CN1884890A - Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof - Google Patents

Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof Download PDF

Info

Publication number
CN1884890A
CN1884890A CN 200610012772 CN200610012772A CN1884890A CN 1884890 A CN1884890 A CN 1884890A CN 200610012772 CN200610012772 CN 200610012772 CN 200610012772 A CN200610012772 A CN 200610012772A CN 1884890 A CN1884890 A CN 1884890A
Authority
CN
China
Prior art keywords
tube
resin
power plant
preparation
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610012772
Other languages
Chinese (zh)
Other versions
CN100392306C (en
Inventor
栗小锋
石双柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Clight (hebei) Environmental Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100127722A priority Critical patent/CN100392306C/en
Publication of CN1884890A publication Critical patent/CN1884890A/en
Application granted granted Critical
Publication of CN100392306C publication Critical patent/CN100392306C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention relates to a pulp glass steel spray tube used in the desulfurizing tower of power plant, which comprises: the invention plates demould agent on the mould tube; the mould tube is coiled with polyester fiber with resin to form inner anti-abrasion layer; the molded inner anti-abrasion layer is coiled with the fiber with resin to form glass steel liner tube; the molded glass steel liner layer is coiled with polyester fiber with resin to form outer anti-abrasion layer; then solidifying. The invention has long service life, with high temperature resistance.

Description

Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof
Technical field
The invention belongs to the pipe technology field, disclose a kind of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof specifically.
Background technique
Desulfurization is one main program in the thermal power plant toxic emission flow process, and its principle is to utilize sulphur, sulfur dioxide in lime water and the high-temp waste gas to react, and it eliminating is prevented its emptying.The equipment of this operation is mainly, and is provided with multilayer by the lime water pipeline that supporting frame supports in the desulfurization tower body, is connected with arm on this lime water pipeline, and the nearly 10 kilograms lime water shower nozzle of some weight is housed on this arm or lime water pipeline.During work, lime water from shower nozzle, spray with high-temp waste gas in sulphur, sulfur dioxide react.
At present, employed lime water pipeline has three kinds in desulfuration absorbing tower: a kind of PP of being plastic tube, this plastic tube in use, when in case the pressure of lime water reduces to spray deficiency, its ambient temperature can raise moment, this PP plastic tube is because its heat resistance missionary society bending deflection causes whole desulfurizer paralysis; Second kind is the steel-lined rubber pipeline, although its mechanics of this pipeline and heat resistance are better, but the rubber layer that is served as a contrast on the steel pipe inwall is easy to peel off and comes off, and the decay resistance of steel pipe is relatively poor, therefore shorter its working life for projected life at the desulfuration absorbing tower more than 30 years, can not satisfy the demand; The third is a fiber reinforced plastic pipe, and the decay resistance extreme difference of this pipeline mostly is about 1 year working life.In addition, in the spray process, wash away because high pressure lime water produces the inner and outer wall of pipeline, above-mentioned three kinds of pipelines are the wear-resisting performance of tool not all, therefore needs often maintenance and changes, and can cause the proper functioning of power station to seriously influence.
Summary of the invention
Purpose of the present invention just provides a kind of corrosion-resistant, anti abrasive glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Another object of the present invention just provides the preparation method of above-mentioned glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
The technological scheme that realizes the object of the invention is: glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant, comprise the frp liner pipe that constitutes by long fibre and resin, and be provided with the innner and outer wearing layer in the both sides of this frp liner pipe and constitute.
In addition: described innner and outer wearing layer is made of the polyster fibre of 20-40 weight portion, the high-abrasive material of 10-20 weight portion and the resin of 40-50 weight portion; The thickness of described innner and outer wearing layer is between 1.5-5 centimetre; The thickness of described frp liner pipe is between 3-8 centimetre; Described long fibre is glass fibre or polyster fibre.
The preparation method who realizes glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant proposed by the invention includes following operation:
The preparation of first step mould
Mould tube placed roll on the frame, and spraying releasing agent on the mould tube;
The preparation of wearing layer in second step
Rotate mould tube, and twine by resin that is mixed with high-abrasive material and the polyster fibre that hangs with this resin, to the thickness of regulation at this mould tube;
The preparation of the 3rd step frp liner pipe
Rotate mould tube, and twine the preparation moulding in twine again on the wearing layer by being mixed with resin and hanging with the fiber of this resin, to the thickness of regulation;
The preparation of the 4th step outer wear layer
Rotate mould tube, on the frp liner pipe that twines the preparation moulding, twine by resin that is mixed with high-abrasive material and the polyster fibre that hangs with this resin, to the thickness of regulation;
The 5th step solidifying
Rotate mould tube, make the glass fibre reinforced plastics spraying tube pipe of moulding solidify.
Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant provided by the present invention and preparation method thereof, compared with prior art, because the structural bone rack-layer of this glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant is a frp layer, has construction layer corrosion-resistant and the antiscour friction in the setting of the both sides of framework layer, can reach working life more than 30 years after testing, make that the projected life of working life of this glass fiber reinforced plastic sprinkling tube for desulfurizing tower and desulfurizing tower of electric power plant is suitable, therefore, need not to change and can guarantee the normal operation of desulfurizer in the using process; After testing this glass fiber reinforced plastic sprinkling tube under 180-200 ℃ ambient temperature, be 5 hours indeformable, therefore have resistant to elevated temperatures characteristics, can satisfy the requirement of desulfurizing tower of electric power plant ordinary accident.
Description of drawings
As shown be the structural representation of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment
Below in conjunction with accompanying drawing glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant provided by the invention and preparation method thereof is described in further detail:
As shown be the structural representation of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.Its structure comprises the frp liner pipe 1 that is made of long fibre and resin, and wearing layer 2 and outer wear layer 3 constitute in the about both sides of this frp liner pipe are provided with.
The technological method for preparing above-mentioned glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant is:
Embodiment 1
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent in the top layer of mould tube spraying last layer solid wax;
The preparation of wearing layer in second step
The configuration of resin: the Atlc382 that gets 40 kilograms is the epoxy vinyl ester of modification, and adds 20 kilograms silicon carbide therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 5 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The DOW470 that gets 45 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 5 cm thicks in the mould tube of wearing layer, make need the glass fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the glass fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 8 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
For easy to process, make this outer wear layer consistent with the preparation method of lining wearing layer, promptly get the epoxy vinyl ester of 40 kilograms Atlc382 modification, and add 20 kilograms silicon carbide therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 5 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 2
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent at the top layer of mould tube spraying last layer machine oil;
The preparation of wearing layer in second step
The configuration of resin: the Atlc430 that gets 50 kilograms is the epoxy vinyl ester of modification, and adds 10 kilograms aluminium oxide therein and do wear-resisting part, stirs and forms colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.2 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 4 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The Atlc382 that gets 50 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 4 cm thicks in the mould tube of wearing layer, make need the polyster fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the polyster fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 3 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
For easy to process, make this outer wear layer consistent with the preparation method of lining wearing layer, promptly get the epoxy vinyl ester of 50 kilograms Atlc430 modification, and add 10 kilograms aluminium oxide therein and do wear-resisting part, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.2 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 2 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 3
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent at the top layer of mould tube spraying last layer edible fat;
The preparation of wearing layer in second step
The configuration of resin: the DOW411 that gets 45 kilograms is the epoxy vinyl ester of modification, and adds 15 kilograms quartz flour therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.5 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 3 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The Atlc430 that gets 42 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 3 cm thicks in the mould tube of wearing layer, make need the glass fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the glass fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 5 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
For easy to process, make this outer wear layer with above-mentioned in the preparation method of wearing layer consistent, promptly get the epoxy vinyl ester of 45 kilograms DOW411 modification, and add 15 kilograms quartz flour therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.5 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 3 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 4
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent at the top layer of mould tube spraying last layer machine oil;
The preparation of wearing layer in second step
The configuration of resin: the DOW470 that gets 42 kilograms is the epoxy vinyl ester of modification, and adds 18 kilograms quartz flour therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 2.5 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 2 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The DOW411 that gets 45 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 2 cm thicks in the mould tube of wearing layer, make need the polyster fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the polyster fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 4 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
For easy to process, make this outer wear layer consistent with the preparation method of lining wearing layer, promptly get the epoxy vinyl ester of 42 kilograms DOW470 modification, and add 18 kilograms aluminium oxide therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 2.5 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 2 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 5
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent at the top layer of mould tube spraying last layer edible fat;
The preparation of wearing layer in second step
The configuration of resin: the Atlc382 that gets 50 kilograms is the epoxy vinyl ester of modification, and adds 15 kilograms aluminium oxide therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 2.0 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 1.5 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The DOW470 that gets 40 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 1.5 cm thicks in the mould tube of wearing layer, make need the glass fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the glass fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 6 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
The configuration of resin: get the epoxy vinyl ester of 48 kilograms DOW470 modification, and add 15 kilograms quartz flour therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.5 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 4 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 6
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent in the top layer of mould tube spraying last layer solid wax;
The preparation of wearing layer in second step
The configuration of resin: the DOW411 that gets 40 kilograms is the epoxy vinyl ester of modification, and adds 16 kilograms brown corundum therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.8 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 5 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The Atlc430 that gets 50 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 5 cm thicks in the mould tube of wearing layer, make need the polyster fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the polyster fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 5 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
The configuration of resin: get the epoxy vinyl ester of 50 kilograms Atlc430 modification, and add 16 kilograms brown corundum therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 3 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 7
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent in the top layer of mould tube spraying last layer solid wax;
The preparation of wearing layer in second step
The configuration of resin: the Atlc430 that gets 48 kilograms is the epoxy vinyl ester of modification, and adds 20 kilograms brown corundum therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 3 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The DOW411 that gets 48 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 3 cm thicks in the mould tube of wearing layer, make need the glass fibre that twines by and hang up Resin Wound on the wearing layer of lining; Thickness in the glass fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 4 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
The configuration of resin: get the epoxy vinyl ester of 45 kilograms DOW411 modification, and add 16 kilograms silicon carbide therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.8 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 2 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
With the pipe demoulding after solidifying, and trimming can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.
Embodiment 8
The preparation of first step mould
Mould tube placed roll on the frame, and make releasing agent at the top layer of mould tube spraying last layer machine oil;
The preparation of wearing layer in second step
The configuration of resin: the DOW470 that gets 48 kilograms is the epoxy vinyl ester of modification, and adds 10 kilograms silicon carbide therein and do anti-wear agent, stirs to form colloid; Start power, rotate mould tube, make need the polyster fibre that twines by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 1.5 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 2 centimetres, wearing layer in the formation glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 3rd step frp liner pipe
The DOW411 that gets 48 kilograms is that the epoxy vinyl ester of modification is put into container, starts power, rotate be wound with 2 cm thicks in the mould tube of wearing layer, make need the glass fibre that twines by and hang up Resin Wound on the wearing layer of lining; The amount of the colloid hung of control glass fibre makes it to be controlled at 1: 1 ratio; Thickness in the glass fibre of the resin of hanging that control power makes is wound on the wearing layer reaches 3 centimetres to be ended, and forms the frp liner pipe of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The preparation of the 4th step outer wear layer
The configuration of resin: get the epoxy vinyl ester of 40 kilograms Atlc382 modification, and add 10 kilograms brown corundum therein and do anti-wear agent, stir and form colloid; Start power, rotate mould tube, make the polyster fibre that will twine by and hang up colloid and be wrapped on the mould tube; The amount of the colloid that the control polyster fibre is hung, feasible employed polyster fibre consumption of winding and the employed amount of colloid are controlled at 1: 2.0 ratio; The thickness that the polyster fibre of the colloid of the extension that control power makes is wound on the mould tube only reaches 3 centimetres, forms the outer wear layer of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant;
The 5th step solidifying
Rotation is wound with the blank of the glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant on the mould tube, makes the pipe that is made of resin and fiber solidify;
The 6th step solidifying
Pipe demoulding trimming after solidifying can be prepared glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant.

Claims (6)

1, glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant is characterized in that, comprises the frp liner pipe that is made of long fibre and resin, is provided with the innner and outer wearing layer in the both sides of this frp liner pipe and constitutes.
2, glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant as claimed in claim 1 is characterized in that: described innner and outer wearing layer is made of the polyster fibre of 20-40 weight portion, the high-abrasive material of 10-20 weight portion and the resin of 40-50 weight portion.
3, glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant as claimed in claim 1 is characterized in that: the thickness of described innner and outer wearing layer is between 1.5-5 centimetre.
4, glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant as claimed in claim 1 is characterized in that: the thickness of described frp liner pipe is between 3-8 centimetre.
5, glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant as claimed in claim 1 is characterized in that: described long fibre is glass fibre or polyster fibre.
6, the preparation method of glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant includes following operation:
The preparation of first step mould
Mould tube placed roll on the frame, and spraying releasing agent on the mould tube;
The preparation of wearing layer in second step
Rotate mould tube, and twine by resin that is mixed with high-abrasive material and the polyster fibre that hangs with this resin, to the thickness of regulation at this mould tube;
The preparation of the 3rd step frp liner pipe
Rotate mould tube, and twine the preparation moulding in twine again on the wearing layer by being mixed with resin and hanging with the fiber of this resin, to the thickness of regulation;
The preparation of the 4th step outer wear layer
Rotate mould tube, on the frp liner pipe that twines the preparation moulding, twine by resin that is mixed with high-abrasive material and the polyster fibre that hangs with this resin, to the thickness of regulation;
The 5th step solidifying
Rotate mould tube, make the glass fibre reinforced plastics spraying tube pipe of moulding solidify.
CNB2006100127722A 2006-05-30 2006-05-30 Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof Expired - Fee Related CN100392306C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100127722A CN100392306C (en) 2006-05-30 2006-05-30 Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100127722A CN100392306C (en) 2006-05-30 2006-05-30 Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof

Publications (2)

Publication Number Publication Date
CN1884890A true CN1884890A (en) 2006-12-27
CN100392306C CN100392306C (en) 2008-06-04

Family

ID=37583173

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100127722A Expired - Fee Related CN100392306C (en) 2006-05-30 2006-05-30 Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof

Country Status (1)

Country Link
CN (1) CN100392306C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343697A (en) * 2011-10-12 2012-02-08 成都龙泉防腐工程有限公司 Anticorrosive and wear-resistant material for spraying zones of desulfurization towers
CN103407221A (en) * 2013-02-04 2013-11-27 四川泸天化股份有限公司 Anti-corrosion and anti-abrasion lining, preparation method and application thereof
CN103802381A (en) * 2013-02-04 2014-05-21 四川泸天化股份有限公司 Repairation method of anticorrosion and abrasion-resistant lining
CN106034993A (en) * 2016-07-12 2016-10-26 张日龙 Rotary water spraying device for gardens
CN109630768A (en) * 2018-12-29 2019-04-16 浙江德创环保科技股份有限公司 A kind of desulfuration spraying tube road and its production technology
JP2019108962A (en) * 2017-12-20 2019-07-04 三菱日立パワーシステムズ株式会社 Spray pipe, desulfurization device equipped with the same, and method of inspecting the same
CN114352846A (en) * 2022-01-06 2022-04-15 重庆钢铁股份有限公司 Long-life desulfurization slurry pipeline and manufacturing method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2035034U (en) * 1988-02-11 1989-03-29 广东省建筑科研设计所 Conveyer pipe made of sandwich fibre reinforced plastic
CN1032387C (en) * 1993-12-25 1996-07-24 刘雄亚 Inorganic compound material pressure pipe and forming technology
CN1142031A (en) * 1995-08-01 1997-02-05 李祝安 Sewer of glass-fiber reinforced plastics composite material
US6581644B1 (en) * 1997-04-04 2003-06-24 Exxonmobil Research And Engineering Company Composite pipe structure having improved containment and axial strength
CN2630606Y (en) * 2003-07-23 2004-08-04 刘堪金 Carbon-plastic alloy fire-retardant temp. resisting oil-gas pipe material
CN2735140Y (en) * 2004-09-08 2005-10-19 郜东河 Anticorrosive abrasion resistant protective layer for external wall of straight-push steel pipe
CN100473518C (en) * 2005-11-07 2009-04-01 伦慧东 Technique for steel-plastic composite tube enhanced by antistatic flame retardant Nano fibers and products therefrom

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343697A (en) * 2011-10-12 2012-02-08 成都龙泉防腐工程有限公司 Anticorrosive and wear-resistant material for spraying zones of desulfurization towers
CN102343697B (en) * 2011-10-12 2013-11-20 成都龙泉防腐工程有限公司 Anticorrosive and wear-resistant material for spraying zones of desulfurization towers
CN103407221A (en) * 2013-02-04 2013-11-27 四川泸天化股份有限公司 Anti-corrosion and anti-abrasion lining, preparation method and application thereof
CN103802381A (en) * 2013-02-04 2014-05-21 四川泸天化股份有限公司 Repairation method of anticorrosion and abrasion-resistant lining
CN106034993A (en) * 2016-07-12 2016-10-26 张日龙 Rotary water spraying device for gardens
CN106034993B (en) * 2016-07-12 2019-04-19 湖北宜翔建设有限公司 A kind of rotary water jet device in gardens
JP2019108962A (en) * 2017-12-20 2019-07-04 三菱日立パワーシステムズ株式会社 Spray pipe, desulfurization device equipped with the same, and method of inspecting the same
CN111512080A (en) * 2017-12-20 2020-08-07 三菱日立电力系统株式会社 Spray pipe, desulfurization device provided with same, and method for inspecting desulfurization device
JP7009200B2 (en) 2017-12-20 2022-01-25 三菱パワー株式会社 Spray pipe, desulfurization device equipped with it and its inspection method
CN109630768A (en) * 2018-12-29 2019-04-16 浙江德创环保科技股份有限公司 A kind of desulfuration spraying tube road and its production technology
CN114352846A (en) * 2022-01-06 2022-04-15 重庆钢铁股份有限公司 Long-life desulfurization slurry pipeline and manufacturing method thereof
CN114352846B (en) * 2022-01-06 2024-02-06 重庆钢铁股份有限公司 Long-life desulfurization slurry pipeline and manufacturing method thereof

Also Published As

Publication number Publication date
CN100392306C (en) 2008-06-04

Similar Documents

Publication Publication Date Title
CN1884890A (en) Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof
CN1807130A (en) Polyurethane solid tyre and manufacturing method thereof
CN1604993A (en) Wind power generator, windmill, and spindle and blade of the windmill
CN1867770A (en) Method for manufacturing a wind turbine blade, wind turbine blade, front cover and use of a front cover
CN101031348A (en) Honeycomb structure and manufacturing method thereof
CN101033642A (en) Lightweight polyphenyl composite wall board
CN1671970A (en) Wind turbine, hydraulic system, air bleed system and method for controlling at least two wind turbine blades
CN1449467A (en) Structure reinforcing method, structure-reinforcing reinforcing fiber yarn-containing material, reinforcing structure material and reinforced structure
CN1865728A (en) Composite mineral fibre reinforced brake liner and preparation process and special device therefor
CN1496801A (en) Device for transporting ceramic moulded pieces
CN1923883A (en) Polypropylene cable sheath material for submersible pump and producing technology thereof
CN1223784C (en) Theramal insulation device for at least one underwater pipe comprising sealed partitions
CN1169660C (en) Tool for shaping hollow tube
CN1727152A (en) Die in use for molding component of concrete filled double thin wall
CN1851307A (en) Pneumatic brake pipe, and its manufacturing method
CN1619038A (en) Blended centrifuging glass cotton fiber felt and its making method
CN1781980A (en) High performance elastomer composite material spcially for printing rubber roller and its preparing method
CN1858017A (en) Anti-freezing type cement asphalt mortar and its preparing method
CN1203243A (en) Rubber composition for conveyor belt
CN1793215A (en) Trielement ethyl propylric rubber waterproofing coiled material and production process thereof
CN1320047C (en) Superlow hardness high elastic non-treatment rubber pipe and method for producing same
CN1114739C (en) Hollow tube member and its making process
CN1420813A (en) Method of producing centrifugally cast, glass fiber reinforced plastic tubes
CN1398797A (en) Quick installation of aerator in aerator tank
CN1603669A (en) Pushing technique capable of reducing friction around pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hebei KNT FRP Co., Ltd.

Assignor: Li Xiaofeng|Gao Donghe

Contract record no.: 2011130000121

Denomination of invention: Glass fiber reinforced plastic sprinkling tube for desulfurizing tower of electric power plant and preparation method thereof

Granted publication date: 20080604

License type: Exclusive License

Open date: 20061227

Record date: 20110819

ASS Succession or assignment of patent right

Owner name: JISHUI KNT (HEBEI) ENVIRONMENTAL TECHNOLOGY CO., L

Free format text: FORMER OWNER: LI XIAOFENG

Effective date: 20130709

Free format text: FORMER OWNER: GAO DONGHE

Effective date: 20130709

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130709

Address after: 053200 No. 1198, Southern China Avenue, Jizhou, Hebei

Patentee after: Water clight (Hebei) Environmental Technology Co. Ltd.

Address before: Jizhou City, Hebei Province, 053200 Jinji Street No. 124 Hebei KNT FRP Co.

Patentee before: Li Xiaofeng

Patentee before: Gao Donghe

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080604