CN1908364A - Offshore oil well drilling used water insulation duct and method for testing its elastic stability - Google Patents

Offshore oil well drilling used water insulation duct and method for testing its elastic stability Download PDF

Info

Publication number
CN1908364A
CN1908364A CN 200610112494 CN200610112494A CN1908364A CN 1908364 A CN1908364 A CN 1908364A CN 200610112494 CN200610112494 CN 200610112494 CN 200610112494 A CN200610112494 A CN 200610112494A CN 1908364 A CN1908364 A CN 1908364A
Authority
CN
China
Prior art keywords
tubing string
riser pipe
sin
beta
alpha
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610112494
Other languages
Chinese (zh)
Inventor
姜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical China National Offshore Oil Corp CNOOC
Priority to CN 200610112494 priority Critical patent/CN1908364A/en
Publication of CN1908364A publication Critical patent/CN1908364A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a water-separated tube used in marine oil well, and the method for detecting its flexibility stability, wherein the invention is characterized in that: said water-separated tube is in tower rigidity-variable post, while the upper part has lower rigidity and the lower part has high rigidity; the lengths and diameters of upper and lower posts meet the critical load formula as aforementioned formula, to design the projective parameter and detect present project. The invention can save steel consumption and reduce cost.

Description

The detection method of a kind of offshore oil well drilling used water and elastic stability thereof
Technical field
The present invention relates to a kind of riser pipe and detection method thereof, particularly about the detection method of a kind of offshore oil well drilling used water and elastic stability thereof.
Background technology
Along with a large amount of exploitations of marine marginal oil field, how to adopt most economical effective means, obtain the maximum profit in oil field, satisfy the demand that oilfield safety is effectively produced simultaneously again, be the problem of the applicant's primary study.When carrying out petroleum drilling operation at sea, usually need be in the external circumferential setting of bored shaft by a string 30 " * 28 " riser pipe formed of the tubing string of (OD * ID, external diameter * internal diameter).Owing at well head wellhead blowout preventor is installed, therefore, riser pipe need bear the effect of concentrated load P, and simultaneously, because the riser pipe caliber is big, it is also very big to conduct oneself with dignity, and therefore, needs also to consider that riser pipe is subjected to the effect of the uniformly distributed load q of own wt formation.In view of this, all be to adopt tubing string material to make usually as the waterproof casing of pressure-containing member, and the rigidity of these tubing strings all is identical from top to bottom usually with certain rigidity.Yet, by to critical pressure under riser pipe concentrated load and the uniformly distributed load effect and further investigation that operation is exerted an influence thereof, find that there is unreasonable place in this traditional design, the waste of material that causes therefrom also is huge, but, should use which type of rigidity material where, whether its security performance can be protected, when the well head blowout preventer set is installed, can carry on the riser pipe and should carry great weight and be advisable or the like, in existing literature and textbook, there is not ready-made answer to seek, these are the present invention's problem that need solve just, also is one of key issue of controlling effectively in marginal field development development cost.
Summary of the invention
At the problems referred to above, the purpose of this invention is to provide and a kind ofly can bring into play well head blowout prevention effect to greatest extent, can save the offshore oil well drilling used water of steel and the detection method of elastic stability thereof in a large number again.
For achieving the above object, the present invention takes following technical scheme: a kind of offshore oil well drilling used water, it is characterized in that: described riser pipe is tower change rigidity tubing string, top tubing string rigidity is little, bottom tubing string rigidity is big, after the material that concentrated load that wellhead blowout preventor forms and tubing string use was determined, the length of described upper and lower section tubing string and caliber satisfied the critical load formula of following riser pipe elastic stability:
P cr = E I 1 π l 3 α 1 + EI 2 π l 3 α 2 - ( q 2 β 2 2 l π 2 + q 1 β 1 2 l π 2 ) In the formula:
α 1 = π ( l - l 2 ) + l 2 sin 2 πl 2 l
α 2 = l 2 sin 2 πl 1 l - πl 2
β 1 = π 2 l 1 2 - πl l 1 sin 2 π l 2 l - l 2 sin ( πl 2 l ) 2
β 2 = π 2 l 2 ( l + l 1 ) + πl l 1 sin 2 πl 2 l + l 2 sin ( π l 2 l ) 2
Wherein: P CrBe critical axial load [N] that E is steel modulus of elasticity [N/m 2], generally: E=2.058 * 10 5MPa; I is a polar moment of inertia, I=3.14 * (external diameter 4-internal diameter 4)/32[m 4]; L be riser pipe 1 from the seabed length [m] to the top; l 1Length for the hypomere tubing string; l 2Length for the hypomere tubing string; q 1Unit weight [N/m] for the epimere tubing string; q 2Unit weight [N/m] for the hypomere tubing string.
Work as l 2=l q 2During=q,
P cr = EI 2 π l 3 ( - πl ) - ( q 2 π 2 l 2 2 l π 2 ) = EI 2 π 2 l 2 - q 2 l 2 .
When l 1 = l 2 = l 2 The time:
P cr = EI 1 π 2 2 l 2 + EI 2 π 2 2 l 2 - l 2 [ q 2 ( 3 4 + 1 π 2 ) + q 1 ( 1 4 - 1 π 2 ) ]
The internal diameter of described upper and lower part tubing string is identical, and the external diameter of described top tubing string is less than the external diameter of described hypomere tubing string.
The external diameter of described upper and lower part tubing string is identical, and the internal diameter of described top tubing string is greater than the internal diameter of described bottom tubing string.
A kind of detection method of offshore oil well drilling used water elastic stability may further comprise the steps:
1) set up the critical load formula of riser pipe elastic stability:
P cr = E I 1 π l 3 α 1 + EI 2 π l 3 α 2 - ( q 2 β 2 2 l π 2 + q 1 β 1 2 l π 2 ) Wherein:
α 1 = π ( l - l 2 ) + l 2 sin 2 πl 2 l
α 2 = l 2 sin 2 πl 1 l - πl 2
β 1 = π 2 l 1 2 - πl l 1 sin 2 π l 2 l - l 2 sin ( πl 2 l ) 2
β 2 = π 2 l 2 ( l + l 1 ) + πl l 1 sin 2 πl 2 l + l 2 sin ( π l 2 l ) 2
2) parameters of riser pipe is brought into above-mentioned critical load formula, obtain the critical load of riser pipe;
3) according to the critical load of riser pipe and the ratio that all is added in weight on the described riser pipe, judge whether to meet the requirement of safety factor, if meet the requirement of safety factor, can be by the detection of riser pipe elastic stability.
The present invention is owing to take above technical scheme, it has the following advantages: 1, the present invention is from the actual conditions of drilling well, use the theory of elastic stability, riser pipe under the drillng operation condition is carried out mechanical analysis, thereby obtained under the synergy condition that end concentrated load p and deadweight uniformly distributed load q are arranged, the elastic stability critical load mathematical formulae of riser pipe can select the present invention to become each section rigidity and the physical dimension of rigidity riser pipe according to this Mathematical Modeling convenient and reasonablely.2, the Mathematical Modeling of setting up according to the present invention, the length that can comprise each section of riser pipe by every definite riser pipe parameter, inside and outside footpath, weight, material stiffness coefficient etc., detect the elastic stability of riser pipe, simultaneously, according to safety factor require, load requirement such as sea water advanced, preventer weight, also can pass through the critical load formula of the elastic stability of riser pipe, in conjunction with the specification of existing riser pipe, parameters such as the length of selection upper and lower part riser pipe 1 and caliber.3, the present invention has high practicality and directive significance to the offshore oil drilling engineering, adopt riser pipe of the present invention can save great deal of steel, the cost that effectively reduces cost guarantees the reliability stability of engineering, and it can be widely used in the various seawater petroleum drilling engineerings.
Description of drawings
Fig. 1 is a structural representation of the present invention
The general state schematic diagram of Fig. 2 offshore drilling pit shaft
Fig. 3 is reduced to typical stressed member deflection deformation schematic diagram with riser pipe
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described in detail.
As shown in Figure 1, the present invention is directed to use in the prior art from top to bottom with the riser pipe 1 of rigidity, a kind of riser pipe 1 of tower stiffness changing structure has been proposed, this riser pipe 1 is divided into top tubing string 11 and bottom tubing string 12 two parts, the material that upper and lower part tubing string 11,12 uses is generally identical, top tubing string 11 is thin, and rigidity is little, and bottom tubing string 12 is thick, rigidity is big; Perhaps the external diameter of upper and lower part tubing string 11,12 is identical, the internal diameter difference, and promptly the tube wall of top tubing string 11 is thin, and rigidity is little, the thickness of pipe wall of bottom tubing string 12, rigidity is big.Can save great deal of steel like this, reduce cost.Yet how the length and the caliber of upper and lower tubing string 11,12 are selected, guarantee safe requirement in the time of could both satisfying field operation, does economical with materials reduce cost to greatest extent again? this need provide the foundation of a selection, it is truly feasible that this foundation should have theoretical foundation and process actual verification, and does not have ready-made foundation to follow at present.
For this reason, the applicant has carried out following work:
At first the mud line of going into of riser pipe 1 is looked closely and is position of fixity 2, riser pipe 1 is considered as hinge support 3 in uphole end, the blowout preventer set that acts on riser pipe 1 top is considered as concentrated load P, the riser pipe own wt is considered as uniformly distributed load q, under the effect of concentrated load P and uniformly distributed load q, riser pipe 1 is a typical stressed member (as Fig. 2, shown in Figure 3).During this stressed member deflection deformation, establishing riser pipe 1 length is l, is subjected to that the maximum displacement of rod member off-axis is δ behind the responsive to axial force, supposes that its deflection curve is a sine curve, and as general approximate, can obtain Flexural Equation to be:
y = δ sin πx l . . . ( 1 )
Ask first derivative to obtain to formula (1): dy / dx = δπ l cos πx l . . . ( 2 )
Ask second dervative to obtain to formula (1): d y 2 / d x 2 = - δ π 2 l 2 sin πx l . . . ( 3 )
Hinged line of deflection is when bending, and the difference of the length of its deflection curve and chord length AB is:
λ = 1 2 ∫ o l ( dy dx ) 2 dx = δ 2 π 2 4 l . . . ( 4 )
Axially point load P acting is: w 1 = P · λ = P δ 2 π 2 4 l . . . ( 5 )
Consider that simultaneously the uniformly distributed load q acting that deadweight causes is:
w 2 = 1 2 q ∫ o l ( l - x ) ( dy dx ) 2 dx = q δ 2 π 2 8 . . . ( 6 )
Its deformability is during member bending: μ = 1 2 EI ∫ o l ( dy 2 dx 2 ) 2 dx = EI π 4 δ 2 4 l 3 . . . ( 7 )
Wherein E is the rod member modulus of elasticity, and I is the polar moment of inertia of rod member, I=3.14 * (external diameter 4-internal diameter 4)/32[m 4].
When system reaches critical condition, must have: μ=w 1+ w 2(8)
Formula (5), (6), (7) substitution formula (8) can be got: EI 2 π 2 l 3 = P l + q 2 . . . ( 9 )
Can solve the critical load of riser pipe 1 according to formula (9), promptly the end when considering riser pipe 1 end concentrated load P and deadweight uniformly distributed load q props up the critical load with the hinged rod member of an end admittedly.Observation type (9) can be found:
Do not considering under the riser pipe 1 deadweight condition that 1, promptly (9) second of formulas are zero, then (9) formula becomes P cr = EI π 2 l 2 , This is Euler's load of standard.
When 2, considering riser pipe 1 deadweight uniformly distributed load, its effect is to reduce critical load, and its critical load minimizing value is half of riser pipe gross weight ql.
As shown in Figure 1, in the present invention, when considering operation at the scene, under the precondition that guarantees safety, economical with materials as much as possible, therefore adopt tower stiffness changing structure:
w 3 = 1 2 q 2 ∫ o l 2 ( l - x ) ( dy dx ) 2 dx
w 3 = q 2 δ 2 8 l 2 [ lπ ( l - l 2 ) sin 2 π l 2 l + π 2 l 2 ( 2 l - l 2 ) + l 2 sin ( π l 2 l ) 2 ] . . . ( 10 )
w 4 = 1 2 q 1 ∫ l 2 l ( l - x ) ( dy dx ) 2 · dx
w 4 = q 1 δ 2 8 l 2 [ π 2 ( l - l 2 ) 2 + πl ( l 2 - l ) sin 2 π l 2 l - l 2 sin ( π l 2 l ) 2 ] . . . ( 11 )
Simultaneously, by formula (7) as can be known, its flexural deformation can for:
μ = μ 1 + μ 2 = EI 1 2 ∫ l 2 l δ 2 l 4 sin ( πx l ) 2 dx + EI 2 2 ∫ o l 2 δ 2 l 4 sin ( πx l ) 2 dx
μ = EI 1 π 3 δ 2 4 l 4 [ π ( l - l 2 ) + l 2 sin 2 πl 2 l ] + EI 2 π 3 δ 2 4 l 4 [ l 2 sin 2 π l 2 l - π l 2 ] . . . ( 12 )
With formula (5), (10), (11) and (12) substitutions (8) Shi Kede:
P cr = E I 1 π l 3 α 1 + EI 2 π l 3 α 2 - ( q 2 β 2 2 l π 2 + q 1 β 1 2 l π 2 ) . . . ( 13 )
In the formula (13):
α 1 = π ( l - l 2 ) + l 2 sin 2 πl 2 l . . . ( 14 )
α 2 = l 2 sin 2 πl 1 l - πl 2 . . . ( 15 )
β 1 = π 2 l 1 2 - πl l 1 sin 2 π l 2 l - l 2 sin ( πl 2 l ) 2 . . . ( 16 )
β 2 = π 2 l 2 ( l + l 1 ) + πl l 1 sin 2 πl 2 l + l 2 sin ( π l 2 l ) 2 . . . ( 17 )
In the formula: P CrBe critical axial load [N] that E is steel modulus of elasticity [N/m 2], generally: E=2.058 * 10 5MPa; I is a polar moment of inertia, I=3.14 * (external diameter 4-internal diameter 4)/32[m 4]; L be riser pipe 1 from the seabed length [m] to the top; l 1Length for the hypomere tubing string; l 2Length for the hypomere tubing string; q 1Unit weight [N/m] for the epimere tubing string; q 2Unit weight [N/m] for the hypomere tubing string.
Now formula (13) is discussed:
1, works as l 2=l q 2=q I 2=I (18)
With α in the formula (19) 2And β 2Substitution formula (13) can get:
P cr = EI 2 π l 3 ( - πl ) - ( q 2 π 2 l 2 2 l π 2 ) = EI 2 π 2 l 2 - q 2 l 2 . . . ( 20 )
Observation type (20) can be found:
1) when considering riser pipe 1 for same rigidity tubing string, identical by the critical load that formula (20) draws with the critical load that draws by formula (9), this has illustrated two problems: the correctness of having verified formula (13) on the one hand, illustrated becoming under the rigidity condition, can adopt formula (13) to find the solution critical load; On the other hand, contact inherent between formula (13) and the formula (20) has been described.
2) formula (20) is a specific example of formula (13), illustrates to adopt general-purpose type (13), goes for finding the solution with rigidity condition lower critical load fully.
Figure A20061011249400092
With formula (21) substitution (13) Shi Kede:
P cr = EI 1 π 2 2 l 2 + EI 2 π 2 2 l 2 - l 2 [ q 2 ( 3 4 + 1 π 2 ) + q 1 ( 1 4 - 1 π 2 ) ] . . . ( 22 )
Observation type (22) can be found:
1) works as I 1=I 2=I; q 1=q 2During=q, its substitution formula (22) can be drawn:
P cr = EI π 2 l 2 - 1 2 ql . . . ( 23 )
As seen: formula (23) is to work as l 1=l 2The time, q 1-q 2=q; I 1-I 2Special circumstances under the qualifications constraint of=I, this moment is identical with the situation of front formula (9) just, and this formula (13) is a general formula, and formula (22) is at l 1=l 2Special formula under the condition.
2) in formula (22), can find, in two of the fronts, work as I 1=I 2The time, EI 1 π 2 2 l 2 + EI 2 π 2 2 l 2 ⇒ EI π 2 l 2
Being Euler's load of depression bar, and in the back in the 3rd, the 4th, then is that explanation deadweight uniformly distributed load is to critical influence, and at l 1=l 2Condition under, q 2Influence than q 1Influence is big.
Further specify the critical load formula application in practice that the present invention proposes below in conjunction with specific embodiment.
Embodiment 1
Adopt the present invention that Bohai Bay Oil one drilling riser critical load and stability are detected.
The opening of setting riser pipe 1 this moment is in the drilling well moon pool of offshore boring island, the top is in fixing state, known: oil field, Bohai Sea depth of water 25m, carry out drillng operation with self-elevating drilling platform, its air gap is 10m, and the conduit top is subjected to the constraint of temporary guide base, the top can be considered hinge support 3, mud 50m is gone in its bottom, can be considered solid end 2, and this moment, bored shaft mud was hung above pit shaft conduit and surface pipe data following (as shown in table 1):
Table 1
Sleeve pipe-grade of steel-# External diameter "/mm Internal diameter "/mm Length m Uniformly distributed load kg/m Remarks
30”-X52 30”/762 28”/711.2 35 461.3 Go into mud 50m
20”-K55 20”/508 18.73”/475.7 35 104 More than mud is hung
13-3/8”-N80-68# 13-3/8”/339.7 12.915”/315.3 35 100 More than mud is hung
Wellhead blowout preventor group weight: 13-5/8 " * 10M (M=10 * 1000psi (pound/inch 2)), be combined as: omnipotent preventer * 5M+ double ram type preventer * 10M+ single ram type perventer * 10M+ drilling spool, gross weight is about: 44t, find the solution its elastic stability.
At first detect or gather the following technical data of riser pipe, getting the steel modulus of elasticity is E=2.1 * 10 6Kg/cm 2
The riser pipe 1 of present embodiment is found the solution above-mentioned technical data substitution critical load formula (23) and is obtained (as shown in table 2), wherein P under the condition of the constant rigidity of identical caliber CrlBe the critical load value of not considering to conduct oneself with dignity and influence:
Table 2
Caliber " (inch) External diameter cm Internal diameter cm Uniformly distributed load kg/m The l length m Critical load P cr?t Critical load P crl?t Load value
Tubing string weight t Tension
30” 76.2 71.1 2 461.3 35 666.192 674.260 39.2 54.8
20” 50.8 47.5 7 198 35 124.155 127.620 16.8 57.3
13-3/8 ” 33.97 31.5 3 100 35 26.719 28.469 8.5 83
Analyze the above-mentioned detection of present embodiment, result calculated as can be seen, after this drilling well is spudded in, be lowered to common 30 " riser pipe; install 30 at well head " * the ring-like preventer of 1M, its weight is 14.7t, and this moment, riser pipe 1 uniformly distributed load was 461.3kg/m, its critical load P Cr=666.2t.30 " weight of ring-like preventer is 14.7t, only is 2.2% of critical load 666.2t.Show that its safety allowance of tubing string commonly used is very big, the safety factor of its critical load is n s = 666 14.7 = 45.3 .
In subsequent job, with 13-5/8 " * after the weight of 10M blowout preventer set all was added on the riser pipe 1, its safety factor was n s = 666 44 = 15 .
According to above parameter, the drilling riser of present embodiment exists according to critical load formula (22) when becoming the condition of rigidity l = l 2 = 17.5 m The time find the solution the critical load (as shown in table 3) that obtains:
Table 3
The combination caliber OD/ID cm l 2 m q2 kg/m OD/ID cm l 1 m q1 kg/m Critical load Pcr t Tubing string deadweight t The tension safety factor
30”×20” 76.2/71. 12 17.5 461 50.8/47 .5 17.5 194 393.566 34.6 27.9
20” ×13-3/8” 50.8/47. 5 17.5 198 34/32 17.5 100 74.834 15.1 46.7
30”×30” 76.2/71. 12 17.5 461 76/73 17.5 292 430.668 36.2 37.5
Analyze the above-mentioned detection of present embodiment, result calculated as can be seen, adopted and become after the tower structure of rigidity, same outer diameter as size as shown in table 3, different inner diameters size 30 " * 30 " riser pipe, during the i.e. change rigidity combination of the thin two kinds of different inwalls of bottom wall thickness and top wall, its deadweight uniformly distributed load is 461kg/m and 292kg/m, its critical load is 430.7t, promptly show the deadweight of installing this moment be 14.7t 30 " * the ring-like preventer of 1M, the safety factor of its critical load is n s = 430.7 14.7 = 29.3 , Safety allowance also is flush with money.
In subsequent job with 13-5/8 " * after the weight of 10M blowout preventer set all was added on the riser pipe, its safety factor had also reached n = 461 44 = 10.4 .
When operating condition allows, adopt tower stiffness changing structure, promptly be to adopt large diameter pipe near sea bed one end, adopt narrow tube (as shown in Figure 1) near drilling well well head one end, be employing 30 as shown in table 3 " * 20 " the combination of tower change rigidity riser pipe, this moment, critical load was 393.56t, the 21-1/4 of installation " * the 5M preventer; its deadweight is 20t, the then safety factor of critical load n s = 383.56 20 = 19.68 ;
In subsequent job, with 13-5/8 " * total weight of 10M blowout preventer set adds that all its safety factor still is n = 393.56 44 = 8.9 . As seen, allowance is very big at this moment, is enough to engineering demands.
Drillng operation reduces cost in consideration, when raising the efficiency, spud in and can adopt the tower structure (as shown in table 3) that becomes rigidity in the top layer, select 20 " * 13-3/8 " combination, this moment, the critical load of riser pipe 1 was 74.8t, install 211/4 " * preventer of 5M, its deadweight is 20t, the safety factor of its critical load is n s = 74.8 20 = 3.74 , As seen safety allowance still can engineering demands, promptly can be by the detection requirement of riser pipe 1 elastic stability.
Embodiment 2
Adopt the present invention that another drilling riser critical load of Bohai Bay Oil and stability are detected.
This drilling well depth of water 32m of living in, the technical data that all the other on-the-spot drilling conditions and institute detect and collect is identical with embodiment 1.According to detecting the technical data that is collected, the drilling riser of present embodiment is found the solution the critical load that obtains according to formula (23) under the condition of constant rigidity conduit, and the result is as shown in table 4.
Table 4
Caliber "/mm External diameter cm Internal diameter cm Critical load kg/m The l length m Critical load P cr?t Tubing string deadweight t The tension safety factor
30” 76.2 71.12 461.3 42 458.554 39.2 54.8
20” 50.8 47.57 198 42 89.625 16.8 57
13-3/8” 33.97 31.53 100 42 17.670 8.5 83
According to above parameter, present embodiment according to formula (22), is found the solution the critical load (as shown in table 5) that obtains when using notch cuttype riser pipe 1 condition that becomes rigidity:
Table 5
The combination caliber OD/ID cm l 2 m q 2 kg/m OD/ID cm l 1 m q 1 kg/m Critical load P cr t Tubing string deadweight t The tension safety factor
30”×20” 76.2/71.1 2 21 461 50.84/47.5 7 21 194 79.777 13.7 6 69.8
20” ×13-3/8” 50.8/47.5 21 198 34/32 21 100 15.918 6.26 77.18
30”×30” 76.2/71.1 2 21 461 76/73 21 292 295.21 8 15.8 7 85.75
Below the result of calculation of embodiment 1,2 is analyzed, as can be seen from Table 2:
If 1 is lowered to common 30 at spudding well " behind the riser pipe; suppose that we install 30 at well head " * the ring-like preventer of 1M, its weight is 14.7t, and our deadweight adopted is that the critical load (as shown in table 2) of 461.3kg/m is: 666.2t, that is this moment 30 usually " ring-like preventer weight only is 2.2% of critical load.As seen, the safety allowance of tubing string commonly used is big, and the safety factor of its critical load is n s = 666 14.7 = 45.3 , And in the follow-up operation, if 13-5/8 " * 10M blowout preventer set weight all is added on the riser pipe, and its safety factor also is n s = 666 44 = 15 .
If 2 adopt the tower structure that becomes rigidity, as the same outside dimension in the table 3, but different inner diameters 30 " * 30 ", riser pipe, its deadweight be for 461kg/m and 292kg/m, and promptly bottom wall thickness and top wall are thin two kinds, when the change rigidity of different inwalls makes up, its critical load is 430.7t, that is install this moment deadweight for 14.7t 30 " * the ring-like preventer of 1M, the safety factor of its critical load is n s = 430.7 14.7 = 29.3 , As seen safety allowance is flush with money naturally, even consider in the subsequent job 13-5/8 " * 10M blowout preventer set weight all is added on the riser pipe 1, and its safety factor is n = 461 44 = 10.4 .
3, when operating condition allows, we adopt tower stiffness changing structure, promptly be to adopt large diameter pipe near sea bed one end, adopt the way (as shown in table 3) of narrow tube near drilling well well head one end, if adopt 30 " * 20 " the combination of tower change rigidity marine riser, this moment, critical load was 393.56t, and if 21-1/4 is installed this moment " * the 5M preventer; its deadweight is 20t, then this moment critical load safety factor n s = 383.56 20 = 19.68 , Consider in the subsequent job, even with 13 5/8 " * total weight of 10M blowout preventer set adds that all allowance is also very big, is enough to engineering demands, its safety factor still is n = 393.56 44 = 8.9 .
4, the demand of considering operation is wanted to reduce cost, raise the efficiency, spud in and adopt the tower structure (as shown in table 3) that becomes rigidity in the top layer, if adopt 20 " * 13-3/8 " combination, then this moment, its critical load was 74.8t, and we this moment if after only considering the top layer operation, 21-1/4 is installed " * preventer of 5M; its deadweight is 20t, then this moment critical load safety factor be n s = 74.8 20 = 3.74 .
5, as seen by the contrast of table 4 and table 2: when the depth of water when 35m is increased to 42m, critical load reduces very fast, for 30 " deadweight is the riser pipe of 461kg/m, its critical load is reduced to 458.6t by 666.2t, promptly the depth of water increases by 16%, critical load reduction by 31%.
6, as seen: if the employing stiffness changing structure is 30 " * 20 " during the riser pipe structure by the contrast of table 5 and table 3, when the depth of water increases to 42m by 35m, its critical load is reduced to 79.8t by 393.6t, that is under the condition of depth of water increase by 16%, critical load reduces about 80%.
By above practice with the analysis showed that the present invention is considered as an end build-in with the riser pipe on the self-elevating drilling platform 1, the mechanical model that an end hinged constraint is set up is found the solution the method for the critical load of its elastic stability, is feasible on principle and field practice.Operation on the sea top layer preventer 30 commonly used just at present " * 1M and 21-1/4 " * two kinds of patterns commonly used of 5M on, calculate with the inventive method, conventional 30 " and become rigidity 30 " * 20 " and 30 " * 30 " three kinds of various combination forms, its critical load all satisfies the operation needs.
In sum, as can be seen, become the critical load formula that the rigidity tower structure proposes according to the present invention, can comprise the length of riser pipe 1 each section by every definite riser pipe 1 parameter, inside and outside footpath, weight, stiffness factors etc. calculate the critical load value of riser pipe 1 elastic stability, act on gross weight on the riser pipe according to preventer etc., just can obtain safety factor, obtain the testing result of riser pipe elastic stability.Simultaneously, according to safety factor require, load requirement such as sea water advanced, preventer weight, also can pass through the critical load formula of the elastic stability of riser pipe, in conjunction with the specification of existing riser pipe, parameters such as the length of selection upper and lower part riser pipe 1 and caliber.

Claims (6)

1, a kind of offshore oil well drilling used water, it is characterized in that: described riser pipe is tower change rigidity tubing string, top tubing string rigidity is little, bottom tubing string rigidity is big, after the material that concentrated load that wellhead blowout preventor forms and tubing string use was determined, the length of described upper and lower section tubing string and caliber satisfied the critical load formula of following riser pipe elastic stability:
P cr = EI 1 π l 3 α 1 + EI 2 π l 3 α 2 - ( q 2 β 2 2 l π 2 + q 1 β 1 2 l π 2 ) In the formula:
α 1 = π ( l - l 2 ) + l 2 sin 2 πl 2 l
α 2 = l 2 sin 2 πl 1 l - πl 2
β 1 = π 2 l 1 2 - πll 1 sin 2 πl 2 l - l 2 sin ( πl 2 l ) 2
β 2 = π 2 l 2 ( l + l 1 ) + πll 1 sin 2 π l 2 l + l 2 sin ( πl 2 l ) 2
Wherein: P CrBe critical axial load [N] that E is steel modulus of elasticity [N/m 2], generally: E=2.058 * 10 5MPa; I is a polar moment of inertia, I=3.14 * (external diameter 4-internal diameter 4)/32[m 4]; L be riser pipe 1 from the seabed length [m] to the top; l 1Length for the hypomere tubing string; l 2Length for the hypomere tubing string; q 1Unit weight [N/m] for the epimere tubing string; q 2Unit weight [N/m] for the hypomere tubing string.
2, a kind of offshore oil well drilling used water as claimed in claim 1 is characterized in that:
Work as l 2=l q 2During=q,
P cr = EI 2 π l 3 ( - πl ) - ( q 2 π 2 l 2 2 l π 2 ) = EI 2 π 2 l 2 - q 2 l 2 .
3, a kind of offshore oil well drilling used water as claimed in claim 1 is characterized in that: when l 1 = l 2 = l 2 The time:
P cr = EI 1 π 2 2 l 2 + EI 2 π 2 2 l 2 - l 2 [ q 2 ( 3 4 + 1 π 2 ) + q 1 ( 1 4 + 1 π 2 ) ]
4, a kind of offshore oil well drilling used water as claimed in claim 1 is characterized in that: the internal diameter of described upper and lower part tubing string is identical, and the external diameter of described top tubing string is less than the external diameter of described hypomere tubing string.
5, a kind of offshore oil well drilling used water as claimed in claim 1 is characterized in that: the external diameter of described upper and lower part tubing string is identical, and the internal diameter of described top tubing string is greater than the internal diameter of described bottom tubing string.
6, a kind of detection method of offshore oil well drilling used water elastic stability may further comprise the steps:
1) set up the critical load formula of riser pipe elastic stability:
P cr = EI 1 π l 3 α 1 + EI 2 π l 3 α 2 - ( q 2 β 2 2 l π 2 + q 1 β 1 2 l π 2 ) Wherein:
α 1 = π ( l - l 2 ) + l 2 sin 2 πl 2 l
α 2 = l 2 sin 2 πl 1 l - πl 2
β 1 = π 2 l 1 2 - πll 1 sin 2 πl 2 l - l 2 sin ( πl 2 l ) 2
β 2 = π 2 l 2 ( l + l 1 ) + πll 1 sin 2 π l 2 l + l 2 sin ( πl 2 l ) 2
2) parameters of riser pipe is brought into above-mentioned critical load formula, obtain the critical load of riser pipe;
3) according to the critical load of riser pipe and the ratio that all is added in weight on the described riser pipe, judge whether to meet the requirement of safety factor, if meet the requirement of safety factor, can be by the detection of riser pipe elastic stability.
CN 200610112494 2006-08-22 2006-08-22 Offshore oil well drilling used water insulation duct and method for testing its elastic stability Pending CN1908364A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610112494 CN1908364A (en) 2006-08-22 2006-08-22 Offshore oil well drilling used water insulation duct and method for testing its elastic stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610112494 CN1908364A (en) 2006-08-22 2006-08-22 Offshore oil well drilling used water insulation duct and method for testing its elastic stability

Publications (1)

Publication Number Publication Date
CN1908364A true CN1908364A (en) 2007-02-07

Family

ID=37699574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610112494 Pending CN1908364A (en) 2006-08-22 2006-08-22 Offshore oil well drilling used water insulation duct and method for testing its elastic stability

Country Status (1)

Country Link
CN (1) CN1908364A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581197B (en) * 2009-06-24 2012-05-09 中国海洋石油总公司 Design method for optimization of matching between pile hammer and riser pipe
WO2017121112A1 (en) * 2016-01-14 2017-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Method for evaluating performance of multistage hydraulic jet fracturing string
CN110132473A (en) * 2019-05-21 2019-08-16 中国石油大学(华东) Moment of flexure measuring mechanism and measurement method, sucker rod moment of flexure measuring device and measuring method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101581197B (en) * 2009-06-24 2012-05-09 中国海洋石油总公司 Design method for optimization of matching between pile hammer and riser pipe
WO2017121112A1 (en) * 2016-01-14 2017-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Method for evaluating performance of multistage hydraulic jet fracturing string
CN110132473A (en) * 2019-05-21 2019-08-16 中国石油大学(华东) Moment of flexure measuring mechanism and measurement method, sucker rod moment of flexure measuring device and measuring method

Similar Documents

Publication Publication Date Title
ATE386240T1 (en) METHOD FOR PRODUCING A GETHER HEAT PROBE
JP2015212508A (en) Offshore drilling installation and method for offshore drilling
MY155858A (en) Offshore drilling system
GB2485731A (en) Offshore casing drilling method
CN1451075A (en) Method and apparatus for hydrocarbon subterranean recovery
CN2911009Y (en) One-leg three-pile simple platform suitable for developing medium-small oil fields in sea
GB2585602A (en) Arrangement for supporting a wellhead
CN1908364A (en) Offshore oil well drilling used water insulation duct and method for testing its elastic stability
CN200943449Y (en) Riser pipe for marine petroleum drilling well
US9109725B2 (en) Conductor bend restrictor
US20130284459A1 (en) Bearing apparatus and methods
CN106761443B (en) The assembled casing of casing deformation when preventing shale gas well fracturing
CN1317522C (en) SCS combined hydropower station pressure underground pipe design method
Greene et al. The influence of drilling rig and riser system selection on wellhead fatigue loading
EA200800121A1 (en) DRILLING MACHINE WITH TOP DRIVE AND FLEXIBLE PIPE AND METHOD OF INTRODUCTION FLEXIBLE PIPE TO THE WELL
Hariharan et al. Drilling riser management in deepwater environments
CN2854052Y (en) Casing leap well double releasing gadget centralising tool
KR20130051259A (en) Semi-submersible drilling rig
Lazzarotto et al. Technological developments in deep drilling in the Lardarello area
CN214697778U (en) Deep water drilling pipe head is sat and is hung device
CN208858325U (en) A kind of three gear wheel drag bits
Benson et al. Coiled tubing excitation technology leads to greater reach in the wellbore
CN210317187U (en) Counter weight protective pipe device for water drilling
Chedzoy et al. Design challenges of deepwater dry tree riser systems for different vessel types
CN2562179Y (en) Magnetic controller for testing pressure and releasing pressure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication