i.e. corresponding relationship of sweep equipment 1 and seat in the plane 3.
It should be noted that third mark can be there are many form, for example, can be number, text, symbol, color etc. Diversified forms, those skilled in the art can be rule of thumb determining with actual conditions, specifically without limitation.
In the embodiment of the present invention, it can be managed by process of the scheduler module 2022 to equipment undercarriage, so as to Rapidly corresponding information more in new system guarantees the actual conditions in the information in IDC resource management system and the IDC under line It is consistent.
(2) internal work order
By work order be operation management module 2023 transmitted by for, operation management module 2023 can be used for determine to After to maintain equipment breaks down, work order is generated, the work order includes the mark to maintain equipment;Further, operation management is set Standby 2023 can be also used for sending work order to scheduler module 2022.In turn, scheduler module 2022 can be used for include according to work order The mark to maintain equipment, from data management module 2021 search equipment mark and seat in the plane corresponding relationship, determine to The corresponding seat in the plane to be safeguarded of the mark of to maintain equipment;Further, scheduler module 2022 can be also used for data management module 2021 send the 4th instruction, it is described 4th instruction be used to indicate data management module 2021 search seat in the plane to be safeguarded it is corresponding be responsible for People.In turn, data management module 2021 can be used for after receiving the 4th instruction of the transmission of scheduler module 2022, search wait tie up The corresponding responsible person in seat in the plane is protected, is safeguarded so that the responsible person treats to maintain equipment.
It should be noted that the 4th mark can be there are many form, for example, can be number, text, symbol, color etc. Diversified forms, those skilled in the art can be rule of thumb determining with actual conditions, specifically without limitation.
In the embodiment of the present invention, once equipment breaks down, IDC resource management system can be notified in time with quick response Relevant person in charge is safeguarded, so that relevant manufacturers, client understand the operating condition of equipment in time.
Operation management module 2023 can be used for storing and managing the operation feelings for the multiple equipment being placed in multiple IDC Condition.Specifically, the operating condition of equipment may include that Standardization instrument bar-code label administrative situation, resource are made an inventory situation, letter Registration situation, data check and correction situation, synchronizing information situation, equipment fault situation etc. are ceased, specifically without limitation.
Further, operation management module 2023 can be also used for receiving the fortune that mobile terminal 500 shown in Fig. 1 is sent Tie up message, the O&M message include to maintain equipment mark and to maintain equipment the first moment O&M information;In turn, Operation management module 2023 can be used for, in the O&M information at the first moment, treating the operation of to maintain equipment according to to maintain equipment Situation is updated.
Analysis module 2024 can be used for from operation management module 2023 obtain multiple equipment operating condition, and according to The operating condition of multiple equipment analyzes multiple equipment;Alternatively, analysis module 2024 can be also used for from data management mould The resource service condition of multiple IDC, and the progress according to the resource service condition of multiple IDC to multiple IDC are obtained in block 2021 Analysis.
So, on the one hand, from the point of view of client visual angle, analysis module 2024 can provide resource information, money for each client The information of the various dimensions such as source utilization rate;On the other hand, and from the point of view of internal resource management angle, analysis module 2024 can be pipe The functions such as reconciliation management, capacity management, Energy Efficiency Analysis, specialist paper that reason person provides, thus both convenient for for understanding IDC at any time Much information included in resource management system, but convenient for manager it is more convenient, efficiently to IDC resource management system into Row management.In conclusion analyzing by analysis module 2024 resource data, client is able to ascend to the clear of resource information Clear cognition solves " tomography " of data center's capacity management and resource management, provides resource utilization and cost for administrative department The analysis report of saving provides the data supportings such as assets capacity management planning and trend analysis report, Jin Erti for operational decision making Source data of increasing salary control and analysis ability, realize capacity optimum management.
Visualization model 2025 is determined for the corresponding displaying shape of the information stored in modules in management level 202 Formula, so that presentation layer 203 can show the information stored in modules according to display form.Specifically, mould is visualized The various ways such as two dimension, three-dimensional, large-size screen monitors, mobile terminal can be carried out unified presentation by block 2025, can be realized one-touch quick Inquire all kinds of resources.
In this way, visualization model 2025 can provide two dimension, comprehensive resource of three-dimensional, large-size screen monitors, mobile phone terminal visualization system One is presented, and inquires all kinds of resources automatically, and provide customer self-service query function, so as to promote business service level, improves Customer satisfaction effectively supports IDC signing efficiency;Further, it can be realized visualization resource management, can be provided to client The Client view of various dimensions is shown, convenient for experiencing so as to promote customer service, power-assisted for checking the information of various dimensions IDC business increases.
In the embodiment of the present invention, the information that modules are stored in IDC resource management system can be respectively stored in pair In the module answered, for example, the resource service condition for multiple IDC that data management module 2021 stores can store in data management In module 2021;The operating condition for the multiple equipment in multiple IDC that operation management module 2023 stores can store in O&M In management module 2023.In other possible examples, modules are stored in IDC resource management system information can also be with It is unifiedly stored in the same database, for example, the resource for multiple IDC that data management module 2021 stores can be used feelings The operating condition for the multiple equipment in multiple IDC that condition and operation management module 2023 store, which is stored to shown in Figure 2, matches It sets in management database (Configuration Management Database, CMDB), consequently facilitating to IDC resource management Data in system are managed collectively.
Using the IDC resource management system based on CMDB, seamless new IDC resource type can be managed and presented;Due to It is a variety of that CMDB may include essential information, Resource Properties, resources relationship topology, page resource management, business operation of resource etc. Information, and it is also equipped with CMDB interface abundant, so as to realize and other tools (such as monitor supervision platform, report tool, ERP System etc.) real-time, interactive, meet the types of applications demand of operation management, ensures the accuracy and real-time of platform data.
In the embodiment of the present invention, IDC resource management system can use distributed browser/server (Browser/ Server, B/S) management mode that combines.Under this information management mode, IDC resource management system can support more Web server and database server, user can realize the access to each database by Web server on a web browser; That is, it is only necessary to corresponding browser be installed in the client of user, while being established on each Web server to each data Above-mentioned function can be realized in the access interface in library.
Based on same inventive concept, the embodiment of the present invention also provides a kind of data center IDC method for managing resource, the party Method can be applied to IDC resource management system described above.As shown in figure 3, also providing a kind of data for the embodiment of the present invention Flow diagram corresponding to the IDC method for managing resource of center, specifically comprises the following steps:
Step 301, scheduler module searches from data management module after receiving work order and meets the work order demand Target resource.
Step 302, the target resource that data management module is determined according to scheduler module uses feelings to the resource of target resource Condition is updated.
In this way, carrying out electronic management to work order by scheduler module, more by various resources in work order triggering system Newly, to realize the purpose being managed to the multidate information generated in IDC operation.Compared with the prior art, of the invention Embodiment realize IDC resource-related data from open, restocking, preemption, use, undercarriage recycle service dynamic life cycle pipe Reason;Further, the embodiment of the present invention can be realized the fusion management end to end of Life cycle in IDC operation, energy Enough so that on-line off-line data keep relevance, the inconsistent situation of on-line off-line data is avoided the occurrence of.
Specifically, in step 301, data management module can store the resource service condition of multiple IDC.Each The resource service condition of IDC may include the core resource and necessary resources corresponding with IDC core resource of IDC business.Than Such as, the resource service condition of IDC may include the resource service condition of the space resources such as computer room, rack, seat in the plane;Alternatively, IDC Resource service condition may include that the resource of the physical resources such as safety equipment, the network equipment, host equipment, storage equipment uses feelings Condition;Alternatively, the resource that the resource service condition of IDC may include the virtual resources such as IP address, bandwidth, storage, electric power uses feelings Condition;Alternatively, the resource service condition of IDC may include the resource of the building necessary resources such as water pump, fire-fighting, security protection, video, gate inhibition Service condition;Alternatively, the resource service condition of IDC may include the connection resources such as naked fibre, special line resource service condition and The resource service condition of the resource model configuration management on basis.
Further, the resource service condition of IDC may include the information provision of each IDC.Wherein, the supply letter of IDC Breath may include the geographical location information of IDC, the line information of IDC, quantity of seat in the plane etc..
Further, it is contemplated that multiple seats in the plane have can be set in each IDC, and the resource service condition of IDC can also wrap Include the information provision of multiple seats in the plane in each IDC.Wherein, the information provision of seat in the plane may include the status information of seat in the plane, seat in the plane Location information etc. in IDC.
In the embodiment of the present invention, the difference of the type of the work order received according to scheduler module, the target money found Source is also different, and in turn, the content that data management module is updated is also different.
In a kind of possible implementation, as shown in figure 4, for IDC method for managing resource institute provided in an embodiment of the present invention One of corresponding flow diagram, specifically comprises the following steps:
Step 401, scheduler module receives the first work order that client is sent, and first work order includes customer demand letter Breath.
Step 402, scheduler module is according to the money of each IDC stored in client requirement information and data management module Source service condition determines at least one target seat in the plane in Target id C and Target id C.
Step 403, scheduler module sends the first instruction to data management module, and first instruction includes described at least one A target seat in the plane.
Step 404, after data management module receives the first instruction that scheduler module is sent, each target seat in the plane is marked For first identifier, the first identifier is for indicating that the target seat in the plane is predetermined state.
It, can be by scheduler module to client requirement information using content described in above-mentioned steps 401 to step 404 It is managed, so as to quickly respond the demand of client;It further, can be real-time according to the data provided on Client line Ground is updated the target resource in system, guarantees that the information in IDC resource management system is consistent with the actual conditions of client.
In alternatively possible implementation, as shown in figure 5, being IDC method for managing resource provided in an embodiment of the present invention The two of corresponding flow diagram, specifically comprise the following steps:
Step 501, scheduler module receives the second work order that client is sent, and second work order includes to restocking equipment Mark and the seat in the plane placed to restocking equipment.
Step 502, scheduler module sends the second instruction to data management module, and second instruction includes to restocking equipment Mark and the seat in the plane placed to restocking equipment.
Step 503, it after data management module receives the second instruction that scheduler module is sent, will be placed to restocking equipment Seat in the plane be labeled as second identifier, and establish that mark to restocking equipment is corresponding with the seat in the plane placed to restocking equipment to close System;The second identifier is used to indicate that the seat in the plane placed to restocking equipment to be occupied state.
It, can be by scheduler module to the mistake of equipment restocking using content described in above-mentioned steps 501 to step 503 Journey is managed, and so as to corresponding information in rapidly more new system, guarantees the information and line in IDC resource management system Under IDC in actual conditions be consistent.
In alternatively possible implementation, as shown in fig. 6, being IDC method for managing resource provided in an embodiment of the present invention The three of corresponding flow diagram, specifically comprise the following steps:
Step 601, scheduler module receives the third work order that client is sent, and the third work order includes to undercarriage equipment Mark.
Step 602, scheduler module is according to the mark to undercarriage equipment, searched from data management module the mark of equipment with The corresponding relationship of seat in the plane determines the seat in the plane placed to undercarriage equipment.
Step 603, scheduler module sends third instruction to data management module, and the third instruction includes to undercarriage equipment The seat in the plane placed.
Step 604, it after the third that data management module receives scheduler module transmission indicates, will be placed to undercarriage equipment Seat in the plane identified labeled as third, and delete that mark to undercarriage equipment is corresponding with the seat in the plane placed to undercarriage equipment to close System;Seat in the plane of the third mark for indicating to be placed to undercarriage equipment is idle state.
It, can be by scheduler module to the mistake of equipment undercarriage using content described in above-mentioned steps 601 to step 604 Journey is managed, and so as to corresponding information in rapidly more new system, guarantees the information and line in IDC resource management system Under IDC in actual conditions be consistent.
In alternatively possible implementation, as shown in fig. 7, being IDC method for managing resource provided in an embodiment of the present invention The four of corresponding flow diagram, specifically comprise the following steps:
Step 701, operation management module obtains the operating condition of the multiple equipment in the multiple IDC, and to described more The operating condition of a equipment is stored.
Step 702, operation management module receives the O&M message that mobile terminal is sent, and the O&M message includes wait safeguard The mark of equipment and to maintain equipment the first moment O&M information.
Step 703, operation management module is searched and the mark to maintain equipment from the operating condition of the multiple equipment The corresponding operating condition to maintain equipment.
Step 704, operation management module, in the O&M information at the first moment, treats to maintain equipment according to to maintain equipment Operating condition is updated.
Step 705, operation management module is determining after to maintain equipment failure, the 4th work order of generation, the described 4th Work order includes the mark to maintain equipment.
Step 706, operation management module sends the 4th work order to scheduler module.
Step 707, after scheduler module receives the 4th work order that operation management module is sent, include according to the 4th work order To the mark of to maintain equipment, the mark of equipment and the corresponding relationship of seat in the plane are searched from resource management module, determination is set wait safeguard The corresponding seat in the plane to be safeguarded of standby mark.
Step 708, scheduler module sends the 4th instruction to data management module, and the 4th instruction includes machine to be safeguarded Position.
Step 709, after data management module receives the 4th instruction that scheduler module is sent, it is corresponding to search seat in the plane to be safeguarded Responsible person safeguarded so that the responsible person treats to maintain equipment.
Using content described in above-mentioned steps 701 to step 709, once equipment breaks down, IDC resource management system System can notify that in time relevant person in charge is safeguarded, so that relevant manufacturers, client understand the operation of equipment in time with quick response Situation.
The embodiment of the present application also provides a kind of device, which, which has, realizes data center IDC money as described above The function of power supply management method.The function can execute corresponding software realization by hardware, in a kind of possible design, the dress Set includes: processor, transceiver, memory;The memory is for storing computer executed instructions, and the transceiver is for realizing this Device is communicated with other communication entities, which is connect with the memory by the bus, when the apparatus is operative, should Processor executes the computer executed instructions of memory storage, so that the device executes data center as described above IDC method for managing resource.
The embodiment of the present invention also provides a kind of computer storage medium, stores software program in the storage medium, this is soft Part program realizes number described in above-mentioned various possible implementations when being read and executed by one or more processors According to center IDC method for managing resource.
The embodiment of the present invention also provides a kind of computer program product comprising instruction, when run on a computer, So that computer executes data center's IDC method for managing resource described in above-mentioned various possible implementations.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (21)

1. a kind of data center IDC resource management system, which is characterized in that the system comprises: access platform is provided for user Presentation layer, the content providing business logic support shown by the presentation layer management level, for the management level provide base The acquisition layer of plinth framework;The system is for managing the multiple IDC connecting with the system;The management level include:
Data management module, for storing and managing the resource service condition of the multiple IDC;
Scheduler module, for being searched from the data management module and meeting the work order demand after the work order received Target resource;
The data management module is also used to be updated the resource service condition of the target resource.
2. system according to claim 1, which is characterized in that the resource service condition of each IDC includes described every The information provision of multiple seats in the plane in the information provision of a IDC and each IDC;
The work order is used to indicate client requirement information;
The scheduler module, for described every according to what is stored in the client requirement information and the data management module The resource service condition of a IDC determines at least one target seat in the plane in the Target id C and Target id C;
The scheduler module, is also used to send the first instruction to the data management module, and first instruction is used for the number It is updated according to resource service condition of the management module at least one target seat in the plane;
The data management module is specifically used for:
After receiving the first instruction that the scheduler module is sent, each target seat in the plane is labeled as first identifier, described first Mark is for indicating that the target seat in the plane is predetermined state.
3. system according to claim 1, which is characterized in that the work order is used to indicate mark and institute to restocking equipment State the seat in the plane placed to restocking equipment;
The scheduler module is specifically used for:
The second instruction is sent to the data management module, second instruction is used to indicate the data management module to described The resource service condition for the seat in the plane placed to restocking equipment is updated;
The data management module is specifically used for:
After receiving the second instruction that the scheduler module is sent, the seat in the plane placed to restocking equipment is labeled as second Mark, and establish the mark and the corresponding relationship of the seat in the plane placed to restocking equipment to restocking equipment;Described Two marks are for indicating that the seat in the plane placed to restocking equipment is occupied state.
4. system according to claim 1, which is characterized in that the work order is used to indicate the mark to undercarriage equipment;
The scheduler module is specifically used for:
According to the mark to undercarriage equipment, the mark pass corresponding with seat in the plane of equipment is searched from the data management module System determines the seat in the plane placed to undercarriage equipment;And third instruction, the third are sent to the data management module Indicate that being used to indicate the data management module carries out more the resource service condition of the seat in the plane placed to undercarriage equipment Newly;
The data management module is specifically used for:
After receiving the third instruction that the scheduler module is sent, the seat in the plane placed to undercarriage equipment is labeled as third Mark, and delete the mark and the corresponding relationship of the seat in the plane placed to undercarriage equipment to undercarriage equipment;Described Three marks are for indicating that the seat in the plane placed to undercarriage equipment is idle state.
5. system according to claim 1, which is characterized in that the management level further include operation management module, for depositing Store up and manage the operating condition for the multiple equipment being placed in the multiple IDC;
The operation management module, is also used to:
The O&M message that mobile terminal is sent is received, the O&M message includes the mark to maintain equipment and described sets wait safeguard The standby O&M information at the first moment;And according to the O&M information to maintain equipment at the first moment, to described wait safeguard The operating condition of equipment is updated.
6. system according to claim 5, which is characterized in that the operation management module is also used to:
It is described after to maintain equipment failure determining, work order is generated, the work order includes the mark to maintain equipment; And the work order is sent to the scheduler module;
The scheduler module is specifically used for:
According to the work order include described in mark to maintain equipment, the mark of equipment is searched from the data management module With the corresponding relationship of seat in the plane, the corresponding seat in the plane to be safeguarded of mark to maintain equipment is determined;And to the data management Module sends the 4th instruction, and it is corresponding that the 4th instruction is used to indicate the data management module lookup seat in the plane to be safeguarded Responsible person;
The data management module is specifically used for:
After receiving the 4th instruction that the scheduler module is sent, the corresponding responsible person in the seat in the plane to be safeguarded is searched, so that institute Responsible person is stated to safeguard to described to maintain equipment.
7. system according to claim 5, which is characterized in that the management level further include analysis module, are used for from described The operating condition of the multiple equipment is obtained in operation management module, and according to the operating condition of the multiple equipment to described more A equipment is analyzed.
8. system according to claim 7, which is characterized in that the analysis module is also used to:
The resource service condition of the multiple IDC is obtained from the data management module, and according to the resource of the multiple IDC Service condition is analyzed the multiple IDC's.
9. system according to claim 1, which is characterized in that the management level further include visualization model, for determining The corresponding display form of the information stored in modules in the management level, so that the presentation layer is according to the display form Show the information stored in the modules.
10. system according to claim 1, which is characterized in that the acquisition layer includes for connecting third party system Network interface, the third party system are used to provide corresponding information for modules in the management level.
11. system according to claim 9, which is characterized in that the third party system include ERP system, note system, At least one of in network flow monitoring system, information technoloy equipment monitoring system.
12. system according to claim 1, which is characterized in that the acquisition layer includes the net for connecting internal platform Network interface.
13. system according to claim 12, which is characterized in that the network interface for connecting internal platform includes At least one of below:
Notice bulletin interface, flow engine interface, Report Engine interface, log management interface, claim management interface.
14. a kind of data center IDC method for managing resource, which is characterized in that the method is applied to the claims 1 to 13 Any one of described in system, which comprises
Scheduler module searches the target resource for meeting the work order demand after receiving work order from data management module;Institute State the resource service condition that data management module is stored with the multiple IDC;
The target resource that the data management module is determined according to the scheduler module uses feelings to the resource of the target resource Condition is updated.
15. according to the method for claim 14, which is characterized in that the scheduler module is after receiving work order, from data The target resource for meeting the work order demand is searched in management module, comprising:
The scheduler module receives the first work order that client is sent, and first work order includes client requirement information;
The scheduler module is according to the money of each IDC stored in the client requirement information and the data management module Source service condition determines at least one target seat in the plane in the Target id C and Target id C;
The scheduler module sends the first instruction to the data management module, and first instruction includes at least one described mesh Mark seat in the plane;
The data management module is updated the resource service condition of the target resource, comprising:
After the data management module receives the first instruction that the scheduler module is sent, by each target seat in the plane labeled as the One mark, the first identifier is for indicating that the target seat in the plane is predetermined state.
16. according to the method for claim 14, which is characterized in that the scheduler module is after receiving work order, from data The target resource for meeting the work order demand is searched in management module, comprising:
The scheduler module receives the second work order that client is sent, and second work order includes the mark and institute to restocking equipment State the seat in the plane placed to restocking equipment;
The scheduler module sends the second instruction to the data management module, and second instruction includes described to restocking equipment Mark and the seat in the plane placed to restocking equipment;
The data management module is updated the resource service condition of the target resource, comprising:
After the data management module receives the second instruction that the scheduler module is sent, placed described to restocking equipment Seat in the plane be labeled as second identifier, and establish the mark to restocking equipment and the seat in the plane placed to restocking equipment Corresponding relationship;The second identifier is used to indicate that the seat in the plane placed to restocking equipment to be occupied state.
17. according to the method for claim 14, which is characterized in that the scheduler module is after receiving work order, from data The target resource for meeting the work order demand is searched in management module, comprising:
The scheduler module receives the third work order that client is sent, and the third work order includes the mark to undercarriage equipment;
The scheduler module according to the mark to undercarriage equipment, searched from the data management module mark of equipment with The corresponding relationship of seat in the plane determines the seat in the plane placed to undercarriage equipment;
The scheduler module sends third instruction to the data management module, and the third instruction includes described to undercarriage equipment The seat in the plane placed;
The data management module is updated the resource service condition of the target resource, comprising:
After the data management module receives the third instruction that the scheduler module is sent, placed described to undercarriage equipment Seat in the plane identified labeled as third, and delete the mark to undercarriage equipment and the seat in the plane placed to undercarriage equipment Corresponding relationship;The third mark is for indicating that the seat in the plane placed to undercarriage equipment is idle state.
18. according to the method for claim 14, which is characterized in that the method also includes:
Operation management module obtains the operating condition of the multiple equipment in the multiple IDC, and the operation to the multiple equipment Situation is stored;
The operation management module receives the O&M message that mobile terminal is sent, and the O&M message includes the mark to maintain equipment Know and it is described to maintain equipment the first moment O&M information;
The operation management module is searched corresponding with the mark to maintain equipment from the operating condition of the multiple equipment The operating condition to maintain equipment;
The operation management module is according to the O&M information to maintain equipment at the first moment, to described to maintain equipment Operating condition is updated.
19. according to the method for claim 18, which is characterized in that carried out more to the operating condition to maintain equipment After new, further includes:
The operation management module is determining described after to maintain equipment failure, the 4th work order of generation, the 4th work order Including the mark to maintain equipment;
The operation management module sends the 4th work order to the scheduler module;
The scheduler module searches the target for meeting the work order demand after receiving work order from the data management module Resource, comprising:
After the scheduler module receives the 4th work order that the operation management module is sent, include according to the 4th work order The mark to maintain equipment searches the mark of equipment and the corresponding relationship of seat in the plane from the resource management module, determines The corresponding seat in the plane to be safeguarded of the mark to maintain equipment;
The scheduler module sends the 4th instruction to the data management module, and the 4th instruction includes the machine to be safeguarded Position;
The data management module is updated the resource service condition of the target resource, comprising:
After the data management module receives the 4th instruction that the scheduler module is sent, it is corresponding to search the seat in the plane to be safeguarded Responsible person so that the responsible person safeguards to described to maintain equipment.
20. a kind of computer readable storage medium, which is characterized in that the storage medium is stored with instruction, when described instruction exists When being run on computer, so that computer realizes method described in any one of perform claim requirement 14 to 19.
21. a kind of computer equipment characterized by comprising
Memory, for storing program instruction;
Processor executes such as claim 14 according to the program of acquisition for calling the program instruction stored in the memory To method described in 19 any claims.
CN201810968944.6A 2018-08-23 2018-08-23 A kind of data center IDC resource management system and management method Pending CN109302308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810968944.6A CN109302308A (en) 2018-08-23 2018-08-23 A kind of data center IDC resource management system and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810968944.6A CN109302308A (en) 2018-08-23 2018-08-23 A kind of data center IDC resource management system and management method

Publications (1)

Publication Number Publication Date
CN109302308A true CN109302308A (en) 2019-02-01

Family

ID=65165546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810968944.6A Pending CN109302308A (en) 2018-08-23 2018-08-23 A kind of data center IDC resource management system and management method

Country Status (1)

Country Link
CN (1) CN109302308A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110290215A (en) * 2019-06-28 2019-09-27 深圳前海微众银行股份有限公司 A kind of method for transmitting signals and device
CN112260878A (en) * 2020-11-04 2021-01-22 罗鑫龙 Artificial intelligent management system and method for Internet data center machine room
CN112540997A (en) * 2020-12-17 2021-03-23 中国农业银行股份有限公司 Data resource management method, device, equipment and medium
CN114611848A (en) * 2020-11-25 2022-06-10 北京秦淮数据有限公司 Resource management system and method
CN114611849A (en) * 2020-11-25 2022-06-10 北京秦淮数据有限公司 IDC resource management system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103379168A (en) * 2012-04-27 2013-10-30 北京云杉世纪网络科技有限公司 Data center resource distribution management method and system
CN104144183A (en) * 2013-05-08 2014-11-12 株式会社日立制作所 Data center system and management method for data center system
CN106850244A (en) * 2015-12-07 2017-06-13 北京航天长峰科技工业集团有限公司 The resource allocation and operation management system of a kind of across a network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103379168A (en) * 2012-04-27 2013-10-30 北京云杉世纪网络科技有限公司 Data center resource distribution management method and system
CN104144183A (en) * 2013-05-08 2014-11-12 株式会社日立制作所 Data center system and management method for data center system
CN106850244A (en) * 2015-12-07 2017-06-13 北京航天长峰科技工业集团有限公司 The resource allocation and operation management system of a kind of across a network

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110290215A (en) * 2019-06-28 2019-09-27 深圳前海微众银行股份有限公司 A kind of method for transmitting signals and device
CN110290215B (en) * 2019-06-28 2021-09-28 深圳前海微众银行股份有限公司 Signal transmission method and device
CN112260878A (en) * 2020-11-04 2021-01-22 罗鑫龙 Artificial intelligent management system and method for Internet data center machine room
CN114611848A (en) * 2020-11-25 2022-06-10 北京秦淮数据有限公司 Resource management system and method
CN114611849A (en) * 2020-11-25 2022-06-10 北京秦淮数据有限公司 IDC resource management system and method
CN112540997A (en) * 2020-12-17 2021-03-23 中国农业银行股份有限公司 Data resource management method, device, equipment and medium

Similar Documents

Publication Publication Date Title
CN109302308A (en) A kind of data center IDC resource management system and management method
CN103460184B (en) System and method for being monitored in conjunction with generic data model repository and managing data center resource
EP2510473B1 (en) Unified user login for co-location facilities
CN107958337A (en) A kind of information resources visualize mobile management system
AU2017299712B2 (en) Method and system for implementing a data center operating system
CN103348328A (en) System and method for monitoring and managing data center resources in real time
CN104463492A (en) Operation management method of electric power system cloud simulation platform
CN109784508A (en) A kind of power grid panorama monitoring operation management method and system based on cloud platform
CN103477326A (en) Infrastructure control fabric system and method
CN107480251A (en) A kind of system for managing data access
CN103329109A (en) System and method for monitoring and managing data center resources in real time incorporating manageability subsystem
CN104536965B (en) A kind of data query display systems under the conditions of big data and method
CN107645410A (en) A kind of virtual machine management system and method based on OpenStack cloud platforms
CN107330580A (en) Power marketing Base data platform construction method
CN105978716A (en) Isomorphic treatment and three-dimensional display method for monitoring information of IT devices and dynamic loop devices
CN109902919A (en) Server assets management method, device, equipment and readable storage medium storing program for executing
CN1697399A (en) Monitored control system for network based on general information model
CN103295164A (en) Power grid safety monitoring management information system and management method
Corradi et al. SIRDAM4. 0: A support infrastructure for reliable data acquisition and management in industry 4.0
CN104601378A (en) Virtual resource flexible scheduling implementation method combining application performance indicator monitoring data
CN106850322B (en) Resource equipment management system based on six-layer model
CN105871659A (en) Monitoring method and device of newly added server
US20140095244A1 (en) Facility visualization and monitoring
CN109583846A (en) A kind of data check method and system for powered communication management system
CN108322336A (en) Intelligent management and system towards domestic autonomous controllable server

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190225

Address after: 100191 Six Stories 602, One Real Building, 39 College Road, Haidian District, Beijing

Applicant after: BEIJING QINHUAI DATA Co.,Ltd.

Address before: 361006 South Building 201-5, Torch Square, No. 56-58 Torch Road, Torch Garden, Xiamen High-tech Zone, Fujian Province

Applicant before: XIAMEN QINHUAI TECHNOLOGY Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201