CN1776113A - Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile - Google Patents

Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile Download PDF

Info

Publication number
CN1776113A
CN1776113A CN 200510047840 CN200510047840A CN1776113A CN 1776113 A CN1776113 A CN 1776113A CN 200510047840 CN200510047840 CN 200510047840 CN 200510047840 A CN200510047840 A CN 200510047840A CN 1776113 A CN1776113 A CN 1776113A
Authority
CN
China
Prior art keywords
gear
shaft sleeve
axis
steel concrete
fixed disk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510047840
Other languages
Chinese (zh)
Other versions
CN100395414C (en
Inventor
王国奋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005100478404A priority Critical patent/CN100395414C/en
Publication of CN1776113A publication Critical patent/CN1776113A/en
Application granted granted Critical
Publication of CN100395414C publication Critical patent/CN100395414C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

This invention discloses a under-reamed pile equipment for foundation construction, especially the equipment for immersed tube fabricated steel-concrete under-reamed pile. It includes frame positioned with immersed tube, power source, driving mechanism and cutting rest. Compared with current technology, said invention has advantages of precision positioning, high single pile load bearing ability, convenient operation, high efficiency and engineering quality.

Description

The bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile
Technical field
The present invention relates to a kind of bottom-expanding equipment of foundation construction expanded bore pile equipment, particularly a kind of pipe sinking prefabricated steel concrete club-footed pile, is that pipe sinking prefabricated steel concrete club-footed pile expands the preferred unit of cutting the earth and pulverizing the soil body in the end.
Background technology
Fast development along with builing industry, the high buildings and large mansions of each big and medium-sized cities stand in great numbers and are seen everywhere, high-rise building requires also increasing to its basic supporting capacity, often adopt expanded bore pile with the distribution density that reduces foundation pile with reduce cost in order to increase single pile bearing capacity, expand end shoveling equipment arises at the historic moment thereupon, yet however, shoveling equipment all is not suitable for the shoveling needs that immersed tube prefabricated steel concrete expands the end at the bottom of the expansion in the past, because equipment is not to be positioned on the immersed tube, but be placed on the soil body of bottom, its poor accuracy, effect and control ability are low, are subjected to certain limitation so it is applied.
Summary of the invention
The present invention is directed to the problem that above-mentioned prior art exists, provide a kind of positional accuracy good, control well, single pile bearing capacity is strong, the bottom-expanding equipment that reduces a stake distribution density, reduces cost and be suitable for pipe sinking prefabricated steel concrete club-footed pile expansion end shoveling and pulverize the pipe sinking prefabricated steel concrete club-footed pile of soil.
The present invention realizes that the purpose technical scheme is: a kind of bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile, it can open and the cutter saddle of gathering is formed by driving with the frame of immersed tube location, power source, the transmission mechanism that is connected with power source, by transmission mechanism.
Described transmission mechanism comprises that an end links to each other with power source, the power rail that the other end links to each other with Upper shaft sleeve, the gear that is installed in the Upper shaft sleeve bottom is meshed with the pinion of being located at the gear shaft upper end, the pinion of this lower end is meshed with gear on the axis, the lower end of axis is passed frame, lower fixed disk, knife rest cross bar successively and is linked to each other with the upper end of vertical cut cutter, its cross section is circular upper part and square lower part or scarce limit circle, Lower shaft sleeve is set on the axis, and the lower end is passed the frame lower fixed disk and fixedlyed connected with the knife rest cross bar.
Described knife rest comprises the knife rest cross bar of fixedlying connected with Lower shaft sleeve the top, and its two ends are hinged with an end that expands the undercutting sharpener, and an end of support link is hinged with the middle part of expanding the undercutting sharpener, and the other end is hinged on the both sides on vertical cut cutter top.
Described axis epimere is a screw rod, and the projection by the both sides, upper end puts in the corresponding slideway in the Upper shaft sleeve, and the hypomere cross section is square and matches with its outer Lower shaft sleeve of suit.
Described axis is provided with defining flange on the position of the following certain distance of knife rest cross bar.
The upper and lower side of described frame is a fixed disk, by fusing each other along circumferential uniform column, also is provided with two reinforcement fixed heads therebetween at least between the two.
Described going up in the fixed disk along circumferentially uniform is provided with the horizontal location pin that three afterbodys have spring at least.
In the described lower fixed disk both sides be arranged with immersed tube in the alignment pin that is complementary of locating slot, the inner of its pin is provided with spring, on spacer pin is arranged, the outer end is provided with the iron pin on band inclined-plane, top; Lower fixed disk is inherent to be vertical centre with alignment pin and radially to be provided with the horizontal pin that can put in draw-in groove wide on the Lower shaft sleeve perisporium, and afterbody has spring with screw, and is provided with the handle of pulling out horizontal pin on horizontal pin.
Pyramidal metal closures of round platform of the upper end suit of described Upper shaft sleeve, place on the centre of fixed disk, the bottom is provided with the spring of support, and the lower end of Upper shaft sleeve is provided with rolling bearing, and the projection that its interior axially both sides are provided with slideway and both sides, axis upper end is complementary.
The present invention compared with prior art, because adopted last horizontal location pin, down detent rail pin, axis epimere screw rod hypomere are squarely to cooperate with last Lower shaft sleeve is organic respectively, axis descends and vertically cuts the earth, and cut the earth in the expansion end of rising, a series of technical measures such as hack of reversing, and it is good through the evidence positional accuracy, guarantee pile body and expanded bore pile base good concentricity, obviously improve single pile bearing capacity, expanded bore pile seat shape meets standard-required, easy control easy and simple to handle reduces the Foundation Design cost; Expand simultaneously to cut the earth in the end and pulverize the soil body and finish simultaneously, raise the efficiency and the Foundation Design quality.Bottom-expanding equipment compact conformation of the present invention, can be used with immersed tube, automatic and mechanical degree height, it is good to expand the substrate amount, the precision height, work progress is safe and reliable, and is simple to operation, and the controlled ability of equipment is strong, soil body good crushing effect.
Below in conjunction with the drawings and specific embodiments the present invention is described in further details.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present invention.
Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1.
Fig. 3 is the B-B sectional structure schematic diagram of Fig. 1.
Fig. 4 is the partial enlarged drawing of axis, last lower shaft, gear drive part.
Among the figure 2, the iron pin; 3, alignment pin; 4, overcoat; 5, draw-in groove; 6, column; 7, gear shaft; 8, gear; 9, pinion; 11, metal closures; 12, gear; 13, pinion; 14, Upper shaft sleeve; 15, spring; 17, power rail; 18, horizontal location pin; 19, go up fixed disk; 21, Lower shaft sleeve; 22, support link; 23, axis; 24, vertical cut cutter; 25, expand the undercutting sharpener; 27, spring; 29, horizontal pin; 30, spring; 31, screw; 32, spacer pin; 33, lower fixed disk; 34, spring; 41,42, strengthen fixed head; 50, knife rest cross bar; 52, defining flange.
The specific embodiment
Embodiments of the invention are described in detail in conjunction with the accompanying drawings, but protection scope of the present invention is not limit by embodiment.
Embodiment one: as shown in Figure 1 be main TV structure schematic diagram of the present invention.The last fixed disk 19 of frame and lower fixed disk 33, between the two by it being fused along circumferentially uniform four or two or eight or more root posts 6, top, the middle part also is provided with at least two reinforcement fixed heads 41,42, be the upper end that the pyramidal metal closures 11 of round platform is set in Upper shaft sleeve 14, and place the center of fixed disk 19, bottom is provided with support spring 15, the power rail 17 that the upper end of Upper shaft sleeve 14 links to each other with power source links to each other, the lower end of Upper shaft sleeve 14 places on the lower plywood of strengthening fixed head 41, its outer rolling bearing that is provided with, the upper end that gear 12 is installed in the bottom axis 23 of Upper shaft sleeve puts in the Upper shaft sleeve 14 and the projection on both sides, upper end is entered in the corresponding slideway of Upper shaft sleeve, the upper semisection of axis 23 is a screw rod, the lower semisection cross section is a square or scarce limit circle, Lower shaft sleeve 21 is sleeved on the Lower Half of axis 23, overcoat 4 is sleeved on Lower shaft sleeve 21 outsides, the lower end of axis 23 is passed the lower fixed disk 33 of frame in turn, knife rest cross bar 50 links to each other with vertical cut cutter 24 upper ends, the lower fixed disk 33 that frame is passed in the lower end of Lower shaft sleeve 21 is fixedlyed connected with knife rest cross bar 50, the two ends of knife rest cross bar 50 are hinged with an end that expands undercutting sharpener 25, one end of support link 22 is hinged with the middle part of expanding undercutting sharpener 25, and the both sides, top of the other end and vertical cut cutter 24 are hinged; The described gear 12 that is installed in Upper shaft sleeve 14 bottoms is meshed with the pinion 9 of gear shaft 7 upper ends, and the pinion 13 of coaxial lower end is meshed with internal thread gear 8 on the axis 23; The described fixed disk 19 interior edges of going up circumferentially are laid with four horizontal location pins 18, and the outer end is exposed the side face tail end and is provided with spring 34; The both sides of described lower fixed disk 33 are arranged with the alignment pin 3 that can be complementary with immersed tube bottom locating slot, and the inner of its pin is provided with spring 27, on spacer pin 32 is arranged, the outer end is provided with the iron pin 2 on band inclined-plane, top, to be provided with three be that effect is better to iron pin 2 for equidistant.And radially being provided with the horizontal pin 29 that can put in the draw-in groove 5 wide on Lower shaft sleeve 21 perisporiums being vertical central part with it, afterbody has spring 30 with screw 31 location, also is provided with the handle that it is pulled out on the horizontal pin 29.Described axis 23 is provided with defining flange 52 at the position of knife rest cross bar 50 following certain distances.Defining flange 52 is two flanges, is fixed in the both sides of axis 23.The circle flange that defining flange 52 also can be provided with for the excircle of Yanzhong axle 23.Distance between defining flange 52 and the knife rest cross bar 50 is provided with according to requirement of engineering, and defining flange 52 should guarantee to expand undercutting sharpener 25 and spend less than 45 with the angle of axis 23.The power source of present device is the motor that can change anyway.
When equipment of the present invention uses, power rail 17 is mentioned, equipment is aimed at the immersed tube mouth, and the mark that iron pin 2 is aimed on the immersed tube mouth, this mark is to aim at the immersed tube locating slot at bottom, afterwards equipment is put into immersed tube, this moment, spring 27 was compressed, and iron pin 2 presses closer the immersed tube inwall and slides downwards, directly enters the channel opening place, slip in the groove, iron pin 2 is positioned fixing.This moment, its total weight was depressed metal closures 11, and four horizontal location pins 18 are pushed outwards to be gone out, and presses closer the immersed tube inwall, and the equipment upper end is also fixedly positioning.When the power rail 17 of machining this moment turns clockwise, gear 8 puts in axis 23 downwards, vertical cut cutter 24 clockwise rotates vertically thereupon the bottom pan soil is reamed, and stops automatically after dark when reaching mark, and this moment, horizontal pin 29 stretched in the draw-in groove 5 on Lower shaft sleeve 21 perisporiums; Power rail 17 rotates counterclockwise, axis 23 begins to promote, support link 22 with outside open when will expand undercutting sharpener 25 and get out pan soil reamed, reach the design base diameter, be after power rail 17 reaches the regulation rotating speed, expand end shoveling and finish that the defining flange 52 of axis 23 lower ends contacts with knife rest cross bar 50 and stops to open at this moment, power rail 17 is rotated further a few, because the draw-in groove 5 on the Lower shaft sleeve 21 has suitable width, after a bit of distance of whole knife rest vertical-lift, stop after promptly arriving the regulation revolution, then power rail 17 counter-rotatings, the knife rest rotation is drawn in, and its gathering process is pulverized the soil body, certainly does so repeatedly, enough pulverized until the soil body, after action was finished, power rail 17 promoted, and horizontal location pin 18 moves to the center, bundle is removed in the upper end, iron pin 2 skids off in groove, and equipment is hung out ground, with handle horizontal pin 29 is pulled out draw-in groove 5, knife rest recovers the original shape that draws in, prepares to cut the earth next time.
Embodiment two: embodiment one described transmission mechanism also can adopt following structure: comprise that an end links to each other with power source, the power rail that the other end links to each other with Upper shaft sleeve 14, the gear 12 that is installed in Upper shaft sleeve 14 bottoms is meshed with the pinion 9 of being located at gear shaft 7 upper ends, the pinion 13 of this lower end is meshed with gear 8 on the axis 23, the lower end of axis 23 is passed frame successively, lower fixed disk 33, knife rest cross bar 50 links to each other with the upper end of vertical cut cutter 24, its cross section is circular upper part and square lower part or scarce limit circle, knife rest cross bar 50 is sleeved on the axis 23, and Lower shaft sleeve 21 is fixedlyed connected with knife rest cross bar 50.Just drive knife rest cross bar 50 with axis 23, knife rest cross bar 50 is driving Lower shaft sleeve 21.Other structure is with embodiment one.
Embodiment three: the gear shaft 7 described in embodiment one and the embodiment two, gear 8, gear 12 and pinion 13 can be substituted by a fixing gear 8, and gear 8 is threaded with axis 23, and other structure is with embodiment one.
Embodiment four: by column 6 it is fused between last fixed disk 19 described in the embodiment one and the lower fixed disk 33, column 6 wherein can be substituted by the rounded cylindrical shell body, and other is with embodiment one.
Transmission mechanism of the present invention can be used with the frame of other bottom-expanding equipment, and frame of the present invention also can be used with the transmission mechanism of other bottom-expanding equipment.

Claims (10)

1, a kind of bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile is characterized in that it can open and the cutter saddle of gathering is formed by driving with the frame of immersed tube location, power source, the transmission mechanism that is connected with power source, by transmission mechanism.
2, the bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile according to claim 1, it is characterized in that described transmission mechanism comprises that an end links to each other with power source, the power rail that the other end links to each other with Upper shaft sleeve (14), the gear (12) that is installed in Upper shaft sleeve (14) bottom is meshed with the pinion (9) of being located at gear shaft (7) upper end, the pinion of this lower end (13) is meshed with gear (8) on the axis (23), the lower end of axis (23) is passed frame successively, lower fixed disk (33), knife rest cross bar (50) links to each other with the upper end of vertical cut cutter (24), its cross section is circular upper part and square lower part or scarce limit circle, Lower shaft sleeve (21) is set on the axis (23), and the lower end is passed frame lower fixed disk (33) and fixedlyed connected with knife rest cross bar (50); Described gear shaft (7), gear (8), gear (12) and pinion (13) can be substituted by a fixing gear (8).
3, the bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile according to claim 1, it is characterized in that described cutter saddle comprises the knife rest cross bar of fixedlying connected with Lower shaft sleeve (21) in the top (50), its two ends are hinged with an end that expands undercutting sharpener (25), one end of support link (22) is hinged with the middle part of expanding undercutting sharpener (25), and the other end is hinged on the both sides on vertical cut cutter (24) top.
4, according to the bottom-expanding equipment of the described a kind of pipe sinking prefabricated steel concrete club-footed pile of claim 2, it is characterized in that described axis (23) epimere is a screw rod, and the projection by the both sides, upper end puts in the corresponding slideway in the Upper shaft sleeve (14), and the hypomere cross section is square or lacks that the limit is circular matches with its Lower shaft sleeve outward of suit.
5,, it is characterized in that described axis (23) is provided with defining flange (52) on the position of the following certain distance of knife rest cross bar (50) according to the bottom-expanding equipment of claim 2 or 4 described a kind of pipe sinking prefabricated steel concrete club-footed piles.
6, the bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile according to claim 1, the upper and lower side that it is characterized in that described frame is upper and lower fixed disk (19,33), by fusing each other along circumferential uniform column (6), column (6) also is provided with two reinforcement fixed heads (41,42) therebetween at least between the two.
7,, it is characterized in that described going up in the fixed disk (19) along circumferentially uniform is provided with the horizontal location pin (18) that three afterbodys have spring at least according to the bottom-expanding equipment of the described a kind of pipe sinking prefabricated steel concrete club-footed pile of claim 6.
8, according to the bottom-expanding equipment of the described a kind of pipe sinking prefabricated steel concrete club-footed pile of claim 6, it is characterized in that the interior both sides of described lower fixed disk (33) be arranged with immersed tube in the alignment pin (3) that is complementary of locating slot, the inner of its pin is provided with spring (27), on spacer pin (32) is arranged, the outer end is provided with the iron pin (2) on band inclined-plane, top; Lower fixed disk (33) is inherent to be vertical centre with alignment pin (3) and radially to be provided with the horizontal pin (29) that can put in the draw-in groove on Lower shaft sleeve (21) perisporium, it is fixing with screw (31) that afterbody is provided with spring (30), and be provided with the handle of pulling out horizontal pin (29) on horizontal pin (29).
9, according to the bottom-expanding equipment of the described a kind of pipe sinking prefabricated steel concrete club-footed pile of claim 2, a pyramidal metal closures of round platform of upper end suit (11) that it is characterized in that described Upper shaft sleeve (14), place on the centre of fixed disk (19), the bottom is provided with the spring (15) of support, the lower end of Upper shaft sleeve (14) is provided with rolling bearing, and the projection that its interior axially both sides are provided with slideway and both sides, axis (23) upper end is complementary.
10, bottom-expanding equipment according to the described a kind of pipe sinking prefabricated steel concrete club-footed pile of claim 1, it is characterized in that described transmission mechanism comprises that an end links to each other with power source, the power rail that the other end links to each other with Upper shaft sleeve (14), the gear (12) that is installed in Upper shaft sleeve (14) bottom is meshed with the pinion (9) of being located at gear shaft (7) upper end, the pinion of this lower end (13) is meshed with gear (8) on the axis (23), the lower end of axis (23) is passed frame successively, lower fixed disk (33), knife rest cross bar (50) links to each other with the upper end of vertical cut cutter (24), its cross section is circular upper part and square lower part or scarce limit circle, knife rest cross bar (50) is sleeved on the axis (23), and Lower shaft sleeve (21) is fixedlyed connected with knife rest cross bar (50); Described gear shaft (7), gear (8), gear (12) and pinion (13) can be substituted by a fixing gear (8).
CNB2005100478404A 2005-11-28 2005-11-28 Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile Expired - Fee Related CN100395414C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100478404A CN100395414C (en) 2005-11-28 2005-11-28 Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100478404A CN100395414C (en) 2005-11-28 2005-11-28 Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100044409A Division CN100570073C (en) 2005-11-28 2005-11-28 The bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile

Publications (2)

Publication Number Publication Date
CN1776113A true CN1776113A (en) 2006-05-24
CN100395414C CN100395414C (en) 2008-06-18

Family

ID=36765806

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100478404A Expired - Fee Related CN100395414C (en) 2005-11-28 2005-11-28 Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile

Country Status (1)

Country Link
CN (1) CN100395414C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100453742C (en) * 2006-06-30 2009-01-21 王国奋 Method for enlarging bottom and pile making of immersed tube and prefabricated steel concrete under-reamed pile
CN101158154B (en) * 2006-06-30 2010-06-09 王国奋 Bottom expanding and pile-forming method for pipe sinking prefabricated steel concrete pedestal pile
CN101161952B (en) * 2006-06-30 2010-09-01 王国奋 Bottom expanding and pile-forming method for pipe sinking prefabricated steel concrete pedestal pile
CN102383429A (en) * 2011-01-18 2012-03-21 上海城地建设发展有限公司 Device for sinking pile while digging soil in center of large-diameter pipe pile and use method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5693920A (en) * 1979-12-25 1981-07-29 Mitsuo Shibata Method and device for constructing expanded batholith under ground
JPS59217834A (en) * 1983-05-23 1984-12-08 Konoike Constr Ltd Excavator for on-site expansion-type bottom pile
JPS60102417A (en) * 1983-11-08 1985-06-06 Katsumi Kitanaka Split bucket type bottom expander
JPS63184612A (en) * 1987-01-27 1988-07-30 Hitachi Constr Mach Co Ltd Excavator for expanded bottom
CN2088124U (en) * 1990-07-27 1991-11-06 顾尧章 Multi-functional pile-enlarging device of pipe-sinking pouring pile
JP3497948B2 (en) * 1996-06-17 2004-02-16 日立建機株式会社 Drilling equipment and method for drilling bottom hole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100453742C (en) * 2006-06-30 2009-01-21 王国奋 Method for enlarging bottom and pile making of immersed tube and prefabricated steel concrete under-reamed pile
CN101158154B (en) * 2006-06-30 2010-06-09 王国奋 Bottom expanding and pile-forming method for pipe sinking prefabricated steel concrete pedestal pile
CN101161952B (en) * 2006-06-30 2010-09-01 王国奋 Bottom expanding and pile-forming method for pipe sinking prefabricated steel concrete pedestal pile
CN102383429A (en) * 2011-01-18 2012-03-21 上海城地建设发展有限公司 Device for sinking pile while digging soil in center of large-diameter pipe pile and use method thereof
CN102383429B (en) * 2011-01-18 2016-08-10 上海城地建设股份有限公司 Digging pile-sinking device in the middle of a kind of heavy caliber pile tube

Also Published As

Publication number Publication date
CN100395414C (en) 2008-06-18

Similar Documents

Publication Publication Date Title
CN202730618U (en) Inspection well milling machine
CN100570073C (en) The bottom-expanding equipment of pipe sinking prefabricated steel concrete club-footed pile
CN1776113A (en) Bottom-expanding equipment for pipeline sinking precast reinforced concrete pile
CN2876182Y (en) Bottom expanding equipment
JP2011220085A (en) Manufacturing device of reinforcement cage for cast-in-place concrete piles
CN2835346Y (en) Frame for under-reamed device for construction
CN2835348Y (en) Under-reamed device for foundation construction
CN2835344Y (en) Bottom-enlarging device capable of being used together with immersed tube
CN2835349Y (en) Under-reamed device
CN2835345Y (en) Under-reamed device for building foundation construction
CN2835342Y (en) Bottom-enlarging device frame capable of being used together with immersed tube
CN101153488A (en) Bottom-expanding and piling method for immersed tube bottom-expanding pile
CN2835347Y (en) Tool rest of under-reamed device for foundation construction
CN206408619U (en) The adjustable pile cutting machine of cutting-height
CN2835343Y (en) Limiting mechanism for bottom-enlarging device for construction
CN214602874U (en) Welding positioning tool for reinforcement cage
CN201089894Y (en) Bottom-enlarging equipment capable of being used combining with pipe-sinking
CN113322979A (en) Novel supporting construction of combined prefabricated assembled push pipe working well
CN201089895Y (en) Bottom-enlarging equipment capable of being used combining with pipe-sinking
CN201089896Y (en) Foundation construction bottom-enlarging equipment
CN201121313Y (en) Bottom expanding device for foundation construction
CN220433637U (en) Pile driving device for municipal engineering
CN201121311Y (en) Bottom expanding equipment for building foundation construction
CN220427356U (en) Bed-jig structure for positioning reinforcing steel bars
CN100453742C (en) Method for enlarging bottom and pile making of immersed tube and prefabricated steel concrete under-reamed pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080618

Termination date: 20111128