CN1804495A - Gas-fired water heating boiler - Google Patents
Gas-fired water heating boiler Download PDFInfo
- Publication number
- CN1804495A CN1804495A CN 200510136800 CN200510136800A CN1804495A CN 1804495 A CN1804495 A CN 1804495A CN 200510136800 CN200510136800 CN 200510136800 CN 200510136800 A CN200510136800 A CN 200510136800A CN 1804495 A CN1804495 A CN 1804495A
- Authority
- CN
- China
- Prior art keywords
- flue
- gas
- water heating
- pyrotechnics pipe
- heating boiler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Chimneys And Flues (AREA)
Abstract
The invention relates to a fuel gas water heating boiler, which comprises a boiler case, an internal furnace, a smoke tube and a ventilating device. Wherein, the internal furnace is filled by water; the smoke tube is through the internal furnace whose open has a flame injector and connected to the interlayer between the internal furnace and the case; the upper end of said interlayer has a open of smoke channel; the flame injector has wind inlet; the open of said smoke channel has a ventilating device; and the smoke tube is a corrugated tube. The invention has high efficiency which can reach 97% and increase the water temperature to preset one in short time. The invention can save energy while the consumed fuel is one third of similar product, and it can protect environment without discharging innocent smoke. It can operate without pressure to replace the coal boiler which is less than 1t.
Description
One, technical field
The invention belongs to boiler manufacturing technology field, be specifically related to a kind of gas-fired water heating boiler.
Two, background technology
Existing gas fired-boiler mostly is that combustion gas is sprayed onto in the combustion chamber, by fuel gas buring the water in boiler furnace flue or the chuck is heated for use.The shortcoming of these gas furnaces is that burning is insufficient, and the thermal efficiency is not high.More advanced boiler is a condenser boiler at present, and its course of work is that flame is directly got in the furnace chamber, and high-temperature flue gas flows back in the stove invagination, and utilizes condensing heat exchanger to carry out heat exchange at the exhaust opening place, thereby reaches the higher purpose of utilizing heat energy.Because the flame of this boiler is directly to be sprayed onto in the furnace chamber, there is not any resistance, the combustion gas that does not have burning causes burning insufficient also along with flue gas is discharged to outside the stove, and the thermal efficiency is low, the fuel consumption height.This boiler has been installed condensing heat exchanger at the exhaust opening place, utilize high-temperature flue gas to give the heating of the water in the heat exchanger, this reaches very high just passable with regard to requiring through the high-temperature flue-gas of exhaust opening, thereby reduced the utilization rate of high-temperature flue gas in boiler, and mounting heat exchanger has just correspondingly increased manufacturing cost and technology difficulty, has also increased consumer's expense.
Three, summary of the invention
The purpose of this invention is to provide a kind of efficient, energy-conservation gas-fired water heating boiler,
The present invention is made of boiler shell, flue, pyrotechnics pipe and exhaust blower, fill water in the flue, the pyrotechnics pipe passes flue, and the pyrotechnics tube inlet that penetrates flue has flame spray head, pass the pyrotechnics pipe outlet connection flue of flue and the interlayer between the shell, there is flue outlet the interlayer upper end; There is air inlet at the flame spray head place, and exhaust blower is installed at the flue outlet place.The pyrotechnics pipe adopts bellows, and the shape of bellows flue makes flow of flue gas take place to change greatly, is turbulence state basically, thereby thermal conductivity factor is strengthened, and heat-conducting effect is very desirable.
The present invention is with telescoping structure and the direct-fired flame spray head and the screw thread pyrotechnics pipe jointing of boiler shell, flue, combustion gas is delivered in the stove by gas supply pipe, the combustion of igniting pin mark is arranged through shower nozzle the time, when shower nozzle injects flames into ripple pyrotechnics pipe, during bump ripple tube wall, be subjected to certain resistance, make flame become the wave circulating type and burn by the straight movement type that sprays, make in direct-fired combustion process unburnt carbon molecule participate in burning once more simultaneously, thereby reach clean-burning purpose.The hot flue gas that burning produces reaches the flue outside interlayer that is communicated with it through the pyrotechnics pipe and leads to exhaust opening, and whole boiler water courage all is in the encirclement of flame and hot flue gas from inside to outside, and after making full use of flue gas heat, low-temperature flue gas discharges out of the furnace through exhaust blower.
The present invention is efficient, and the thermal efficiency reaches 97%, can in the short period of time water temperature be brought up to default temperature.Energy-conservation, in the identical time, the fuel that is consumed has only 1/3rd of like product.Environmental protection, essentially no harmful smoke discharging.There is not the operation of pressure, safe and reliable.Can replace coal-burning boiler below a ton.
Four, description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is that the A of Fig. 1 is to view;
Fig. 3 is B-B, the C-C cutaway view of Fig. 1;
Fig. 4 is the boiler schematic diagram of single annular pyrotechnics pipe;
Fig. 5 is the boiler schematic diagram of S shape pyrotechnics pipe;
Fig. 6 is the boiler schematic diagram of N shape pyrotechnics pipe;
Fig. 7 is the boiler schematic diagram of many straight tube pyrotechnics pipes;
Fig. 8 is the boiler schematic diagram of many bend pipe pyrotechnics pipes;
Fig. 9 is the many staggered boiler schematic diagrames of bend pipe pyrotechnics pipe.
Five, the specific embodiment
Body of heater of the present invention is vertical circle, has to be with the flue 5 that metallic plate is made in the housing 6 of heat-insulation layer, and ripple pyrotechnics pipe 4 is installed in the flue 5.Gas supply pipe 7 is transported to flame spray head 2 by the body of heater outside with combustion gas, and shower nozzle 2 is ejected into flame in the pyrotechnics pipe 4.Pyrotechnics pipe 4 passes from flue 5, and flue 5 lower openings are communicated with the interlayer between flue and the shell 6, and burned flame and flue gas march to flue by pyrotechnics tube inlet spiral and export, again through the interlayer of furnace outer wall, after exhaust blower 1 discharge out of the furnace.Control device 3 is equipped with in the body of heater outside, and furnace bottom has distilled water discharging valve 8.
Pyrotechnics pipe of the present invention 4 adopts corrugated steel tubes, and corrugated steel tube is furnished with single tube structure and multitube structure in flue.The coiling mode of single tube structure has spirality, single annular, S shape and N shape etc. multiple.The pyrotechnics pipe upper/lower terminal of multitube structure has collecting and distributing box, be after flame is introduced into collecting and distributing box, enter down collecting and distributing box through many pyrotechnics pipes again, then discharge out of the furnace by flue outlet via interlayer to exhaust blower 1 again, many pyrotechnics pipes can be many straight tubes, also can be many bend pipes, can arrange in proper order, also can be staggered.
The pyrotechnics pipe of single tube structure also can have two covering devices and be listed in the flue, two pyrotechnics pipes that pass flue have the turnover mouth of pipe separately, there is separately independently flame spray head in each pyrotechnics pipe import department, and two cover pyrotechnics pipes in use can select to light one or two shower nozzle according to actual needs.
Claims (10)
1, a kind of gas-fired water heating boiler, it is made of boiler shell (6), flue (5), pyrotechnics pipe (4) and exhaust blower (1), it is characterized in that: flue is filled water in (5), pyrotechnics pipe (4) passes flue (5), pyrotechnics pipe (4) inlet that penetrates flue (5) has flame spray head (2), passes pyrotechnics pipe (4) the outlet connection flue (5) of flue (5) and the interlayer between the shell (6), and there is flue outlet the interlayer upper end, flame spray head (2) has been located air inlet, and exhaust blower (1) is installed at the flue outlet place; Pyrotechnics pipe (4) is a bellows.
2, gas-fired water heating boiler according to claim 1 is characterized in that: pyrotechnics pipe (4) is the single tube structure.
3, gas-fired water heating boiler according to claim 2 is characterized in that: the pyrotechnics pipe (4) in the flue (5) is a spirality.
4, gas-fired water heating boiler according to claim 2 is characterized in that: the pyrotechnics pipe (4) in the flue (5) is a single annular.
5, gas-fired water heating boiler according to claim 2 is characterized in that: the pyrotechnics pipe (4) in the flue (5) is a S shape.
6, gas-fired water heating boiler according to claim 2 is characterized in that: the pyrotechnics pipe (4) in the flue (5) is a N shape.
7, gas-fired water heating boiler according to claim 1 is characterized in that: pyrotechnics pipe (4) is the multitube structure, and the pyrotechnics pipe has collecting and distributing box in two ends up and down.
8, gas-fired water heating boiler according to claim 7 is characterized in that: pyrotechnics pipe (4) is many straight tubes.
9, gas-fired water heating boiler according to claim 7 is characterized in that: pyrotechnics pipe (4) is many bend pipes.
10, gas-fired water heating boiler according to claim 2 is characterized in that: two cover pyrotechnics pipes (4) are arranged in flue (5), and each pyrotechnics pipe (4) inlet has separately independently flame spray head (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101368007A CN100470162C (en) | 2005-12-29 | 2005-12-29 | Gas-fired water heating boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101368007A CN100470162C (en) | 2005-12-29 | 2005-12-29 | Gas-fired water heating boiler |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1804495A true CN1804495A (en) | 2006-07-19 |
CN100470162C CN100470162C (en) | 2009-03-18 |
Family
ID=36866602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005101368007A Expired - Fee Related CN100470162C (en) | 2005-12-29 | 2005-12-29 | Gas-fired water heating boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100470162C (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103712196A (en) * | 2014-01-17 | 2014-04-09 | 吴文佳 | Fire tube type heat exchanger |
CN104296130A (en) * | 2014-10-21 | 2015-01-21 | 安徽贵宏节能锅炉有限公司 | Biomass circulation combustion boiler |
CN106482331A (en) * | 2016-11-25 | 2017-03-08 | 宁夏华清节能环保锅炉有限公司 | A kind of energy-conserving and environment-protective gas-heating and hot-water boiler |
CN106895582A (en) * | 2017-05-06 | 2017-06-27 | 郑州大学 | Gas fired-boiler flue inner conduit formula heat sink |
-
2005
- 2005-12-29 CN CNB2005101368007A patent/CN100470162C/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103712196A (en) * | 2014-01-17 | 2014-04-09 | 吴文佳 | Fire tube type heat exchanger |
CN103712196B (en) * | 2014-01-17 | 2015-09-30 | 吴文佳 | Fire tube type heat exchanger |
CN104296130A (en) * | 2014-10-21 | 2015-01-21 | 安徽贵宏节能锅炉有限公司 | Biomass circulation combustion boiler |
CN106482331A (en) * | 2016-11-25 | 2017-03-08 | 宁夏华清节能环保锅炉有限公司 | A kind of energy-conserving and environment-protective gas-heating and hot-water boiler |
CN106895582A (en) * | 2017-05-06 | 2017-06-27 | 郑州大学 | Gas fired-boiler flue inner conduit formula heat sink |
Also Published As
Publication number | Publication date |
---|---|
CN100470162C (en) | 2009-03-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102620274B (en) | Horizontal oil-fired and gas-fired efficient energy-saving boiler | |
CN100470162C (en) | Gas-fired water heating boiler | |
CN201093753Y (en) | Low energy consumption and high heat cold heat converter | |
CN201973885U (en) | Water and air heating double-function efficient energy-saving hot water boiler | |
CN201715495U (en) | Vertical type biquadratic back burning furnace | |
CN2881436Y (en) | Gas water boiler | |
CN201297763Y (en) | Smoke-free environment-friendly boiler | |
CN103968384B (en) | The burner apparatus exchanged heat using high-temperature flue gas | |
CN101943475B (en) | Combustion chamber structure for heat exchanger | |
CN107218619A (en) | A kind of fume afterheat takes into account the boiler utilized | |
CN113375141A (en) | Energy-efficient steam boiler | |
CN209495366U (en) | Gas stove based on waste heat recycling | |
CN203893182U (en) | Burner device for utilizing high temperature smoke to conduct heat exchange | |
CN208069616U (en) | The steam generation facility of steam car washer | |
CN201923980U (en) | Novel vertical asphalt tube heating furnace | |
CN206944114U (en) | Gas fuel boiler with compound water-cooled furnace | |
CN2700772Y (en) | Indirect heat transferred hot-blast stove with high temperature and high efficiency | |
CN108662774A (en) | A kind of field heating air heat engine | |
CN2557830Y (en) | Domestic energy-saving boiler | |
CN2708160Y (en) | Direct-exchanging type water heater | |
CN2585109Y (en) | Direct contact heat transfer type heating medium boiler | |
CN202350080U (en) | Heat pipe type air preheater | |
CN2472060Y (en) | Multi-combusting water steam separated steam generator | |
CN201811440U (en) | Combustion chamber structure for heat exchanger | |
CN2835872Y (en) | Coupling type hot water boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090318 Termination date: 20101229 |