CN1857820A - Quick chucking structure for combined mold - Google Patents
Quick chucking structure for combined mold Download PDFInfo
- Publication number
- CN1857820A CN1857820A CN 200610067186 CN200610067186A CN1857820A CN 1857820 A CN1857820 A CN 1857820A CN 200610067186 CN200610067186 CN 200610067186 CN 200610067186 A CN200610067186 A CN 200610067186A CN 1857820 A CN1857820 A CN 1857820A
- Authority
- CN
- China
- Prior art keywords
- clamp
- card trough
- screw
- die sleeve
- combined mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Moulds For Moulding Plastics Or The Like (AREA)
Abstract
The quick chucking structure for combined mold includes a mold sleeve with notch for mounting mold core, and two chucking plates. The present invention features the mold sleeve with at least two slots for the chucking plate on the upper surface; and the chucking plate with cross section shape matching that of the slots and length smaller than that of the slots. The chucking plates can clamp the mold core in the mold sleeve by means of screws. The combined mold has fast chucking and convenient use.
Description
Technical field
The present invention relates to a kind of assembling die structure that is installed, is a kind of structure that can realize rapid-mounted.
Background technology
Existing mould is installed structure as shown in Figure 1, and circle core rod 2 is placed in the die sleeve 1, respectively has a clamp to be through in the clamp hole on the die sleeve so that core rod is blocked from both sides in die sleeve 1 both sides, and is fixed on the die sleeve 1 by cover plate 3 usefulness screws 4.Because the fastening direction of screw 4 is consistent with the force direction of clamp,, need with 8 screws 4 so that clamp 3 is fixed on the die sleeve 1 on each clamp 3 for guaranteeing enough power is arranged will justify core rod 2 mounting boards.This structure that is installed is installed and discharges and wants 16 screws of complete loading and unloading, and service speed is slow, has greatly influenced production efficiency.In addition, the screw of pulling down 4 is also lost easily.
Summary of the invention
The object of the present invention is to provide a kind of rapid-mounted structure of assembling die, to solve existing mould be installed structure installation and removal complicated operation, problem that speed is low.
The present invention adopts following technical scheme: a kind of quick chucking structure for combined mold, comprise die sleeve and clamp, the groove that the dress core rod is arranged on the die sleeve, be positioned at the die sleeve upper surface described dress core rod the groove bilateral symmetry be provided with twice Card trough at least, Card trough is along described groove radial arrangement, and the bottom land of Card trough has at least one screw; The shape of cross section of described clamp and Card trough coincide and slidably are stuck in the Card trough, its length is less than the length of Card trough, the through hole that can align with the screw of Card trough bottom is arranged on the clamp, when the screw that passes through hole was tightly gone into through hole on the Card trough, the core rod that two clamps can will be contained in the die sleeve from both sides blocked.
The cross section of described Card trough and clamp can be convex shape.
The preferred number of corresponding screw and through hole is two on described Card trough and the clamp.
Described clamp top can be provided with a projection, with the position of convenient mobile clamp.
Through hole on the described clamp can be screw.
The present invention has following beneficial effect: the clamp that (1) is used to clamp core rod is stuck in the Card trough on the die sleeve, and fix by 1-2 screw, fixedly during core rod as long as sliding jaw is fastening to the shared 2-4 of a correct position screw, as long as unclamp these several screws to the both sides sliding jaw when changing core rod, be installed and knockout screw quantity is few, the operation quick.(2) the fastening force direction of screw is vertical to the force direction of core rod with clamp, fastening convenience and difficult loosening, and screw can not lost yet during dismounting.(3) clamp is stuck in the Card trough on the die sleeve, and being connected firmly does not come off.
Description of drawings
Fig. 1 is the existing assembling die structural representation that is installed.
Fig. 2 is a quick chucking structure for combined mold schematic diagram of the present invention.
Fig. 3 is that the A of Card trough is to view.
Fig. 4 is the clamp structural representation.
Fig. 5 is the left view of clamp among Fig. 4.
Fig. 6 is the vertical view of clamp among Fig. 4.
The specific embodiment
Below in conjunction with the drawings and specific embodiments quick chucking structure for combined mold of the present invention is described further, to help understanding content of the present invention.
As shown in Figure 2, quick chucking structure for combined mold, comprise die sleeve and clamp, the groove that dress circle core rod 2 is arranged on the die sleeve 1, be positioned at die sleeve 1 upper surface the dress core rod the groove bilateral symmetry be provided with the Card trough 5 that the twice cross section is a convex shape shown in Figure 3, Card trough 5 is along the groove radial arrangement of dress core rod, and the trench bottom of Card trough 5 has two screws 6.
The structure of clamp is shown in Fig. 4-6, the shape of cross section of clamp 7 and size and card utmost point groove 5 coincide, and are convex shape shown in Figure 5, and slidably are stuck in the Card trough 5, its length clamps and decontrols circle core rod 2 less than the length of Card trough 5 so that it reaches by sliding in Card trough 5.Two screws 76 that can align with two screws 6 in the Card trough 5 are arranged on the clamp 7.One projection that raises up 77 is arranged at top, with when clamp 7 is loaded on Card trough 5, can make its slip by dialling this projection 77.
During use two clamps 7 are packed in two Card troughs 5 on the die sleeve 1, will justify core rod 2 and put into die sleeve 1, sliding jaw 7 is to correct position, with screw (omitting among the figure) clamp 7 is fastened on and will justifies core rod 2 on the die sleeve 1 and clamp from both sides, promptly finishes being installed.When changing core rod 2, screw is unclamped, clamp 7 is slided to both sides, just can easily take out core rod 2.Because screw 76 is vertical, bottom in the use is as long as withdraw from the screw 6 from the die sleeve 1, clamp 7 is slided in Card trough 5, and screw can keep being screwed in the screw 76 on the clamp, screw is lost, and reduced the workload of fastening and loosening screw, improved operating efficiency.It is the structure of convex shape that Card trough 5 and clamp 7 adopts cross sections, guarantees that clamp can only can slide in Card trough and can not rotate, and guarantees that screw 6,76 aligns easily, and clamp and Card trough are convenient to processing.
Claims (5)
1, a kind of quick chucking structure for combined mold, comprise die sleeve and clamp, the groove that the dress core rod is arranged on the die sleeve, it is characterized in that: be positioned at the die sleeve upper surface described dress core rod the groove bilateral symmetry be provided with twice Card trough at least, Card trough is along described groove radial arrangement, and the bottom land of Card trough has at least one screw; The shape of cross section of described clamp and Card trough coincide and slidably are stuck in the Card trough, its length is less than the length of Card trough, the through hole that can align with the screw of Card trough bottom is arranged on the clamp, when the screw that passes through hole was tightly gone into through hole on the Card trough, the core rod that two clamps can will be contained in the die sleeve from both sides blocked.
2, quick chucking structure for combined mold as claimed in claim 1 is characterized in that: the cross section of described Card trough and clamp is a convex shape.
3, quick chucking structure for combined mold as claimed in claim 1 or 2 is characterized in that: described clamp top is provided with a projection.
4, quick chucking structure for combined mold as claimed in claim 1 or 2 is characterized in that: the quantity of corresponding screw and through hole is two on described Card trough and the clamp.
5, quick chucking structure for combined mold as claimed in claim 1 or 2 is characterized in that: the through hole on the described clamp is a screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100671868A CN100368111C (en) | 2006-04-05 | 2006-04-05 | Quick chucking structure for combined mold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100671868A CN100368111C (en) | 2006-04-05 | 2006-04-05 | Quick chucking structure for combined mold |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1857820A true CN1857820A (en) | 2006-11-08 |
CN100368111C CN100368111C (en) | 2008-02-13 |
Family
ID=37296805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100671868A Expired - Fee Related CN100368111C (en) | 2006-04-05 | 2006-04-05 | Quick chucking structure for combined mold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100368111C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102463299A (en) * | 2010-10-31 | 2012-05-23 | 扬州锻压机床集团有限公司 | Mould-clamping device |
CN103252855A (en) * | 2013-06-07 | 2013-08-21 | 南通超达机械科技有限公司 | Rapid die-filling structure |
CN107672217A (en) * | 2017-08-10 | 2018-02-09 | 河南航天精工制造有限公司 | The die assembly and its die sleeve of fast changeable |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3090612A (en) * | 1960-04-25 | 1963-05-21 | Warren B Rouse | Hold down clamp |
US5206982A (en) * | 1990-08-27 | 1993-05-04 | Brown Donald H | Die transfer structure and method |
US5234205A (en) * | 1992-01-15 | 1993-08-10 | Shanley Stephen F | Quick die change clamp |
CN2254399Y (en) * | 1995-11-29 | 1997-05-21 | 黄登源 | Locating device for die slide carriage |
JP3594396B2 (en) * | 1996-02-21 | 2004-11-24 | 株式会社日本製鋼所 | Die fall prevention mechanism in injection molding machine |
JP4211220B2 (en) * | 2000-12-26 | 2009-01-21 | 株式会社明電舎 | Fixing device for fixing equipment to the surface plate |
DE20301189U1 (en) * | 2002-01-30 | 2003-04-03 | Hwa Chin Machinery Factory Co., Ltd., Yung-Kang Hsiang, Tainan | Improved mold seat for anchoring the molding tool of a spraying machine |
-
2006
- 2006-04-05 CN CNB2006100671868A patent/CN100368111C/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102463299A (en) * | 2010-10-31 | 2012-05-23 | 扬州锻压机床集团有限公司 | Mould-clamping device |
CN103252855A (en) * | 2013-06-07 | 2013-08-21 | 南通超达机械科技有限公司 | Rapid die-filling structure |
CN103252855B (en) * | 2013-06-07 | 2015-09-23 | 南通超达机械科技有限公司 | A kind of fast mounting die structure |
CN107672217A (en) * | 2017-08-10 | 2018-02-09 | 河南航天精工制造有限公司 | The die assembly and its die sleeve of fast changeable |
CN107672217B (en) * | 2017-08-10 | 2019-07-26 | 河南航天精工制造有限公司 | Fast changeable die assembly and its die sleeve |
Also Published As
Publication number | Publication date |
---|---|
CN100368111C (en) | 2008-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102259260B (en) | Press | |
CN1857820A (en) | Quick chucking structure for combined mold | |
CN213381325U (en) | Quick-release type core-loosing machine | |
CN105774323B (en) | A kind of planar design combination drawing board | |
CN201324936Y (en) | Screw tightening machine | |
CN203319255U (en) | Sheet material feeding mechanism of stamping manipulator | |
CN203541198U (en) | Feeding device of automatic threaded pipe making machine | |
CN212763248U (en) | Pre-installation auxiliary tool for large copper bush | |
CN202779691U (en) | Rotor cast aluminum machine automatic material receiving plate | |
CN211805700U (en) | Clamp for producing solar assembly | |
CN209774741U (en) | Quick cutting device is used in digital printing | |
CN204819995U (en) | Sawing machine silicon rod anchor clamps | |
CN218050708U (en) | Special fixture for processing cable cover lug | |
CN216446187U (en) | C-shaped steel structure beneficial to connection | |
CN218018389U (en) | Brake pedal support trimming die | |
CN215356573U (en) | Automatic tapping machine | |
CN217050622U (en) | Feeding machine material taking device for LED module production | |
CN215050873U (en) | Special-shaped spinneret plate structure with high air permeability | |
CN215545047U (en) | Drilling equipment that civil engineering used | |
CN216862094U (en) | Valve feeding and discharging equipment | |
CN211360827U (en) | Cutting device is used in processing of reinforcement steel sheet | |
CN212946380U (en) | Rotary chip mounting device | |
CN218903872U (en) | High-efficient tooth device of attacking of porous aluminum product | |
CN213968470U (en) | Improved generation goods shelves are steel equipment of bending for processing production | |
CN218696055U (en) | Support arrangement with limit structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080213 Termination date: 20150405 |
|
EXPY | Termination of patent right or utility model |