CN1796025A - Long nozzle in composite structure free from prewarming - Google Patents

Long nozzle in composite structure free from prewarming Download PDF

Info

Publication number
CN1796025A
CN1796025A CN 200410060354 CN200410060354A CN1796025A CN 1796025 A CN1796025 A CN 1796025A CN 200410060354 CN200410060354 CN 200410060354 CN 200410060354 A CN200410060354 A CN 200410060354A CN 1796025 A CN1796025 A CN 1796025A
Authority
CN
China
Prior art keywords
long nozzle
exempting
composite construction
liner
mgo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410060354
Other languages
Chinese (zh)
Other versions
CN100398233C (en
Inventor
杨彬
李红霞
杨金松
刘国齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Luoyang Institute of Refractories Research Co Ltd
Original Assignee
LUOYANG REFRACTORY MATERIALS INST ZHONGGANG GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUOYANG REFRACTORY MATERIALS INST ZHONGGANG GROUP filed Critical LUOYANG REFRACTORY MATERIALS INST ZHONGGANG GROUP
Priority to CNB2004100603541A priority Critical patent/CN100398233C/en
Publication of CN1796025A publication Critical patent/CN1796025A/en
Application granted granted Critical
Publication of CN100398233C publication Critical patent/CN100398233C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention belongs to a functional refractory material for continuous casting process, and provides a non-preheating long sprue with composite structure. It includes an external layer made of Al2O3-C material and a lining which contains no carbon material and is combined on the inner wall of said external layer. Said lining material is formed from metal powder additive, three-component system Al2O3-MgO-TiO2 synthetic material with low expansion coefficient, sintered or electrofused spinel and corundum, in which the content of spinel and corundum is 25-70wt%, content of Al2O3-MgO-TiO2 synthetic material is 25-70 wt% and the content of metal powder is 2-10 wt%.

Description

Exempt from preheating composite construction long nozzle
Affiliated technical field
The invention belongs to the continuous casting functional refractory, relate generally to and a kind of molten steel is exempted from preheating composite construction long nozzle by what ladle imported tundish.
Background technology
Long nozzle is the important refractory material of continuous casting, is connected on the mouth of a river under the steel ladle sliding water gap mechanism during use, and molten steel is imported tundish, prevents that molten steel from splashing and secondary oxidation.Long nozzle service condition harshness: high-temperature molten steel flows directly into the mouth of a river under the normal temperature state, stands extremely strong thermal shock; After molten steel imported long nozzle by slide gate mechanism, steel stream had strong the washing away effect of deteriorating to the neck at the mouth of a river and tapping hole.Safe and reliable for guaranteeing long nozzle, on selecting, the long nozzle material at first to make product have fabulous thermal-shock resistance, and content of graphite is all higher, also will add the vitreous silica of low coefficient of dilatation sometimes.For making long nozzle have higher service life, do not wish that again content of graphite is too high and do not add quartz as far as possible, to improve washing away and deteriorating of the anti-molten steel in the mouth of a river, the two has certain contradiction on material mixture ratio is selected.So, in actual production, always the reliability of using is put in the first place, cause the service life of long nozzle and the submersed nozzle and integral column of sagger can not be synchronous, sometimes must long nozzle of replacing in a casting cycle.
Summary of the invention
The objective of the invention is to propose a kind of preheating composite construction long nozzle of exempting from, make it have the direct use of the preheating of exempting from and good thermal shock, anti-molten steel wash away, to the characteristics of not carburetting of molten steel.
The preheating composite construction long nozzle of exempting from that the present invention proposes has similar common Al 2O 3The skin of-C material and local or whole compound not carbonaceous material liner; Outer field Al 2O 3-C material proportioning and conventional aluminium carbon long nozzle are similar, and alumina raw material adopts electro-corundum or alundum, and the carbon raw material adopts crystalline flake graphite, suitably adds a spot of antioxidant SiC, B4C, metal Si powder etc., is bond with phenolic resins.
The not carbonaceous material of the long nozzle liner of composite construction of the present invention is by the metal powder additive and have low-expansion ternary system Al 2O 3-MgO-TiO 2Synthesis material, sintering or electric smelting spinelle, corundum are formed; Wherein, the addition 25~70wt% of spinelle, corundum raw material, Al 2O 3-MgO-TiO 2Addition 25~the 70wt% of synthesis material, the addition 2~10%wt% of metal powder.Metal powder can be selected aluminium powder, silica flour, alusil alloy powder, Al-Mg alloy powder etc. for use, and bond can be selected inorganic bonding agent for use, as aluminium dihydrogen phosphate, aluminium colloidal sol or aluminium Ludox, magnalium colloidal sol, also can select phenolic resins; The bond addition is 4~10% of an inner lining material gross weight.
When the long nozzle of preparation composite construction, isostatic compaction of liner and outer body, protective atmosphere heat treatment, heat treatment temperature is 1000~1400 ℃.
One of long nozzle inner lining material feature of this composite construction is not carbon containing, has the Al of ratio 2O 3The thermal conductivity that-C material is much lower, continuous casting open that high-temperature molten steel directly contacts with this liner when watering, and the heat conduction is than former Al 2O 3-C liner is much lower, thereby makes Al 2O 3The outer inner thermal stress of-C reduces greatly, has improved the external condition of thermal shock, and this carbon-free liner has played an effect that thermal resistance is disconnected.Simultaneously, this composite bed and Al 2O 3The difference of-C body on mechanical property, its interface can also play the effect that suppresses the crackle expansion.
Two of this inner lining material feature is that this inner lining material body material is magnesium aluminate spinel or corundum, and a kind of low-expansion ternary system Al 2O 3-MgO-TiO 2Synthesis material.Adjust charge ratio, can obtain having the lower coefficient of thermal expansion that is complementary with alumina-carbon material, thereby make inside and outside composite heat coupling, good combination is arranged in heat treatment and use.
Three of this inner lining material feature is because carbon containing not, and the reaction in-situ sintering in heat treatment and use again has good anti-molten steel erosion and deteriorates.
Ternary system Al in this inner lining material 2O 3-MgO-TiO 2Synthesis material is the pre-synthesis material of high temperature, and its compositing range is Al 2O 330~50%, MgO5~15%, TiO 235~55%, pre-synthesis temperature is 1500~1800 ℃.
Adopt the long nozzle of the present invention's preparation, have directly use of the preheating of exempting from, good thermal shock, anti-molten steel wash away, to characteristics such as not carburetting of molten steel.
Description of drawings
Accompanying drawing 1 is exempted from the schematic diagram of the long nozzle of preheating composite construction for the present invention.
Among the figure, 1, mouth of a river skin, 2, liner.
The specific embodiment
Embodiment 1
The prepared outer aluminium carbon batching of preheating long nozzle of exempting from is electric smelting diamantane 55%, sintering oxidation aluminium powder 14%, and crystalline flake graphite 25%, carborundum powder 5%, boron carbide 1%, bond phenolic resins is 10% of the batching gross weight; Carbon containing internal layer batching is not magnesium aluminate spinel 70%, Al 2O 3-MgO-TiO 2Synthesis material 27%, it consists of Al 2O 330%, MgO15%, TiO 255%; Alusil alloy powder 3%, aluminium Ludox (Al 2O 3Content 20%, SiO 2Content 5%) be 5% of inner lining material gross weight.Above-mentioned two kinds of batchings are added bond respectively mix evenly in muller, isostatic compaction in the oven dry back injection gum cover between 70 ℃, body aluminium carbon material injects the outside, and liner not carbon containing material injects inboard, briquetting pressure 140Mpa, pressurize 3 minutes.Base substrate heat treatment in 1300 ℃ * 6 hours under the shuttle kiln blanket of nitrogen after the moulding forms through processing, installation metal vent hood, brush antioxidizing paint again.
Embodiment 2
The outer aluminium carbon batching of long nozzle is brown diamond spar 55%, sintering oxidation aluminium powder 14%, and crystalline flake graphite 25%, carborundum powder 5%, boron carbide 1%, bond phenolic resins is 10% of the batching gross weight; Carbon containing internal layer batching is not electro-corundum 70%, Al 2O 3-MgO-TiO 2Synthesis material 25%, it consists of Al 2O 350%, MgO10%, TiO 240%; Metallic aluminium powder 5%, aluminium colloidal sol (Al 2O 3Content 25%) be 5% of inner lining material gross weight.Above-mentioned two kinds of batchings are added bond respectively mix evenly in muller, inject isostatic compaction in the gum cover after 70 ℃ of oven dry, body aluminium carbon material injects the outside, and the injection of carbon containing material is not inboard for liner, briquetting pressure 140Mpa, pressurize 3 minutes.Base substrate heat treatment in 1300 ℃ * 3 hours under the shuttle kiln blanket of nitrogen after the moulding forms through processing, installation metal vent hood, brush antioxidizing paint again.
Embodiment 3
Outer aluminium carbon batching is brown diamond spar 55%, sintering oxidation aluminium powder 14%, and crystalline flake graphite 25%, carborundum powder 5%, boron carbide 1%, bond phenolic resins is 10% of the batching gross weight; Carbon containing internal layer batching is not magnesium aluminate spinel 25%, Al 2O 3-MgO-TiO 2Synthesis material 70%, it consists of Al 2O 350%, MgO5%, TiO 245%; Al-Mg alloy powder 5%, phenolic resins are 8% of liner batching total weight percent.Above-mentioned two kinds of batchings are added bond respectively mix evenly in muller, inject isostatic compaction in the gum cover after 70 ℃ of oven dry, body aluminium carbon material injects the outside, and it is inboard that liner does not have the carbon-free material injection of silicon, briquetting pressure 140Mpa, pressurize 3 minutes.Base substrate heat treatment in 1200 ℃ * 3 hours under the shuttle kiln blanket of nitrogen after the moulding forms through processing, installation metal vent hood, brush antioxidizing paint again.
Embodiment 4
Outer aluminium carbon batching is brown diamond spar 55%, sintering oxidation aluminium powder 14%, and crystalline flake graphite 25%, carborundum powder 5%, boron carbide 1%, bond phenolic resins is 10% of the batching gross weight; Carbon containing internal layer batching is not electro-corundum 45%, Al 2O 3-MgO-TiO 2Synthesis material 47%, it consists of Al 2O 350%, MgO15%, TiO 235%; Silica flour 8%, magnalium colloidal sol (Al 2O 3Content 20%, MgO content 5%) be 8% of inner lining material gross weight.Above-mentioned two kinds of batchings are added bond respectively mix evenly in muller, inject isostatic compaction in the gum cover after 70 ℃ of oven dry, body aluminium carbon material injects the outside, and it is inboard that liner does not have the carbon-free material injection of silicon, briquetting pressure 140Mpa, pressurize 3 minutes.Base substrate heat treatment in 1200 ℃ * 3 hours under the shuttle kiln blanket of nitrogen after the moulding forms through processing, installation metal vent hood, brush antioxidizing paint again.
Embodiment 5
Outer aluminium carbon batching is brown diamond spar 55%, sintering oxidation aluminium powder 14%, and crystalline flake graphite 25%, carborundum powder 5%, boron carbide 1%, bond phenolic resins is 10% of the batching gross weight; Carbon containing internal layer batching is not alundum 25%, magnesium aluminate spinel 45%, Al 2O 3-MgO-TiO 2Synthesis material 26%, it consists of Al 2O 340%, MgO8%; TiO 252%; Silica flour 4%, aluminium colloidal sol (Al 2O 3Content 25%) be 8% of inner lining material gross weight.Above-mentioned two kinds of batchings are added bond respectively mix evenly in muller, inject isostatic compaction in the gum cover after 70 ℃ of oven dry, body aluminium carbon material injects the outside, and it is inboard that liner does not have the carbon-free material injection of silicon, briquetting pressure 140Mpa, pressurize 3 minutes.Base substrate heat treatment in 1200 ℃ * 3 hours under the shuttle kiln blanket of nitrogen after the moulding forms through processing, installation metal vent hood, brush antioxidizing paint again.

Claims (7)

1, a kind of preheating composite construction long nozzle of exempting from, this mouth of a river has Al 2O 3The skin of-C material (1), feature of the present invention is: the inwall of outer (1) is compounded with the not liner of carbon containing material (2), and this inner lining material is by the metal powder additive and have low-expansion ternary system Al 2O 3-MgO-TiO 2Synthesis material, sintering or electric smelting spinelle, corundum are formed; Wherein, the consumption of spinelle, corundum is 25~70wt%, Al 2O 3-MgO-TiO 2The consumption of synthesis material is 25~70wt%, and the consumption of metal powder is 2~10wt%.
2, the preheating composite construction long nozzle of exempting from according to claim 1 is characterized in that: described ternary system Al 2O 3-MgO-TiO 2Synthesis material is pre-synthesis material, and it forms consumption is Al 2O 330~50wt%, MgO 5~15wt%, TiO 235~55wt%.
3, the preheating composite construction long nozzle of exempting from according to claim 1 is characterized in that: described metal powder is a kind of in aluminium powder, silica flour, Al-Mg alloy powder, the alusil alloy powder.
4, the preheating composite construction long nozzle of exempting from according to claim 1, it is characterized in that: the part of described skin (1) inwall is compounded with the not liner of carbonaceous material.
5, the preheating composite construction long nozzle of exempting from according to claim 1, it is characterized in that: described skin (1) inwall all is compounded with the not liner of carbonaceous material.
6, the preheating composite construction long nozzle of exempting from according to claim 1 is characterized in that: it is bond that described liner adopts phenolic resins, and its addition is 4~10% of an inner lining material gross weight.
7, the preheating composite construction long nozzle of exempting from according to claim 1, it is characterized in that: described liner adopts inorganic bonding agent, it is a kind of in aluminium dihydrogen phosphate, aluminium colloidal sol, aluminium Ludox, the magnalium colloidal sol, and the addition of inorganic bonding agent is 4~10% of a liner batching gross weight.
CNB2004100603541A 2004-12-24 2004-12-24 Long nozzle in composite structure free from prewarming Active CN100398233C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100603541A CN100398233C (en) 2004-12-24 2004-12-24 Long nozzle in composite structure free from prewarming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100603541A CN100398233C (en) 2004-12-24 2004-12-24 Long nozzle in composite structure free from prewarming

Publications (2)

Publication Number Publication Date
CN1796025A true CN1796025A (en) 2006-07-05
CN100398233C CN100398233C (en) 2008-07-02

Family

ID=36817466

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100603541A Active CN100398233C (en) 2004-12-24 2004-12-24 Long nozzle in composite structure free from prewarming

Country Status (1)

Country Link
CN (1) CN100398233C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102603317A (en) * 2012-03-07 2012-07-25 陈漪恺 Injecting sleeve for protective pouring of high-temperature metal melt and manufacture method thereof
CN103058694A (en) * 2013-02-01 2013-04-24 武汉科技大学 High-purity corundum-spinel composite material and preparation method thereof
CN103058693A (en) * 2013-02-01 2013-04-24 武汉科技大学 Tundish working lining for clean steel smelting and preparation method thereof
CN104039479A (en) * 2011-12-28 2014-09-10 杰富意钢铁株式会社 Immersion nozzle for continuous casting and continuous casting method using same
CN105127409A (en) * 2015-09-15 2015-12-09 辽宁科技大学 Preheating-free long nozzle capable of being repeatedly used and preparing method thereof
CN105195724A (en) * 2015-10-10 2015-12-30 无锡兴达节能科技股份有限公司 Novel aluminum-carbon brick used for hot metal ladle
CN105665692A (en) * 2016-03-24 2016-06-15 洛阳理工学院 Thermal shock resistant liner composite body for long nozzle and preparation process thereof
CN105983684A (en) * 2015-03-05 2016-10-05 宝山钢铁股份有限公司 Low-carbon inner hole body-contained submersed nozzle

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6096567A (en) * 1983-10-29 1985-05-30 ハリマセラミック株式会社 Manufacture of sliding nozzle plate
JP2000202583A (en) * 1999-01-12 2000-07-25 Kawasaki Steel Corp Continuous casting method and mold for continuous casting

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104039479A (en) * 2011-12-28 2014-09-10 杰富意钢铁株式会社 Immersion nozzle for continuous casting and continuous casting method using same
CN104039479B (en) * 2011-12-28 2016-07-06 杰富意钢铁株式会社 Immersion nozzle for continuous casting and manufacture method thereof and use the continuous casing of this immersion nozzle for continuous casting
CN102603317A (en) * 2012-03-07 2012-07-25 陈漪恺 Injecting sleeve for protective pouring of high-temperature metal melt and manufacture method thereof
CN102603317B (en) * 2012-03-07 2013-08-14 陈漪恺 Injecting sleeve for protective pouring of high-temperature metal melt and manufacture method thereof
CN103058694A (en) * 2013-02-01 2013-04-24 武汉科技大学 High-purity corundum-spinel composite material and preparation method thereof
CN103058693A (en) * 2013-02-01 2013-04-24 武汉科技大学 Tundish working lining for clean steel smelting and preparation method thereof
CN105983684A (en) * 2015-03-05 2016-10-05 宝山钢铁股份有限公司 Low-carbon inner hole body-contained submersed nozzle
CN105127409A (en) * 2015-09-15 2015-12-09 辽宁科技大学 Preheating-free long nozzle capable of being repeatedly used and preparing method thereof
CN105195724A (en) * 2015-10-10 2015-12-30 无锡兴达节能科技股份有限公司 Novel aluminum-carbon brick used for hot metal ladle
CN105665692A (en) * 2016-03-24 2016-06-15 洛阳理工学院 Thermal shock resistant liner composite body for long nozzle and preparation process thereof
CN105665692B (en) * 2016-03-24 2018-05-11 洛阳理工学院 A kind of long nozzle anti-thermal shock liner complex and its preparation process

Also Published As

Publication number Publication date
CN100398233C (en) 2008-07-02

Similar Documents

Publication Publication Date Title
CN105127409B (en) Preheating-free long nozzle capable of being repeatedly used and preparing method thereof
CN101712559A (en) Water gap lining layer material for continuous casting
CN102335738B (en) Composite submerged nozzle and manufacturing method thereof
CN101429040A (en) Composite baking-free stopper rod of magnesium aluminate spinel and production process thereof
CN102335739B (en) Compound silicon-free long nozzle and manufacturing method thereof
US4870037A (en) Prevention of Al2 O3 formation in pouring nozzles and the like
CN101722302B (en) Preparation method of magnesium-carbon composite monolithic stopper rod for continuous casting
CN100398233C (en) Long nozzle in composite structure free from prewarming
JP5697210B2 (en) Converter operating method, magnesia carbon brick used in the converter, manufacturing method of the brick, and lining structure of the converter lining
CN115650742A (en) Preparation method of metal-Al-containing in-situ composite carbon-containing refractory material
CN101439976A (en) Composition for making submerged nozzle
KR20020025878A (en) Carbonaceous Refractory and Method for Preparing the Same
CN101851104A (en) Zirconium oxide ceramic composite material for continuous casting water gap and preparation method thereof
CN105642877A (en) High-strength composite submersed nozzle combined with silicon carbide crystal whiskers and manufacturing method
JPH0212664B2 (en)
CN100398234C (en) Integral column of sagger in composite structure
CN115536410A (en) Low-carbon magnesia carbon brick and preparation method thereof
CN116287534A (en) Low-carbon composite converter tapping hole brick and preparation method thereof
CN102336573B (en) Aluminum titanate-sialon-silicon carbide composite molten steel feeding port, and manufacturing method thereof
CN1846904A (en) Carbon-free combined plunger for continuous casting
CN101402527A (en) Compact aluminum silicon carbide composite material and method of manufacturing the same
CN103771874A (en) Preparation method for upper nozzle used for continuous casting
CN1108212C (en) Slide sprue brick containg sialon
CN103286306A (en) Non-oxide enhanced material for slag line of submersed nozzle
CN102896309B (en) Monolithic stopper used for continuous casting, and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SINOSTEEL CORPORATION LUOYANG INSTITUTE OF REFRACT

Free format text: FORMER NAME: SINOSTEEL CORPORATION LUOYANG INSTITUTE OF REFRACTORIES RESEARCH

CP01 Change in the name or title of a patent holder

Address after: 471039 Xiyuan Road, Jianxi District, Henan, No. 43, No.

Patentee after: Luoyang Refractory Institute Co., Ltd., SINO Steel Corporation

Address before: 471039 Xiyuan Road, Jianxi District, Henan, No. 43, No.

Patentee before: Luoyang Refractory Materials Inst, Zhonggang Group