CN1818336A - 高瓦斯突出掘进工作面高压注水破煤新工艺 - Google Patents
高瓦斯突出掘进工作面高压注水破煤新工艺 Download PDFInfo
- Publication number
- CN1818336A CN1818336A CN 200610018597 CN200610018597A CN1818336A CN 1818336 A CN1818336 A CN 1818336A CN 200610018597 CN200610018597 CN 200610018597 CN 200610018597 A CN200610018597 A CN 200610018597A CN 1818336 A CN1818336 A CN 1818336A
- Authority
- CN
- China
- Prior art keywords
- coal
- water injection
- pressure water
- driving face
- greatly reduced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000003245 coal Substances 0.000 title claims abstract description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 28
- 238000002347 injection Methods 0.000 title claims abstract description 16
- 239000007924 injection Substances 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title abstract description 4
- 238000005553 drilling Methods 0.000 claims abstract description 4
- 238000005516 engineering process Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 3
- 238000005336 cracking Methods 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 3
- 239000002817 coal dust Substances 0.000 abstract description 2
- 230000006378 damage Effects 0.000 abstract description 2
- 239000002360 explosive Substances 0.000 abstract description 2
- 239000011435 rock Substances 0.000 abstract description 2
- 238000005422 blasting Methods 0.000 abstract 3
- 230000005641 tunneling Effects 0.000 abstract 2
- 238000007599 discharging Methods 0.000 abstract 1
- 230000009172 bursting Effects 0.000 description 6
- 238000004880 explosion Methods 0.000 description 3
- 238000004945 emulsification Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
一种高瓦斯突出掘进工作面高压注水破煤新工艺,其特征在于其工艺步骤为:(1)首先对垱头进行预向巷帮抽放,然后按设计要求施工的卸压浅孔;(2)用煤电钻在预定部位打注水孔;(3)高压注水至煤体开裂移动,拔出注水封孔器;(4)出煤。本发明的优点是:(1)避免了高突头爆破作业,瓦斯事故的可能性大幅度降低;(2)注水后煤巷掘进垱头的煤尘生成量大幅度降低,对从事煤巷掘进的职工的身体健康有了进一步的保障;(3)可以节省、减小因爆破作业大规模撤人的时间和管理的难度;(4)避免了雷管炸药消耗;(5)对巷道顶板及两帮围岩稳定的破坏程度比放炮落煤有大幅度减少,有利于巷道成形、支护和维护使用;(6)投资少,消耗低,操作简便。
Description
技术领域
本发明涉及一种高瓦斯突出掘进工作面高压注水破煤新工艺。
背景技术
在煤矿井下作业过程中,煤矿工人常采用爆破作业掘煤,推进工作面前移,对于高瓦斯突出矿井爆破作业易诱发瓦斯爆炸,造成严重生产事故,为避免爆破作业诱发瓦斯爆炸造成人身安全事故,往往采取最简单的远距离区域停电、撤人、警戒措施后再进行爆破作业,这样人身事故相对来说少了,但随之而来的循环作业时间被延长,职工体力消耗增大了,突出后空洞处理难且后患多,单进更是越来越低。
发明内容
本发明的目的是提供一种高瓦斯突出掘进工作面高压注水破煤新工艺,利用高压注水及封孔器膨胀的压力将煤松动,挤压以达到破煤效果。
本发明是这样来实现的,其工艺步骤为:(1)首先对挡头进行预抽或巷帮抽放,然后按设计要求施工12-24个φ75mm、深度为11m的卸压浅孔,再进行效果检验,确认无突出危险后确定允许进尺量;(2)用煤电钻在预定部位打一个φ45mm、深度1.5-2.0m的注水孔;(3)插入注水封孔器,采用18-28MPa高压注水至煤体开裂移动或煤体裂隙有大量水流出,关闭闸阀,卸载,拔出注水封孔器;(4)少量手镐落煤,出煤。
以上步骤(2)、(3)、(4)工序反复循环。
本发明的优点是:(1)避免了高突头爆破作业,诱发瓦斯突出的重要因素被消除,瓦斯事故的可能性大幅度降低;(2)注水后煤巷掘进挡头的煤尘生成量大幅度降低,对从事煤巷掘进的职工的身体健康有了进一步的保障;(3)可以节省、减小因爆破作业大规模撤人的时间和管理的难度;(4)避免了雷管炸药消耗;(5)对巷道顶板及两帮围岩稳定的破坏程度比放炮落煤有大幅度减少,有利于巷道成形、支护和维护使用;(6)投资少,消耗低,操作简便,不需要大量资金的买大型设备,乳化泵一台可同时服务2-3个头,封孔器操作得当可以反复使用。
具体实施方式
实施例一、
采用以下主要设备:矿用乳化泵、φ19mm高压主泵管、φ10mm高压枪管及注液枪、卸载闸阀、注水封孔器、煤电钻,工艺步骤为:
(1)首先对挡头进行预抽或巷帮抽放,然后按设计要求施工20个φ75mm、深度为11m的卸压浅孔,再进行效果检验,确认无突出危险后确定允许进尺量;
(2)用煤电钻在预定部位打一个φ45mm、深度1.5-2.0m的注水孔;
(3)插入注水封孔器,采用18-28MPa高压注水至煤体开裂移动或煤体裂隙有大量水流出,关闭闸阀,卸载,拔出注水封孔器;
(4)少量手镐落煤,出煤。
Claims (1)
1、一种高瓦斯突出掘进工作面高压注水破煤新工艺,其特征在于其工艺步骤为:(1)首先对垱头进行预抽或巷帮抽放,然后按设计要求施工12-24个φ75mm、深度为11m的卸压浅孔,再进行效果检验,确认无突出危险后确定允许进尺量;(2)用煤电钻在预定部位打一个φ45mm、深度1.5-2.0m的注水孔;(3)插入注水封孔器,采用18-28MPa高压注水至煤体开裂移动或煤体裂隙有大量水流出,关闭闸阀,卸载,拔出注水封孔器;(4)少量手镐落煤,出煤。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610018597 CN1818336A (zh) | 2006-03-16 | 2006-03-16 | 高瓦斯突出掘进工作面高压注水破煤新工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610018597 CN1818336A (zh) | 2006-03-16 | 2006-03-16 | 高瓦斯突出掘进工作面高压注水破煤新工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1818336A true CN1818336A (zh) | 2006-08-16 |
Family
ID=36918507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610018597 Pending CN1818336A (zh) | 2006-03-16 | 2006-03-16 | 高瓦斯突出掘进工作面高压注水破煤新工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1818336A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101644156B (zh) * | 2009-07-17 | 2011-06-08 | 中国矿业大学 | 煤岩体水力爆破致裂弱化方法 |
CN102787843A (zh) * | 2012-08-07 | 2012-11-21 | 新汶矿业集团有限责任公司协庄煤矿 | 一种夹矸煤层工作面采煤工艺 |
-
2006
- 2006-03-16 CN CN 200610018597 patent/CN1818336A/zh active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101644156B (zh) * | 2009-07-17 | 2011-06-08 | 中国矿业大学 | 煤岩体水力爆破致裂弱化方法 |
CN102787843A (zh) * | 2012-08-07 | 2012-11-21 | 新汶矿业集团有限责任公司协庄煤矿 | 一种夹矸煤层工作面采煤工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102678120B (zh) | 冲击地压卸压解危方法 | |
CN110080771B (zh) | 一种深井高应力大巷煤柱释能改性防治冲击地压的方法 | |
AU2017393408B2 (en) | Pneumatic self-propelled impact rock breaking device with the assistance of ultra-high-pressure pulsed jet flow | |
CN102518436B (zh) | 煤矿巷道掘进时构造型冲击地压防治方法 | |
CN104100266B (zh) | 防治沿空巷道冲击地压的方法 | |
CN104632174A (zh) | 煤层液态二氧化碳压裂装置及方法 | |
CN102678117A (zh) | 基于聚能爆破的定向水力致裂方法 | |
CN103557000B (zh) | 利用抽帮充填防治沿空巷道冲击地压的方法 | |
CN1664310A (zh) | 煤矿孤岛煤柱冲击地压控制方法 | |
CN111502662B (zh) | 一种冲击地压矿井超前煤体深部卸压浅部加固的防治方法 | |
CN109139092B (zh) | 一种治理深埋煤层冲击与瓦斯灾害的一孔多用施工方法 | |
CN204419145U (zh) | 煤层液态二氧化碳压裂装置 | |
CN104329113B (zh) | 一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法 | |
CN110145305B (zh) | 一种水力切顶留巷防治巷道冲击地压的方法 | |
CN102606177A (zh) | 一种用于液压支架系统的液压支柱 | |
CN107023295B (zh) | 一种硬煤防冲卸压钻孔施工方法及设备 | |
CN103195467A (zh) | 一种水力压裂与注浆固化相结合的石门揭煤方法 | |
CN108999596B (zh) | 一种超临界co2点式射流冲击气爆致裂煤岩体的方法 | |
CN109372508B (zh) | 煤矿井下液压定向切顶设备及其施工方法 | |
CN102383728A (zh) | 煤矿冲击地压缺陷分割控制方法 | |
CN102322267A (zh) | 深井软岩型冲击地压防治方法 | |
US11976557B2 (en) | Coal bump control method for sectional hydraulic fracturing regions of near vertical ultra thick coal seam | |
CN105804786A (zh) | 一种松软煤层底板穿层钻孔压冲增透方法 | |
CN113187480A (zh) | 一种煤矿冲击地压的综合防护方法 | |
CN210798914U (zh) | 钻孔多段封堵、致裂、注浆、注水一体化设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |