CN1884700A - Bamboo bridge - Google Patents

Bamboo bridge Download PDF

Info

Publication number
CN1884700A
CN1884700A CN 200610031948 CN200610031948A CN1884700A CN 1884700 A CN1884700 A CN 1884700A CN 200610031948 CN200610031948 CN 200610031948 CN 200610031948 A CN200610031948 A CN 200610031948A CN 1884700 A CN1884700 A CN 1884700A
Authority
CN
China
Prior art keywords
bamboo
girder
bridge
diaphragm
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610031948
Other languages
Chinese (zh)
Other versions
CN100510262C (en
Inventor
肖岩
单波
黄政宇
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CNB2006100319489A priority Critical patent/CN100510262C/en
Publication of CN1884700A publication Critical patent/CN1884700A/en
Application granted granted Critical
Publication of CN100510262C publication Critical patent/CN100510262C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a bamboo bridge, which comprises a support element, a bamboo main beam, a bamboo baffle beam and a bridge panel, wherein the bamboo main beam is mounted on the support; the bamboo baffle beam is mounted between two opposite bamboo main beams; the bridge panel is laid above the bamboo baffle beam. The invention has simple structure and low cost.

Description

Bamboo bridge
Technical field
The present invention relates to the bridge field, refer in particular to a kind of bamboo bridge applicable to Selection of Urban Pedestrian Overpass and common bridge.
Background technology
Need a large amount of middle-size and small-size common bridges in city, rural area and the gardens, for example, the pedestrian overcrossing of representing as the typical case is exactly means of transportation very common and important in the city, for realizing that human and vehicle shunting and traffic safety are extremely important.Now, almost every city all has the pedestrian overcrossing of One's name is legion on the traffic main artery, and along with the development in city, will have more pedestrian overcrossing input to build and use.The pedestrian overcrossing of having built at present, substructure is generally prefabricated steel column or reinforced concrete post, superstructure generally has two kinds of forms, a kind of is steel work, girder and diaphragm are welded steel beam or section steel beam, lay the steel bridge deck above, adopt bolt to be connected or field Welding between girder and the diaphragm; Another kind is a steel-concrete combined structure, girder is a girder steel, the girder steel top flange is provided with profiled sheet, smash a layer concrete at the profiled sheet top-pour again and form bridge floor, girder steel and bridge deck form whole co-operation by shear connector, and this structure makes full use of the advantage of steel and two kinds of materials of concrete.For the pedestrian overcrossing of these two kinds of common structure forms, major advantage is as follows:
1. deadweight is lighter.Because superstructure adopts steel work or steel-concrete combined structure, reduce greatly than traditional reinforced concrete structure and prestressed reinforced concrete construction deadweight, therefore, when the pedestrian overcrossing span was identical, the beam section height can reduce.Simultaneously, also be beneficial to on-the-spot the installation from heavy and light.For steel work, the deadweight of the form of compound beam increases to some extent, but this form of structure bridge floor rigidity is big, and rolled steel dosage reduces, and cost reduces, and is a good selection under many circumstances.
2. the construction period is short.Steel column or reinforced concrete post can be prefabricated, and superstructure is a steel work, and girder steel, diaphragm and bridge deck can adopt prefabrication, and on-the-spot the installation if girder steel adopts bolt to be connected with diaphragm, can also be avoided the welding effect, and speed of application is faster.If superstructure is a combining structure, girder steel, profiled sheet and shear connector can be carried out in factory, lifting at the scene again, and last fluid concrete forms bridge floor, and speed of application is also very fast.
No matter be to adopt steel work or combining structure, pedestrian overcrossing of having built and common middle-size and small-size bridge mainly have the following disadvantages:
1. corrosion-resistant.No matter be steel work or combining structure, its main supporting member all is a girder steel.At present, each big or middle urban air-quality of China is relatively poor, and acid rain is serious, causes the girder steel corrosion more serious.The application life of pedestrian overcrossing has been shortened in the corrosion of girder steel greatly, has also strengthened the maintenance cost of overline bridge.In addition, the corrosion of girder steel has also destroyed the attractive in appearance of overline bridge, has influenced city look and feel.
2. not environmental protection of constructional materials itself.No matter be steel or cement, all belong to the product of high energy consumption, high pollution industry in China.Technology and equipment that China produces steel and cement are comparatively backward, and the environmental protection equipment of factory is imperfection also, and steel and Cement Production need consume a large amount of energy, produce a large amount of waste water, waste gas and waste residue simultaneously, have had a strong impact on ecological environment.In the today of advocating sustainable development energetically, " green building " selection that is inevitable, it is unfavorable continuing to adopt steel and cement to build pedestrian overcrossing as main constructional materials, needs to adopt material novel, greenization to build pedestrian overcrossing.
3, existing steel bridge cost is higher, and the construction period of Reinforced Concrete Bridge is longer, and higher not interrupted with traffic under the maintenance bridge to construction requirement.
Summary of the invention
The technical problem to be solved in the present invention just is: at the technical problem that prior art exists, the invention provides the bamboo bridge that a kind of simple in structure, easy construction, construction material environmental protection, engineering cost are lower, can satisfy function of use and durability requirement simultaneously.
For solving the problems of the technologies described above, the solution that the present invention proposes is: a kind of bamboo bridge, it is characterized in that: it comprises supporter, bamboo girder, bamboo diaphragm and bridge deck, bamboo girder is installed on the supporter, bamboo diaphragm is located between the bamboo girder that is oppositely arranged, and bridge deck are layed on the bamboo diaphragm.
The bottom of described bamboo girder is provided with back-up coat, and back-up coat is fiber-reinforced plastic layer, carbon fibre reinforced plastic layer or glass fiber reinforced plastics layer.
Link to each other by connector between described bamboo diaphragm and the bamboo girder.
Described connector is a cornerite iron, and an end of cornerite links to each other with bamboo girder, and the other end links to each other with bamboo diaphragm.
Described bamboo girder and bamboo diaphragm adopt the bamboo offset plate to make.
Described supporter is reinforced concrete post, bamboo concrete post, steel column, pin or bamboo post.
Compared with prior art, advantage of the present invention just is:
1, the raw material source is wide, renewable.Among the present invention, the superstructure of bamboo bridge adopts bamboo wood, and bamboo is a renewable resource, fast growth, the cycle of becoming a useful person is short, and output is big, and the bamboo wood source is secure, what is more important, bamboo wood is a green material, and its manufacturing process environmental protection is pollution-free, meets the requirement of sustainable development;
2, the present invention adopts bamboo beam system to make the superstructure of bridge from heavy and light, easy construction.The main material of bamboo bridge is the bamboo fibre of hollow, and density is little, and therefore, the bamboo beam is conducted oneself with dignity much smaller than girder steel and compound beam.Simultaneously, adopt the bamboo offset plate to make the bamboo girder construction, can dig, can saw, can bore by the resin-bonded bamboo beam that forms, easy to process.The tensile strength of bamboo wood is not as steel, therefore, the present invention is provided with back-up coat in bamboo girder bottom, back-up coat has very high specific strength and specific stiffness, can not increase the bamboo girder construction is conducted oneself with dignity, do not influenced provides bamboo bridge significantly under the condition of bamboo girder construction outward appearance bearing capacity substantially, increasing the span of bamboo bridge.Adopt the bamboo girder construction, the used member of superstructure can be prefabricated in the factory, the on-the-spot installation, and not wet effect and welding, technology is simple, and speed of application is fast.
3, good looking appearance, good endurance.Bamboo wood can be the true qualities of bamboo wood through after processing, and also can carry out multiple mode as required and handle rich color.Simultaneously, the neat appearance of bamboo girder construction, surface smoothing, elegant in appearance.The main material of bamboo girder construction is the bamboo offset plate, the anti-mould and anti-moth of bamboo offset plate own, and ageing properties is good, and is also acidproof, corrosion-resistant after the processing well-thought-out plan girder construction, the corrosion problems of steel can not occur, and maintenance cost is low.
4, the bridge superstructure of employing bamboo wood of the present invention can be erected on the bearing of bridge end, or lower support body fastens, and the lower support system can adopt, reinforcing bar (or bamboo reinforcement) concrete column, and steel column is on wood or the bamboo post.
Description of drawings
Fig. 1 is master's TV structure schematic diagram of the present invention;
Fig. 2 is the schematic cross-section of the bamboo girder of the present invention;
Fig. 3 is the connection diagram of bamboo girder and diaphragm in the embodiment of the invention.
Marginal data
1, bamboo girder 2, bamboo diaphragm
3, connector 4, back-up coat
5, bridge deck 6, expansion bolt
7, screw rod 8, supporter
The specific embodiment
Below with reference to the drawings and specific embodiments the present invention is described in further details.
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of bamboo bridge of the present invention, it comprises supporter 8, bamboo girder 1, bamboo diaphragm 2 and bridge deck 5, bamboo girder 1 is installed on the supporter 8, bamboo diaphragm 2 is located between the bamboo girder 1 that is oppositely arranged, and bridge deck 5 are layed on the bamboo diaphragm 2.Supporter 8 can be reinforced concrete post, bamboo concrete post, steel column, pin or bamboo post.Bamboo girder 1 and supporter 8 are connected by bolt, and can further at supporter 8 and 1 of bamboo girder shock isolating pedestal be set.Bamboo girder 1 and bamboo diaphragm 2 adopt the bamboo offset plate to make, and the bamboo offset plate cuts into normalized strip, and strip is superimposed along depth of beam or width, adopt the resin-bonded bamboo beam that the bamboo girder construction is used that becomes between strip.In the manufacturing process of bamboo offset plate, at first bamboo wood steams through high-temperature high-pressure, the sterilization dehumidifying, the bamboo wood impregnated phenolic resin is hot-forming at last then, so the anti-mould and anti-moth of bamboo offset plate own, ageing properties is good, also acidproof, corrosion-resistant behind the processing well-thought-out plan beam, the corrosion problems of steel can not appear, and maintenance cost is low.The bottom of bamboo girder 1 is provided with back-up coat 4, back-up coat 4 is fiber-reinforced plastic layer (FRP), carbon fibre reinforced plastic layer (CFRP) or glass fiber reinforced plastics layer (GFRP), can increase the span of bamboo bridge not increasing the bamboo bridge dead load substantially, not influencing the bearing capacity that bamboo bridge is provided under the condition of bamboo bridge outward appearance significantly like this.Link to each other by connector 3 between bamboo diaphragm 2 and the bamboo girder 1.In the present embodiment, connector 3 is a cornerite, and an end of angle bar links to each other with bamboo girder 1 by expansion bolt 6, and the other end links to each other with bamboo diaphragm 2 by screw rod 7.
Job practices: factory according to drawing with various element precasts good after, install at the scene of being transported to.After installing supporter 8, lift bamboo girder 1, bamboo girder 1 is connected with supporter 8 usefulness bolts.Steel connector 3 is fixed on the side of bamboo girder 1 with expansion bolt 6.Lift bamboo diaphragm 2 then, bamboo diaphragm 2 is connected with bamboo girder 1 with split bolt 7.Bridge deck 5 are installed at last, and bridge deck 5 can adopt steel connector 3 to be connected with bamboo diaphragm 2.In an example, concrete working procedure is as follows:
1, the size of bamboo girder 1 and bamboo diaphragm 2 is installed, the bamboo offset plate behind the 40mm is cut into 600 * 3000,600 * 1500 or 400 * 1200,400 * 600 strip;
2, the strip broad ways is overlapped into corresponding deck-siding, epoxy resin-impregnated between strip, and along the side direction cure under pressure, solidified 7 days under the room temperature;
3, bamboo girder 1 after the moulding and bamboo diaphragm 2 are dug, processing such as brill, make finished product;
4, used member is transported to on-the-spot the installation, at first supporter 8, i.e. bridge post are installed in the location;
5, the bamboo girder 1 of lifting;
6, connector 3 is installed, is lifted bamboo diaphragm 2;
7, bridge deck 5, stair and handrail are installed, are decorated bridge.

Claims (9)

1, a kind of bamboo bridge, it is characterized in that: it comprises supporter (8), bamboo girder (1), bamboo diaphragm (2) and bridge deck (5), bamboo girder (1) is installed on the supporter (8), bamboo diaphragm (2) is located between the bamboo girder (1) that is oppositely arranged, and bridge deck (5) are layed on the bamboo diaphragm (2).
2, bamboo bridge according to claim 1 is characterized in that: the bottom of described bamboo girder (1) is provided with back-up coat (4), and back-up coat (4) is carbon fibre reinforced plastic layer or glass fiber reinforced plastics layer for fiber-reinforced plastic layer.
3, bamboo bridge according to claim 1 and 2 is characterized in that: link to each other by connector (3) between described bamboo diaphragm (2) and the bamboo girder (1).
4, bamboo bridge according to claim 3 is characterized in that: described connector (3) is a cornerite, and an end of cornerite links to each other with bamboo girder (1), and the other end links to each other with bamboo diaphragm (2).
5, bamboo bridge according to claim 1 and 2 is characterized in that: described bamboo girder (1) and bamboo diaphragm (2) adopt the bamboo offset plate to make.
6, bamboo bridge according to claim 3 is characterized in that: described bamboo girder (1) and bamboo diaphragm (2) adopt the bamboo offset plate to make.
7, bamboo bridge according to claim 1 and 2 is characterized in that: described supporter (8) is reinforced concrete post, bamboo concrete post, steel column, pin or bamboo post.
8, bamboo bridge according to claim 3 is characterized in that: described supporter (8) is reinforced concrete post, bamboo concrete post, steel column, pin or bamboo post.
9, bamboo bridge according to claim 5 is characterized in that: described supporter (8) is reinforced concrete post, bamboo concrete post, steel column, pin or bamboo post.
CNB2006100319489A 2006-07-12 2006-07-12 Bamboo bridge Expired - Fee Related CN100510262C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100319489A CN100510262C (en) 2006-07-12 2006-07-12 Bamboo bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100319489A CN100510262C (en) 2006-07-12 2006-07-12 Bamboo bridge

Publications (2)

Publication Number Publication Date
CN1884700A true CN1884700A (en) 2006-12-27
CN100510262C CN100510262C (en) 2009-07-08

Family

ID=37582999

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100319489A Expired - Fee Related CN100510262C (en) 2006-07-12 2006-07-12 Bamboo bridge

Country Status (1)

Country Link
CN (1) CN100510262C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121220A (en) * 2011-01-30 2011-07-13 申昌均 Combined shock-resistant energy-saving multifunctional multi-layer three-dimensional traffic highway
CN103498412A (en) * 2013-09-24 2014-01-08 中北大学 Novel energy-saving bamboo bridge
CN104594175A (en) * 2014-12-23 2015-05-06 重庆交通大学 Modern arch type bamboo bridge and construction method thereof
CN104631327A (en) * 2014-12-26 2015-05-20 重庆交通大学 Construction method for modern bamboo pedestrian truss bridge
CN106316238A (en) * 2016-07-29 2017-01-11 上海轩颂建筑科技有限公司 Method for preparing modified bamboo reinforced concrete
CN106544948A (en) * 2017-01-10 2017-03-29 重庆交通大学 A kind of people's row cantilever glider bridge construction method
CN106638255A (en) * 2017-01-10 2017-05-10 重庆交通大学 Modern bamboo pedestrian cantilever beam bridge
CN111733661A (en) * 2020-06-22 2020-10-02 河海大学 Wetland and saline-alkali soil pedestrian path and construction method thereof
CN112049014A (en) * 2020-08-31 2020-12-08 安徽东方风景建设有限公司 Construction process of wooden trestle
CN112482186A (en) * 2020-12-16 2021-03-12 中南林业科技大学 High-strength glued wood beam bridge convenient to manufacture and construct and manufacturing and construction method thereof

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437271B (en) * 2013-09-11 2014-05-21 赵炜 Assembly type bamboo bridge
CN103452035B (en) * 2013-09-11 2014-11-05 赵炜 Assembly type bamboo bridge with variable expansion coefficients

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121220A (en) * 2011-01-30 2011-07-13 申昌均 Combined shock-resistant energy-saving multifunctional multi-layer three-dimensional traffic highway
CN103498412A (en) * 2013-09-24 2014-01-08 中北大学 Novel energy-saving bamboo bridge
CN103498412B (en) * 2013-09-24 2014-09-10 中北大学 Novel energy-saving bamboo bridge
CN104594175A (en) * 2014-12-23 2015-05-06 重庆交通大学 Modern arch type bamboo bridge and construction method thereof
CN104631327A (en) * 2014-12-26 2015-05-20 重庆交通大学 Construction method for modern bamboo pedestrian truss bridge
CN106316238A (en) * 2016-07-29 2017-01-11 上海轩颂建筑科技有限公司 Method for preparing modified bamboo reinforced concrete
CN106544948A (en) * 2017-01-10 2017-03-29 重庆交通大学 A kind of people's row cantilever glider bridge construction method
CN106638255A (en) * 2017-01-10 2017-05-10 重庆交通大学 Modern bamboo pedestrian cantilever beam bridge
CN106638255B (en) * 2017-01-10 2018-03-09 重庆交通大学 A kind of modern bamboo figure's row cantilever glider bridge
CN111733661A (en) * 2020-06-22 2020-10-02 河海大学 Wetland and saline-alkali soil pedestrian path and construction method thereof
CN112049014A (en) * 2020-08-31 2020-12-08 安徽东方风景建设有限公司 Construction process of wooden trestle
CN112482186A (en) * 2020-12-16 2021-03-12 中南林业科技大学 High-strength glued wood beam bridge convenient to manufacture and construct and manufacturing and construction method thereof

Also Published As

Publication number Publication date
CN100510262C (en) 2009-07-08

Similar Documents

Publication Publication Date Title
CN100510262C (en) Bamboo bridge
CN105064208B (en) A kind of deck structrue combined with steel bridge deck by prefabricated U HPC plate and construction method thereof
CN2856237Y (en) Light-weight mounting II-type light-weight steel member for building
CN2918523Y (en) Bamboo wood bridge
CN2878478Y (en) Fabricated grooved beam for rear extending pre-stress segment pre-formation
CN202482751U (en) Longitudinal non-shearing-resistant type pulling resistant connecting member
CN104131652A (en) Fabricated RPC-steel-concrete hybrid beam structure
CN106245837A (en) A kind of assembled GFRP drawing and extruding section bar core wood composite floor slab structural system
CN201043326Y (en) Composite fibre hollow grouting anchoring-bolt
CN103194969A (en) FRP (Fiber Reinforce Plastic)-concrete combined bridge deck
CN102943434B (en) Semi-assembly bamboo-concrete composite bridge
CN201447662U (en) Steel grider combined bridge deck system structure of staggered superimposed sheet
CN201043327Y (en) Composite fibre steel anchor stock
CN203160126U (en) FRP-concrete composite bridge panel
CN110056117B (en) Corrugated surface hollow FRP profile sea sand concrete slab structure
CN204139061U (en) Based on the steel-ultra-high performance concrete combined bridge deck plated construction of steel channel connector
CN202830741U (en) Semi-assembled type bamboo-concrete combined bridge
CN205276129U (en) Fibre reinforced composite - bamboo combination decking
CN105484355A (en) Connection system of wood-concrete composite structure
CN211113115U (en) Steel-bamboo combined truss bridge
CN101451339B (en) Fiber reinforcement composite material rope bridge and preparation method thereof
CN206016000U (en) A kind of assembled GFRP drawing and extruding section bars core wood composite floor slab structural system
CN111663696A (en) Formwork-free self-bearing prefabricated rib beam concrete hollow laminated slab
CN106836639B (en) FRP box-shaped section-concrete combined beam provided with bidirectional shear keys
CN203700960U (en) Bridge face plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGSHA KAISEN BAMBOO NEW TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: HUNAN UNIVERSITY

Effective date: 20100329

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410082 CIVIL ENGINEERING COLLEGE, HUNAN UNIVERSITY, HEXI YUELU MOUNTAIN, CHANGSHA CITY, HUNAN PROVINCE TO: 410013 BUILDING R6, HUOJUCHENG, CHANGSHA CITY HIGH-TECH DEVELOPMENT ZONE, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100329

Address after: 410013 high tech Development Zone, Hunan, Changsha torch city building R6

Patentee after: Changsha kaisen Bamboo Wood New Technology Co.,Ltd.

Address before: 410082 School of civil engineering, Hunan University, Changsha, Hexi, Hunan, China

Patentee before: Hunan University

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170117

Address after: Yuelu District City, Hunan province 410013 Changsha sunshine 100 3-15-1103

Patentee after: Dan Bo

Address before: 410013 high tech Development Zone, Hunan, Changsha torch city building R6

Patentee before: Changsha kaisen Bamboo Wood New Technology Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090708

Termination date: 20180712

CF01 Termination of patent right due to non-payment of annual fee