CN1858361A - 超软弱土快速加固方法及其加固装置 - Google Patents

超软弱土快速加固方法及其加固装置 Download PDF

Info

Publication number
CN1858361A
CN1858361A CN 200610035853 CN200610035853A CN1858361A CN 1858361 A CN1858361 A CN 1858361A CN 200610035853 CN200610035853 CN 200610035853 CN 200610035853 A CN200610035853 A CN 200610035853A CN 1858361 A CN1858361 A CN 1858361A
Authority
CN
China
Prior art keywords
weak soil
super soft
soft weak
sand
drainage blanket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610035853
Other languages
English (en)
Other versions
CN100480472C (zh
Inventor
房营光
莫海鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CNB2006100358534A priority Critical patent/CN100480472C/zh
Publication of CN1858361A publication Critical patent/CN1858361A/zh
Application granted granted Critical
Publication of CN100480472C publication Critical patent/CN100480472C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及一种超软弱土快速加固方法,包括(1)在超软弱土上铺设一层或多层格栅,垂直插入长度与超软弱土厚度相当的塑料排水板或袋装砂井,在格栅上铺设排水垫层,并在排水垫层中沿水平方向铺设滤管,然后覆盖密封膜,形成超软弱土快速加固装置;(2)对步骤(1)形成的超软弱土快速加固装置内的超软弱土层进行7~14天的真空预压;(3)清除步骤(1)铺设的排水垫层,再铺设排水砂垫层,然后采用常规的真空预压法或堆土预压法对地基进行整体加固。按所述方法施工得到的装置由密封膜、排水垫层、抽真空滤管、排水板或袋装砂井、格栅层构成。本发明采用超软弱土和排水垫层,大大降低成本,缩短施工工期,施工后差异沉降小。

Description

超软弱土快速加固方法及其加固装置
技术领域
本发明涉及建筑工程、港口工程、公路工程等领域,具体是超软弱土快速加固方法。
本发明还涉及所述方法得到的超软弱土快速加固装置。
技术背景
我国沿海地区人口密集,人均耕地面积甚少,随着国民经济的持续发展,沿海地区建设规模不断扩大,土地资源越来越紧张。为了解决建筑、港口码头等工程用地问题,近年来天津港、连云港、广州南沙港以及深圳盐田区等地进行了大量的围海造陆工程。围海造陆工程面临2个问题,一是吹填土材料问题,二是吹填土地基的加固问题。从技术的角度来看,最理想的吹填材料是砂土,吹填砂地基的加固技术也比较简易。但是,由于建筑工程消耗了大量的砂,并且出于环境保护和水利安全的要求,各地水利和环保部门限制或禁止采砂,因此,砂土价格昂贵,且极为短缺,难于满足围海造陆工程所需大量吹填砂的要求。近年来,结合下游航道或出海口的清淤疏浚工程,采用超软弱土作为围海造陆的填土,这样既解决了清淤工程的淤泥沉积和堆填场地问题,又解决了围海造陆工程的吹填材料困难。但是,吹填的淤泥土属于超软弱土,含水量极高,处于流动状态,其压缩性大、强度及承载力极低,必须对超软弱土地基进行加固,才能把围海造陆所得的土地作为建设用地。
对于超软弱土地基的加固包括对表面超软弱土的加固和下卧软土的加固,最有效的加固方法是预压法(如真空预压法或堆土预压法等)。预压法加固地基需要插入穿过软土层的塑料排水板或袋装砂井作为排水通道,其长度视软土层的厚度而定,通常为20~25米,地表还需要铺设600~800mm的排水砂垫层。进行塑料排水板或袋装砂井施工的插板机或砂井机的重量为30~40吨,施工时插板机或砂井机需在地表行走。由于表面超软弱土处于流动状态,不具有承载能力,各种施工设备都将陷入超软弱土之中。因此,无法采用常规方法进行塑料排水板或袋装砂井的施工,也无法在流动状态的表层超软弱土上铺设排水砂垫层。
采用常规方法对超软弱土地基进行加固时,为防止施工设备陷入淤泥土中,表层超软弱土通常需自然晾晒1~2年或采用其他方法进行预处理,施工效率低,成本高,施工工期长。
此外,采用常规方法加固超软弱土地基时,通常在吹填的淤泥中加入砂土以改善其性能,由此容易形成淤泥包,加固效果、强度不均匀,工后差异沉降大。
发明内容
本发明针对现有技术加固超软弱土地基存在的困难,提供一种超软弱土快速加固方法,通过采用超软弱土和排水垫层,大大降低成本,缩短施工工期,施工后差异沉降小。
本发明的目的还在于提供采用所述方法得到的超软弱土快速加固装置。
本发明的超软弱土快速加固方法包括如下步骤:
(1)在超软弱土上铺设一层或多层格栅,垂直插入长度与超软弱土厚度相当的塑料排水板或袋装砂井,在格栅上铺设排水垫层,并在排水垫层中沿水平方向铺设滤管,然后覆盖密封膜,形成超软弱土快速加固装置;
(2)对步骤(1)形成的超软弱土快速加固装置内的超软弱土层进行7~14天的真空预压;
(3)清除步骤(1)铺设的排水垫层,再铺设排水砂垫层,然后采用常规的真空预压法或堆土预压法对地基进行整体加固。
步骤(1)中,所述格栅包括土工布和/或土工编织物。
步骤(1)中,可以采用轻型水上插板机或砂井机、底座改造为船式的轻型插板机或砂井机来设置塑料排水板或袋装砂井。也可以把轻型插板机或袋装砂井安装于小船上进行设置施工。
塑料排水板或袋装砂井的长度与吹填的表层淤泥土厚度相当,或根据第二步加固施工所要求的表层土承载力而定。
步骤(1)中,为更有利于插板机或袋装砂井机在超软弱土上行走,可以沿加固区周边筑一道上围堰蓄满一定深度水,利用水的浮力减轻施工设备对超软弱土的压力。
超软弱土中的塑料排水板或袋装砂井完成后,排干围堰蓄内的水,铺设厚度约30-50cm的稻草、芦苇、杂草、土工编制物中的一种或一种以上作为排水垫层;
经步骤(2)真空预压加固后的超软弱土的承载力可达到40~60kPa,为步骤(3)的地基整体加固实施提供施工条件。
步骤(3)中,由于经步骤(2)真空预压加固后的超软弱土达到一定的强度,能承受大型施工设备的压力,可满足常规真空预压法或其它施工方法的施工条件。
按本发明方法施工得到的超软弱土快速加固装置由密封膜、排水垫层、抽真空滤管、排水板或袋装砂井、格栅层构成,所述密封膜覆盖在排水垫层的上面和侧面,格栅层在排水垫层的底面,抽真空滤管水平安装在排水垫层内,排水板或袋装砂井垂直插入在超软弱土中,其上端埋入排水垫层内。
所述密封膜是塑料密封膜。
本发明与现有技术相比,具有如下优点:
1、由于超软弱土处于流动状态,无法在超软弱土上铺设常规排水砂垫层。本发明采用了排水垫层,排水垫层与超软弱土之间用格栅分隔,防止泥浆侵入垫层材料之中而影响其透气透水功能。该排水垫层具有排水功能,且重量轻而可直接铺设于超软弱土之上,使超软弱土的加固施工可顺利实施。而且大大降低成本,并有利于资源和生态环境保护。
2、本发明采用轻型水上插板机或砂井机、或底座改造为船式的轻型插板机或砂井机、或把轻型插板机或袋装砂井安装于小船上等施工方法,有效防止施工设备沉陷,能在超软弱土之上直接进行排水板、袋装砂井的设置;同时,沿加固区周边筑土围堰蓄水,利用水的浮力减轻施工设备对超软弱土的压力,更有利于插板机或袋装砂井机在超软弱土上行走,提高施工效率。
3、本发明可在吹填超软弱土后即时进行加固,工艺简易,成本低,施工工期短;加固强度均匀,施工后差异沉降小。
附图说明
图1是本发明的超软弱土快速加固装置结构示意图。
图2是本发明方法中设置排水板或袋装砂井的施工示意图。
具体实施方式
如图1所示,密封膜1覆盖在排水垫层2的上面和侧面,格栅层5在排水垫层2的底面,抽真空滤管3水平安装在排水垫层2内,排水板或袋装砂井4垂直插入铺设在原地面上的超软弱土7中,其上端插入排水垫层2内。
所述密封膜1可以采用塑料密封膜,排水垫层可以采用稻草、芦苇、杂草、多孔土工材料垫层中的一种或一种以上。格栅可以采用土工布和/或土工格栅。
图1中,通过表层超软弱土加固提高其强度,为地基整体加固的后继工艺实施提供条件。其中塑料排水板或袋装砂井的长度L也是有效加固深度,根据后继工艺要求而定,通常为数米;真空度通过滤管、排水垫层和塑料排水或袋装砂井传递,对有效加固深度L范围内的超软弱土进行预加固。
如图2所示,沿加固区周边筑土围堰9,围堰内蓄水10后,采用轻型水上插板机或砂井机11设置排水板或袋装砂井。
实施例
本发明在广州南沙地区一吹填淤泥土地基加固试验中得到了成功应用。该试验场地为100×100m2,原地基为厚度约20m的淤泥和淤泥质土层,在原地基面吹填6m厚的淤泥。采用本发明先对地表新吹填淤泥土进行加固,经过9天的真空加载,新吹填淤泥的承载力达到45~55kPa,满足了地基整体加固的后继施工条件要求,地基整体加固仍然采用真空预压法。地基经过93天的真空加载整体加固后,承载力达到90kPa,满足设计要求。

Claims (5)

1、一种超软弱土快速加固方法,其特征在于包括如下步骤:
(1)在超软弱土上铺设一层或多层格栅,垂直插入长度与超软弱土厚度相当的塑料排水板或袋装砂井,在格栅上铺设排水垫层,并在排水垫层中沿水平方向铺设滤管,然后覆盖密封膜,形成超软弱土快速加固装置;
(2)对步骤(1)形成的超软弱土快速加固装置内的超软弱土层进行7~14天的真空预压;
(3)清除步骤(1)铺设的排水垫层,再铺设排水砂垫层,然后采用常规的真空预压法或堆土预压法对地基进行整体加固。
2、根据权利要求1所述的方法,其特征在于所述格栅包括土工布和/或土工编织物。
3、根据权利要求1或2所述的方法,其特征在于步骤(1)中,采用轻型水上插板机或砂井机、或底座改造为船式的轻型插板机或砂井机来设置排水板或袋装砂井;或者把轻型插板机或袋装砂井安装于小船上进行设置施工。
4、根据权利要求3所述的方法,其特征在于沿超软弱土加固区周边筑一道土围堰蓄水。
5、权利要求1-4之一所述方法得到的超软弱土快速加固装置,其特征在于由密封膜、排水垫层、抽真空滤管、排水板或袋装砂井、格栅层构成,所述密封膜覆盖在排水垫层的上面和侧面,格栅层在排水垫层的底面,抽真空滤管水平安装在排水垫层内,排水板或袋装砂井垂直插入铺设在超软弱土中,其上端插入排水垫层内。
CNB2006100358534A 2006-06-09 2006-06-09 超软弱土快速加固方法及其加固装置 Expired - Fee Related CN100480472C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100358534A CN100480472C (zh) 2006-06-09 2006-06-09 超软弱土快速加固方法及其加固装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100358534A CN100480472C (zh) 2006-06-09 2006-06-09 超软弱土快速加固方法及其加固装置

Publications (2)

Publication Number Publication Date
CN1858361A true CN1858361A (zh) 2006-11-08
CN100480472C CN100480472C (zh) 2009-04-22

Family

ID=37297312

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100358534A Expired - Fee Related CN100480472C (zh) 2006-06-09 2006-06-09 超软弱土快速加固方法及其加固装置

Country Status (1)

Country Link
CN (1) CN100480472C (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100549304C (zh) * 2007-08-01 2009-10-14 汤连生 一种无密封快速真空预压法
WO2010028547A1 (zh) * 2008-09-11 2010-03-18 中国科学院武汉岩土力学研究所 加快吹填淤泥排水固结速度的立体网络状排水装置
CN101793022A (zh) * 2010-02-26 2010-08-04 曾国海 二次循环管路系统无砂垫层真空预压方法
CN101225656B (zh) * 2008-01-31 2010-09-15 中交第四航务工程局有限公司 超软弱土浅表层快速加固方法
CN102220756A (zh) * 2011-04-15 2011-10-19 中港基业(北京)岩土技术有限公司 长短塑料排水板相结合的二次真空预压地基处理方法
CN102220757A (zh) * 2011-04-18 2011-10-19 中交四航工程研究院有限公司 超软弱土浅表层空间排水固结快速处理方法
CN102493428A (zh) * 2011-12-09 2012-06-13 中国建筑西南勘察设计研究院有限公司 一种软基加固用真空预压结构
CN102776877A (zh) * 2012-08-22 2012-11-14 吉林大学 超软土地基梯级真空排水固结方法
CN103088809A (zh) * 2011-11-07 2013-05-08 中交上海航道勘察设计研究院有限公司 一种无砂真空预压软基处理水平排水垫层设置方法
CN105821828A (zh) * 2016-04-06 2016-08-03 浙江水利水电学院 一种用于海涂围垦区处理的排水布设方法
CN106638550A (zh) * 2016-09-21 2017-05-10 同济大学 一种地基排水去污装置

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392448A (zh) * 2011-09-28 2012-03-28 上海强劲地基工程股份有限公司 一种长短排水板组合的软基加固结构及其施工方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1071391C (zh) * 1997-07-29 2001-09-19 浙江省围海工程公司 水下塑料排水板加固软基专用插板船
CN2516596Y (zh) * 2002-01-14 2002-10-16 河海大学 复合加筋排水褥垫
CN1420239A (zh) * 2002-10-24 2003-05-28 广东省航盛工程有限公司 一种真空排水预压加固软基的方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100549304C (zh) * 2007-08-01 2009-10-14 汤连生 一种无密封快速真空预压法
CN101225656B (zh) * 2008-01-31 2010-09-15 中交第四航务工程局有限公司 超软弱土浅表层快速加固方法
WO2010028547A1 (zh) * 2008-09-11 2010-03-18 中国科学院武汉岩土力学研究所 加快吹填淤泥排水固结速度的立体网络状排水装置
CN101357817B (zh) * 2008-09-11 2010-06-09 中国科学院武汉岩土力学研究所 一种加快吹填淤泥排水固结速度的立体网络状排水装置
CN101793022A (zh) * 2010-02-26 2010-08-04 曾国海 二次循环管路系统无砂垫层真空预压方法
CN101793022B (zh) * 2010-02-26 2011-09-28 曾国海 二次循环管路系统无砂垫层真空预压方法
CN102220756A (zh) * 2011-04-15 2011-10-19 中港基业(北京)岩土技术有限公司 长短塑料排水板相结合的二次真空预压地基处理方法
CN102220756B (zh) * 2011-04-15 2012-08-29 中港基业(北京)岩土技术有限公司 长短塑料排水板相结合的二次真空预压地基处理方法
CN102220757B (zh) * 2011-04-18 2013-01-09 中交四航工程研究院有限公司 超软弱土浅表层空间排水固结快速处理方法
CN102220757A (zh) * 2011-04-18 2011-10-19 中交四航工程研究院有限公司 超软弱土浅表层空间排水固结快速处理方法
CN103088809A (zh) * 2011-11-07 2013-05-08 中交上海航道勘察设计研究院有限公司 一种无砂真空预压软基处理水平排水垫层设置方法
CN102493428A (zh) * 2011-12-09 2012-06-13 中国建筑西南勘察设计研究院有限公司 一种软基加固用真空预压结构
CN102776877A (zh) * 2012-08-22 2012-11-14 吉林大学 超软土地基梯级真空排水固结方法
CN102776877B (zh) * 2012-08-22 2015-03-25 吉林大学 超软土地基梯级真空排水固结方法
CN105821828A (zh) * 2016-04-06 2016-08-03 浙江水利水电学院 一种用于海涂围垦区处理的排水布设方法
CN105821828B (zh) * 2016-04-06 2017-11-28 浙江水利水电学院 一种用于海涂围垦区处理的排水布设方法
CN106638550A (zh) * 2016-09-21 2017-05-10 同济大学 一种地基排水去污装置
CN106638550B (zh) * 2016-09-21 2018-08-24 同济大学 一种地基排水去污装置

Also Published As

Publication number Publication date
CN100480472C (zh) 2009-04-22

Similar Documents

Publication Publication Date Title
CN100480472C (zh) 超软弱土快速加固方法及其加固装置
CN2911010Y (zh) 吹填淤泥土地基快速加固装置
CN109736291B (zh) 一种欠固结吹淤地基上生物水泥加固路基及其施工方法
CN102561308B (zh) 软土地基轻井塑排叠加真空预压法
CN102587352B (zh) 一种软土地基的热排水固结处理装置及其处理方法
CN102011391B (zh) 一种软弱地基的加固处理方法
CN102926376B (zh) 一种围海造地区域软土地基处理方法
CN101250868A (zh) 降水预压联合动力固结深层加固法
CN111733792B (zh) 一种软土地基真空预压结合动力固结排水的地基处理方法及其处理系统
CN102220757A (zh) 超软弱土浅表层空间排水固结快速处理方法
CN1948632A (zh) 深层软土地基加固方法
CN1807773A (zh) 一种深厚湿陷性黄土地基的处理方法
CN205636721U (zh) 滤井真空预压加固深厚软土地基的设备
CN104412751A (zh) 一种盐碱滩地黏质滨海盐土改良方法
CN105019425A (zh) 一种排水体和固化层组合地基结构的施工方法
CN103015399A (zh) 可液化地基的抗震减灾系统及地基处理方法
CN110512592B (zh) 一种真空预压利导管桩注气碳化超软地基的加固处理系统
CN109083100B (zh) 一种吹泥成陆后的河道开挖施工工艺
CN106498923A (zh) 自排水后固结充填砂袋复合桩体系及其施工方法
CN105804045A (zh) 滤井真空预压加固深厚软土地基的设备及方法
CN109667260A (zh) 一种基于软土地基排水固结的加固体系及其施工方法
CN220579959U (zh) 一种尾矿库闭库细粒径软弱区域固结的系统
CN103276717B (zh) 复合土工合成材料加筋垫层处理软土地基的方法
Deng et al. Consolidating dredge soil by combining vacuum and dynamic compaction effort
CN204875755U (zh) 一种排水体和固化层组合地基结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090422

Termination date: 20140609

EXPY Termination of patent right or utility model