- CN1884725A CN1884725A CN 200610014608 CN200610014608A CN1884725A CN 1884725 A CN1884725 A CN 1884725A CN 200610014608 CN200610014608 CN 200610014608 CN 200610014608 A CN200610014608 A CN 200610014608A CN 1884725 A CN1884725 A CN 1884725A
- Authority
- CN
- China
- Prior art keywords
- steel
- jack
- steel pipe
- pipe column
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention relates to an underground steel tube pile positioning vertical adjusting device, when constructing subway station or other underground buildings, wherein it is characterized in that: it is formed by ground positioning platform, steel protective cylinder, jack, slide track, steel tube post, steel ring, incline testing system, and jack vertical adjusting control system; the steel tube post is arranged inside the steel protective cylinder; the jack is arranged between the steel protective cylinder and the steel tube post; the bottom of jack is sliding connected to the slide track at the inner wall of steel protective cylinder; the steel tube post is fixed with incline testing sensor and connected to the incline testing displaying system; the jack is connected to the jack vertical adjusting control system. The invention has the advantages that: only 1/3 of whole depth is arranged with steel protective cylinder, to save steel proactive cylinder, and reduce the extended length of steel tube post, with high automatic degree.
Description
Technical field
The invention belongs to the building operations apparatus for work, the steel pipe stake positioning and plumbing device for underground architecture when relating in particular to the construction of a kind of subway station or other underground building employing cap excavation method.
Background technology
When adopting cap excavation method to build subway station, underground indoor-bollard is used steel pipe column, and the lower end of steel pipe column is connected with the base concrete castinplace pile, and castinplace pile is used for below the subway station base plate of multilayer, and steel pipe column is used for more than the subway station base plate.The cap excavation method job practices is to do underground structure exterior wall and cast-in-place concrete pile earlier, send down steel pipe column again in the dark hole of mud-filled castinplace pile, docks with the upper end of castinplace pile.Because steel pipe column is structural column, thus very strict to the requirement of its location and verticality, but when in mud-filled dark hole steel pipe column being installed, it is very big that the location of steel pipe column and verticality are controlled difficulty.
Positioning and plumbing method commonly used at present has artificial hole installing and locating method down and top to correct the frame method.Artificial hole installing and locating method down: be that a steel casing bigger than steel pipe column diameter is installed earlier in the hole, steel casing lower end tightly is connected with cast-in-place concrete pile, the upper end reaches ground, after mud in the casing drained, the workman arrives at the bottom of the hole down, installation positioner guarantees the verticality of steel pipe column with locator.Its weak point is artificial down under tens meters dark holes during operation, big, the variations in temperature of manual work noise is difficult to control in atmosphere draught-free, the hole, the steel casing is connected with cast-in-place concrete pile has underground water to enter the danger of casing when tight, operator's security risk is big in the hole, full hole depth is provided with steel casing cost height, is not suitable for groundwater table height, the vigorous area of underground water; The frame method is corrected on top: be the steelframe that a certain altitude is installed more than ground, stake hole, steel pipe column inserts in the stake hole in the middle of being fixed on steelframe, bring in the verticality of adjusting steel pipe on the steelframe by adjusting after the location, steelframe bottom surface, its weak point is to need steel pipe column to increase the above length in ground, and the steel pipe consumption is big; When underground steel pipe column reached more than 30 meter deeply, it is short big to the vertical adjustment error of steel pipe column that frame is corrected on top, and top is corrected and set up the cost increasing high, takes turns to use mobile difficulty etc.Along with subway station and underground structrue engineering enlarge day by day, demand developing a kind of automaticity height, safety, duration are short, be convenient to operate steel pipe column location and verticality control method in the industry urgently.
Summary of the invention
The objective of the invention is to overcome the deficiency of above-mentioned technology, do not need under the workman in the hole and provide a kind of, the automaticity height, operation is lacked, is convenient to safety, duration, reduce the material usage on the plumbing devices such as steel casing and correction frame again, lower-cost steel pipe stake positioning and plumbing device for underground architecture.
The present invention for achieving the above object, by the following technical solutions: a kind of steel pipe stake positioning and plumbing device for underground architecture, it is characterized in that: by the ground locating platform, the steel casing, jack, slideway, steel pipe column, the steel enclosure, the deviational survey system, jack vertical adjustment ground control system is formed, described steel pipe column places in the steel casing, between steel casing and steel pipe column, be provided with jack, the jack bottom is slidingly connected with the slideway that is located at steel casing inwall, affixed deviational survey sensor and be connected with the deviational survey display system on the steel pipe column, jack is connected with jack vertical adjustment ground control system.
Described steel casing inwall is provided with four slideways, and slidely connects the quadruplet jack respectively.
Be provided with the steel enclosure between described jack fore-set end and the steel pipe column.
Beneficial effect of the present invention: the technical program is only established 1/3rd steel casing along hole depth, save steel casing materials, do not establish and correct frame on the ground, can shorten the extension elongation of steel pipe column, by the locating platform on ground and the very heavy positioning and plumbing in the hole, the automaticity height enters in the hole without the workman, safe and reliable devoid of risk.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the partial enlarged drawing of Figure 1A;
Fig. 3 is a C-C broken section enlarged drawing among Fig. 1;
Fig. 4 is the partial enlarged drawing of B among Fig. 3.
Among the figure: 1 hole, 2 castinplace piles, 3 ground locating platforms, 4 steel casings, 5 steel pipe columns, 6 jack, 7 slideways, 8 steel enclosures, 9 deviational survey sensors, 10 deviational survey display systems, 11 jack vertical adjustment ground control systems.
The specific embodiment
Describe the specific embodiment of the present invention in detail below in conjunction with accompanying drawing and preferred embodiment.
A kind of steel pipe stake positioning and plumbing device for underground architecture, by ground locating platform 3, steel casing 4, jack 6, slideway 7, steel pipe column 5, steel enclosure 8, the deviational survey system, jack vertical adjustment ground control system is formed, described steel pipe column places in the steel casing, between steel casing and steel pipe column, be provided with jack, the jack bottom is slidingly connected with the slideway that is located at steel casing inwall, affixed deviational survey sensor 9 and be connected on the steel pipe column with deviational survey display system 10, jack is connected with jack vertical adjustment ground control system, jack is controlled by ground installation, can adjust the position of pipe column lower end to any direction.Described steel casing inwall is provided with four slideways, and slidely connects the quadruplet jack respectively, and after the steel pipe vertical adjustment was fixing, jack can be put on ground along slideway and reclaim.Be provided with the steel enclosure between described jack fore-set end and the steel pipe column, reduced the gap of steel pipe column and steel casing, make the stroke of jack satisfy the requirement of steel pipe column vertical adjustment.
After having dug stake hole 1 during construction, the concrete of building castinplace pile 2 earlier fixes ground locating platform 3 to the absolute altitude of setting, and puts into steel casing 4 in the hole, and the steel casing is vertical with the ground locating platform and fixing.In the hole, hang the degree of depth of steel pipe column 5 to designing requirement, verticality by deviational survey sensor 9 in the deviational survey system and deviational survey display system 10 monitoring steel pipe columns, when the against regulation standard of the verticality numerical value of steel pipe column, the verticality that starts jack 6 and jack vertical adjustment ground control system 11 adjustment steel pipe columns is till meeting the requirements, in the hole, build the fixedly lower end of steel pipe column of a part of concrete again, reclaim jack by slideway 7 then.
The above only is preferred embodiment of the present invention, is not structure of the present invention is done any pro forma restriction.Every foundation technical spirit of the present invention all still belongs in the scope of technical scheme of the present invention any simple modification, equivalent variations and modification that above embodiment did.
Claims (3)
1, a kind of steel pipe stake positioning and plumbing device for underground architecture, it is characterized in that: form by ground locating platform, steel casing, jack, slideway, steel pipe column, steel enclosure, deviational survey system, jack vertical adjustment ground control system, described steel pipe column places in the steel casing, between steel casing and steel pipe column, be provided with jack, the jack bottom is slidingly connected with the slideway that is located at steel casing inwall, affixed deviational survey sensor and be connected with the deviational survey display system on the steel pipe column, jack is connected with jack vertical adjustment ground control system.
2, steel pipe stake positioning and plumbing device for underground architecture according to claim 1 is characterized in that: described steel casing inwall is provided with four slideways, and slidely connects the quadruplet jack respectively.
3, steel pipe stake positioning and plumbing device for underground architecture according to claim 1 is characterized in that: be provided with the steel enclosure between described jack fore-set end and the steel pipe column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610014608 CN1884725A (en) | 2006-06-30 | 2006-06-30 | Steel pipe stake positioning and plumbing device for underground architecture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610014608 CN1884725A (en) | 2006-06-30 | 2006-06-30 | Steel pipe stake positioning and plumbing device for underground architecture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1884725A true CN1884725A (en) | 2006-12-27 |
Family
ID=37583025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610014608 Pending CN1884725A (en) | 2006-06-30 | 2006-06-30 | Steel pipe stake positioning and plumbing device for underground architecture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1884725A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824919A (en) * | 2010-03-26 | 2010-09-08 | 中铁隧道集团有限公司 | Deep hole underwater installation and locating method of steel pipe column in weak watery stratum |
CN101845896A (en) * | 2010-05-31 | 2010-09-29 | 中建钢构有限公司 | Positioner and method for positioning steel member |
CN102704512A (en) * | 2012-05-29 | 2012-10-03 | 中交一航局第二工程有限公司 | Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology |
CN107288357A (en) * | 2017-08-18 | 2017-10-24 | 云南省建设投资控股集团有限公司 | In reverse construction steel pipe column plumbing device and utilize the device carry out pile integrated construction technique |
CN110158631A (en) * | 2019-06-17 | 2019-08-23 | 中交第三公路工程局有限公司 | A kind of Bridge Pile Foundation Construction method |
CN111379275A (en) * | 2020-03-30 | 2020-07-07 | 中铁第四勘察设计院集团有限公司 | System and method for positioning steel pipe column of cover-excavation top-down construction underground structure |
CN113235654A (en) * | 2021-05-15 | 2021-08-10 | 中铁十一局集团第一工程有限公司 | Permanent steel pipe column positioning device for cover-excavation top-down construction method and construction method |
CN113605390A (en) * | 2021-09-03 | 2021-11-05 | 中国建筑第二工程局有限公司 | Accurate positioning structure for pile connection and construction method |
CN113638417A (en) * | 2021-09-03 | 2021-11-12 | 中国建筑第二工程局有限公司 | Pile connection accurate positioning pouring system and construction method |
CN113832988A (en) * | 2021-09-24 | 2021-12-24 | 中电建路桥集团有限公司 | Self-correcting recyclable steel casing system for verticality in karst cave area and correcting method |
CN114541783A (en) * | 2022-03-09 | 2022-05-27 | 中建三局基础设施建设投资有限公司 | Accurate positioning device suitable for permanent-temporary combined steel pipe column and construction method |
-
2006
- 2006-06-30 CN CN 200610014608 patent/CN1884725A/en active Pending
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824919A (en) * | 2010-03-26 | 2010-09-08 | 中铁隧道集团有限公司 | Deep hole underwater installation and locating method of steel pipe column in weak watery stratum |
CN101824919B (en) * | 2010-03-26 | 2011-06-22 | 中铁隧道集团有限公司 | Deep hole underwater installation and locating method of steel pipe column in weak watery stratum |
CN101845896A (en) * | 2010-05-31 | 2010-09-29 | 中建钢构有限公司 | Positioner and method for positioning steel member |
CN102704512A (en) * | 2012-05-29 | 2012-10-03 | 中交一航局第二工程有限公司 | Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology |
CN102704512B (en) * | 2012-05-29 | 2014-10-01 | 中交第一航局工程局有限公司 | Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology |
CN107288357A (en) * | 2017-08-18 | 2017-10-24 | 云南省建设投资控股集团有限公司 | In reverse construction steel pipe column plumbing device and utilize the device carry out pile integrated construction technique |
CN110158631A (en) * | 2019-06-17 | 2019-08-23 | 中交第三公路工程局有限公司 | A kind of Bridge Pile Foundation Construction method |
CN110158631B (en) * | 2019-06-17 | 2021-08-17 | 中交第三公路工程局有限公司 | Bridge pile foundation construction method |
CN111379275A (en) * | 2020-03-30 | 2020-07-07 | 中铁第四勘察设计院集团有限公司 | System and method for positioning steel pipe column of cover-excavation top-down construction underground structure |
CN113235654A (en) * | 2021-05-15 | 2021-08-10 | 中铁十一局集团第一工程有限公司 | Permanent steel pipe column positioning device for cover-excavation top-down construction method and construction method |
CN113605390A (en) * | 2021-09-03 | 2021-11-05 | 中国建筑第二工程局有限公司 | Accurate positioning structure for pile connection and construction method |
CN113638417A (en) * | 2021-09-03 | 2021-11-12 | 中国建筑第二工程局有限公司 | Pile connection accurate positioning pouring system and construction method |
CN113832988A (en) * | 2021-09-24 | 2021-12-24 | 中电建路桥集团有限公司 | Self-correcting recyclable steel casing system for verticality in karst cave area and correcting method |
CN114541783A (en) * | 2022-03-09 | 2022-05-27 | 中建三局基础设施建设投资有限公司 | Accurate positioning device suitable for permanent-temporary combined steel pipe column and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1884725A (en) | Steel pipe stake positioning and plumbing device for underground architecture | |
CN101824919B (en) | Deep hole underwater installation and locating method of steel pipe column in weak watery stratum | |
CN111962504A (en) | Construction method for covering and digging top-down permanent steel pipe column | |
CN112576812B (en) | Large-diameter long-distance linear jacking pipe jacking method | |
CN107130592B (en) | construction method for long spiral drill and impact drill double-machine composite hole-forming cast-in-place pile | |
CN106759477A (en) | A kind of sheltered reverse excavation steel pipe column positioning construction method | |
CN212358284U (en) | Construction structure of permanent steel-pipe column of lid digs contrary process | |
US7530176B2 (en) | Method and apparatus for monitoring element alignment | |
CN112663613A (en) | Verticality control device and verticality control method for latticed column | |
CN114277803B (en) | Post-insertion method positioning construction method for reverse construction method steel pipe structural column | |
CN2915952Y (en) | Underground building steel pipe column positioning and verticality adjusting device | |
CN200964697Y (en) | Reverse-striking steel column vertical positioning device | |
CN114164858B (en) | High-precision construction method for vertical column in cover-excavation type subway station | |
CN209368877U (en) | Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage | |
CN113356185B (en) | Assembled underground station steel pipe column and accurate installation method thereof | |
CN214460261U (en) | Automatic monitoring device for layered settlement of soil | |
CN214500502U (en) | Pipeline leakage repairing device | |
CN201588410U (en) | Automatic positioning device of steel pipe pillar | |
CN114234873A (en) | Device and method for detecting displacement of segment in deep well in-water construction operation | |
CN209923971U (en) | Suspension connecting device for steel pipe column and steel reinforcement cage in reverse construction | |
CN111676963A (en) | Steel pipe upright post positioning device and positioning construction method thereof | |
CN203716148U (en) | Hydraulic vertical insertion machine | |
CN209368826U (en) | Underground space development contrary sequence method steel pipe column verticality adjuster | |
CN216410117U (en) | Detection apparatus for deep well is at water construction operation section of jurisdiction displacement | |
CN218060451U (en) | Foundation pit supporting structure horizontal displacement monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |