CN1866867A - Plan and task realizing method in device management - Google Patents

Plan and task realizing method in device management Download PDF

Info

Publication number
CN1866867A
CN1866867A CN 200610001620 CN200610001620A CN1866867A CN 1866867 A CN1866867 A CN 1866867A CN 200610001620 CN200610001620 CN 200610001620 CN 200610001620 A CN200610001620 A CN 200610001620A CN 1866867 A CN1866867 A CN 1866867A
Authority
CN
China
Prior art keywords
plan target
execution
content
execution content
trigger condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610001620
Other languages
Chinese (zh)
Other versions
CN100442715C (en
Inventor
高洪涛
柴晓前
李克鹏
何江水
董晓艺
程建章
赵贵玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB2006100016202A priority Critical patent/CN100442715C/en
Publication of CN1866867A publication Critical patent/CN1866867A/en
Application granted granted Critical
Publication of CN100442715C publication Critical patent/CN100442715C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a planing task realizing method of device management, which comprises the following steps: according to received prospectus from service end to install the actjvation condition corresponding to the prospectus; carrying out execution contents type; getting execution contents type corresponding to prospectus after confirming the actjvation condition of program task is satisfied; according to the corresponding execution contents which gets by execution contents type; carrying out the corresponding operation. The invention simplifies the structure of control tree, which reduces the control tree redundancy.

Description

Plan task realizing method in the equipment control
Technical field
The present invention relates to the communications field, relate in particular to the realization of the plan target in the equipment control.
Background technology
Along with improving constantly of user's request, the user wishes and can arbitrarily visit various abundant Internet resources from portable terminal, enjoys various mobile phone value-added services.But the user does not wish hell to pay again, does not wish to finish download software by hand, and loaded down with trivial details work such as parameter are set.And along with the becoming increasingly abundant of termination function, the possibility that the application software on terminal and the terminal causes because of going wrong normally using also increases thereupon.Therefore the user wishes that service end can provide more service.
Along with mobile network's development, and the fusion of mobile network and the Internet, service end can provide increasing value-added service to the mobile network user at present.And the equipment control of OMA (Open Mobile Alliance) at present (Device Management, DM) working group has proposed the DM technology.The proposition of this DM technology, (DM Server DMS) provides terminal firmware renewal, Device Diagnostic and monitoring, parameter configuration, software to download automatically by OTA (aerial download technology) mode for the user and a series of services such as installation, task scheduling provide possibility for device management server.
At present the DM technology has proposed system architecture as shown in Figure 1, and based on described framework standard service end provide the implementation of the service that terminal firmware upgrades for the user, as follows:
Device management server is handed down to terminal equipment by DM interface (DM agreement) with the administration order of firmware upgrade, after terminal equipment receives described administration order, explain and carry out the administration order of firmware upgrade by equipment control agency (DMAgent), and manage the entity of being managed by the management tree mode, that is to say, by operation, as increasing, deletion, replacing node on the corresponding management tree and realize management to the terminal managed entity to management tree.
Device Diagnostic and the monitoring that proposes for the DM technology, software downloads automatically and the realization of installation, plan target a series of services such as (scheduling), only is in the demand collection phase, does not also have concrete solution.
Summary of the invention
The purpose of this invention is to provide plan task executions method in a kind of equipment control, by the present invention, not only proposed in device management process, to realize the concrete solution that automatically performs of the plan target in the terminal equipment by the mode of management tree, but also can streamlining management the structure of tree, reduce the redundancy of management tree, and help the management tree structure of unified planning task.
The objective of the invention is to be achieved through the following technical solutions:
The invention provides in a kind of equipment control and plan task realizing method, it comprises:
A, terminal equipment are according to receiving the plan target that service end issues, the trigger condition of described plan target correspondence, the execution content type of execution content correspondence are set, and after the trigger condition of confirming described plan target satisfies, then obtain the execution content type of described plan target correspondence;
B, obtain corresponding execution content, and carry out corresponding operation according to described execution content type.
Wherein, described steps A specifically comprises:
Equipment control agency in A1, the terminal equipment is provided with the trigger condition of described plan target and carries out content type according to the plan target that the service end that receives issues in terminal equipment, and the positional information of perhaps carrying out the content place in carrying out;
A2, after plan target is activated, the plan target assembly in the terminal equipment detects the trigger condition of the plan target correspondence that service end issues;
A3, judge that whether described trigger condition satisfies, if search and obtain the execution content type of described task correspondence in the type information of the execution content that then in terminal equipment, is provided with; Otherwise, continue execution in step A2.
Wherein, described execution content type comprises:
Local operation and/or non-local operation.
Wherein, described steps A 1 also comprises:
When the execution content type is local operation, to carry out content and carry out on the execution content subtree of management tree that content type is kept at the plan target assembly, and the trigger condition of plan target is kept on the trigger condition subtree of management tree of plan target assembly;
Or,
When the execution content type is non-local operation, be kept on the node tree that enables parts accordingly carrying out content, and the positional information that will carry out content type and carry out the content place is kept on the execution content subtree of management tree of plan target assembly, and the trigger condition of plan target is kept on the trigger condition subtree of management tree of plan target assembly.
Wherein, when the execution content type was local operation, described step B specifically comprised:
B1, obtain the execution content of described plan target correspondence in this locality, and carry out the execution content that gets access to.
Wherein, described step B1 specifically comprises:
On the execution content subtree of plan target assembly, obtain the execution content of described task correspondence, and carry out the execution content that gets access to.
Wherein, when the execution content type was non-local operation, described step B specifically comprised:
B2, obtain the positional information of carrying out the content place in this locality, and call according to the positional information that obtains and to enable parts accordingly, and described positional information is passed to the described parts that enable;
B3, the described parts that enable obtain corresponding execution content according to described positional information, and carry out;
B4, described enabling after parts are finished return to plan target assembly in the terminal equipment with execution result.
Wherein, described step B2 specifically comprises:
On the execution content subtree of plan target assembly, obtain the positional information of carrying out the content place, and call according to the positional information that obtains and to enable parts accordingly, and described positional information is passed to the described parts that enable.
Wherein, described step B also comprises:
Described execution result is saved on the execution result subtree in the management tree of plan target assembly.
As seen from the above technical solution provided by the invention, terminal equipment is according to receiving the plan target that service end issues among the present invention, the trigger condition of described plan target correspondence, the execution content type of execution content correspondence are set, and after the trigger condition of confirming described plan target satisfies, then obtain the execution content type of described plan target correspondence; Obtain corresponding execution content according to described execution content type then, and carry out corresponding operation.。By the present invention, not only proposed in device management process, to realize the concrete solution that automatically performs of the plan target in the terminal equipment by the mode of management tree, but also can streamlining management the structure of tree, reduce the redundancy of management tree, and help the management tree structure of unified planning task.
Description of drawings
Fig. 1 is a system architecture diagram of realizing DM mechanism in the background technology;
Fig. 2 is the flow chart of embodiment provided by the invention;
Fig. 3 is the structure chart of management tree provided by the invention.
Embodiment
Demand to Device Diagnostic and monitoring in the equipment control that DM working group proposes comprises: monitor network performance and terminal affair.Device management server is configured to terminal with certain strategy, makes terminal by this strategy record and report information; Terminal opening entry network performance and terminal affair information, and initiate and being connected of device management server according to reporting strategy, and after successfully connecting, with the information reporting equipment management server that writes down; Device management server is operated accordingly according to the information of receiving.
The purpose of the scheduling that DM working group proposes is by making equipment control agency (DMAgent) automatically perform the management role that device management server pre-establishes according to regular hour and condition, to the consumption of Internet resources, improve the flexibility of equipment control and the experience that improves the terminal use in the minimizing device management process.Its demand comprises:
1, startup self-detection.Automatically perform diagnostic task by DMA (facility management client) during the terminal equipment start, needing the content of diagnosis can be the configuration or the state of software on equipment or the equipment.And the record diagnosis result, if the result has problem, DMA reports device management server with the result.
2, task is postponed.Because consuming time longer, may bring very big inconvenience for firmware upgrade or big object download, therefore need provide a kind of method to allow the user can postpone or set the suitable time or condition is carried out this class management role to the user.
3, data collection.As user during to the operator reflection problem relevant with QoS, device management server is regularly gathered qos-related information to equipment insertion data collection profile by terminal, is recorded in the profile file, reports device management server at preset time.
4, parameter renegotiation configuration.Some parameter of terminal is set to some values under some situation, need to be arranged to the other value in addition under the situation.By plan target, parameter is arranged to suitable value in the different time.
5, public task scheduling function.Instrument on the portable terminal, as the Device Diagnostic instrument, scanning engine (Scan Engines), daily record instrument, monitoring tools.Can start these instruments by the task scheduling function by other trigger conditions of regular hour conditioned disjunction as required.
According to the purpose of scheduling as can be seen, a plan target should comprise three parts, and promptly trigger condition is carried out content and execution result.Accordingly, the management tree node in the plan target assembly also is divided into three parts and preserves trigger condition, carries out content and execution result.Demand according to scheduling, several respects problem that scheduling need solve, promptly carrying out content can be that sense terminals disposes, carries out the operation of ordinary node or carries out tool terminal etc., these carry out differing greatly between content, if adopt node tree to store the execution content, need can cause management tree very huge for the special child node tree of all kinds of execution content design, thereby increase the complexity of terminal operation, and can increase the consumption of terminal internal memory.
Demand according to Scheduling it can also be seen that, during starting up of terminal, carry out the self check task, need some configurations on the terminal be detected.And the execution content class of startup self-detection and Device Diagnostic and monitoring seemingly, therefore can consider the realization that combines.
The data collection that comprises in the demand of Scheduling on demand with Device Diagnostic and monitoring in monitor network performance similar, difference is that DM working group indicates with profile file logging data, rather than with management tree method record.If but, then can combine and realize with Device Diagnostic and monitoring with management tree method record data.
Through above-mentioned analysis, the mode by management tree can realize the automatically performing of plan target in the equipment control.
The present invention proposes the implementation of plan target in a kind of equipment control, and it combines plan target with Device Diagnostic and monitoring technique, and the mode by management tree realizes the automatically performing of plan target in the equipment control.Its core is: after equipment control in terminal equipment agency (DM Agent) receives the plan target that service end issues, by the plan target assembly trigger condition of described plan target correspondence, the execution content type of execution content correspondence are set, and after the trigger condition of confirming described plan target satisfies, then obtain the execution content type of described plan target correspondence; Obtain corresponding execution content according to described execution content type then, and carry out corresponding operation.
First embodiment provided by the invention as shown in Figure 2, comprising:
Step 1, after the equipment control in terminal equipment agency (DM Agent) receives the plan target that service end issues, in terminal equipment, the trigger condition of task, the type of execution content are set by tree, and positional information and/or the execution result of carrying out the content place.
The type of described execution content comprises: local operation and non-local operation.When the type of carrying out content was local operation, then expression was carried out in the management tree that content is kept at the plan target assembly on some nodes.When the type of carrying out content was non-local operation, then expression execution content was kept on other management tree that enables parts.Present embodiment passes through management tree governing plan task as shown in Figure 3.Each node in this management tree is described below:
<x〉node:
Being the placeholder node, one<x〉node and following subtree thereof represent a scheduling task.
<x/ID〉node:
Be the task identification node, be used for task of unique identification.
<x/Description〉node:
Be the task description node, this node is an optional node.
<x/Enable〉node:
Whether be used to identify this scheduling task is opened.
<x/Condition〉node:
The subtree of this node back is the trigger condition of scheduling task.
<x/Condition/*〉node:
*Be used to represent concrete trigger condition.Trigger condition can be represented with a logical expression, also can otherwise represent.For example, if when the trigger condition of certain plan target is on every Mondays 22, trigger condition can be expressed as: WEEK=Monday AND TIME=22:00, and WEEK wherein, AND, TIME can define its meaning in advance.For startup self-detection, trigger condition management subtree can be set to sky, and after the terminal equipment start, equipment control agency (DM Agent) can be automatically performed, and carry out startup self-detection task by DM Agent this moment.
<x/ToBeExecuted〉node:
The subtree of this node back is a scheduling task executions content.
<x/ToBeExecuted/x〉node:
Be the placeholder node, carry out content can have a plurality of, one<x〉node and following subtree thereof represent that is carried out a content.
<x/ToBeExecuted/x/Type〉node:
Be this type of carrying out content, type can be divided into non-local operation and local operation.
Non-local operation is to be kept on other management tree node that enables parts carrying out content.As the detection of starting shooting, firmware upgrade operation, execution content are kept at respectively on the MO (management object) of diagnosis monitoring enabler (enabling parts) and firmware upgrade enabler.
Local operation is to carry out on the respective nodes of management tree that content directly is kept at the plan target assembly, promptly next describe<x/ToBeExecuted/x/ToBeExecuted〉on the node.
<x/ToBeExecuted/x/ToBeExecuted〉node:
For perhaps having preserved the positional information that this execution content is deposited in this execution.
If carrying out content type is non-local operation, then this node has been preserved the management tree URI (station location marker information) that carries out content place node.
If carrying out content type is local operation, this node is preserved and is carried out content.
<x/Results〉node:
The subtree of this node back is scheduling task executions result.
<x/Results/*〉node:
*Represent concrete execution result, can write down the result, also record otherwise with character string.
<x/Status〉node:
This node is the state of this scheduling task, for example is closed, moves, triggers, carries out end etc.
<x/Ext〉node:
This node is the spare extension node.
By foregoing description as can be seen, in this node tree, carry out content type and be kept at<x/ToBeExecuted/x/Type on the node, perhaps carry out content-location information in the execution and be kept at<x/ToBeExecuted/x/ToBeExecuted on the node.
Carrying out the type of content can also store by alternate manner, as directly obtaining to carry out content type according to carrying out content, or obtains to carry out content type according to the positional information of carrying out content.For example, as<x/ToBeExecuted/x/ToBeExecuted〉when node is preserved URI information, judge that then the type of carrying out content is non-local operation; Non-above situation can judge that type is a local operation.Carrying out content type can also be by general<x/ID〉be arranged to the value representation of specific format.
After structure by management tree is provided with corresponding information, and after plan target is activated (can be by the startup of server of service end, also can the user start), this plan target then can automatically perform based on the respective nodes in the described structure, and its flow process is as follows:
Step 2, the plan target assembly detects the trigger condition of described task correspondence.
After terminal equipment receives the plan target that service end issues, detect by the trigger condition of plan target assembly to the described task correspondence of preserving in the Condition node in the management tree.For example, if task is startup self-detection, then start powers up to move and is trigger condition.
Step 3 judges whether trigger condition satisfies, when trigger condition satisfies, and execution in step 3; Otherwise, continue execution in step 2.
Step 4 is searched and obtains the execution content type of described task correspondence in the type information of the execution content that the plan target assembly is provided with in terminal equipment, and carry out corresponding operation according to described type.
By step 2 as can be seen, be provided with two kinds of types of carrying out content in terminal equipment, two types of promptly non-local operation and local operations are described in detail at both of these case in step 4 below.
When the type of searching and obtain the execution content of described task correspondence in terminal equipment in the type information of the execution content that the plan target assembly is provided with was non-local operation, the implementation of plan target was as follows:
Step 4.10 is searched the positional information of carrying out the content place in this locality, and calls according to the positional information that finds and to enable parts accordingly, and described positional information is passed to the described parts that enable.
Step 4.11, the described parts that enable obtain corresponding execution content according to described positional information, and carry out.
Step 4.12, described enabling after parts are finished returns to plan target assembly in the terminal equipment with execution result.
Step 4.13, the plan target assembly of described terminal equipment is saved in described execution result on the execution result node in the described tree.
In conjunction with the node in the management tree process of step 4.10 to step 4.13 described, as follows:
The plan target assembly triggers Scheduling enabler (plan target enables parts) and reads the Type node, when the execution type that reads according to described task is non-local operation, show that then carrying out content is not kept on the node, so scheduling enabler in the plan target assembly<x/ToBeExecuted/x/ToBeExecuted search URI (position indication) information that content is deposited of carrying out on the node, then according to URI (position indication) information that finds, call corresponding enabler, and URI information is passed to this enabler.Described enabler carries out the execution content of preserving on the node tree of URI information indication.After carrying out end, call scheduling enabler, and operating result is passed to scheduling enabler; Described Scheduling enabler is kept at operating result on the execution result subtree in the management tree in the plan target assembly, promptly in the Results node.
When the execution content type of searching and obtain described task correspondence in terminal equipment in the type information of the execution content that the plan target assembly is provided with was local operation, the implementation of plan target was as follows:
Step 4.20 is searched and obtains the execution content of described task correspondence in this locality, and carries out the execution content that gets access to.
Afterwards with step 4.13, promptly the plan target assembly of described terminal equipment is saved in described execution result on the execution result node in the described tree.
In conjunction with the implementation of the description of the node in management tree plan target when the execution content type is local operation, as follows:
When the execution content type is local operation, read the execution content in the ToBeExecuted node of scheduling enabler node from management tree, carry out described content then.After being finished, execution result is recorded in the Results node.
In the above-mentioned whole process, scheduling enabler can revise the Status node in different phase, to indicate the state of this scheduling task.For example, when the plan target work package was in the testing process of trigger condition, then the status modifier with the Status node in the management tree was detection; After plan target work package executable operations finishes, then with the status modifier of the Status node in the management tree for being finished.
As seen from the above technical solution provided by the invention, receive the task that service end issues when terminal equipment among the present invention, and after the trigger condition of confirming described task satisfied, then obtain the type of the execution content of described task correspondence; Carry out corresponding operation according to the type of described execution content.Therefore by the present invention, not only proposed in device management process, to realize the concrete solution that automatically performs of the plan target in the terminal equipment by the mode of management tree, but also can streamlining management the structure of tree, reduce the redundancy of management tree, and help the management tree structure of unified planning task.
The above; only for the preferable embodiment of the present invention, but protection scope of the present invention is not limited thereto, and anyly is familiar with those skilled in the art in the technical scope that the present invention discloses; the variation that can expect easily or replacement all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection range of claim.

Claims (9)

1, plan task realizing method in a kind of equipment control, it is characterized in that, comprising:
A, terminal equipment are according to receiving the plan target that service end issues, the trigger condition of described plan target correspondence, the execution content type of execution content correspondence are set, and after the trigger condition of confirming described plan target satisfies, then obtain the execution content type of described plan target correspondence;
B, obtain corresponding execution content, and carry out corresponding operation according to described execution content type.
2, method according to claim 1 is characterized in that, described steps A specifically comprises:
Equipment control agency in A1, the terminal equipment is provided with the trigger condition of described plan target and carries out content type according to the plan target that the service end that receives issues in terminal equipment, and the positional information of perhaps carrying out the content place in carrying out;
A2, after plan target is activated, the plan target assembly in the terminal equipment detects the trigger condition of the plan target correspondence that service end issues;
A3, judge that whether described trigger condition satisfies, if search and obtain the execution content type of described task correspondence in the type information of the execution content that then in terminal equipment, is provided with; Otherwise, continue execution in step A2.
3, method according to claim 1 and 2 is characterized in that, described execution content type comprises:
Local operation and/or non-local operation.
4, method according to claim 3 is characterized in that, described steps A 1 also comprises:
When the execution content type is local operation, to carry out content and carry out on the execution content subtree of management tree that content type is kept at the plan target assembly, and the trigger condition of plan target is kept on the trigger condition subtree of management tree of plan target assembly;
Or,
When the execution content type is non-local operation, be kept on the node tree that enables parts accordingly carrying out content, and the positional information that will carry out content type and carry out the content place is kept on the execution content subtree of management tree of plan target assembly, and the trigger condition of plan target is kept on the trigger condition subtree of management tree of plan target assembly.
5, method according to claim 1 is characterized in that, when the execution content type was local operation, described step B specifically comprised:
B1, obtain the execution content of described plan target correspondence in this locality, and carry out the execution content that gets access to.
6, method according to claim 5 is characterized in that, described step B1 specifically comprises:
On the execution content subtree of plan target assembly, obtain the execution content of described task correspondence, and carry out the execution content that gets access to.
7, method according to claim 1 is characterized in that, when the execution content type was non-local operation, described step B specifically comprised:
B2, obtain the positional information of carrying out the content place in this locality, and call according to the positional information that obtains and to enable parts accordingly, and described positional information is passed to the described parts that enable;
B3, the described parts that enable obtain corresponding execution content according to described positional information, and carry out;
B4, described enabling after parts are finished return to plan target assembly in the terminal equipment with execution result.
8, method according to claim 7 is characterized in that, described step B2 specifically comprises:
On the execution content subtree of plan target assembly, obtain the positional information of carrying out the content place, and call according to the positional information that obtains and to enable parts accordingly, and described positional information is passed to the described parts that enable.
9, according to claim 5 or 7 described methods, it is characterized in that described step B also comprises:
Described execution result is saved on the execution result subtree in the management tree of plan target assembly.
CNB2006100016202A 2006-01-18 2006-01-18 Plan and task realizing method in device management Active CN100442715C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100016202A CN100442715C (en) 2006-01-18 2006-01-18 Plan and task realizing method in device management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100016202A CN100442715C (en) 2006-01-18 2006-01-18 Plan and task realizing method in device management

Publications (2)

Publication Number Publication Date
CN1866867A true CN1866867A (en) 2006-11-22
CN100442715C CN100442715C (en) 2008-12-10

Family

ID=37425758

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100016202A Active CN100442715C (en) 2006-01-18 2006-01-18 Plan and task realizing method in device management

Country Status (1)

Country Link
CN (1) CN100442715C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103259804A (en) * 2013-06-05 2013-08-21 袁海军 Method and system for obtaining and comparing network service quality information
WO2015027780A1 (en) * 2013-09-02 2015-03-05 Tencent Technology (Shenzhen) Company Limited Methods and systems for managing a task based on geographical locations
CN112564971A (en) * 2020-12-07 2021-03-26 广州芯德通信科技股份有限公司 Tr069 protocol-based automatic batch CPE (customer premise Equipment) management method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000031985A (en) * 1998-07-13 2000-01-28 Nec Corp Communication fault detection control system and communication fault detection control method
JP2000076160A (en) * 1998-08-31 2000-03-14 Ando Electric Co Ltd Communication monitoring device
US20020112047A1 (en) * 2000-12-05 2002-08-15 Rakesh Kushwaha System and method for wireless data terminal management using general packet radio service network
AU2002359548B2 (en) * 2001-12-03 2005-03-24 Nokia Technologies Oy Apparatus, and associated method, for retrieving mobile-node logic tree information
US8694620B2 (en) * 2003-09-08 2014-04-08 Microsoft Corporation System and method for an OMA DM extension to manage mobile device configuration settings

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103259804A (en) * 2013-06-05 2013-08-21 袁海军 Method and system for obtaining and comparing network service quality information
CN103259804B (en) * 2013-06-05 2017-05-03 王媛媛 Method and system for obtaining and comparing network service quality information
WO2015027780A1 (en) * 2013-09-02 2015-03-05 Tencent Technology (Shenzhen) Company Limited Methods and systems for managing a task based on geographical locations
US9917906B2 (en) 2013-09-02 2018-03-13 Tencent Technology (Shenzhen) Company Limited Methods and systems for managing a task based on geographical locations
US10305998B2 (en) 2013-09-02 2019-05-28 Tencent Technology (Shenzhen) Company Limited Methods and systems for managing a task based on geographical locations
CN112564971A (en) * 2020-12-07 2021-03-26 广州芯德通信科技股份有限公司 Tr069 protocol-based automatic batch CPE (customer premise Equipment) management method
CN112564971B (en) * 2020-12-07 2022-02-22 广州芯德通信科技股份有限公司 Tr069 protocol-based automatic batch CPE (customer premise Equipment) management method

Also Published As

Publication number Publication date
CN100442715C (en) 2008-12-10

Similar Documents

Publication Publication Date Title
CN1313923C (en) A software distribution method and system
CN1920828A (en) Method and system for cleaning garbage files
CN1859180A (en) Method and system for realizing network terminal equipment configuration automatic updating
KR101619557B1 (en) Computer application packages with customizations
CN1291313C (en) System and method for the automatic installation and configuration of an operating system
CN1852538A (en) Method and apparatus for monitoring and updating software in apparatus management
CN1570868A (en) Method and system for deployment of operating system
CN100339830C (en) Method for updating software
CN1852101A (en) Parallel downloading method and terminal
CN1976352A (en) Method and system for providing supporting of long-distance software application
CN1959640A (en) System and method for representing user process to software package in software package management system
CN101064630A (en) Data synchronization method and system
CN1975672A (en) Information processing device and its download method
CN1859162A (en) Realizing method and system for automatic restoring equipment fault
CN1916843A (en) Method and system for laying out and accessing modules of user interface
CN1946226A (en) Method, device for upgrading telecommunication equipment and upgrading engine unit
CN1741460A (en) Method and system for realizing telecommunication network universal performance management
CN1886976A (en) Method, software and apparatus for performing actions on a wireless device using action lists and versioning
CN1975772A (en) Method and device for integrating information in multi-system
CN1863102A (en) System and method for testing apparatus based on managing information base
CN1913692A (en) Method for loading equipment software according to allocation
CN1617496A (en) Method for automaticall updating configuration for next generation network terminal
CN1835454A (en) Event notification management program and event notification management apparatus
CN101034348A (en) Software component management apparatus and method
CN1881891A (en) Method for storing configuration data of communication equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant