CN1862280B - Battery management system and device with abnormity report function - Google Patents

Battery management system and device with abnormity report function Download PDF

Info

Publication number
CN1862280B
CN1862280B CN2006100783153A CN200610078315A CN1862280B CN 1862280 B CN1862280 B CN 1862280B CN 2006100783153 A CN2006100783153 A CN 2006100783153A CN 200610078315 A CN200610078315 A CN 200610078315A CN 1862280 B CN1862280 B CN 1862280B
Authority
CN
China
Prior art keywords
battery
test
value
oms
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2006100783153A
Other languages
Chinese (zh)
Other versions
CN1862280A (en
Inventor
乔纳森·B·昆特
史蒂文·H·德沃肯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BATTERY CORP
Original Assignee
BATTERY CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/125,450 external-priority patent/US7616002B2/en
Application filed by BATTERY CORP filed Critical BATTERY CORP
Publication of CN1862280A publication Critical patent/CN1862280A/en
Application granted granted Critical
Publication of CN1862280B publication Critical patent/CN1862280B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the management of large stationary batteries. The invention is a comprehensive process for the management of stationary batteries that are used for backup power and are deployed in widely dispersed locations. The OMS(TM) (Optimization Management System) solution is comprised of Mega-Tags (preferably serialized bar-coded identification labels), a battery testing and data acquisition device, and web-based software. The OMS(TM) system employs algorithmic testing to determine whether a particular battery unit needs to be replaced or whether it can be advantageously redeployed. It also determines whether a particular deployment location contains anomalous readings, signifying potential problems with either the batteries themselves or possibly with other electrical equipment at the location. These components work together to provide a platform for managing a large number of perishable, expensive, and geographically dispersed assets.

Description

Battery management system and have the device of predictive failure analysis
Technical field
The present invention relates to the management of large-scale self-contained battery.The present invention is a kind of to as back-up source and be deployed in system ensemble and the device that the self-contained battery of extensive dispersed locations manages.Optimal Management System (OMS TM) solution comprise battery label (sometimes be called " large label (Mega-Tag) " here, they are preferably the bar code recognition mark of serial), battery testing and data acquisition facility, and based on the OMS of web TMSoftware.These ingredient co-operation are with the platform of the resource that is provided for managing a large amount of perishable, costliness and local position distribution.
Background technology
The many peculiar problem that solution of the present invention is relevant with battery.Battery is perishable.That is to say that battery has limited preservation life-span and limited serviceable life.Have benefited from OMS TMThe lead-acid battery that the fixing industrial battery types of solution normally seals.Usually these electromechanical assemblies must be installed in 6~10 months from build date, otherwise they need again charging.In addition, these battery design of great majority serviceable life is 10 years, but generally only continues at the scene to use 2~6 years.Deviation between this designed life and actual life is subject matter for the user of these batteries.
Self-contained battery is also large and heavy, and expensive.Usually this battery of a large amount of uses is to provide the back-up source that needs.Therefore, understand these devices extra resource management challenge is provided.
Battery comprises environmentally harmful dangerous substance.Strict rules and regulations are used for the waste treatment of management battery.These rules and regulations also comprise the requirement that file is provided.The user must be able to provide the enough evidences that abide by rules and regulations, otherwise will face severe punishment.Provide process height effort and the costliness of file, and most of observing replenished afterwards.
Usually two or four 12 volts unit is linked to be string, three 12 volts unit and is linked to be string and disposes battery, perhaps six or 12 2 volts unit is linked to be string and disposes battery, with the power devices to 24 volts, 36 volts or 48 volts.Other series arrangement also is feasible.This electricity combination of battery has increased the difficulty of managing these memory devices.In a word, the management self-contained battery is difficult, and usually is not the core competence of using most industries of these batteries.
Summary of the invention
OMS TM(Optimal Management System) follows the trail of the whole life-span of battery.The company of a large amount of deployment self-contained batteries can be managed for it because perishable, local position distribution and unmanageable resource.
OMS TMComprise that following co-operation is to provide the project of this unique services: the first, large label (being preferably the bar code recognition mark of serial) is fixed on each single battery.Comprise bar code reader and scan large label with the battery tester (being preferably BatteryCorp BC-T2000 or BCCelltron or Ultra or similar proving installation) that is connected to the serial ports of PC, then any given battery is carried out test.Battery is deployed as into the unit of the electrical interconnection of " string " usually, to increase voltage and output power.Each battery testing data point is stored together with the unique identifier value that is associated with the single battery unit.The user uses the dec non-modem DEC cable provide BatteryCorp BC-T2000 or BCCelltron or Ultra (perhaps similarly proving installation) to be connected to the serial ports of PC.Link software (being preferably the T2000 link software) make data from the test and data acquisition facility be sent to the PC internal storage become the facility.Then, the user signs in to proprietary network address, clicks the icon that uploads data; OMS TMUpload the data file of appointment to proprietary web server.This web server is processed this data file, and the storage relevant data is to OMS TMIn the suitable form of database.
The invention provides consolidated return and analysis option.This comprises operational report and financial report, and detailed recycling file.OMS TMAutomatically notification feature sends the prompting that needs test by Email to client technician.These Emails take user-defined business rules as the basis (test period interval and ROMPaq, pass through business unit).
OMS TMSolution makes the user of self-contained battery can manage the various aspects that battery is disposed.It is the unique available instrument that can make the process automation of any given battery upstate of unique identification, test, assessment and report.It provides the information about installing, disposing, test, recycle and damage.It provides the information of total information and long form, to be used for inside and outside use.
This solution has many advantages.It make the user can high-level efficiency, save into the self-contained battery that large-scale, the extensive dispersion of local management is disposed.It has increased the reliability of backup power equipment, because the operator has the information about the battery performance state now.This system also helps the safety recycling of potential poisonous device, reduces simultaneously the risk that does not conform to statutory regulation.
The OMS of method invention as an alternative TMConcrete application be OMS TMClient's business rules is applied to upload test data, and by automatic which battery of pointing technology personnel of sequence number or which battery need to be replaced.The technician no longer needs to make any decision, has therefore got rid of the subjectivity in processing.OMS TMNot only write report and describe the concrete condition that need to be replaced battery in detail, also the autoelectrinic email message is sent to corresponding technician with relevant installation instruction.
OMS as the invention of dispositions method again TMConcrete application be OMS TMAdditional business rules and algorithm are applied to upload test data, and determine which battery, if having, can be redeployed (recycling) to other side.The feasibility that battery redeploys depends on many business rules, include but not limited to the Use Limitation, position, weight of battery, specified serviceable life, the internal resistance by measuring battery and electric current and the use state of definite battery, and the present voltage readings of battery.OMS TMDetermine which battery can be redeployed, and with where.This has saved expense widely for the user.
OMS TMSystem uses test of heuristics to determine whether a certain specific battery deployed position comprises unusual reading, this means battery itself or may exist potential problem at other consumer of same position.In order to get the use state of self-contained battery device clear, be necessary the routine test battery.According to test, the roughly fault of battery is normally obvious.The variation of voltage, temperature and device structure aspect recognised standard is so unobvious." exception reporting " disposes the mass data storehouse of data for this category information search self-contained battery.Lack to detect and correct in the time of unusually causing the system with back-up power source used battery in the situation of main power source loss, to carry out its function and break down.
Another purpose of the present invention provides a kind of battery management system, and this system can easily be applied to existing battery, and needn't change battery, and the various batteries that provided by different manufacturers easily are provided.
According to following disclosure and subsidiary claim, it is more obvious that other purpose and advantage will become.
Description of drawings
With reference to by reference to the accompanying drawings to the following explanation of the embodiment of the invention, above-mentioned and further feature and purpose of the present invention and realize that its mode will become obviously, and can understand best the present invention, wherein:
Fig. 1 represents the label that the present invention uses;
Fig. 2 is the skeleton view with battery unit of the label that is associated with battery;
Fig. 3 is the battery testing that uses of the present invention and the view of data acquisition facility;
Fig. 4 is the process flow diagram of expression processing of the present invention;
Fig. 5 is the process flow diagram of expression battery replacement method;
Fig. 6 is the process flow diagram of the example application of expression replacement method;
Fig. 7 shows the again process flow diagram of deployment framework of intelligence;
Fig. 8 shows the process flow diagram of disposing again Intelligent Matching by example rule.
Embodiment
The invention provides and coordinate the waste treatment of battery testing, maintenance, installation, realization and battery, and can extensively carry out these functions in the geographic area.The present invention is by the BatteryCorpBC-T2000 tester with based on the OMS of web TMPlatform is seamlessly in conjunction with these business.This new solution helps company to improve their backup power system, reduces simultaneously cost.
The preferred large label that Fig. 1 represents to be associated with single battery.This label is associated with the particular battery unit, so that the unique identification number that embeds in this label is associated with this particular battery all the time.Preferably, for guaranteeing this continuous association, as shown in Figure 2, use bonding agent that large label is fixed on the shell body of battery 5.
Large label is preferably the bar code label of the unique identifier that comprises associated batteries.Label shown in Fig. 1 preferably has following information: (1) service provider's title and telephone number; (2) bar code of unique identification number; (3) battery size; (4) the unique identification number of human-readable form.Owing to preferably comprise human-readable information and bar code identification number, therefore large label preferably is fixed on the human operator may place that battery just can see and scan that need not be shifted.
Fig. 3 represents test and the data acquisition facility that native system uses.Shown device is the BatteryCorpBC-T2000 device.But, can use different testers, this tester should be able to be inputted data from bar code reader, and has the function of output data file.Bar code scanner or reader preferably with the battery tester direct communication, use and mutual reliably with convenient.This mode is preferably by also realizing for the port 6 that is connected to computing machine with being used for bar code reader.Fig. 3 also shows port 7, A/C current input terminal mouth 8 and the on/off switch 9 for two test probes.Since the present invention be can with the mutual flexible platform of the data file of multiple format, so data file can be multiple format.
Especially, cell tester should be able to be in internal memory store test results, each test is associated with relevant unique scanning identifier.This tester also should be able to be with the industrial standard file layout, such as ASCII text or Excel XLS formatted output test result.This tester should be able to be carried out impedance or conductivity test (technology of IEEE approval).The company of many use self-contained batteries carries out impedance or conductivity test.
In alternative embodiment, this tester can be worked in coordination with infrared thermometer operation, and this infrared thermometer or be integrated on the cell tester is perhaps communicated by letter with this tester.This thermometer will read the temperature of each battery and the temperature relevant with this particular battery unit unique identifier.This thermometer will provide the additional information about the tested person battery unit, and this additional information can be read, uploads and store.This thermometer is incited somebody to action so that the thermometer that no longer needs usefulness to separate records battery unit environment temperature on every side, and wherein environment temperature is stored with the battery testing data, and the more accurately reading of individual unit temperature is provided.
The proving installation file preferably has following heading message.At first, this document comprises position code.This code link database of the present invention, the position of pilot cell.Secondly, environment temperature is stored together with detecting information, because battery temperature is relevant with expected life.Many battery manufacturers are because warranty request also needs this information.
The proving installation file preferably has following details.The first, for the unique identifier of sign single battery unit.The second, comprise testDate and time in the file.The 3rd, as single battery unit testing result's test value, be typically resistance value or electric conductivity value.Test value is the key mark of battery upstate.Impedance is larger or electricly lead lower (they are opposite measurements of same alike result), and the upstate of battery is poorer.The 4th, cross-over connection test (strap test) value, it is optional.The cross-over connection test is the interconnecting test between next battery (in string) in current battery itself and the sequence.The 5th, as the voltage of the voltage determination value of battery.Voltage is the one other identification of battery upstate, and also is the sign for the unit state that battery is charged.
Data base administration is another ingredient of the present invention.Each battery testing data point is stored together with the unique identifier value that is associated with this single battery unit.So just make trend analysis report and single battery detailed report become possibility.
In operation, the user uses the dec non-modem DEC cable that battery tester is connected to the serial ports of personal computer (PC), and the dec non-modem DEC cable belongs to the criterion calculation peripheral devices of easy acquisition.Link software is facility so that the internal storage that data are sent to PC from test and data acquisition facility becomes.Usually, the user clicks " transmission " button in graphic user interface (GUI) demonstration of software.Response is " waiting pending data ".Prompting on the cell tester is directed to the user menu option of downloading data.
Then the user signs in to proprietary service provider website.The user then clicks the icon that uploads data that shows in this GUI.Then link software is uploaded the data file of appointment to proprietary web server.This web server is processed this data file, thereby relevant data is stored in OMS TMIn the suitable form of database.
The data element of storing comprises:
A. unique identifier (ID)
B. carry out the user's of test ID
C. testDate and time
D. test-types (impedance or electricity are led)
E. thermometrically value
F. connect measured value (if available)
G. voltage
H. environment temperature
Then, the present invention generates consolidated return and analysis, preferably includes as follows:
A. battery testing historical (position detail drawing)
B. battery testing summary (test and result general introduction)
C. the battery (verification tool) of not testing
D. battery is installed timeliness (based on installed date)
E. performance state report (based on user-defined state rule " by ", " well ", " warning " and " fault " analysis that battery is divided into groups)
F. forecast (estimating the analysis of the cost that will replace based on user-defined standard)
Automatically notice is another part of the present invention.This feature is take user-defined business rules as the basis.These rules are test interval and ROMPaq, automatic battery replacement interval and ROMPaq usually.These business rules can be by commercial unit's regulation of client definition.Commercial unit can be geographic area, product line grouping etc.This provides great dirigibility for how the user uses aspect method for automatically notifying.All notices are preferably undertaken by Email or other electric transmission mode.
The high-level overview that Fig. 4 provides the present invention to process.OMS TMSoftware needs the autoelectrinic mail notification of battery testing to send to the relevant technologies personnel each position.This processing is called automatic notice.The notified people that need to test can be inner (being the client company employee) or outside (third party's) technician.Because the OMS that the user may use automatic notification feature to lose efficacy TMSoftware, and set up alone test plan, therefore this automatic notification feature is not that operation is essential to the invention.
The technician uses the cell tester test battery, and by network connection, is preferably for example global computer network of Internet, uploads the data to OMS TMProprietary database, this database is preferably placed on the server.When receiving the data file of uploading, OMS TMSoftware is processed immediately this Data Concurrent and is sent automatic report (Auto Report) to return to this technician.This report with pilot cell whether all " by ", whether " by " test is perhaps arranged.This report can also according to this client's business rules (automatic replacement), provide the instruction of whether replacing particular battery or all batteries to this technician.If automatic replacement activates, OMS TMSoftware will send adequate information to relevant field engineering personnel.OMS TMSoftware can provide the recycling file, so that the battery that is replaced can suitably recycle.
Automatically report generates via cell tester, and through network connection, preferably by for example global computer network of Internet, sends to OMS TMProprietary software and OMS TMDatabase.
Use the programming tool of Microsoft to make up OMS TMSoftware platform.This Integrated Development Environment (IDE) comprises the feature of Speeding up development, such as automatically grammer management, powerful editing machine, line by line debugging, graphic design tool (comprising visual class and subclass) and integrated database access.This platform is fully OO, thereby the advantage of complete inheritance, encapsulation property and polymorphism is provided to the developer.This has just greatly reduced design, coding and test duration, thereby produces high efficiency rapid application develop (RAD) environment.
OMS TMThe method of work that platform adopts can be called commercial function modeling (BFM).Whole tendentiousness of development amount all center on business rules and method.This also can be called the object functionality model.Each function package specific business task, yet from the exploitation viewpoint, it has also inherited necessary any and all systemic-functions of execution preplanned mission.For example, the buying order object will accept request, and the access necessary data is used all relevant business rules, the data that checking is sent, and more new database and generation response, all these is carried out in single software object.This is main architecture advantage.
The replacement method framework that Fig. 5 shows comprises the steps:
Formulate standard with the client;
Be OMS with standard conversion TMBusiness rules;
Obtain data, recognizing site and battery;
For each independently battery case (jar)/battery produce large label;
Test battery and the OMS that uploads data TM
Business rules is applied in the test result;
By the electronics mode replacement instruction is notified to the technician relevant with the battery that will replace.
Fig. 6 is also for replace determining that method enumerated example rule, gather for:
General rule is every X month test battery, and X is the value of distributing according to the specific model of battery.The X value can be passed through OMS TMSoftware is formulated automatically.The X value that shows in the example is 12 months.Usually the X value is 3 months, 6 months and 12 months.
The 2nd X value is the Use Limitation value, if surpass the X month, business rules will be replaced battery.X value in the example is 60 months, and the Use Limitation of with good grounds battery is not replaced the option of battery in the rule.
The upload test results of single battery is to OMS TMIn the software.The preferred condition option that produces by business rules is applied to test result will for: " by "; " well "; " warning "; Or " fault ".OMS TMThe benchmark of test result and known associated batteries model is compared.According to the percentage difference between reference value and the actual test value, OMS TMMake a determination according to state.For example, if battery testing is 1.87 milliohms and benchmark is 1.0 milliohms, percentage difference is 87% so, and battery is exactly " fault "; If battery testing is 1.05 milliohms, percentage difference is 5% so, battery be exactly " by ".The percentage standard of mensuration state is to set and be imported into OMS by the client TMMiddle business rules setting.The method is used for two kinds of ohms mensuration, and form---impedance and electricity are led.In Fig. 6, according to the model of tested battery with for the business rules setting of " fault ", example shows 2.87 milliohms or will cause OMS greater than the test result of 2.87 milliohms TMThink that battery is " fault " state.In Fig. 6, resistance value is made as 2.87 milliohms, if the resistance value that obtains from test result greater than 2.87 milliohms, system will issue " fault " message.
Fig. 6 has also shown the business rules based on the electric battery mean difference, and this difference is to obtain by ohm test value (impedance or electric conductivity value) of a certain battery measurement in will organizing and the contrast of electric battery average conductance value.In the example, if the electric conductivity value of single battery is lower by 25% than the average conductance value of electric battery, system will produce and replace notification signal.
Although maximum problems that native system is automatic processing fully may be faced should not ignored and with the naked eye check battery.The visual check at the scene of this class is the rough sledding that determines whether that existence can affect battery life, security consideration or cause latency environment to endanger.Usually, if check that discovery electrolytic solution is revealed, battery container breaks or other relates to the above physical damage of worrying, battery will be replaced.
Caution signal is a kind of condition message, and it allows the user to determine whether should change battery.A factor of considering is, whether other battery that is in same position with battery under " warning " state will be replaced, replace when replacing under the alarm condition battery other battery may more save, more efficient.This idea also is applicable to electric battery and replaces, if determine in advance the certain proportion of battery failures, perhaps nearly all battery has all reached predetermined serviceable life in the electric battery, and so whole electric battery should be replaced.The shown Use Limitation from installation day of example among Fig. 6 is 3 years, if the battery more than 40% has produced " fault " message in the group, perhaps uses at least 3 years, will produce replacement message.This business rules has utilized by the client and has measured and OMS TMTwo settings carrying out: (1) causes the proportional numers of replacing required electric battery, and (2) cause the required Use Limitation of replacement.Common proportional range is 25% to 50%, and the Use Limitation scope is 2 years to 4 years.
Fig. 7 has shown the again process flow diagram of deployment framework of intelligence.Deployment framework starts from formulating standard for battery user again, and is OMS with standard conversion TMBusiness rules in the software.Then obtain the data of recognizing site and battery.For each independently battery case or battery produce unique identifier, preferably with the related barcode identifiers of single battery.Then test battery and data are uploaded to OMS TMSoftware, this software is applied to test result with the business rules that generates.
By OMS TMThe notification signal that generates based on business rules is applied to test result is the signal of recycling dead battery or the signal that reclaims recycling battery.If the result is the recycling signal, OMS TMSystem can provide for the technician recycling instruction and the documentary evidence of reasonable handling failure battery unit.If signal is to reclaim recycling battery, so OMS TMJust with the electric battery of battery unit Intelligent Matching for redeploying, this will effectively prolong the serviceable life of battery and can not destroy power supply in system.In order to realize this purpose, this signal will comprise the correct replacement of issuing the technician or the instruction that redeploys the single battery unit.Signal will indicate the sequence number of the battery that is redeployed, and a battery that redeploys or the position of a plurality of batteries.
Fig. 8 is the process flow diagram that shows the Intelligent Matching that redeploys by example rule.Detect battery status, and work as OMS TMSystem is under the state that redeploys, and also will detect battery location.Detect the floating voltage (float voltage) of battery, floating voltage is when battery and the power supply that is used for charging, is also referred to as light source of charger, measured magnitude of voltage during connection.At last, detect the Use Limitation of battery, also be worth being redeployed determining whether.
Example rule among Fig. 8 has reflected actual method.Just as showing in the replacement method, when the state of battery be by the time, just consider to redeploy.In case determined the position of battery unit, just can other place in same position or same market scope have been redeployed about battery unit and make decision.If disposing still is option, so OMS again TMJust determine whether battery meets the floating voltage standard that redeploys.The last item Rule Expression that shows among Fig. 8, only have when the Use Limitation of battery is lower than designated value (being 36 months in the example), just dispose again because only have when battery is surplus when the rationality that enough serviceable life, proof was disposed is again arranged, redeploy be only favourable.According to the type of battery, the standard of battery Use Limitation did not wait from 30 months to 120 months.
" exception reporting "
OMS TMSystem determines with test of heuristics whether a certain specific deployed position comprises unusual reading, and other consumer of unusual readings signify battery itself or possibility same position exists potential problem.
In order to get the use state of self-contained battery device clear, be necessary the routine test battery.According to test, the roughly fault of battery usually clearly.The variation of the recognised standard of voltage, temperature and device structure aspect is so unobvious.Exception reporting is disposed the large database concept of data for this category information search self-contained battery.Lack unusual detection and correct in the time of to cause the system with back-up power source used battery in the situation of main power source loss, to carry out its function and break down.
The main test of battery status and the state of use is the measured value of battery unit impedance, specifically by from without external loading and the internal resistance of cell determined with the difference between the loaded voltage, here utilize the formula R=E/I that is familiar with that voltage is obtained the internal resistance of cell divided by strength of current, wherein R is resistance, E is voltage, and I is strength of current or says electric current.Along with increase service time of battery, the difference between its no-load voltage and the on load voltage increases gradually.In other words, the electric power generation performance along with battery reduces its internal resistance value increasing gradually.Theoretically, the internal resistance of ideal source is zero ohm.
The labor of battery data can produce following a few class exception reporting information:
1) cell voltage.If the voltage of testing surpasses specified nominal voltage 16.7% or higher, if the voltage of perhaps testing is lower than specified nominal voltage, will report so unusual.When low-voltage or high voltage and underproof ohm measurement result occur simultaneously, confirm that battery broken, but when low-voltage or high voltage and ohm measurement result of passing through occur simultaneously, may mean that electrical issues has appearred in charging equipment.For example: rated voltage is 12 volts, is 15.7 but the battery testing result shows voltage readings.
2) equipment is to cell voltage.If the nominal voltage of the nominal voltage of equipment and battery does not mate, will report so unusually, so that the information that can correct a mistake.For example: specified equipment voltage is 48 volts, and the battery of listing is 12 volts, but only has two batteries in the electric battery, thereby has formed 24 volts total voltage.Can report so unusually, so that the client can determine or equipment has been reported mistakenly into 48 volts and is actually 24 volts, or be to lack two batteries in the battery case.
3) high temperature.In the situation that does not have underproof ohm measurement result, it is unusual this class to occur easily.High temperature is normally caused by the fault of device cooling system.The fault that occurs for the correction high-temperature condition can cause unusual equipment and battery failures.For example: the environment temperature reading is 85
Figure 200610078315310000210003_0
Environment temperature can calculate according to many independent readings, and environment temperature can be confirmed as the mean value in the special time cycle here.
4) low temperature.In the situation that does not have underproof ohm measurement result, it is unusual this class also may to occur.Low temperature normally causes owing to the fault of installing heating system.The fault that occurs for the correction low temperature condition can cause equipment malfunction and bad battery performance.For example: the environment temperature reading is 4 ℃.
5) unknown equipment and battery.This class is comprised of the battery data in the system that lacks specification of equipment unusually.This situation stops OMS TMOr any similar software do not knowing in the situation of this equipment that the use state of battery is made decision based on authentic communication, and therefore suitable benchmark test value and any ohm are measured reading and become nonsensical.
Following form is that exception reporting has shown representational report details.Except the identification specific user, beyond the time cycle and diverse location data of report, report also will reflect the group quantity of battery unit, the position of battery unit in group, device type (manufacturer and model), identification code (being preferably the serial digital from the bar coded sticker that sticks on battery unit), manufacturer's part number, voltage specification, the date of manufacture of battery unit, testDate, ohm measured value, test benchmark (standard) value that ohm is measured, battery ohm is measured state and (is passed through typically, well, bad or not by), the cell voltage reading, environment temperature and Exception Type.
The electric battery numbering The position Device type ID Part number Voltage Date of manufacture
1 3 PCP 196813 TEL12-12550 12.0 9/5/01
2 2 PCP 118192 TEL12-125 12.0 5/1/00
TestDate Test value Benchmark State Test voltage Environment temperature Unusually
8/2/05 3.130 3.000 By 13.525 74F Resistance is low
8/3/04 3.130 3.000 By 14.111 70F Cell voltage
At last, OMS TMPlatform comprises abundant complete fastening means.It is the data of the various forms of I/O easily, from plain text to separating file to Excel to XML.In fact, the cell tester upload module is accepted the data of text and XLS form.OMS TMData source that also can any adaptation ODBC of direct access is such as Oracle, DB2 and other database.But we expect that the XML class will be particularly conducive to OMS TMAnd the seamless communication between any related system.
Be used for making up OMS TMAppointed product comprise:
● the Visual FoxPro of Microsoft 7.0 (IDE)
● West Wind Web connects (the basic class that is used for web services)
● Macromedia HomeSite (HTML/JavaScript editing machine; Any operable editing machine)
● the IDAutomation.com bar code font
●Adobe Acrobat 5.0
The web connection of West Wind technology is the framework for the basic class that makes up the web application.These classes are carried out the low order function of the authentication that is useful on, request management, dialogue management, providing data formatting and output.If the renewal version of said procedure is arranged, can preferably use it to upgrade version.
Because other modification or variation are significantly for those skilled in the art, therefore together with specific device principle of the present invention are described.Yet should be appreciated that what this description was just made by example, rather than to the limitation of the scope of the invention.

Claims (4)

1. determine unusual battery management method for one kind, may further comprise the steps:
Determine the benchmark test value for battery using state, described benchmark test value has one group of standard value;
For battery creates unique identifier;
With described unique identifier input cell tester;
Utilize described cell tester that described battery is carried out a plurality of tests;
From each test that described battery is carried out, generate test value;
Described test value is related with described unique identifier;
Described test value is stored in the database;
Use test of heuristics to determine whether a specific deployed position comprises unusual reading;
The test value of relatively storing and the standard value of selected described benchmark test value;
Determine whether described test value satisfies selected standard value;
Dispose the mass data storehouse of data for potential problem search self-contained battery;
For the test value that does not satisfy selected standard value generates exception reporting;
In described exception reporting, describe unusual;
Described exception reporting is stored in the described database.
2. the method for claim 1 further may further comprise the steps:
In described exception reporting, generate the form of expression data;
With described form stores in described database.
3. the method for claim 1 further may further comprise the steps:
Described database is connected to computer network;
With the user of the data transmission in the described exception reporting to described computer network;
In the message that is connected to the data that receiving belt is transmitted to some extent on the device of described computer network.
4. the method for claim 1, wherein said standard value comprises resistance value and Use Limitation value.
CN2006100783153A 2005-05-10 2006-05-09 Battery management system and device with abnormity report function Expired - Fee Related CN1862280B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/125,450 US7616002B2 (en) 2003-12-30 2005-05-10 Battery management system and apparatus with anomaly reporting
US11/125,450 2005-05-10

Publications (2)

Publication Number Publication Date
CN1862280A CN1862280A (en) 2006-11-15
CN1862280B true CN1862280B (en) 2013-04-24

Family

ID=37389749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006100783153A Expired - Fee Related CN1862280B (en) 2005-05-10 2006-05-09 Battery management system and device with abnormity report function

Country Status (1)

Country Link
CN (1) CN1862280B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120060820A (en) * 2009-09-01 2012-06-12 보스톤-파워, 인크. Large scale battery systems and method of assembly
CN103376420B (en) * 2013-06-20 2016-01-06 桑铂士能源技术(杭州)有限公司 Storage battery after-sale management system
CN109455094B (en) * 2018-11-22 2020-07-24 安徽江淮汽车集团股份有限公司 Method and system for automatically identifying battery information of electric automobile

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1128087A (en) * 1994-03-15 1996-07-31 艾利森·Ge·流动通讯有限公司 Rechargeable battery pack with identification circuit, real time clock and authentication capability
CN1576873A (en) * 2003-07-01 2005-02-09 明基电通股份有限公司 Verification system for verifying authenticity of a battery and method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1128087A (en) * 1994-03-15 1996-07-31 艾利森·Ge·流动通讯有限公司 Rechargeable battery pack with identification circuit, real time clock and authentication capability
CN1576873A (en) * 2003-07-01 2005-02-09 明基电通股份有限公司 Verification system for verifying authenticity of a battery and method thereof

Also Published As

Publication number Publication date
CN1862280A (en) 2006-11-15

Similar Documents

Publication Publication Date Title
US7616002B2 (en) Battery management system and apparatus with anomaly reporting
US7317995B2 (en) Battery management system and apparatus
US7349816B2 (en) Battery management system and apparatus with runtime analysis reporting
US7750639B2 (en) Battery management system with predictive failure analysis
US7915860B2 (en) Battery management system with runtime reserve analysis
US20060077609A1 (en) System and method for circuit protector monitoring and management
CN1797837B (en) Battery management system and apparatus
CN102870056A (en) Intelligent network
CN102003336A (en) System and method for managing wind turbines and enhanced diagnostics
CN107515370A (en) A kind of PCBA detection means and detection method
CN102003335A (en) System and method for managing wind turbines
Sandtorv et al. Practical experience with a data collection project: the OREDA project
Fioravanti et al. Predictive-maintenance practices: For operational safety of battery energy storage systems
CN1862280B (en) Battery management system and device with abnormity report function
CN115668081A (en) Information processing apparatus, information processing method, and program therefor
US20190145804A1 (en) Operating a gas meter with a smart power supply
CN103348557A (en) Field response system
US20050143955A1 (en) Battery management system and apparatus
CN1881666B (en) Battery management system and apparatus
Bagen et al. Enhanced probabilistic approach for substation reliability assessment
CN1862281B (en) Battery management system and apparatus with runtime analysis reporting function
WO2012026574A1 (en) Storage-battery information management device
CN1808453A (en) Battery management system and apparatus
Chao et al. How to Combine Standardization Digital Transformation Technology with Power Business Scenarios: Demand Analysis, Technical Route and Application Practice
Betharajoo et al. Safety Risk Assessment and Warning System at Engineering Laboratory Through IoT Technologies

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20160509

CF01 Termination of patent right due to non-payment of annual fee