CN1884714A - After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process - Google Patents

After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process Download PDF

Info

Publication number
CN1884714A
CN1884714A CN 200610052169 CN200610052169A CN1884714A CN 1884714 A CN1884714 A CN 1884714A CN 200610052169 CN200610052169 CN 200610052169 CN 200610052169 A CN200610052169 A CN 200610052169A CN 1884714 A CN1884714 A CN 1884714A
Authority
CN
China
Prior art keywords
pressure
tube
pile
pump
phc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610052169
Other languages
Chinese (zh)
Other versions
CN100432341C (en
Inventor
钱勇
刘小檀
江守慈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100521697A priority Critical patent/CN100432341C/en
Publication of CN1884714A publication Critical patent/CN1884714A/en
Application granted granted Critical
Publication of CN100432341C publication Critical patent/CN100432341C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a pouring self-priming hole PHC tube pile sharp anti-rust cap constructing device, which is connected to the static hydraulic compress machine formed by water tank, multistage eccentric pump, high-pressure transmission tube, clamper, transmission tube, PHC hollow tube pile, high-pressure gas transmission tube and air compressor, with water jet gas jet priming hole, wherein the high-pressure pouring pump via high-pressure pouring tube and three-way tube is connected to the high-pressure water transmission tube; one-way valves are mounted between three-way tube and multistage eccentric pump, three-way tube and high-pressure pouring pump; when the PHC chamber tube pile is fed to the holding layer, and stopping jetting water and gas, starting the high-pressure pouring pump; using high-pressure pouring tube, three-way tube and high-pressure water transmission tube to feed some cement pulp to the pile sharp pump; filling steel pile sharp inner and outer; the forming anti-rust cap packed by cement pulp at the surface of pile sharp, to separate the pile sharp and soil, to resist rust and strengthen foundation, to improve its carrier force.

Description

After-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction equipment and construction technology thereof
Technical field the present invention relates to a kind of protection construction equipment and job practices thereof of architecture foundation pile, particularly a kind of after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction equipment and construction technology thereof.
The use foundation pile that the development of background technology pile is a large amount of.And the PHC pile tube is a suitability for industrialized production, and quality is directly perceived, and the pile-formation process quality is easy to guarantee, compare with other concrete filling piles have cheap, short construction period, advantage such as environmental protection and the developing direction of stake for building of becoming.Stake end self-guiding hole PHC tubular pole construction technology is the static(al) hydraulic pressure pile press with band High-Pressure Water and high pressure draught, PHC cavity pile tube is sent into a kind of method of soil layer.The static pressure that relies on the hydraulic pressure pile press merely when pile tube draws the hole by high pressure water transport pipe and high pressure gas pipeline to PHC cavity pile tube bath qi of chong channel ascending adversely when the sand gravel layer pile sinking is obstructed, reduce the pile tube end resistance, and the limit trimming is pressed, and reaches the purpose that penetrates sand gravel layer.But the steel stake of this process using point is owing to be embedded in the soil layer for a long time, is subjected to the immersion of water in soil unavoidably and corrosion, finally influences the bearing capacity of single pile ability of PHC pile tube.Therefore, the problems such as effective stable bond of the corrosion of solution steel stake point, reinforcement stake point and bearing stratum have caused the concern of engineering circle.
Summary of the invention the purpose of this invention is to provide a kind of after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction equipment and construction technology thereof, anti-rust cap can intercept PHC pile tube point and contact with the direct of soil layer, stake point and soil layer are isolated, to reach effect antirust and raising and firm bearing capacity of single pile.
The present invention realizes by following technical proposal: a kind of after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction equipment, and the static(al) hydraulic pressure pile press that draws the hole with the band bath qi of chong channel ascending adversely of being made up of water tank, centrifugal multistage pump multiple centrifugal pump, high pressure water transport pipe, pile chuck, Pile feeder, PHC cavity pile tube, high pressure gas pipeline and air compressor links; High-pressure injection pump is connected with high pressure water transport pipe with tee piece by the high-pressure slip-casting pipe, between tee piece and centrifugal multistage pump multiple centrifugal pump and tee piece and high-pressure injection pump one-way cock is housed.
A kind of after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction technology: when PHC cavity pile tube is delivered to bearing stratum by static pressure, stop to wash by water after the qi of chong channel ascending adversely, start high-pressure injection pump, by high-pressure slip-casting pipe, tee piece and high pressure water transport pipe to a certain amount of cement paste of stake point pumping, steel stake point inside and outside is filled up, the surface of stake point forms the anti-rust cap by the cement paste parcel, and stake point and soil layer are isolated.
Effective effect of the present invention is:
1, by high-pressure slip-casting pipe and high pressure water transport pipe, the cement paste to the pumping of stake end prepares fills up steel stake point inside and outside, the surface of stake point is because the parcel of cement paste, intercept PHC pile tube point and contact with the direct of soil layer, thus the etch of moisture in the blocking-up soil layer, to reach antirust effect.
2, steel stake point can better be combined into one with bearing stratum owing to the effect of cement paste, thereby improves the stability of stake point in soil layer.
3,, thereby reach consolidated subsoil, improve the purpose of bearing capacity of pile foundation because existing crack in the bearing stratum can be effectively filled in the effect of cement paste.
The present invention is further described below in conjunction with drawings and Examples for description of drawings.
Fig. 1 is the schematic diagram of pile tube tip anti-rusting cap construction equipment.
Fig. 2 is the schematic diagram of static(al) hydraulic pressure pile press operation.
Specific embodiment embodiment is shown in Fig. 1-2: a kind of after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction equipment, and the static(al) hydraulic pressure pile press that draws the hole with the band bath qi of chong channel ascending adversely of being made up of water tank (1), centrifugal multistage pump multiple centrifugal pump (2), high pressure water transport pipe (7), pile chuck (8), Pile feeder (9), PHC cavity pile tube (10), high pressure gas pipeline (11) and air compressor (12) links; High-pressure injection pump (3) is connected with high pressure water transport pipe (7) with tee piece (6) by high-pressure slip-casting pipe (4), between tee piece (6) and centrifugal multistage pump multiple centrifugal pump (2) and tee piece (6) and high-pressure injection pump (3) one-way cock (5) is housed.
A kind of after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction technology, when PHC cavity pile tube is delivered to bearing stratum by static pressure, stop to wash by water after the qi of chong channel ascending adversely, start high-pressure injection pump (3),, to a certain amount of cement paste of stake point pumping steel stake point inside and outside is filled up by high-pressure slip-casting pipe (4), tee piece (6) and high pressure water transport pipe (7), the surface of stake point forms the anti-rust cap by the cement paste parcel, intercept PHC pile tube point and contact, stake point and soil layer are isolated with the direct of soil layer.

Claims (2)

1. after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction equipment, with by water tank (1), centrifugal multistage pump multiple centrifugal pump (2), high pressure water transport pipe (7), pile chuck (8), Pile feeder (9), PHC cavity pile tube (10), the static(al) hydraulic pressure pile press that the hole is drawn in the band bath qi of chong channel ascending adversely that high pressure gas pipeline (11) and air compressor (12) are formed links, it is characterized in that: high-pressure injection pump (3) is connected with high pressure water transport pipe (7) with tee piece (6) by high-pressure slip-casting pipe (4), between tee piece (6) and centrifugal multistage pump multiple centrifugal pump (2) and tee piece (6) and high-pressure injection pump (3) one-way cock (5) is housed.
2. after-grouting self-guiding hole PHC tubular pole tip anti-rust cap construction technology, it is characterized in that: when PHC cavity pile tube is delivered to bearing stratum by static pressure, stop to wash by water after the qi of chong channel ascending adversely, start high-pressure injection pump (3), by high-pressure slip-casting pipe (4), tee piece (6) and high pressure water transport pipe (7) to a certain amount of cement paste of stake point pumping, steel stake point inside and outside is filled up, and the surface of stake point forms the anti-rust cap by the cement paste parcel, and stake point and soil layer are isolated.
CNB2006100521697A 2006-06-26 2006-06-26 After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process Expired - Fee Related CN100432341C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100521697A CN100432341C (en) 2006-06-26 2006-06-26 After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100521697A CN100432341C (en) 2006-06-26 2006-06-26 After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process

Publications (2)

Publication Number Publication Date
CN1884714A true CN1884714A (en) 2006-12-27
CN100432341C CN100432341C (en) 2008-11-12

Family

ID=37583014

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100521697A Expired - Fee Related CN100432341C (en) 2006-06-26 2006-06-26 After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process

Country Status (1)

Country Link
CN (1) CN100432341C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498129B (en) * 2008-01-31 2011-04-27 黄秋生 Water-gas mixing jet apparatus for pile sinking
CN110714464A (en) * 2019-10-25 2020-01-21 江苏地基工程有限公司 Construction equipment and construction method for tubular pile in dense sand layer
CN113863294A (en) * 2021-09-13 2021-12-31 湖南省交通规划勘察设计院有限公司 PHC (prestressed high-strength concrete) tubular pile internally provided with pile end grouting device and construction process thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2088450A (en) * 1980-11-19 1982-06-09 Nevo Alex Grouting piles
SU1564267A1 (en) * 1987-04-22 1990-05-15 Сибирский зональный научно-исследовательский и проектный институт типового и экспериментального проектирования жилых и общественных зданий Precast pile
CN1034033A (en) * 1987-12-28 1989-07-19 湖北省工业建筑总公司机械施工运输公司 Compound pile base construction method
FR2657906A1 (en) * 1990-02-06 1991-08-09 Morillon Corvol Courbot METHOD OF MAKING MOLDED PILES IN THE SOIL, MOLDED PIGS SO OBTAINED AND IMPRESSION TUBE USED TO IMPLEMENT THIS METHOD.
CN2756706Y (en) * 2004-11-05 2006-02-08 宁波市机电工业研究设计院 Pile bottom pust filling prestress pipe pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498129B (en) * 2008-01-31 2011-04-27 黄秋生 Water-gas mixing jet apparatus for pile sinking
CN110714464A (en) * 2019-10-25 2020-01-21 江苏地基工程有限公司 Construction equipment and construction method for tubular pile in dense sand layer
CN113863294A (en) * 2021-09-13 2021-12-31 湖南省交通规划勘察设计院有限公司 PHC (prestressed high-strength concrete) tubular pile internally provided with pile end grouting device and construction process thereof

Also Published As

Publication number Publication date
CN100432341C (en) 2008-11-12

Similar Documents

Publication Publication Date Title
CN101644053B (en) Method for enhancing pulling-resistant and tensile-resistant capability of soft and weak soil layer anchor rod/anchor rope
CN100485134C (en) Construction technique for holding type PHC tube pile with tip entering into rock by augering technique
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN204849738U (en) Can pierce through static pressure tubular pile of sand bed and construction equipment thereof
CN202544883U (en) Self-boring full thread hollow grouting anchor rod
CN110453682A (en) A kind of tubular pole reinforcement system construction method
CN100432341C (en) After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process
CN102518133B (en) Pile sinking method for prestress hollow pipe piles by aid of follow-up sleeve
CN204185844U (en) Draining slip casting structure
CN101575855A (en) Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN204282360U (en) Covering layer prestressed anchoring structure
CN104727315A (en) Post-grouting prestressed concrete hollow pile and manufacturing method thereof
CN103882859B (en) A kind of original state of Shi Hanzhang fetches earth cast-with-pressure concrete pile and construction method thereof
CN100577924C (en) Pile bottom post-grouting method
CN201268848Y (en) Novel grouting device
CN202202325U (en) Compacted and expanded micro mortar pile forming device
CN201661435U (en) Self-suction hydraulic cement mortar pump
CN106480877A (en) The pile making method of pipe sinking pressure grouting composite pile
CN203429620U (en) Static pressure pipe pile
CN204662452U (en) A kind of cast-in-place concrete pile base pressure slurry closing device
CN212615605U (en) Vertical axial compressor fire pump water absorption pit structure
CN204311452U (en) For the grouting device of bored pile grouting behind shaft or drift lining method construction
CN202755366U (en) Leading-in device of injection pipe
CN213086803U (en) Integrated grouting device for pile side grouting of long spiral bored pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081112

Termination date: 20100626